HomeMy WebLinkAbout1288
r4Vtl
Commissioner's Proceedings Vol. P
Jefferson County, Washington
.lIM'LJIAn...Ll.t..~~lL~
---i-
I!
,I
"
"
"
~ i
.
Motion by Commissioner O'Meara, second by Commissioner Brown to approve the minutes of July 8th,15th,and
2 2nd. Unani mous .
Planning Director Cunningham reported on the foU(I)wing:i
(1) Zoning designations, Inner Harbor, Port Ludlow. Sevel'alletters wers received from boaters an~
yacht clubs requesting the entire harbor be classified as "natural". Cunningham said a meeting was held with'
representatives from Pope and Talbot, and members of the Shoreline Advisory Committee inspected the area and
re-examined the designations of the shoreline. They concluded that their previous designations were correct
and re-affirmed that their recommendations to the Board will be that the Shoreline Master Program show the
area as some conservancy, some urban and some suburban.
(2) Letter from Dennis Seinfeld, Attorney re: Herring Operations in Ludlow Bay. Mr. Seinfeld
stated that seven boats are being moored at Port Ludlow and have anchored seven floating herring pens in the
vicinity, causing damage to Mr. Swanson and interferring with his fishing operations. Cunningham said
he has investigated the situation, a,nd submitted a letter advising that the Planning Departments administrative
decision is that operations are of a cost or market val ue of $1,000 or more, and are materially interferring with
normal public use of the water. Therefore, the herring operations require a Shoreline Management Permit from
the county. Board concurs that the operations are illegal and Shollld be forced to cease and desist. Prosecuting
Attorney Daly said he would sign a letter stating all related operations should cease until. an appropriate S. M.
Permit is issued. Copies of the letter will be sent to the companies in violation of the act and Pope & Talbot
Development Inc.
(3) Cunningham submitted a copy of a letter from him to John D. Swift regarding the sale of eleven
parcels of land near the Plat of Lazy C Ranch. ' Sale of property is in violation of the W:ishington State Sub-
division Law, RCW 58.17. Acreage being sold is in an unapproved plat in a flood prone area. Prosecuting
Attorney Daly said that since Mr. Swift has ignored all previous correspondence, the county should file suit
against him. The Board requests Mr. Daly to commence with the necessary procedures
(4) Public Notice, from the Corps of Engineers re: 071-0YB-I-002195. Arthur E. Freeman, Dis-
covery Ba y - construction of pier, drive piling and install float for private boat moorage. Cunningham re-
commends ta t the proposed project is exempt from the S. M. Permit System. Motion by Commissioner Brown,
second by Commissioner O'Meara to approve exemption. Unanimous. Notice will be forwarded to the Corps.
I
I
.
Engineer Becker submitted the following for the Board's determination:
(1) Proposed agreement from the State Highway Commission re: State Project, CS 0502, BogCichiel
River Erosion Control, Haul Road. Motion by Commissioner Brown, second by Commissioner O'Meara to
approve and sign agreement. Unanimous.
(2) Resolutions for CRP No. 380, to improve Paradise Street, Paradise Estates, County Road No.
306; and CRP No. 381, to improve various county roads by striping. Motion by Commissioner O'Meara, second
by Commissioner Brown to approve and sign Resolution No. 43-74, and 44-74, as follows: Unanimous.
.~
RESOLUTION NO. 43-74
COUNTY ROAD PROJECT NO. 380
BEFORE THE, BOARD OF JEFFERSON COUNTY COMMISSIONERS, STATE OF WASHINGTON
I
In the matter of the paradiae Estates
streets, County Road No. 306
Resolution to Improve Paradise Street
IT IS HEREBY RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to improve
Hemlock Street by clearing grading, and draining
BE IT FURTHER RESOLVED THAT for the foregOing proper county road purpose there is hereby appropriated sums
in the follOWing deati1:
.
ALLOCATIONS:
Road Funds
Location Engineering
$
Right of Way
Items of Work:
Day Labor
Contract
15,000.00
Construction Engineering
'rota 1
~ 15.000.00
The county road purose herein described is HF.REBY DECLARED to be a public necessity and the County Road
Engineer is HEREBY ORDERED AND AUTHORIZED TO report and proceed thereon as by law pro"ided.
I
BE IT FURTHER RESOLVED that this purpose be performed by daY'labor in accordance with State of
Washington Standard Spec1f1cations for Road and Bridge Construction as adoptod by this Board.
ADOPTED THIS
29th
da y of
JulY'
, 1974.
.
.'