HomeMy WebLinkAboutReel_0004F346509 Lone Star Road
Statutory Warranty Deed
Ralph D. Powell
Bette Powell
1976
Statutory Warranty Deed
Robert D & Mary Noble
1977
346509 Lone Star Road
Statutory Warranty Deed
Trans Wester Realty
Golvert
1977
346509 Lone Star Road
site map
346509 Lone Star Road
in the court of appeals of the state of washington
unpublished opinion
Bay Industry, Inc.
4/22/1981
346509 Lone Star Road
bay industry
346509 Lone Star Road
Bay Industry
346509 Lone Star Road
Supplemental Designation of
Clerk's papers
Bay Industry, Inc. Plaintiff
vs
Fred C. Edwards et ux et al,
1980
346509 Lone Star Road
Notice of Appeal to Division II
court of appeals
Bay Industry, Inc.
346509 Lone Star Road
Memorandum Opinion
No 9308
Bay Industry, Inc.
346509 Lone Star Road
Memorandum in support of
Defendant's motion to reconsider
Bay Industry, Inc.
Fred C. Edwards
346509 Lone Star Road
346509 Lone Star Road
346509 Lone Star Road
346509 Lone Star Road
Discharge of Property Bond
Bay Industry, Inc.
Fred C. Edwards,
3/28/1979
346509 Lone Star Road
Judgement
Bay Industry, Inc.
346509 Lone Star Road
Judgement
346509 Lone Star Road
IT IS FURTHER ORDERED, AD,JUDGED AND DECREED that the
3 and the same is hereby dismissed for failure of proof.
2 damage claim of Plaintiff against the Defendants above named,
4
IT IS FURTHER ORDERED, ADJUDGED AND DECREED that the
6
5 Plaintiff, Bay Industry, Inc., be and it is hereby granted judgment
against the Defendants, Fred C. Edwards and Judith M. Edwards;
husband and 'wife, Oscar Tate and CarolE. Tate, husband and wife,:
RiChard D. Hanon and Joan D. Hanon, husband and , ~ife, i Raymond C.
12 Joan A. Stevens, husband and wife, jointly and severally, and
11 Mary Carol Barszcz, husband and wife, and Charles G. Stevens and
10 and Elizabeth Z. White, husband and wife, Michael E. Barszcz and'
9 Deimel and Virginia C. Deimel, husband and wife; Eugene White
13 against their respective marital communities, for its statutory
J U D G E
19 Presented by:
20
21
NIICHEL, RUTZ & JOHNSON
346509 Lone Star Road
Findings of Fact and
Conclusions of Law
346509 Lone Star Road
findings
346509 Lone Star Road
2 In May, 1978, the Defendants Edwards. claimed that Plain-
3 tiff,was not entitled to. use of said roadway for access and use in
4 the logging of Plaintiff's property above-describedin paragraph
5 II. Said Defendants placed obstructions across portions of sa-id
6 roadway so that, Plaintiffs, its agen ts , and employees, could not
7 enter and refused Plaintiff use of the same as a means of ingress
8 and egress to its property, and for the logging of its property.
9
10 Said road above described in paragraph IV has been used-
11 as a public highway for a'period of not less th~n 7 year~ and has
The interest of Jefferson County in the road above
18 described in paragraph IV has never been vacated or abandoned.
20 An award of damages to Plaintiff for Defendants actio~s
21 in blocking Plaintiff's access to its property over the Lone Star
22 Ranch Road is too speculative.
23 From the foregoing Findings of Fact, the Court now makes
24 and enters the following Conclusions of Law:
27 That the Court has jurisdiction of the parties and
28 subject matter of this action.
32 FINDINGS & CONCLUSIONS
Page Three
NIICHEL, RUTZ & JOHNSON
346509 Lone Star Road
note
346509 Lone Star Road
findings and conclusions
346509 Lone Star Road
Findings and Conclusions
346509 Lone Star Road
Bay Industries vs Edwards .
Plaintiff appeared in person with counsel. Defendan ts appeared in person
with 'counsel. DGfendant made a motion that the Court find this road was not
346509 Lone Star Road
1 IN THE SUPERIOR COURT' OF STATE OF WASHINGTON
IN AND FOR OF JEFFERSON
3 BAY INDUSTRY, INC
TRIAL BRIEF
6 FRED C. EDWARDS, et ux, et aI,
7 Defendants.
Statement of the CASE
A. Pleadings and Proceedings. Plaintiff,
10 this action against Edwards, et aI, to enjoin the
346509 Lone Star Road
Bay Industry
Trial brief
346509 Lone Star Road
Bay Industry
Trial Brief
346509 Lone Star Road
Trial Brief
346509 Lone Star Road
Trial Brief
346509 Lone Star Road
Trial Brief
346509 Lone Star Road
Trial Brief
346509 Lone Star Road
Trial Brief
346509 Lone Star Road
Unpublished Opinion
April 22, 1981
346509 Lone Star Road
Unpublished opinion
346509 Lone Star Road
unpublished opinion
346509 Lone Star Road
Division Two
Unpublished Opinion
1981
346509 Lone Star Road
346509 Lone Star Road
346509 Lone Star Road
Supplemental designation
of clerk
s papers
346509 Lone Star Road
notice of Appeal
to Division II
Court of Appeals
346509 Lone Star Road
Memorandum Opinion
346509 Lone Star Road
Memorandum in support of
Defendant's Motion to reconsider
346509 Lone Star Road
memorandum
346509 Lone Star Road
memorandum
346509 Lone Star Road
memorandum
346509 Lone Star Road
Discharge of Property Bond
346509 Lone Star Road
Judgement
346509 Lone Star Road
Judgement
346509 Lone Star Road
Judgement
346509 Lone Star Road
Findings of Fact and
Conclusions of Law
346509 Lone Star Road
Findings & Conclusions
346509 Lone Star Road
findings and conclusions
346509 Lone Star Road
findings and conclusions
346509 Lone Star Road
findings and conclusions
346509 Lone Star Road
Bay Industries vs Edwards
plaintiff appeared in person with counsel. Defendun ts appeared
person
with 'counsel. Defendant made a motion that the court find this road was not
a county road. Respective counsel
arguement. Plaintiff made a motion
to amend if the Court grants the
Court granted the
Defendant's motion. Plaintiff made more argument. Court reserved ruling
the matter. Respective coonsel made opening statement. Philip R. Boling
and testified. Plaintiff's 1 &. 2 marked and admitted.
plaintiff,' s # 3 & 4 ADMITED. Cross. Ole Tjemsland was sworn and
Cross. Wally Bowman was sworn and testified. Cross. Defendant's # 5
. Reess 10:55. Reeonvened 11:10. Leif Larson was swor.n add testifed
plaintiff moved to publish the deposition of 1.1r. Stover and Court granted the-
motico Deposition of John Wesley Stover was published in open court.Mary
Gray was sworn and testified. Plaintiff's Exhibit #6 ADMITTED. Cross.
Philip Boling returned to the
stand. Plaintiff's Exhibit. Admitted
Plaintiff rests.Eugene . was and testified. Defendant's Exhibit
#8,9, 10, II, 12, 13, 14. 15, 16, 17. . Cross. Richard Hannan I'lan
Recess" 12: 00, reconvened, 1: 35. z.tr. Hannan returned
C. Edwards was sworn and testified. Cross. Defense rests. Plaintiff
recalled Nary Gray to the stand. Respective counsel marle argument. Pla~ntif
made rebuttal. Court ruled to deny tile prescriptive right but.' there has been
e ncquired on that road. Court 'denied
ilwarding damages to the plaintiff. Court recessed ilt 2:45 p.m.
346509 Lone Star Road
SUPERIOR COURT OF THE STATE OF WASHINGTON
IN AND FOR THE COUNTY OF JEFFERSON
3 BAY INDUSTRY, . INC.
Trial Brief
Statement of the case
Pleadings and Proceedings
346509 Lone Star Road
poses and was eventually taken over by Jefferson COunty as a County road. There
evidence of County
346509 Lone Star Road
Trial Brief
346509 Lone Star Road
trial brief
346509 Lone Star Road
trial brief
346509 Lone Star Road
trial brief
346509 Lone Star Road
Trial Brief
346509 Lone Star Road
Trial Brief
346509 Lone Star Road
Resolution 60-79
Order of County Road Vacation
346509 Lone Star Road
Resolution
1979
346509 Lone Star Road
352909 Snow Creek Road
352909 Snow Creek Road
coordinate form
Survey notes
352909 Snow Creek Road
coordinate form
Survey notes
352909 Snow Creek Road
coordinate form
Survey notes
352909 Snow Creek Road
coordinate form
Survey notes
352909 Snow Creek Road
coordinate form
Survey notes
352909 Snow Creek Road
coordinate form
Survey notes
352909 Snow Creek Road
coordinate form
Survey notes
352909 Snow Creek Road
ROW acreage
352909 Snow Creek Road
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
drawing
plats
352909 Snow Creek Road
note
US Forest Service
352909 Snow Creek Road
Forest Service
coordinates
352909 Snow Creek Road
survey coordinate notes
352909 Snow Creek Road
survey coordinate notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
Slab Camp Road
352909 Snow Creek Road
drawing
Section 21
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
Slab Camp Road
Sections
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
Right of way
across state land
Hinkle & Hinkle
Thinning Sale
352909 Snow Creek Road
Survey notes
coordinates
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
Survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
Photos
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
UNITED STATES GOVERNMENT
Deparlmenl of Agrlculture-Forest Sorvlce
Memorandum
OLYMPIC NATIONAL
FEOEIW. BUILDING, OLYMPIA,
TO
District Ranger, Quilcene R.D.
FROM Lloyd G. Gilmor, Forest Supervisor
June 29, 1965
SUBJECT, Mining Claims, Wayne K. Rice
United Mine Corporation
Your reference:
Reference is made to the enclosed copy of the regions 6/15/65 memorandum,
Mr. Willrich' s memo to the file dated 6/29/65 and your 5610(2810) memo-
randum of 6/22/65.
Region mentions the need to obtain statements from someone having knowledge
that the existing road was in place prior to the initial claim. We will
work with Mr. Hopper in getting this done. i
Region also mentions the need to record the existing location with But in
accordance with 44 LD 513. Your 6/22/65, 5610(2810) memo deals with a
slight relocation of the existing road. If the relocation is accomplished
the exact location of the existing road will 800n .be lost unless. steps arc
taken to adequately monument its location. This is important since we
claim prior rights on the road as located.
It apprears that the best course of action is os follows:
(1) Review FSM 5465, R-6 Supplement No, 30 dated 2/65 concerning the
required preparations for both recording existing roads and ob-
taining new rights-of-way over mining claims.
(2) For purposes of recording the eXisting location with BU1 we sug-
gest that you prepare both an 8xll section of a 2" to the mile
planametric map nnd a large scnle blow-up sheet foldable to 8xll.
showing the claim & location in more detail.
(3) For purposes of obtaining a right-of-way for the relocation you .
can use a reverse sepia of the plat prepared for (2) above and
add the relocated route. Be sure sufficient monumentlltum is
provided on the ground to allow accurate re-establishment in the
future.
We understand that the proposed relocation which you have submitted has been
subjected to an analysis against a high fill route farther downstream, and
found to be the most reasonable route if the mine tunnel entrance and access
is to be undisturbed. The alignment, however. is very undisirable and un-
doutably below the criteria required for the Illtimate standard.
The most desirable location falls over the mine entrance. In the event that
the. claim is found to be invalid and a contest is successful we may be in a
posltlon to properly locate the road if we act fast. It would lnvolve filing
an application for appropriation under 44 L.e. 513 immediately once the
352909 Snow Creek Road
-2-
present claim was invalidated. For this reason we suggest that you also
survey & design the road in the best location irregardless of existing
claim improvements and keep this information in your files. It would be'
needed eventually anyway if condemnation is necessary.
After you have completed items (l), (2}and (3), suhmit the data back to
this office & we will take appropriate action to record the. existing road
with BLM. We l.;ri11 also review the stata,s of the claim determination with
Region & if it appears that a long delay is involved, proceed with ac-
quisition of the right-of-way for the relocation you propose. This work
could then be accomplished as an interim measure pending the construction
of the ultimate location when and if the claim is invalidated.
The material submitted with your 6/22/65, 5600 memo is being returned
under separate cover as you will need it in preparing the above data.
Enclosures
cc: Loyd Bransford
5610 - RD 2907 file
Separate cover
CARL A. WILLRICH
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
Survey coordinates
Road design form
352909 Snow Creek Road
Culvert Design Sheet
12/5/1968
352909 Snow Creek Road
survey coordinates
road design
352909 Snow Creek Road
Survey coordinates
road design
352909 Snow Creek Road
survey coordinates
road design
352909 Snow Creek Road
gold mine
1965
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
earthwork quantity sheet
352909 Snow Creek Road
earthwork quantity sheet
352909 Snow Creek Road
earthwork quantity sheet
352909 Snow Creek Road
TOPO
352909 Snow Creek Road
Memo
Jim Pifer
Tom Murkowski
352909 Snow Creek Road
Culvert Data Sheet
SECTION 6
Geometric
ReQuirements ~
Culvert Selection
352909 Snow Creek Road
352909 Snow Creek Road
Hydrologic and Channel information
4/29/1969
352909 Snow Creek Road
U.S.D.A, Forest Service - R-6
File Reference
CULVERT DESIGN SHEET
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
Culvert Selection
Geometric Requirements
352909 Snow Creek Road
Culvert Data Sheet
352909 Snow Creek Road
Resolution 62-78
8/8/1978
352909 Snow Creek Road
Snow Creek Ranch
Airfield vacated
352909 Snow Creek Road
memo
2/27/1976
352909 Snow Creek Road
Forest Service
2/25/1976
352909 Snow Creek Road
site map
County road
Roads in Quesstion
Forest Boundary
352909 Snow Creek Road
March 2, 1976
Mr. Donald F. Reynolds
Acting District Ranger
U. S. Dep't of AgricUlture Forest Service
Qullcene, Wash, 98376
Re: Howe Creek & BonJon Road
Dear . Reynolds:
In response to your letter of February 25, 1976 concerning the county
maintenance of these two roads, I referred this to the County Road Supervisor.
He indicates that the County grader hao patrolled onto the BOnJon road about
300 feet upon request from the City of Port Townsend in order that they could
have eaaier nccess to Lords Lake. Years ngo the County did patrol into the
Taylor Ranch (Howe Creek Road) upon request by the people who lived there.
It is not this departments desire to create usage roads by maintenance,
therefore, non-county roads or driveways are graded only upon request and e.o
time permits.
ln times past, the County has adopted (by mutual agreement) Forest Service
Roads for the County road system when so doing has been an asset to private
property directly involved. At this time, there is no plan for such Mtion.
Very truly yours,
Edwin A. Becker, Director
Department of Public Works
EAB:mk
Encl. Report
352909 Snow Creek Road
Survey coordinates
field notes
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
352909 Snow Creek Road
Cost estimate for transportation system facilities
1/11/1969
352909 Snow Creek Road
CONSTRUCTION
COST
ESTIMATE
352909 Snow Creek Road
4/15/1969
Olympic National Forest
Road Cost Worksheet
352909 Snow Creek Road
cost
clearing
352909 Snow Creek Road
II. EXCAVATION FOR ROADBED
352909 Snow Creek Road
Surfacing Item
352909 Snow Creek Road
corrugated metal culvert pipe
352909 Snow Creek Road
miscellaneous items
352909 Snow Creek Road
totals
352909 Snow Creek Road
352909 Snow Creek Road
drawing
352909 Snow Creek Road
site map
site map
352909 Snow Creek Road
Levels
352909 Snow Creek Road
levels
352909 Snow Creek Road
levels
352909 Snow Creek Road
levels
352909 Snow Creek Road
levels
352909 Snow Creek Road
levels
352909 Snow Creek Road
levels
352909 Snow Creek Road
levels
352909 Snow Creek Road
survey levels
352909 Snow Creek Road
survey
levels
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey notes
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
.._..~-----~--------"---_._-_.-._-------------_..._----~,
._-..~~ "~.-r----- .... '
i i i II I ~
'i II ! II i "
i I i I
i i
I !
'I'
i>
, .
,JjrH
,::~~~;f
I I
.I~~
a 'V", u
11
"
'1 \(l
:'-,---0.(
1
Ii
01
o
I
'I i
1 i
1 ot
"I
10'
i
. I .,
, ,-,----:-'
i i
0' \ "
~ cu:':::
I ,
i'-' ,rii
,:1; ll'I).jl\M:-. ..J~,)-r~ :..--.
fl l.L.1:'::"~ u.; i\.l '.:::..
_.,. ,-""i _;,___+_,L~i' .I,., ..___..1:;-'-7
! :
~ I ""
:J :::. ;;
I "I 'I
I 0.:- ,;-.\
: , II) ...,Sj 1 \'-c
I 0 l,
I V l/, L_
I ~ 11'".,.1 rJI1 '" 1:,1..
I 1 ~S 0' ,1 " .f' n
00 0 0'
v ':. ~\
I "
----
i .~ "';~ :~ "3
!<9!:: !~: ~
1--'---'----'
l . ~ Q Q
1 J () III 0
~ ~.r "1" r
I ',I 'j .'~ ~'
',-
o
Ii
Q,
1<'>'
::1
~o
~ I
~ i
II) I
I
, I
I~
; qJt-\-~ :-:-
I!_ .'\l. '~
1____.1
" ,
(."!
,,\ o~:
...
0 "
,.,
'-
0'1
r-
0'
~
':)
';,'1
"
I
1
II
O!
01
I:
1
\[II
~i
f--+--, I : ~ I
~~~cl'~ .~
::.I:I~I'~ i O\.ll~l!q-..d
~~ I 'L-_;.._J!
"I, I, I I I
! l \' \
6'1 I
j VI!
: .....:
~ ul
~. 'to"'l"
o ..'
- "..
"
"
~
oj
'f
I
I
1
I,
I
\
I'
0:
Q
1 :
.0'
",
0'
~ t:
1J.;
""~
ru -
II
"'
'~~
~
o
If'
.
0<
.. " .-~ .. """""~-"""'l
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
survey coordinates
352909 Snow Creek Road
Earthwork Quantity Sheet
352909 Snow Creek Road
Earthwork Quantity Sheet
352909 Snow Creek Road
Earthwork quantity sheet
352909 Snow Creek Road
Right of way survey checklist
352909 Snow Creek Road
right of way survey checklist
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
Coordinate form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
COMPUTATION SHEET
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation form
352909 Snow Creek Road
computation form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
coordinate for
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
COMPUTATION SHEET
352909 Snow Creek Road
COMPUTATION SHEET
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
aerial
352909 Snow Creek Road
aerial
topo
352909 Snow Creek Road
aerial
topo
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
Guidelines for writing Engineering Contracts
352909 Snow Creek Road
guidelines for writing engineering contracts
352909 Snow Creek Road
Olympic National Forest
Road Cost Worksheet
352909 Snow Creek Road
clearing
352909 Snow Creek Road
excavation for roadbed
352909 Snow Creek Road
surfacing
352909 Snow Creek Road
corrugated metal culvert pipe
352909 Snow Creek Road
V. MISCELLANEOUS
Cost / C.Y. = Total Cost
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
site map
352909 Snow Creek Road
Little Skidder Hill
352909 Snow Creek Road
Invitation for bids
U.S. Department of Agriculture
Forest Service
Region 6
352909 Snow Creek Road
Solar Observations
352909 Snow Creek Road
solar observation
352909 Snow Creek Road
solar observations
352909 Snow Creek Road
Solar Observation data
352909 Snow Creek Road
solar observation
352909 Snow Creek Road
solar observation
352909 Snow Creek Road
Section 15
T 28
R 2W
drawing
352909 Snow Creek Road
Junction
Snow Creek
Taylor Ranch
Drawing
352909 Snow Creek Road
Memo
Ken Shedd
1/2/1969
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
352909 Snow Creek Road
352909 Snow Creek Road
Culvert Design sheet
352909 Snow Creek Road
area for Andrew Creek
352909 Snow Creek Road
Culvert Design Sheet
352909 Snow Creek Road
352909 Snow Creek Road
Geological survey
Drainage areas
352909 Snow Creek Road
topo
352909 Snow Creek Road
topo
352909 Snow Creek Road
topo
352909 Snow Creek Road
Culvert Design Sheet
352909 Snow Creek Road
352909 Snow Creek Road
Section Drawing
352909 Snow Creek Road
section drawing
352909 Snow Creek Road
Note
coordinates for the Slab Camp ROW plats
352909 Snow Creek Road
Memo
Forest Supervisor
Right of Ways acquired
6/9/1966
352909 Snow Creek Road
right of way survey checklist
Slab Camp Road
352909 Snow Creek Road
Right of way survey checklist
Slab Camp Road
11. Are ties shown and properly labeled at each change of
centerline right of way to a found corner?
12. Is the ststion and the bearing of the tangent to the P.O.C. shown
where there is B. change of ownership on a curve?
13. Are the Land P lines properly labeled?
14. Are existing natural monuments and cultural improvements shown,
with ties when appropriate?
15. Are 40-acre subdivisions shown and correctly labeled?
16. Are the full, names of the property owners shown on all subdivisions
and other parcels of land crossed or closely approached by the
right of way?
17. Is the right-of-way width dimensioned on each sheet and at each
change of width, and do the dimensions tie the right of wsy to
the centerline?
18. Is the right"of-way acresge properly shown?
19. Have all survey data and survey computations been checked?
20. Has all plotting been checked?
21. Hsve all L line scsled P. I. coordinates been checkad?
22. Have all L line computations been checked?
23. Hsve all tie computations been checked?
24. Has the plat been checked for copying errors and amiss ions and
have all bearings and distances been checked with protractor and
scale?
25. Is the plat legible, neat, and can it be readily folded to
8 x 10~-inch standard letter size for filing?
352909 Snow Creek Road
352909 Snow Creek Road
reference slip
8/22/1967
352909 Snow Creek Road
right of way survey checklist
14. Are existing natural monuments and cultural improvements shown,
with ties when appropriste?
15. Are 40-acre subdivisions shown and correctly labeled?
16. Are the full, names of the property owners shown on sll subdivisions
snd other psrcels of Isnd crossed or closely spproached by the
right of wsy?
17, Is the right-of-way width dimensioned on each sheet and at each
change of width, and do the dimensions tie the right of way to
the centerline?
18. Is the right"of-way acreage properly shown?
19. Have all survey data and survey computations been checked?
20. Has all plotting been checked
21. Have all L line scaled P. I. coordinates been checked?
22. Hove all L line computations been checked?
23. Have all tie computations been checked?
24. Has the plat been checked for copying errors and omissions and
have all bearings and distances been checked with protractor and
scale?
STATE OF WASHINGTON
TRAVERSE
Traverse bearings computad from true North os, obtained by solar
observation,
FOUND SECTION CORNER
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
Computation sheet
352909 Snow Creek Road
Coordinate form
352909 Snow Creek Road
. USDA .FOREST SERVICE
COMPUTATION SHEET
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
computation sheet
352909 Snow Creek Road
352909 Snow Creek Road
section drawing
352909 Snow Creek Road
section drawing
352909 Snow Creek Road
section drawing
352909 Snow Creek Road
section drawing
352909 Snow Creek Road
coordinate form
352909 Snow Creek Road
coordinate form