Loading...
HomeMy WebLinkAboutReel_0026E The unit contract price per ton for "Asphalt (grade)" for prime coat of the The eighth and ninth paragraphs of section 5-04.5 of the standard specifications are revised to read: If the Contractor is required to furnish the aggregates, all costs ! of furnishing, hauling and processing aggregates and blending sand ' into the complete mix shall be included in the unit contract price - per ton for Asphalt Concrete Pavement" of the class specified, except that blending sand when set up as a bid item will be paid for in the manner described below. At the discretion of the Engineer, the Contractor may be required to include mineral filler in the mix. All costs of furnishing, hauling and incorporating the mineral filler into the mix will be paid for in the manner described below. a! If any of the aggregates are furnished in stockpile by the State the cost of hauling and incorporating those aggregates in the mix, and all costs of furnishing, hauling, and incorporating the necessary blending sand and any additional aggregate in the complete mix shall be included in the unit contract price per ton for "Asphalt Concrete Pavement" of the class specified, except that blending sand, when set up as a bid item, will be paid for in the manner described below. At the discretion of the Engineer, the Contractor may be required to include mineral filler in the mix' All costs for furnishing, hauling and incorporating the mineral filler into . the mix will be 'paid for in the manner described below. The twelfth paragraph of section 5-04.5 of the standard specifications is revised to read: ` Mineral filler, if required, will be aid for at the paid price agreed by the parties or by force account as specified in section 1-09. t? The thirteenth paragraph of section 5-04.5 of the standard specifications is hereby revised to read: The unit contract price per square yard for "Planing Bituminous Pavement" shall be full compensation for furnishing all tools, equipment, labor, materials, supplies, and incidentals necessary to accomplish the work in accordance with the specifications, including the removal and disposal of all cuttings and debris, and for all other costs required to accomplish the work. Section 5-04.5 of the standard specifications is supplemented by the . following: "Temporary Striping", per linear foot. "Removing Temporary Striping", per linear foot. The unit contract price per linear foot for "Temporary Striping" shall be full compensation for furnishing all labor, material, tools and equipment necessary to construct and maintain temporary striping as specified. -10- W' 41- ., 1 A A ? r r 7,M I Temporary The unit contract price Per linear onoforffurnishing n all labor, ` ompensati as ll i i c str p ng Striping" shall be fu ent necessary to remove temporary i pm tools and equ specified. SECTION 9-03, AGGREGATES (October 13, 1978) econd paragraph of section 9-03.1(2)B of the standard Grading s The table in the specifications is revised to read; Percent Passing Sieve Number Maximum Minimum 4 100 95 98 82 6 6 86 68 16 65 47 42 27 30 20.0 9.0 50 7.0 0 100 2.5 0 200 Use of Substandard Gradings aragraph of section 9-03-1(2)C of the standard d ' p secon The table in the specifications is revised to read: . . 95% Passing No. 8 • • . . . 80% 16 . . . . Passing No. . . . 60$ 30 Passing No. . . 20% . . . Passing No. 50 2.5$ Passing No. 200 . • • • • . _ Grading and Quality ecifications is .4(2) of standard s1/2 inch square sieve section 9-0 i h h n e 100 percent t The table passing supplemented to include 100 - #10 . inch under the column entitled 3/ Gradation - Future Use. ifications is revised to read f the standard spec Section 9-03(8)A o section 9-03.8(3)A. halt concrete I tables for asp specifications The coarse aggregate and fine aggregate section 9-03.8(3)A of the standard i n class B and class D are revised to read: -11- • I • f S Y f J r + iel COARSE AGGREGATE ! f„ , Class of Asphalt Concrete 11 B Size Designation 5/8 "-1/4 " ( % Passing 5/8" Square Opening . . 8 Passing 1/2" Square Opening . . ' . ' ' . ' 100 8 Passing 3/8" Square 'Opening 72-100 $ Passing 1/4" Square Opening 28-72 . % Passing U. S. No. 10 Sieve . . . . . ' ' ' ' . ' 0-28 FINE AGGREGATE J Class of Asphalt Concrete I _ B D ' Size' D•e's nat'ib'n' 11411-0 3/8"-0 % Passing 3/8" Square Opening 100 8 . . . . Passing 1/4" Square Opening . . 100 % Passin . . ' ' 85-100 U g . S. No. 4 Sieve % Passing U. S. No. 8 Sieve . . ... 30-50 . . . . . 8 Passing U. S. No. 10 Sieve. 5-15 50-70 % Passing U S N . . o. 40 Sieve. 18-3G 8 Passing U. S. No. 80 Sieve . . . . . • 1 10-2?_ % Passing U. S. No. 200 Sieve . . . . . . 5_9 2-5 Test Requirements ,I The minimum ercent fracture for Asphalt Concrete Class D in the first table of section 9-03 8(2) f . o the standard specifications is deleted. Section 9-03.8(2) of the standard specifications is incl d o u supplemented t e the following new paragraph following the first paragra the first table: h i p n I F or Asphalt Concrete Class D, the fracture requirements on the U. S. No 8 si . eve and f above a minim- 7 least two mechanically fractured fa p J w a ces and90 percent with at least one mechanically fractured face. f Gradation-Immediate Use-Screenless Plants Th e gradation limits for Asphalt Concrete Class D shown in the table in section 9-03.8(3)C of th e standard specifications are revised to read:' SINGLE STOCKPILE FOR SCREENLESS PLANTS PERCENTAGE BY WEIGHT PASSING SIEVES SIEVE SIZE CLASS OF ASPHALT CONCRETE D /8 ' 3 3/ 4 100% No. No. 8 30-48 No. 200 5-14 2-4 ' -12- ¦ r ?. "1 21, ,ti i, F, 77 v Blending Sand ?,. section 9-03.8(4) of the standard specifications f The first paragraph o is revised to read; asphalt concrete the production of mineral aggregate for the U. S. No. i I + n n ass there is often a deficiency of f mg sand in an amount specified blending 40 sieve. When this occurs, this deficiency, provided, be used t make up cluding a er i ,. y m n roduced, by the Engine however, that a satisfactory final mix shall be p blending sand shall be w pertinent fracture requirements.. The the production of the asphalt concrete or r t F o stockpiled prio payment for aggregates as materials on hand. Proportions of Materials rading and asphalt requirements for Asphalt Concrete Class D f the standard specifications The g shown in the table in section 9-03.8(6) o are revised to read: .... ....: 3/8" Sieve (Square Opening) 100 ' 50 30 - 50 U. S. No. 4 Sieve 5 - U. S. No. 8 Sieve 2-5 U. S. No. 200 Sieve 5.5-8.5 Asphalt % of Total Mixture t 1 -13- I ? ? ? . r r .. ,y.Y?. 4., 14 L J J C'D SPECIAL PROVISIONS t The following special provisions supersede any conflicting provisions of the ? standard specifications, and the foregoing amendments to the standard specifi- cations and are made a part of this contract. DATE OF OPENING BIAS Sealed bids will be received up until the hour os 10:00 A.M., Tuesday, August 19, 1980, at the Office of the County Commissioners, Jefferson County Courthouse, Port Townsend, Washington 98368, at which time the bids will be publicly opened and read. DESCRIPTION OF {YORK The contemplated work to be performed under this contract consists of the improve- ment of 1.1 miles of Clearwater Road and other work, all in accordance with the attached plans, these special provisions and the standard specifications. STATE SALES. TAX The work on this contract is to be performed upon lands whose ownership obligates the Contractor to pay State Sales Tax. The provisions of section 1-07.2(1) of the standard specifications apply. I WAGE RATES In compliance with the provisions of section 1-07.9 of the standard specifications, a list of hourly minimum wate rates is incorporated in and made a part of these specifications. SPECIFIC EQUAL EvIPLO)MUr OPPORTUNITY RESPONSIBILITIES Equal employment opportunity requirements not to discriminate and to take affirma- tive action to assure equal employment opportunity as required by the Governor's Executive Order E0.70-01 are set forth in the standard specifications and shall 3 constitute the specific affirmative action requirements for project activities I under this contract. The requirements set forth in sections 1-07.11(1) through 1.07.11(10) of the standard specifications shall constitute the specific affirma- tive action requirements for project activities under this contract. E MPLOMM OPENINGS h The provisions of section 1-07.28 of the standard specifications are deleted for this project. TIME MR COMPLETION This project shall be completed in accordance with the provisions of section 1-08 > of the standard specifications within 10 working days. PA'? -00 EDGE The Contractor shall protect the finished paved edge of pavement by utilizing the available roadside materials and reshaping the shoulder area.. This shall be in- . cidental to and included in the unit contract price for Item No. 2. -14- X 1 P r I Y lam, ? / J i f r SOUR= OF MATERIALS w act. The Contractor No source has been provided for any materials in this contract. thi shall make his own arranget obtain naterialhin the finished wodrk all costs of acquiring, producing an will be considered incidental to the unit bid items involved. over If the sources of materials provided by the Contractor require haul ngs own oaadts other than State Highways or County Roads, and expense, make all arrangements for the use of the haul routes. SITE RECLAMATION The provisions of section 3-03 of the standard specifications shall not apply to this contract. Site reclamation shall be performed by the contracting agency on all sites furnished by it. On sites provided by the Contractor, and whe reqmirthe edd by a , the Contractor Resources. shall obtain a surface mining operating permit Prior to commencing operations at the site, the Contractor shall furnish evidence to the Engineer that this requirement has been met. All costs involved in complying with the requirements of an operating permit acquired from the Board of Natural Resources for Contractor provided sites shall be considered incidental to the materials to be produced from said site(s). FEATHERING ASPHALT CONCRETE PAVEMENT Where directed by the Engineer, the Contractor shall feather the asphalt concrete pevement overlay in a manner to produce a smooth riding connection to the existing pavement. Asphalt concrete pavement Class F utilized in the construction of the feathered connections to existing pavement, shall be modified by eliminating the coarse aggregate from the mix at the Contractor's plant or the commercial source from which the Contractor obtains the mix or by raking the joint on the roadway, to the satisfaction of the Engineer. All costs and expense in connection with providing, placing and feathering the asphalt concrete pavement will be incidental to and included in the unit contract price(s) per ton for "Asphalt Concrete Pavement Class F." TRAFFIC CONTROL The provisions of 1-07.23 of the standard specifications shall apply. ROAD APPROACHES halt mad A minimum of 10 ft. transition shall be paved onto all the existing asp approaches. This work shall be considered incidental to the paving and shall be included in the bid for Asphalt Concrete Class F pavement. Y' i I EXTRA PRELEVELING There are several localized areas in the existing pavement between the Queets Bridge and the Clearwater Annex and Shop in need of leveling. These areas will be identified with paint marks and shall be given a leveling course in the same manner as the pre-leveling for the 1.1 mile project area. The pavement shall be by the ton and shall be included in Item No. 2. PREVAI " MINIMUM HCURLY WAGE RAD 1-14Y-R32320-AA MARCH 05, 1 980 i CCCUPATION: LABORERS LOCATION: C'L.ALLAN, GRAYS hAROOR, ISLAND, JEFFERSCh, KIN T G, KITSAP, LE HLRSTON AND WIS, PASON, PIERCE, SAN JUAN, SKAGIT, SNOFyONISH, C COUNTY - NORTH O F 7t-E WAHKIAK LM wHATCON COUNTIES AND PACIFI TO . BOUNDARY EXTENDED CUE kEST THE PACIFIC OCEAN. . COUNTY NCRTHERN FRINGE BENEFITS EDUCATION ANC/OR APPR. TRAINING .'02• VHP. $/HR FED FED ERAL S STATE . HEALTH AND WELFARE .95 1.10 $/HR. FED S STATE PENSION 00 $/HR. STA TE 111 TRAINING FUND WAGE PATES TATE FEDERAL I I OCCUPATION OCCUPATICN S RATE RATE CODE DESCRIPTICN i ' I GROUP 1 350-0030 A$PFALT LABORER 11.23 11.23 SANE SAME. I 350-0090 BATCH WEIGF°NAN 11.23 SAME. 150-01.10 BROCMER 11.23 SAME 350-0130 BRUSH CUTTER 11.23 SAME• 350-0150 BRUSH HCG FEEDER . 11.23 SAME . 350-0190 BURNERS 11.23 . SAME 350-0220 CAR LOADER 11.23 . SAME 350-0230 CARPENTER HELPER 11.23 SAME. _ 350-0280 CEMENT HANDLER DRY SHACKMAN CHANGE-HOUSE MAN CR . 11.23 SAME•' . 350-0300 ' 11.23 SAME. •350-0320 CHOKER SETTER 11.23 SAME. 350-0350 CLEAN-UP LABORER CONCRETE AND MONOLITHIC LASCRER 11.23 SAME 350-0360 350-03SO CONCRETE FORM STRIPPER • 11.23 SAME 350-0460 CRUSHER FEEDER 11.23 SAME •350-0470 CURING LABORER DEMCLITION, WRECKING AND NCVING (INCL. 11.23 _ SANE .350-0520 CHARRED MATERIALS) 11.23 SAME •350-OS30 DITCH DIGGER 11.73 SAME 350-0550 DRIERMAN 1 23 1 . .,. SAVE 350-0660 DUMPMAN 1 . 23 1 SAME 350-0700 ELEVATOR FEEDER • 11.23 SAME 350-0710 EPOXY TECHNICIAN 11.23 SAME 350-•0750 FINE GRADERS 11.23 SAME '350-0760 FLAGMAN 'NARCH 1920 WAGERATES r r J I WY-R3?320-An PREVAILING MINIMUM HCURLY I.AGE RATES PARCH 05, 1 580 . CCCUPATION: LAAORERS LOCATION: CLALLAM, GRAYS HARBOR. ISLAND, JEFFERSCN, KING, KITSAP, LE SNOFONISH. THURSTON AND SKAGIT WIS. !1 , 'MASON, PIERCE, SAN JUAN, 'VHATCOP COUNTIES AND PACIFIC COUNTY -•NORTH OF TF•E UAHKIAK UM -- COUNTY NORTHERN BOUNDARY EXTENDED DUE BEST TO THE PACIFIC OCEAN. ? WAGE RATES OCCUPATION OCCUPATICN STATE RATE FEDER. RAT: COCE DESCRIPTICN GROUP 1 350-078D FORD SETTER 11.23 11.23 SAM. SAP " 350•-0820 350-0870 GENERAL LABORER GROUT MACHINE HEADER TENDER 11.23 SAt J' 350-0940 HEACER LABORER AND GUARD RAIL ERECTCR 11.23 SAt. ' 350-0970 ' HOUSE WRECKER TERIAL YARDMAN (INCLUDING ELECTRICAL) M 11.23 11.23 SA: SA i 350-1100 350-1160 A NIPPER-SWAPPER 11.23 S.A II 350-1260 PILCT'CAR 11.23 11.23 SA SC 350-1350 PITMAN 11.23 S) 350-1370 POT TENDER 11.23 SF 350-1530• RIPRAP MAN 11.23 SF• 1 350-1640 SCALEMAN 11.23 'SF 350-16?O SIGNALMAN 11.23 SA. • I 350-1690 350-1720 SKIPMAN SLOPER SPRAYMAN 11.23 SA C ' 350-1790 860 STOCKPILER TJMEER BUCKER AND FALLER (BY HAND) 11.23 11.23 SA: SAi . ' 350-1 350-I87D TOOLROOP MAN (AT-JOB•SITE) 11.23 SAt { 350-1890 TRACK LABORER 11.23• 11.23 SA',, SA 350-1930 TRUCK SPOTTER 11.23 SA 350-2100 WINCOW CLEANER d GROUP •2 '350-0010 ANCHOR MACHINES •11.57- 57 11 Sr SA ." 350-0080 BALLAST 'REGULATOR MACHINE . 11.57 SA 350-0310 CFIPPER 11.57 SA 350-0330 CHOKER SPLICER 11.57 Sa'' 350-0340 '350-0420 CHUCK TENDER CONCRETE SAW OPERATOR 11.57 SA' ' 350-0640 DRILLER WAGON AND AIR TRACK HELPER 11.57 57 11 SA SA 350-0810 GABION BASKET BUILDER . ., MARCH 1980 WAGERATES I -,r s r ? 4 w , 1 !-WY-R32320-AA PREVAILING MINIMUM HCUPLY WAGE RY,:ES MARCH 05, 1980 OCCUPATION: LABORERS LOCATION: CLALLAM, GRAYS hARBOR, ISLAND, JEFFERSCN, KING ,KITSAPv L E61S, MASON, PIERCE, SAN JUAN, SKAGIT, SNOHONTSH, TF( LRSTCK AND WHATCON COUNTIES AND PACIFIC COUNTY - NORTH OF TF•E WAHKIA KLM COUNTY NORTHERN POUNDAPY EXTENCED DUE WEST TO THE PACIFIC OCEAN. WAGE RATES i OCCUPATIO N OCCUPATICN 'STATE FEDERAL COCE. DESCRIPTICN RATE RATE GROUP2 350-0860 GRINDERS 11.57 SAME 350-0880 GROUTMAN (PRESSURE), INCLUDING POST 11.57 SAME TENSION BEAMS 350-0960 JACKHAMMER 11.57 • SAME 1 350-1250 PAVEMENT BREAKER 11.57 SAME •350-1320 PIPE POT TENDER 11.57. SAME 'i 350-1340 PIPEWRAPPER 11.57 SAME 350-1390 PCWDERMAN HELPER 11.57 SAME •350-1400 POWER BUGGY OPERATOR 11.57• SAME 350-1410 POWER JACKS 11.57 SAME 350-1450 POWER WHEELBORROW 11.57 SAME i 350-14EO RAILROAD SPIKE PULLER 11.57' SAME 350-1510 RIBBON SETTER, HEAD 11.57 SAME. .350-1550 RIPRAP MAN, HEAD 11.57 SAME j 350-1580 RODCER 11.57 SAME 350-1710 SLOPER (OVER 202) 11.57 SAME •350-1750 SPREADER - CLARY POWER OR SIMILAR TYPES 11.57 SAME j 350-1770 STAKE JUMPER 11.57 'SAME j 350-ISIO SWINGING SCAFFOLD OR BOATSWAIN CHAIR OVER 11.57 SAME WATER OR 25' IN HEIGHT . 1 :350-1840 TAMPER (MULTIPLE AND SELF PROPELLED) 11.57 SAME , 350-1830 TAMPER (MULTIPLE) 11.57 .SAME- l 350-1820 TAMPER AND SIMILAR ELECTRIC AND AIR 11.57 -SA.F OPERATED TOOLS E 1 350-ISPO TOPMAN-- TAILMAN 11.57 SAM ~ 350-1900 TRACK LINER 11.57 SAME ` 350-2030 1 VIBRATING SCREED (AIR,-GAS CR ELECTRIC) 11.57 SAME 3502000 VIBRATOR 11.57 SAME, 350-2090 WELL-POINT LABORER 114'57 SAME GROUP.. INARCH 1980 WAGERATES -3- l.? w '` ar r HWY-R32320-AA PREVAILING MINIMUM ),CURLY I.AGE RATES MARCH OS, ISBG CCCUPATION: LABORERS LOCATION: CLALLAN, GRAYS HARBOR, ISLAND, JEFFERSCN, KING, KITSAP, LEhIS- 'MASON. PIERCE, SAN JUAN, SKAGIT, SKOHOMISH, THLRSTON- AND 4HATCOM COUNTIES AND PACIFIC COUNTY - NORTH OF TFE WAHKIAKI:ht COUNTY NCRTHERN BOUNDARY EXTENDED DUE NEST TO THE PACIFIC CCE-;'.: WAGE RATES OCCUPATION OCCUPATION STATE FF COLE DESCRIPTICN RATE GROUP .3 350-0050 ASPI-ALT RAKER 11.71 350-0250 CEMENT DUMPER - PAVING 11.71 350-0260 CEMENT FINISHER HELPER 11.71 350-0570 DRILL DOCTCF AND BIT GRINDER 11.71 •350-0650 DRILLER - WAGON AND AIR TRACK OPERATOR 11.71 350-0720 FALLER AND BUCKER - CHAIN SAW 11.71 350-OP40 GRACE CHECKER AND TRANSIT MAN .. 11.7! 350-0950 HIGH SCALER 11.71 350-1000 LASER BEAM CPERATOR 11.71 350-1090 MANE-OLE BUILDER Ci 11 72 350-1200 NOZZLEMAN (CONCRETE PUMP, GFEENCUTTER WHEN . 5, 11.71 S USING COMBINATION OF RICH PRESSURE AIR ANC . { WATER ON CONCRETE AND P CCK SANDBLAST GUNIT . , , E SHOTCRETE) 350-122.0 PIPELAYER AND CAULKER 11 71 350-1380 POWCERMAN . 21 71 Si 350-1670 SEWER TIMBERMAN . 11 71 S; i '350-1740 SPREADER (CARRIES GRADE WITH RODDER) . 11 71 S ; 350-1940.T6GGER OPERATOR . 11 71 S 350-2020. VIBRATOR,•4 INCHES AND OVER . S; , 11_71 Sti GROUP .4 4 '350-0200 CAISSON WORKER 11.81 S;' 350-1030 LASER BEAM OPERATOR (TUNNEL) 11.81 S'. ; •350-1020 MAINTENANCE MAN 11 81 r ' 350-1110 MINER . 11 8I . S p •350-1381 POWCERMAN . 11.81 , S S;{ 350-1500 RE-TIMBERMAN 11 91 350-1730 SPACER (TUNNEL) . 11 .1 SC; 111 ' 1 ^ ? •. . 0 ? r-wY-R32320-64 PREVAILING MINIMUM, HCUFLY WAGE RPT'rs MARCH OS+ 1980 OCCUPATION: LABORERS RSCN, KING, KTTSA ? LOCATION: CLPLLAN, GRAYS HARBOR, ISLPMC, JEFFE SAN JUAN, SKAGIT% SNOHONISH9 THLRSTON PIERCE N ' P, LEI+IS, C AND , , MASO WAHKIAKLI4 UHATCOM COUNTIES AND PACIFIC COUNTY -.NORTH OF THE COLNTY NCRTHERN BOUNDARY EXTENCEC DUE kEST TO THE PACIFIC OCEAN. OTHER 350-5354 STATE: FOREMAN, .50 S/HR. ABOVE THE HIGHEST RATE SUPERVISED WITH THE EXCEPTION-CF SAN JUAN COLNTY 350-5355 STATE' ALL LA20EPS IN JUAN CCUNTYs 5.75 WITH FRINGE BENEFITS x `;. J v: i WI 1 r'p F-WY-R32320-AA PREVAILING MINIMUM HCURLY WAGE RATES MARCH 05, I,RQ CCCUP4TION: POWFP EOUIPMENT OPERATORS LOCATION: CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSCN, KING, KITSAP, LEt+IS. ,MASON. PIERCE, SAN JUAN, SKAGIT, SNOHOPISH. THL RSTON AND WHATCCN COLNTIES AND THOSE PORTIONS OF CFELAN, OCUGLAS, KITTITAS. " •CKANCGAN AND YAKIMA COUNTIES WEST OF THE 120TH MERIDIAN ANC PACIFIC COUNTY - NORTH OF THE VrANKIAKUP COUNTY NCRTHERN EOL•NCARY' EXTENDED DUE WEST TO THE PACIFIC OCEAN. FRINGE BENEFITS EDUCATION ANC/OR APPR. TRAINING -11 S/HR. FEDERAL HEALTH AND WELFARE .85 S/HR. FED I. STA' PENSION 1.50 S/HQ. FED & STA ` TRAINING FUND .11 T/HR. STATE WAGE RATES OCCUPATION OCCUPATION .STATE FEDER COCF. DESCRIPTION RATE RAT GROUP I i 570-COIO MECHANICIS HELPERS, HEAVY DUTY 13.10 SAN - I GROUP-2 570-0020 OILERS, GRADE - OILER CCMBINATION AND/OR 13.20 SAP BRAKEMEN GROUP .? 570-0040 FIREMANs HOT PLANT AND DRIER 13.31 SAM 570-0030 FIREMEN 13.31 SA. GROUP 4 { -570-0050 COMPRESSORS: EXCAVATING AND GENERAL PURPOSE S. 13.3E SAM1 570-0060 P.OLLERSs TAMPERS AND VISRATCRS: OTHER THAN 13.36 SAME PLANT, ROAD MIX OR MULTILIFT MATERIALS (WHEPE TOWED, TO PAY RATE OF ECUIPNENT USED TO RLLL) 570-0070 TRACTORS, FARMALL TYPE, 60 HP AND UNDER j 13.36 SANE GROUP 5 i -NARCH.1920 WAGERATES -6 i 1 K . I t Al 1 Y ?.a r L. r ? r 5 F+.' ?1 ? ii. it 7F F NARCh PREVAIL MINIMUM HCURLY l<AGE RP 057 1980 .wY-R32320-AA :CCUPATION: POWER EQUIPMENT CPERATCRS M j .. ESNONONISH`,ITHLRSTONAANDLWFATCGM OCATION: CLALLAN, GRAYS 'SA T IS D , L SKAGI JUAN N PIERCE. -PASONv ND THOSE PORTIONS CF GFELAN, DOUGLAS. KITT H MERID ITAS, IAN AND A COUNTIES •CKPN6GAN AND YAKIMA COUNTIES WEST OF TFE 120T COUNTY NCRTHERN BOU WAFKXAKU NDARY . PACIFIC 'COUNTY - NORTH OF THE U WEST TO THE PACIFIC EXTENDED WAGE RATES STATE FEDERAL OCCUPATION RATE RATE OCCUPATION DESCRIPTION e CODE: GROUP •5 DRIVER ON TRUCK CRANES OVER 45 TONS UP 13.32 SAME 570-0080 OILER 3 TO. 100 TONS GROUP .6 RLOkER DISTRIBUTOR AND MULCH SEEDING OPERATOR iS?43 SA-EVE. 570-0090 570•-0100 OIL DISTRIBUTORS GROUP ? . = DONKEY-AIR, ELECTRIC, S7EAM+•GhS 13.44 SAME 570--0110 LOCOMOTIVE g OR DIESEL GROUP 2 13.45 SAME 11 570--C120 CEMENT HOGS GROUP •S 570-0130 EQUIPMENT SERVICE, AND FUELING OILER K CRANES 100.TONS AND 13.48 13.42 -SAME '.SAME 570-0140 OILER DRIVER ON TRUC OVER GROUP 10 111 .13.50 SAME 570-0150 PUMPS: WATER TRACTORS, FARNALL TYPE, OVER 60 HP 13.50 SAME 570-0160 " GROUP 11 ,MARCH 1980 WAGERATES • I -7- r rt .K ';7 t i r _i CD FWY-R32320-AA FREVAILING MINIMUM HCURLY RAGE RATES MARC H 04, 1900 CCCUPATION: FOWFR EOUIPMENT CPERATORS } p LOCATION: CLALLAM, GRAYS FARP.OR, ISLAND,'JEFFERSCN, KING, KIT SAP, LEwIS, MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOtNISH, TPLRSTO N AND WHATCCM COUNTIES A.ND THCSE PORTIONS CF CHELAN, DCUCLAS, KIT TITAS. -CKANOGAN AND YAKIMA COUNTIES WEST CF TF-E 120TH MERI DIAN AND I 'FACIFIC COUNTY - NORTH OF THE'wAPKIAKUM COUNTY NCRT HERN BOLNOARY EXTENDED DUE WEST TO THE PACIFIC OCEAN. WAGE RATES OCCUPATION OCCUPATICN STATE FEDERA, COCF DESCRIPTICN RATE, RATE GROUP 11 570-C170 POST HOLE DIGGERS, MECHANICAL 13.63 SAM GROUP 17 570-0180 BROOMS, POWER (WAYNE, SAGINAW OR SIMILAR 13.66 SAM- TYPES) 570--03SO BULLDOZER, ENDER D9 OR SIMILAR 13.66 SAME 570-0700•LOACERS: FORK LIFTS OR LUMBER STACKER 13.66 SANE` (ON CONSTRUCTION SITE), DRCTT TRAVEL LIFT 570-OPIO ROLLERS, TAMPERS AND VTERATCRS (THIN ENGINE) 13.66 SAME . 570-CPZO SAWS, CONCRETE 13.66 SAME 570-C?30 SCRAPERS: CARRYALL TYPE, SINGLE 13.66 SAME GROUP ,13 i '57C.-0240 BATCH PLANT OPERATOR: EATCF AND MIXER, 200 13.69. SANE I YARDS PER HOUR AND UNDER 1 570-0260 CONVEYORS 13.69 SAME 570-0?_50 CRANES: "All FRAME TRUCKS, SINGLE PCWER DRUM 13.69 SAM 570-C770 CRUSHERS (ROCK), WASHING ANC-SCREENING PLANTS 13.69 SAM 570-0?20'FINISHING MACHINE OPERATOR, CONCRETE PAVI•NG'• 13.65 SAM. 570-0250 HOISTS, AIR TUGGERS, STRATC TOWER BUCKET, 13.69 SAN ELEVATORS, AND DECK WINCHES (POWER) 570-0300 LOADERS: ELEVATING - ATHEY. BARBER GREENE._ 13.69 SAM. AND SIMILAR TYPES 570-0310 LOADERS: OVERHEAD AND FRCNT END, UNDER 2 1/2 13.69 SAM - YARDS 570-0320 MIXERS: ASPHALT, UP TO 4 TONS PER EATCH 13.69 SAM' 570-0320 MIXERS: CONCRETE MIXERS AND BATCF - 200 13.69 SAM YARCS PER HOUR A14D UNDER MARCH 19,00 WAGFRATES .y F .. - u.. .. .. _....-._._ .._ __.__ _. __._?_._?_ _ ?• ?. ? /?+ t•WY-R3z370-AA FREVAILircG MINIMUM HCUFLY WAGE R G?,,,,?S MARCH 05, I 1S80 R CCCUPATION: POWER EQUIPMENT CPERATORS Q? LOCATION: CL.ALLAM, GRAYS F•ARBOR. ISLAND. JEFFERSCN, KING, KITSAp. L EWTSs i -MASON, PIERCE, SAN JUAN. SKAGIT, SKOHOMISH, THLRSTOK AND WF•ATCCM: COLNTIES AND THOSE PORTIONS CF CF-ELAN. DCUGLAS, KI TTITAS, •CKANOGAN AND YAKIMA COUNTIES WEST OF TFE 120TH MERIDIAN A ND ' PACIFIC COUNTY - NORTH OF THE WAFKIAKUM COUNTY NCRTHERN B OUNDARY EXTENDED DUE WEST TO THE PACIFIC OCEAN. WAGE RATES OCCUPATION OCCUPATION STATE FEDERAL . CCCE DESCRIPTTCN RATE RATE - GROUP 13 570-0340 POWER PLANT OPERATORS 13.69 SAME 570-0350 PUMPS: CONCRETE AND PUMPCRETE T3.69 SAME 570-0360 PUMPS: FULLER KENYON 1.3.69 -SAME 570-C370 ROLLERS, TANPERS AND VIBRATORS: •CN PLANT, 13.69 SAME' ROAD MIX OR MULTILIFT MATERIALS 570-0380 SCREED PAN 13.69 SAME I .570-0350 SPREADERS, BLAW KNOX, CEDAR - RAPIDS, JAEGER'+ 13.69 SAME FLARRETY OR SIMILAR TYPES 570-0400 TRENCHING MACHINES INCLUDING UNDERWATER - 13.69 SAME REMCTE CONTROLLED UNITS: 'UNDER 16 INCHES,. GROUP 14 570-0410 MOTOR PATROL GRADERS. INCLUDING MCDEL 14 AND 13.76 SAME i SIMILAR. 570-0420 TOURNAPCLLS, CATERPILLAR, EUCLID SCRAPERS AND 13.76 SAME SIMILAR TYPE EQUIPMENT - 25 YARDS AND UNDER GROUP- 15 570-0430 COMPRESSORS: STEEL ERECTION OR TANK ERECTICN 13.78' SAME INCLUDING SAND BLASTING, PAINTING OF THE .5,4101E '570-0440 HOISTS ON STEEL ERECTION, TCWER MOBILES AND 13.7E '-SAME AIR TUGGERS 570-0450 LOADERS: FORK LIFTS WITH TOWER 13.78 SAME GROUP 16 570-0460 MECF•ANICS OR WELDERS, HEAVY DUTY 13.79• SAME i -MARCH 1980 WAGFRATES i -9- e' L .. w ? / rr l ` r 7_7 NWY-R32370-AA PREVAILING MINIMUM HOURLY tcAGE RATES MARC H 65, I9 80 OCCUPATION: FOWFR EOUIPMENT OPERATORS LOCATION: CLALLAM, GRAYS F.ARBOR, ISLAND, JEFFERSCN, KING, KIT SAP, LEtk IS, MASON. PIERCE. SAN JUAN, SKAGIT, SNONOPISH, TF'LRSTO N AND WFATCGM COUNTIES AND THCSE PORTIONS OF CFELAN, DCUGLAS, KIT TITAS. -CKANOGAN AND YAKIMA COUNTIES WEST OF'ThE 120TH MERI DIAN ANC 1 PACIFIC COUNTY - NORTH OF THE WAF•KIAKUM COUNTY NCRT HERNt BOLNDARY EXTENDED.DUE WEST TO THE PACIFIC OCEAN. WAGE RATES OCCUPATION OCCUPATION -STATE FEDER,•', COCF. DESCRIPTION RATE RAT`.. GROUP 17 570-0470 LOACERS: ELEVATING GRADER TYPE - DLMOR AND 13-81 SAN '• SIMILAR TYPES 570-0480 LOCOMOTIVES:- ROD OR GEARED ENGINES 13.fl1 SAN 570-04S0 MIXERS: PAVING 13.81 SAM 570-C500 SCRAPERS: CARRYALL TYPE, DOUBLE 13.81 SA)A.. GROUP IS 570-0510 PUMPS: TRUCK MOUNTED CONCRETE PUMP W/BOOM 13.84 SAMF -ATTACHMENT 570-0520 TRACTORS, FARMALL TYPE, USED AS BACKHCES, 13.84 SAM RUBEER TIRED (FORD, FERGUSCN, CASE AND SIMILAR TYPES) 60 HP AND UNDER E GROUP 19 e 570-0530 BULLDOZER, D9 OR SIMILAR 13.88 SAM GROUP-20 .' 570-0540 TRENCHING MACHINES INCLUDING UNDERWATER - 13.95 SAPi REMOTE CONTROLLED UNITS: 1E INCHES AND OVER ' GROUP •2l 570-0550 BUMP CUTTER. (CONCUT, CRISTIANSCN•CR SIMILAR 13.96 SAME TYPES) -MARCH 1920 t')AGERATES -10- 9a r. ,r t y F-WY-R32320-AA PREVAILING MINIMUM HOURLY WAGE RA`riS MARC H 05, ]SHO i CCCUPATION: POWER EOUIPMENT OPERATORS LOCATION: CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSCN, KING, KIT SAP. L EWIS, 1 :MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOVISH. THLRSTO N AND WPATCOV i COLNTIES'AND THOSE PORTIONS OF CF'ELAN, DOUGLAS. KIT TITAS, CKANOGAN AND YAKIMA COUNTIES WEST OF TFE 120TH MERI DIAN A ND PACIFIC COUNTY - NORTH OF'THE WANKIAKUN COUNTY NORTHERN -B OUNDARY EXTENDED DUE WEST TO TF•E PACIFIC OCEAN. WAGE RATES OCCUPATION OCCUPATION -STATE FEDERAL f CODE DESCRIPTION RATE RATE GROUP 22 E 1 ? 570-0560 9ATCH PLANT OPERATOR: BATCH AND MIXER, OVER 14.01 SANE 200 YARDS PER HOUR 7HROLGH•400 YARDS PER{FOLR 570-0570 CONVEYORS, P.ELTCRETE WITH POWER PACK AND 14.01 SAME SIMILAR TYPES f 570-0520 LOADERS: ELEVATING BELT TYPE - ELCLID AND 14.01 SAME SIMILAR TYPES 570-0590 MIXERS: ASPHALT. 4 TONS AND OVER PER BATCH 14.01 SAME 570-0600 MIXERS: CONCRETE MIXERS AND BATCF -OVER 200 14:01 SAME YARDS PER HOUR THROUGH 400 YARDS PER HOUR . 570-0510 MIXERS: PAVING DUAL 14.01 SAME GROUP 23 ., 579-0630 BULLDOZERS ENGAGED IN YC YO OPERATOR.! (WHILE' 14.06 SAME•'i CLEARING AND SCALING) 570-0640 CABLEWAYS - 3 YARDS AND UNDER 14.06 SAME 570-0690 CHIFPER, WOOD WITH BOOM. ATTACHMENT 14.06 SAME 570-0650 CRANES: "A" FRAME TRUCKS, DOUBLE POWER DRUM 14.06' SAME' { 570-0660 CRANES: CRAWLER, TRUCK TYPE, FLOATINGs 14.06 SAME LOCOMOTIVE, WHIRLEY, EITHER 3 YARDS AND.UNDER OR 1501 OF BOOM INCLUDING JIBS AND:LNDER -CR . j . 45'TONS AND UNDER 570-0700 DERRICKS, ALL 14.0E SAME 570-0710 DRILLING MACHINES, CORE, CABLE, RCTARY AND 14.06 SAME EXPLORATION 570-0670 HYDRA LIFTS 14.06 SAME 570-0680 HYSTER CAT CP.ANES.AND ATTACFMENTS 14-06 SAME 570-0720 LOADERS: FORK LIFTS WITH POWER BCOM AND 14.0E SAME SWING ATTACHMENT -MARCH 1920 WAGERATES ? •-11- v w w r t•WY-R32320-AA PREVAILING MINIMUM HCURLY SAAGE RATES MARCH OS- I980 OCCUPATION: POWER EOUIPMFNT OPERoTCRS LOCATION: CL.ALLAM, GRAYS HARBOR. ISLAND, JEFFERSCN, KING. KITSAP, L EWIS, PASON. PIERCE. SAN JUAN, SKAGIT, SNOFONISH, THL RSTCN AND WHATCCM COUNTIES AND THOSE PORTIONS CF CNF.LAN, DCUGLAS, KITTITAS, C? •CKANCGAN AND YAKIMA COUNTIES WEST OF THE 120TH MERIDIAN A ND PACIFIC COUNTY - NORTH OF THE WAHKIAKUP COUNTY NCRTHERN B OUNDARY EXTENDED DUE WEST TO TFE PACIFIC OCEAN. f` WAGE RATES OCCUPATION OCCUPATION STATE FEDERAL., COCE DESCRIPTION RATE . RATE GROUP 23 570-0730 LOADERS:. CVERHEAD AND FRONT END, 2.5 YARD S 14.0E SAME AND UP TO 4 YARDS 570-C740 MECHANIC LEADMAN. 14.06 SAME 570-0750 MIXERS: MOBILE TYPE WITH HOIST CCMEINATIC N 14.06 SAME'. .570-C760 MOTCR PATROL GRADERS- OVER MODEL 14 AND. 14.06 SANE SIMILAR 570-0770 MUCKING MACHINES, HOLE, TUNNEL DRILL AND•C R 14..0E SAVF SHIELD .570-0620 PAY DOZERS AND LINKED PUSHER, OUAC 5 AND 14.06 SAMi.' SIMILAR 570-07FO PILEDRIVER ENGINEERS. L.B. FOSTER PLLLER CR. 14.0E SAN'' SIMILAR. PAVING BREAKER 570-0790 SHOVELS: CRAWLER AND TRUCK TYPE, ALL 14.06 SAMi ATTACHuENTS, 3 YDS. AND UNDER 570-0800 SUB GRADER, GURRIES• CMI AND CMI ROTOMILL AND 14.0E SAMr SIMILAR TYPES 570-CPZO TCUFNAPLLLS. CATERPILLER, EUCLID-SCRAPERS 14.06 SAMF AND SIMILAR TYPE EOUIPMENT - OVER 25 YARDS THRCUGH 40 YARDS - 570-0610 TRACTORS, FARMALL TYPE, USED AS BACKHOES, 14.06 SANE RUBBER TIRED (FORD, FERGUSCN, CASE AND . SIMILAR TYPES) OVER 60•14P - GROUP 24 570-OP20 LOADERS: CVERHEAD AND FRONT END, 4 YARDS 14.2E SAME ' UP TO 8 YARDS i -PARCH 19PO WAGERATES z i -12- 7- V y .. 'i J r ±1I :? j i-WY-R32320-4A PREVAILING MINIMUM HCURLY WAGE RATES MARCH 04. 1980 CCCUPATION: P06ER EQUIPMENT OPERATORS ISLANCv JEFFERSCN, LOCATION: CS , GRAYS S AN JUAN, ,NA_•ONON+ PIERCE, COUNTIES AND THOSE PORTIONS OF CFELAN, DOUGLAS.. KITTITAS, •CKANCGAN AND YAKIMA COUNTIES WEST OF TFE 120TH NERIDIAN AND THE WAFKIAKUN COUNTY NORTHERN BOUNDARY PACIFIC COUNTY - NORTH OF EXTENDED DUE WEST TO THE PACIFIC OCEAN. WAGE RATES { OCCUPATION OCCUPATION -STATE RATE FEDERAL RATE COCF DESCRIPTION GROUP 25 570-OA4D BATCH PLANT OPERATOR: EATCF AND PIXER,'OVER 14.32 SAME 400 YARDS PER HOUR THROUGH 600 YARDS PER FOUR OVER 570-0B50 MIXERS: CER C 14.32 SAME PER POUR 600 YARDS YARDS PER HOUR THROUGH GROUP '26 , 570-0060 EUC c A E 14.37 SAME YARDS OVER 40 EQUIPMENT TYPE AND SIMILAR 7HRCUGH 55 YARDS GROUP 27 ' 1 570-0870 CABLEWAYS: OVER 3 YARDS _ CRANES; CRAWLER, TRUCK TYPE, FLOATING, LCCC-. 14.45 14.45 SAME' SAME 570-0•P20 j MOTIVE, WHIRLEY9 EITHER OVER 3 YARDS OR OVER 50' OF BOOM INCLUDING-JIBS OR OVER 45 TONS UP.TO 100 TONS 570-C900 HELICOPTER WINCH OPERATOR 14.45 SAME 570-0910 REMCTE'CONTROL OPERATOR ON RUBBER-TIRED 14.45 SAME EARTH MOVING EQUIPMENT 570-0920-SHOVELS: CRAWLER AND TRUCK TYPE, ALL 14945 SAME ATTACHMENTS, OVER 3 YARDS UP. TO 6 YARDS ' 570-0930 SLIP FORM PAVER, ZIMMERNAN, CMI AND SIMILAR 14.45 SANE TYPES 570-OP90 TOWER-CRANES, PECCO, LORRAINE, BUCYRUS AND 14.45 SAME SIMILAR TYPES f PARCH 19E0 WPGERPTES i M.ARCh FREVAILING HINImUM HCURLY HALE RATES 0S+ 1c'80 F4tY-R32320-AO OCCUPATION: Pot+F.R EQUIPMFNT OPERATORS AM, GRAYS FARBOR+ ISLAND, JEFFERSCN+ KING. KITSAP+ LENIS SKAGIT, SNOHONISH, 7HLRSTCN AND tdFA7 LOCATION: CLALL , CGt4 ppc(jN, PIERCE, SAN JUAN,. LAS KITT HOSE PORTIONS CF CFE RIC + C n ITA- TANSANC ME COUNTIES AND T 1207H 7FE OF NCGAN AND YAKIMA COUNTIES WEST M COUNTY NCRTHERN EOUNC K ARY A 'C ACIFIC COUNTY - NORTH OF THE hAFKIAKU EAN . P EXTENDED DUE WEST TO Tt-E PACIFIC OC WAGE RATES STATE FEOEr DESCRIPTICN OCCUPATION OCCUPATION RATE RAP COCF GROUP 29 ERS AND CATERPILLAR+ L 14.67 SAN' 570-0940 TCURNAPLLLS+ 55 YARDS CVER SIMILAR TYPE EQUIPMENT _. I 7HRCUGH 70 YARDS ' GROUP 29 : OVERHEAD AND FRCNTE.N07 8 YARDS ANC 14.87 SAM 570-6950 LOADERS t OVER ' GROUP 30 ERS AND CATERPILLAR, A EUCLID 14.9P SAMFj P .570-0960 TOURNAPCLLS+ SCR C SIMILAR TYPE EQUIPMENT ER 0 III THRCUGH.85 YARDS GROUP ._ 1 - p FLOAT 570-6970 I, EITHERE6 YARDSIAivQ OVER. 15.00 SAN' LOCCMOTIVEv WHIRLEY ' OF BOCM INCLUDING 'JIBS AND OVER OR 100 200 TONS AND OVER TRANSPORTER ON 15.00` SAl t , 570-0920 CRANES: RCLLAG : CRAWLER AND TRUCK TYPE, ALL 15.00 SA •570-0950 SFOVELS ATTACHMENTS,. 6 YARDS ANDOVER GROUP .3? CATERPILLAR, EUCLID SCRAPERS 15.28 SAM} 570-CO93 TCURNAPULLS+ SIMILAR TYPE EQUIPMENT - OVER 85 YARDS AND THRCUGH 100 YARDS MARCH 1920 WAGERATES r ? .e Li , Y t ? ' f I I l "f 1 .. r. ,. .. ...,. ANY-R323250-AA PREVAILING MINIMUM HCURLY WAGE RATES MARCH nS, 19A0 CCCUPATION: TEAMSTERS LOCATION: CLALLAN, GRAYS HARBOR, ISLANC, JEFFERSCN. KING, KITSAP, KITTITAS, LFWIS. MASON:. PIERCE, SAN JUAN, SKAGIT, SNGHOMI5F-9 T1-URSTON, hHATCON AND YAKIMA COUNTIES AND THOSE PORTIONS OF CHELAN, COLGLAS AND CKANCGAN COUNTIES WEST OF THE 120T1- MERICIAN AND THAT PORTION OF PACIFIC COUNTY NORTH OF THE WA}-KIAKUM CCCNTY 0 T"c PACIFIC OCEAN NORTHERN BOUNDARY EXTENDED DUr- WEST T - FRINGE BENEFITS EDUCATION ANC/OR APPR. TRAINING .09 $/HR. FEDERAL HEALTH AND WELFARE .99 $/HR. STATE ' .94 $/HR. FEDERAL PENSION 1.07 $/HR. STATE 1.12' S/HR. FEDERAL TRAINING FUND .09 $/HR. STATE 1 WAGE RATES OCCUPATION OCCUPATION STATE FEDERP,• - COCE DESCRIPTION RATE RATE GROUP 1 730-0400 FSCCRT DRIVER 13.41 SANE 730-0690 LEVERMAN AND LOADERS AT BUNKERS AND 13.41 SANE, BATCH PLANTS 730-1010 PICK-UP TRUCK 13.41 SAME ' 730-1020 PILOT CAP, 13.41 SANE 730-1200 SWAPPER 13.41 SAME 730-ISIO WAREHOUSEMAN AND CHECKERS I 13.41 SAME GROUP c 730-1300 TEAM-DRIVER 13.4E SAME GROUP •3 i 1 730-0110 BULL LIFTS, OR SIMILAR EOL•IFMENT•LSED IN 13.51 SAME LCACING OR UNLOADING TRUCKS, TRANSPCRTING MATERIALS•CN JOB SITES:IvAREFOUSING 730-0140 BUS OR MANHAUL 13.51 SAME 1/40 j 'MARCH-1920 WAGERATES i • -1G- 1 • h . V tr' ,,lr .w w j o I 7r- F-WY-R32320-bA PREVAILING MINIMUM HCUFLY UAGE RATES MARCH 05, 1S130 CCCUPATION: TEAMSTERS LOCATION: CLALL AM, GRAYS F•AReOR, ISLAND, JEFFERSCN, KING, KITSAP, K ITTITAS, LFHI VHATC S- MASON, PIERCE, SAN JUAN, SKAGIT, SNCHOMISH9 OM AND YAKIMA COUNTIES AND THOSE PORTIONS OF C 7i-URST HELAN, ON, AN COUNTIES t,EST OF THE 120TFe MERIDIAN AND O COLGL G AS AND OKAN THAT PORTION OF PACIFIC COUNTY NORTH OF THE WAIKIAKUM COUNTY :NORTHERN BOUNDARY EXTENDED DUE %EST TO TFE PACIFIC OCEAN. ?- WAGE RATES OCCUPATION OCCUPATION STATE RATE FEDERAL RATE COCE DESCRIPTION GROUP 730-0200 DUMPSTERS, AND SIMILAR EQUIPMENT:TDLRNO- 13.51 SAMF ROCKERS, TCURKOWAGON. TCURNOTRAILER, CAT -CW 1 SERIES, TERRA COBRA, LETOURNEAU, AESTINGHCUSE ATHEY WAGON, EUCLID, TWO AND FOUR-WF•EELED POWER TRACTOR WTH TRAILER AND SIMILAR TOP= LOADED EQUIPMENT TRANSPORTING MATERIAL ANC PERFORMING kORK IN. TEAMSTER JURISCICTION:-CUMP TRUCKS, SIDE. END AND BOTTOM DUMP, INCLUDING SEMI-TRUCKS AND TRAINS OR COMBINATIONS THEREOF:UP TO AND INCLUDING 5 YARDS 730-C460 4 FLAFERTY SPREADER FLATBED TPLCK, STNGLE REAR AXLE 13.51 13.51 SAME SAME 90 730-0 730-0610 FUEL TRUCK, GREASE TRUCK, GREASER, BATTERY 13.51 SAME.. SERVICE MAN AND/OR TIRE SERVICE MAN ' 730-1100 730-1350' SCISSORS TRUCK TRACTOR, SMALL RUBBER-TIREC (WHEN USED WITHIN 13.51 13.51 . SAME SAME' TEAMSTER JURISDICTION) 730-1750 730-2000 VACUUM TRUCK WATER WAGON AND TANK TRUCK: UP TO 1600 13.51 13.51 SAME SAME 730-2200 GALLONS WINCH TRUCK: SINGLE REAR AXLE 13.51 .:'• SANE .E 730-2220 WRECKER, TOW TRUCK AND-SIMILAR EQLIPMENT 13.51 SANE GROUP •4 730-0500 FLATBED TRUCK, DUAL REAR AXLE 13.62 SAME GROUP .5 730-0020 BUGGYMOEILE AND SIMILAR 13.66+ SAME MARCH 19e0 WAGERATES -17- ? ?? ?? `Y } x ^?' J r -AA PREVA)l.It.G MINIMUM HCUFLY t4AGE PATES MARC H OS, 1S80 1 WN-R32320 OCCUPATION: TEANSTERS ' ALLAM, GRAYS FARBOR, ISLAND, JEFFERSCN, KING, KIT SKAGIT,•SNCHONISF, LOCATION: CI,%l JUAN SAP, KITTITAS, TF URSTOn, , MASON, PIERCE, SAN YAKINA COUNTIES AND THOSE FORTIONS OF CHELAN, - 1 UHATCON AND IF AND OKANOGAN COUNTIES WEST OF THE 120 ERIDIAN AND COUGLAS KI THAT PORTION OF PACIFIC COUNTY NORTH OF THE WAF TO TFE PACIFIC OCEAN. -NORTHERN BOUNDARY EXTENDED OLE WEST WAGE RATES OCCUPATION STATE FEDEP ' OCCUPATION DESCRIPTICN RATE RA s. COCF GROUP 5 • 730-0670 HYSTER OPERATORS (HAULING BULK LOOSE I3.68 SA' AGGREGATES) 730-1150 STRADDLE CARRIER (ROSS, HYSTER ANC SIMILAR) GALLONS 13.68 13.68 Sh SA 730-2010 WATER WAGON AND TANK TRUCK: 1600 TO 3000 GALLONS GROUP E IN HEAVY. EXCLUSIVELY 730-1500 TRANSI-MIX USIVEL USE 13.72 5t' YD CL D TO CONSTR GROUP 7 730-C710 DUMFSTERS, AND STMILAR EOUIPMENT:TOLRNO-- TCURNOTRAILER, CAT•C'd 13.73 •S!. POCKERS, TCURNOWAGON, TERRA COBRA, LETOURNEAU, kESTINGHCUSE S R , IE SE ATHEY WAGON, EUCLID, TWO AND FOUR-WhEELED r POWER TRACTOR WTH TRAILER AND SIMILAR TOP- G MATERIAL ANC LOADED EQUIPMENT TRANSPORTIN RK IN TEAMSTER JURISCICTION:•DUNP _ PERFORMING UO TRUCKS, SIDE, END AND BOTTOM DUMP, INCLUDING SEMI-TRUCKS AND TRAINS•CR C-OM21NATI-CNS AND INCL. 12 YARDS 'THEREOF:OVER 5 YARDS TO TRUCK (FIELD NIX) AND SIMILAR 13.73 SAt4 730-0410 EXPLOSIVE EOUIPMENT -0710 LOWBED AND HEAVY DUTY TRAILER: UNCER 50 13-73 SAN 730 TONS GRCSS 730-G910 OIL DISTRIBUTOR DRIVER (ROAD) 13.73 13.73 ? SAt SAI- 1 730-1140 SLURRY TRUCK DRIVEP. SiNILAR EOUIFME.NT )3.73. SAt 730-1160 SNO-GO AND .'ARCH 19EO WAGERATES { `•` a • 46 Lj v 1 PREVAILING MINIMUM HOURLY WAGE RATES MARCH 05, 1580 14Y-P32320 76A 'CCUPATION: TEAMSTERS KING, ttI7SAP, KT7T1 7AS, ? N.ISF, TFURSTONt LOCATION: CLALLAN+ GRAYS HARBOR. ISLAND, JEFFFERSC FERSON, PIERCE, SAN JUAN, SKAGIT, SNOHO OF CHELAn• N , LFWIS, MASO MHATCON AND YAKIMA COUNTIES AND THOSE PORTIONS OF THE 120TF•11ERICIAN AND COLGLAS AND OKANOGAN CCUNTIES WEST '.N7Y K E F H PACIFIC OCEAN THAT PACIFIC WEST TNE TO t pORTHE j I WAGE RATES -STATE FEOERI i q OCCUPATION RATE RATE OCCUPATION DESCRIPTICN CODE - GROUP 7 13.73 SAME 730-2210 WINCH TRUCK: DUAL PEAR AXLE GROUP E I3.?B R SA NI CAT:CW 730-07.20 ROCKERS, TOURNOWAGON% TCURNOTRAILER, WESTINGHOUSE SERIES• TERRA COBRA. LETOURNEAU, TWO AND FOUR-WHEELED ATHEY WAGON, EUCLID, POWER TRACTOR WTH TRAILER AND SIMILAR TOP- MATERIAL AND LOADED EQUIPMENT TRANSPORTING STER'JURISCICTION:•CUMP- l PERFORMING WORK IN TEAM END AND BOTTOM DUMP, INCLUDING ' i TRUCKS, SIDE, SEMI-TRUCKS AND TRAINS OR CCMP.INATICNS INCL. 16 YARDS ' AND THEFEOF:OVER.12 YARDS TO GROUP •S 13.84 S0 730-0100 BULK CEMENT TANKER SIMILAR EOUIPMENT:TOURNO- 13.84 SAr 730-0230 DUMPSTERS; AND ROCKERS, TCURNOWAGON, TCURNGTRAILER, CAT•CW ESTINGHCUSE SERIES, TERRA COBRA. LETOURNEAU, W TWO AND FOUR-WHEELED ' EUCLID, ATHEY WAGON, R WTH TRAILER AND SIMILAR TOP- POWER TRACTO LOADED EQUIPMENT TRANSPORTING MATERIAL AND JURISCICTION:•CUNP PERFORMING WORK IN TEAMSTER AND BOTTOM DUMP, INCLUDING TRUCKS, SICE, END SEMI-TRUCKS AND TRAINS OR CCMBINATI•CNS '20 YARDS THEFEOF:OVER 16 YARDS TO AND INCL. GALLONS 13.84 OVE9•3000 SA . 730-2020 WATER WAGON AND TANK TRUCK: .. ? t F-WY-832320-AA PREVAILING MINIMUM HCURLY wAGF. RATES MARCH 0';. 1c'A0 CCCUPATION: TEAMSTERS L0CnTI0N:.CLALLAN, GRAYS FPP.BOR,'TSLANC+ JEFFERSON. KING, KT75AP, KI7TITA5+ LFkIS, MASON, PIERCE, SAN JUAN- SKAGIT, SNCHOMISF, TFUPSTON, 'HHATCOM AND YAKIMA COUNTIES AND THOSE PORTIONS OF CHF.LAN, •COLGLAS AND CKANOGAN COUNTIES 'BEST OF THE 120Tr MERICIAN AND THAT PORTION OF PACIFIC. COUNTY NCRTH OF THE WAFKIAKUN COLNTY NORTFEP.N BOUNDARY EXTENDED DUE BEST 70 TFE PACIFIC OCEAN. WAGE RATES OCCUPATION OCCUPATICN STATE FEDER COCF DESCRIPTION RATE -RAT . i . GROUP 10 e , 730-0120 RULL LIFTS, OR SIMILARY EQUIPMENT USED IN 13.8E SAN 4 LOADING OR UNLOADING TRUCKS, TRANSPCRTING MATERIALS CN JOB SITES:OTFER'THAN WAREHOUSING GROUP 11 730-1510 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY. 13.89 SAF1 CONSTR.:OVER 4.5 YDS. TO AND INCL- E YDS. GROUP 12 730-0010 A-FRAME OR HYDRALTFT'•TRUCKS OR SIMILAR 13.99 SAP EQUIPMENT WFEN A-FRAME OF E'YDRALIFT OR SIMILAR EQUIPMENT IS IN USE GROUP 13 730-0240 DUMPSTERS. AND SIMILAR EQUIPMENT:TOLRNO- 14.01• SAME} ROCKERSs TCURNOWAGON, TCURNOTRAILER+ CAT•CW SERIESs TERRA COBRA, LETOURNEAU+ WESTINGHCUSE ATHEY WAGON+ EUCLID, TWO AND FOUR-WPEELED POWER TRACTCR WTH TRAILER AND SIMILAR TOP- s LOACED EQUIPMENT TRANSPORTING MATERIAL ANC I PERFORMING WORK IN TEAMSTER JURISCICTION:CUMP TRUCKS,'SIOE, END AND BCTTCM DUMP+ INCLUDING _ SEMI-TRUCKS AND TRAINS CR CCMBINATI•CNS ' THEREOF:OVER 20 YARDS TO AND INCL.•30 YARCS 730-0720 LOWEED AND HEAVY DUTY TRAILER: OVER 50 TONS 14-01 SAME'' GROSS TO AND INCLUDING 100 TONS GROSS -MARCH. 1980 WAGFRATES { -20 I y i ': f r Now- - ;• WY--R323?0-AA 1_ _ 01 PREVAILING MINIMUM HOURLY WAGE RATES MARCH 05, 1380 CCUPATION: TEAMSTERS LOCATION: CLALLAM, GRAYS HARBOR, ISLAND. JEFFERSCN, KING, KITSAP. KITTITAS, + LFWI5, MASON. PIERCE, SAN JUAN, SKAGIT, SNOHOMISH. ThURSTON. 1 WHATCOM AND YAKINA COUNTIES AND THOSE PORTIONS OF CHELAN, COLGLAS AND OKANOGAN COUNTIES WEST OF THE 120TF'NERICIAN AND THAT PORTION OF PACIFIC COUNTY NORTH OF THE WAFKIAKUM COLNTY NORTHERN BOUNDARY EXTENDED DUE WEST TO TFE PACIFIC OCEAN. i WAGE RATES OCCUPATION COCF GROUP 14 OCCUPATION DESCRIPTION 730-1520 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY CONSTR.:OVER E YDS. TO AND INCL. 2 YDS. GROUP 15 .730-0250 DUMPSTERS, AND SIMILAR EQUIPMENT:TOLRNO POCKERS, TOURNOWAGON. TCURNOTRAILER, CAT'DW SERIES, TERRA COBRA, LETOURAEAU, WESTINGHCUSE ATHEY WAGON, EUCLID, TWO AND FOUR-WFEELED POWER TRACTOR WTH TRAILER AND SIMILAR TOP- LOADED EQUIPMENT TRANSPORTING MATERIAL AND PERFORMING WORK IN TEAMSTER JURISDICTION:•CUNP TRUCKS, SIDE, END AND BOTTOM DUMP, INCLUDING SEMI-TRUCKS AND TRAINS OR CCMEINATICNS THEREOF:OVER 30 YARDS TO AND INCL. 40 YARCS 730-0730 LOWEED AND HEAVY DUTY TRAILER: OVER 100 TONS GROSS STATE FEDERAL RATE RATE 14.05 SAME 14.17 SAME 14.17 SAME NWY-832320-AA FREVAILING MINTHOP HCUNLY RAGE RATES -m-ARCH 05, 1980 OCCUPATION: TEAMSTERS LOCATION:.CLALLAN, GRAYS HAR80R. ISLAND,'JEFFERSCN, KING, KITSAP, KITTITAS, LF+:IS, MASON, PIERCE, SAN JUAN, SKAGIT, SNCHONISH, TFUPSTON, UHATCOM AND YAKIVA COUNTIES AND THOSE FORTIONS OF CHELAN; COLGLAS AND OKANOGAN COUNTIES VEST OF THE 120TF-PERICIAN AND THAT PORTION O PACIFIC COUNTY NORTH OF THE WAF-KIAKUV CO<NTY -NORTHERN BOUNDARY EXTENDED DBE WEST TO THE PACIFIC CCEAN. WAGE RATES OCCUPATION OCCUPATICN STATE FEDER/ COCE, DESCRIPTICN RATE RATF. i GRCUP 17 730-0?60 DUMFSTERS, AND SIMILAR EOUIFMENT:TOLRNO- 14-33 : SAN ROCKERS, TOURNOWAGON, TOURNCTRAILER, CAT CW SERIES, TERRA COBRA, LETOURNEAU. NESTINGHCUSE ATHEY WAGON, EUCLID, TWO AND FOUR-WFEELED PCWER TRACTOR WTH TRAILER AND SIMILAR TOP- LOADED EQUIPMENT TRANSPORTING MATERIAL AND PERFORMING WORK IN TEAMSTER JURISDICTION:CUPP TRUCKS, SIDE, END AND BCTTCN DUMP, INCLUDING SEf+I-TRUCKS AND TRAINS OR C•CNBINATICNS THEREOF:OVER 40 YARDS TO AND INCL. 55 YARDS GROUP 1R 730-1540 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 14.38 SAME r CONSTR.:OVER 10 YDS. TO AND INCL. 12 YDS. GROUP 19 730-1550 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 14.54 SAMI CCNSTR.:OVER 12 YDS. TO AND INCL. 16 YDS.. GROUP '20 14.70 SAMF 730-1560 TRANSIT-MIX :OVER US16 ED YEXCLUSIVELY INCL. HEAVY YD5. GROUP -21 730-1570 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 14.86 SAFE CONSTR.:OVER 20 YGS. -PARCH 19EO WAGERATES t •. -22- - :a„' .tom ix x,. V EEI r i ! r.l '?':•'J •?' gc PI M'r' 7 F `s i PROPOSAL PROPOSAL: To furnish all labor, tools, equipment and materials specified ] and necessary to construct and complete the improvement shown on the plans and described in the specifications for the County of Jefferson, State of Washington. NAME OF BIDDER =,V7EeSTATE ASP1444.7 CO. Xi)r- { . t ADDRESS OF BIDDER PC, SON 208- ABERDEEN, WA. 198620, To: Board of County Commissioners b Jefferson County Port Townsend, Washington 98368 The undersigned as bidder declares: That he has personally examined the site and premises of the proposed g 4 improvement and determined the amount and character of the work and material . 6 necessary to complete same in compliance with the accompanying contract, i plans and specifications. E That he has been regularly engaged in contract work of the class re- quired for the attached specifications for 28 years. The undersigned proposes and agrees if this proposal is accepted, to provide all necessary machinery, tools and equipment and all other means of construction to do all the work and in the manner therein prescribed and according to the requirements of the Engineer as therein set forth at and for the total sum set forth below which sum shall be adjusted in final settlement according to the amount of actual quantities in construction are increased or decreased from the amounts given in the list of quantities at and for the following unit prices. 7 -7 s y ? I I M: The Board of Jefferson County Commissioners Courthouse Port Townsend, {4A 98368 i Gentlemen:' E The undersigned hereby certifies that he has examined the location of the Clearwater Road Paving Project in the west end of Jefferson County and has read S and thoroughly understands the items of work and the specifications governing the work embraced in this improvement and the method by which payment will be made for said work and hereby proposes to undertake and complete the work embraced in this improvement in accordance with said items of work and specifications at the following rates and prices: tern Quantity No Unit Description Unit' Aunt . Price : 1 1 Ton Asphalt for Tack Coat 9SO00 95Q 2 1800 Ton.'. Asphalt Concrete Class h V including relevelin 4-1 - ?? 00 73380. - PROPOSAL t _l BID BOND KNOW ALL MEN BY THESE PRESENTS: That the undersigned Principal and Surety are held and firmly bound unto BOARD OF COUNTY COMMISSIONERS, JEFFERSON COUNTY, WA as Obligee in the penal amount of the deposit specified in the call for bids the payment of width the Principal and the Surety bind themselves, their heirs, executors, administra- tors, successors and assigns, jointly and severally; by these presents. WHEREAS, the Principal has submitted a bid for CRP 489, Clearwater Road Paving Project I I NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Prin- cipal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bondor bonds as maybe specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, then this obli- gation shall be null and void, otherwise to remain in full force and effect. Provided, how- ever, that if the principal's bid would otherwise be declared non-responsive by the Obligee solely because the wording in this bond varies from that which is specified in the call for bids, then this document is hereby amended to include the wording so specified. E SUMMA RY OF QUANTITIES Alf OGGIN. (.6V/7 /rEM .ATP K GaNC ETE MENr ( / k /BOp C(ASS /n {` I >: lS N - - _ c ~ 1 r t Q- 3 J i `~- - C[ASS F (ryfNN/N'6 GVL/.fSfl ' O. 20 POMP plfer•N ? - I I 9 v k /o Cr . ----------- .?j ROADWAY SECTION F F P.4 _CT II,Ci I. .'i i oa / F cvvwrr C.R.P. NO. les I ? T 51y CLEARWATER ROAD GINITY MAP COUNTY ROAD No. xoe 5pu!!fY/ENGINEER JEFFERSON COUNTY, WASH. Notice is hereby given that the Board of County Commissioners of Jef- ferson County, State of Washington, will receive sealed bids up until the fl hour of 10:00 a.m., Tuesday, August 19, 1980, at the office of the County Commissioners, Courthouse, Port Townsend, Washington, to be opened and publicly read at a meeting of the County Commissioners to be held that date for the improvement of 1.1 miles of the Clearwater Road, County Road No. 206, State Road Log No. 1075 by surfacing and various other work set forth in the plans and specifications for C.R.P. #489 now on file at the office of the Jefferson County Director of Public Works. Major items of work will be 1800 Tons Asphalt Concrete, Class F. Each bid shall be in accordance with plans and specifications now on file with the County Public Works Director, Courthouse, Port Townsend, WA, where copies may be obtained. Each bid shall be accompanied by cash, certified check or bid bond pay- able to the Treasurer of Jefferson County in the sum of 5% of the amount bid;" to be forfeited to the Jefferson County Highway Department by the suc- cessful bidder if he fails to enter into a contract and to file an accept- able surety bond in the amount of 100% of the contract amount within 10 FIR days after award. The Board of County Commissioners reserves the right to reject any or' all bids and to waive all informalities in the bidding, and to select the bid deemed most advantageous to the County. JEFFERSON COUNTY BOARD.OF COMMISSIPNERS A. M. O'Meara, Chairman SEAL: B. G. Brown, Member ATTEST: Carroll M. Mercer, member Betty J on, County Auditor and E O6lcio Clerk of the Board t .fi Q ( 4 V 'L 1 ff ! .. : I , _ - Cat! 1 , r rft ff. COUNT INTRODUCTION The followina amendments and tion with the standard speci: M adopted in February, 1977. All references made to 1 should be made to Jefferson P24ENDMENTS TO 9 The following amendments to t of this contract and supersed specifications. For informat amendment title indicates the the latest date of revision. SECTION 1-02, BID PROCEDURES i Prequalification of Bidders The third paragraph of sectior deleted and replaced by the.fc NOW, PROJECT 489 al provisions shall be used in conjunc- ons of the Department of Highways, shington State Department of Highways Department of Highways and its Director. 1NDARD SPECIFICATIONS k tndard specifications are made a part conflicting provisions of the standard purposes, the date following each mentation date of the amendment or NDITIONS (July 25, 1977) ` .1 of the standard specifications is 1g: Lj-le a standard form of Individual ProjectyStatementeofmJointlso Venture. If two or more prospective bidders desire to jointly qualify and bid jointly as a joint venture on more than one contract, they must submit a joint questionnaire and financial statement and also an agreement to joint venture. Any agreement to joint venture required to be filed shall be signed by each of the bidders, and must specify each individual who is authorized to execute other documents on behalf of the joint venture. cts Ifbanysofnthe J bidders is a corporation, any agreement to bid jointly on more IIII than one contract must be accompanied by a resolution of the corporation authorizing such + ? joint venture agreement and designat- ing the officer(s) authorized to sign such joint venture agree- - { ment or contract on behalf of such corporation. j ^j i ri 9 r ,r i r Irregular Proposals The second paragraph of section 1-02.13 of the standard specifications is revised to read as follows: ?j A proposal may be considered irregular and may be rejected by I I the Department for any of the following reasons: J (f) If the intended unit prices cannot be determined; l (g) If the proposal fails to include a unit price for every bid item; (h) If the Department, for good cause, deems the bid bond inadequate; (i) If the Department deems any of the unit prices to be excessively unbalanced either above or below the amount of a reasonable bid for the item of work to be performed to the potential detriment of the State; (j) If the receipt of addenda is not acknowledged on the proposal. - SECTION 1-03, AWARD AND EXECUTION OF CONTRACT (July 3, 1978) Consideration of Bids Section 1-03.1 of the standard specifications is supplemented by the i addition of the following new sentence after the second sentence: The Department will only acknowledge a unit bid price up to four places to the right of the decimal point. Any additional figures will be disregarded. Execution of Contract Section 1-03.3 of the standard specifications is supplemented by the following: At the discretion of the Secretary, pre-award information requested by the State under the provisions of section 1-02.15 not received before award of the contract shall be furnished by the Contractor prior to execution of the contract by the Secretary. I I SECTION 1-04, SCOPE OF THE WORK (March 20, 1978) Increased or Decreased Quantities j Section 1-04.6 of the standard specifications is supplemented by the I following: Conditions (1) and (2) above will not apply to contract items that are specified to be paid at a fixed unit price. -2- .. Lam.. ., I w •r Y _ vim" CD I SECTION 1-07, LEGAL RELATIONS AND RESPONSIBILITIES (March 20, 1978) Laws to be Observed The second and third paragraphs of section 1-07.1 of the standard specifications are deleted and replaced by the following: i No adjustment will be made in the amount to be paid by the State under the contract because of any change in laws, ordinances or regulations, except as specifically provided by the following: (1) Changes in laws, ordinances or regulations within the scope of RCW 39.04.120. (2) Changes in taxes on materials incorporated in or consumed for construction of the project which are imposed by the Federal or State Government, or changes in the State Sales Tax, provided that the aggregate I amount of all such changes is greater than $100.00 and; (a) for items included in the original contract, j the change takes places after the date of the bid opening, or (b) for negotiated contracts or for items covered by a supplemental agreement, the change takes place after the date on which the contract or supplemental agreement was executed. Compensation will be made by negotiated change order or by force account for any changes within the scope of RCW 39.04.120. Compensa- { tion will be increased or decreased for the actual dollar amount I of changes in Federal or State taxes meeting the requirements of j this section; provided, that the Contractor, if requested by the Engineer, certifies in writing that no amount for any such change in taxes was included in the contract price as a contin- gency reserve or otherwise; and provided further that the Contractor allow the State to audit his records to the extent necessary to substantiate any claim for compensation under the provisions of this section. The last paragraph of section 1-07.1 of the standard specifications is supplemented by the following: It is also recognized that the commission, in carrying out its contractual responsibilities, will assist other agencies which have responsibility for the interpretation and enforcement of any laws, rules and ordinances to assure compliance therewith and to avoid usurping the authority delegated tosuch agencies by law. The Engineer will notify the Contractor and the responsible agency of any noted serious violations of any such laws, rules and ordinances and will assist responsible agencies in enforcement to the extent that such assistance is consistent with the terms and provisions of the contract. -3- i f Y i r SECTION 1-08, PROSECUTION AND PROGRESS ( July 3, 1978) Subcontracting The last sentence of the third paragraph of section 1-08.1 of the { standard specifications is revised to read: n on work that may be performed by an agent shall 250 li itati Th e m o not apply to driving piles, furnishing and driving test piles or installation of steel reinforcing bars. r Time for Completion The second sentence of the first paragraph of section 1-08.5 of the standard specifications is revised to read: The contract time shall start with the first working day following the 25th day after award of the contract, or the first working day following execution of the contract by the Secretary, which- ever occurs last; or, such other day which may be specified in a the special provisions. i Liquidated Damages The schedule in the second paragraph of section 1-08.9 of the standard specifications is revised to read: ORIGINAL CONTRACT AMOUNT LIQUIDATED DAMAGES From more To and Per Than Including Working Day i $ 0 25,000 $ 63 + 25,000 50,000 105 j 50,000 100,000 154 i 100,000 500,000 210 500,000 1,000,000 315 1,000,000 2,000,000 420 2,000,000 5,000,000 630 5,000,000 10,000,000 840 10,000,000 and more 980 SECTION 1-09, MEASUREMENT AND PAYMENT (October 13, 1978) Measurement of Quantities i The last paragraph of section 1-09.1 of the standard specifications is revised to read: No measurement will be made for work performed or materials placed outside of lines indicated on the plans or established by the Engineer; materials wasted, used or disposed of in a manner not called for under the contract; rejected materials, including „I material rejected after it has been placed, by reason of the failure of the Contractor to conform to the provisions of the 1 contract; hauling and disposing of rejected materials; material ' -4- r. H;.yl' ,i .tir ? r y emaining on hand after completion of the work except as provided i n section 1-09.10 of the standard specifications; or any other work or material, payment for which is contrary to any provision of the contract. Scope of Payment Section 1-09.3 of the standard specifications is supplemented by the following: It shall be understood that all pluralized payment items appearing in these specifications are changed to a singular form. It shall also be understood that certain payment items appearing in these specifications may be modified on the plans and proposal ' to include: 1. The words "For Structure" or "For Median Barrier " etc , . with the intent of clarifying where a specific item of work is to be performed. 2. The words " - Site (Site Designation)," with the intent ' I of clarifying where a specific item of work is to be performed. Modification of payment items in this manner shall in no way change the intent of the specifications relating to these items. Payments The fifth paragraph of section 1-09.9 of the standard specifications is supplemented to include the following new sentences: f i For the convenience of the parties to this contract it is mutually l i agreed by the parties that any claims or causes of action which - the Contractor has against the State of Washington arising from this contract shall be brought within 180 calendar days from the date of final acceptance of the contract by the State of Washington; and it is further agreed that any such claims or causes of action I shall be ? j brought only in the Superior Court of Jefferson County. The parties understand and agree that the Contractor's failure to bring suit within the time period provided, shall be a complete b t ar o any such claims or causes of action. Section 1-09 of the standard specifications is supplemented to include the followin i g new sect on: 1-09.10 Payment for Surplus Processed Materials If, at the completion of work under the contract, materials produced by the Contractor from State furnished material i sources n excess of the needs of the contract are on hand, such materials may be disposed of by one of the following methods: 1. The Contractor shall first contact the Engineer to l determine if the State has a need for the surplus materials either for maintena nce purposes or for use on a future -5- ,. J J ' f r ? . I ... 11 contract. If the State agrees to purchase such surplus materials, a price will be negotiated to reimburse the contractor for his production costs. r 2. If the State determines that it does not have a need for the surplus materials, the Contractor may request that such materials be disposed of at public auction. In that event, the State will conduct the auction and return the monetary proceeds thereof to the Contractor after having first deducted the value of the raw materials as determined by the fair market value or the State's unamortized or royalty cost, whichever is greater. Under no circumstances will the amount per unit returned to the Contractor be in excess of his unit bid price, if applicable, or his cost of production. I The procedure described above is applicable only to those materials _ i i which are produced for the contract, but limited to 10 percent in I excess of the plan quantity or the plan quantity as adjusted by change order. Any surplus material which is not disposed of by one of the above described methods prior to acceptance of the contract by the . Secretary shall be left at the site and will remain under State ownership without compensation to the Contractor. SECTION 5-02, BITUMINOUS SURFACE TREATMENT (May 23, 1977) Application of Asphalt The following paragraph is added immediately following the table for Application Rate of Asphalt in section 5-02.3(3) of the standard j specifications: The application rates tabulated above shall be used for cutback asphalts. When asphalt emulsions are specified, the application rate shall be increased to 50% above that shown in the table. I i SECTION 5-04, ASPHALT CONCRETE PAVEMENT (October 13, 1978) Materials The second paragraph of section 5-04.2 of the standard specifications is revised to read: The various mineral materials may be furnished in whole or in part by the State for the manufacture of asphalt concrete, or the Contractor may be required to furnish them. If any of these mineral materials are not provided by the State, it shall be understood that the Contractor will furnish such materials in the amounts required for the designated mix. Mineral materials shall include coarse and fine aggregates, blending sand and, when required by the Engineer, mineral filler. -6- r f Requirements for Rotary Drum Plants Subparagraph No. 1 of section 5-04.3(1)D of the standard specifications is revised to read: The plant shall have a feeder capable of uniformly introducing the aggregate into the drum. The aggregate feeder shall be synchronized with the asphalt material feed. Satisfactory means shall be provided to afford positive interlocking control between each aggregate cold feed bin aggregate feed, and the asphalt feed so that the plant will automatically stop if the feed of I either aggregate or asphalt is interrupted. i Asphalt Pavers The last sentence of the fourth paragraph of section 5-04.3(3) of the I standard specifications is revised to read: The sensor shall be so constructed that it will operate from a I reference line or a multi-footed ski-like arrangement. 1 The third and fourth sentences of the seventh paragraph of section 5-04.3(3) of the standard specifications are revised to read: kk The grade and slope for intermediate lanes shall be controlled automatically from reference lines or by means of a multi-footed ski and a slope control device. When the finish of the grade prepared for paving is superior to the established tolerances, ? and, when in the opinion of the Engineer, further improvement to the line, grade, cross section and smoothness can best be achieved without the use of a reference line, a multi-footed ski-like arrangement may be substituted subject to the continued approval i of the Engineer. Preparation of'Asphalt, Concrete or Brick Surfaces The second paragraph of section 5-04.3(5)A of the standard specifications is supplemented to include the following new sentence: When asphalt concrete pavement Class D is being constructed, a tack coat of CRS-2 shall be applied to the existing surface at a rate of 0.12 to 0.20 (0.08 to 0.12 residual) gallons per square yard or as otherwise directed by the Engineer. Mixing The first sentence of the third paragraph of section 5-04.3(8) of the standard specifications is revised to read: j When discharged, the temperature of the mix shall not exceed 300 degrees F. except that the temperature for mixes designed for j Asphalt Concrete Class D shall not exceed 260 degrees F. Section 5-04.3(8) of the standard specifications is supplemented to include the following new paragraph: j I -7- I !I a y I f 44 A job mix design will be prepared for Asphalt Concrete Class D by the State's Materials Laboratory in Olympia when a representative _ > quantity of crushed mineral aggregate has been produced. A maximum of 10 working days will be required for the initial mix design. Production of the Asphalt Concrete Pavement Class D may l not commence until the job mix design and mixing temperature have i been established. i Spreading and Finishing The last paragraph of section 5-04.3(9) of the standard specifications is revised to read: When the asphalt mixture is being produced by more than one j asphalt plant, the material produced by each plant shall be placed by separate spreading and compacting equipment. j Ffeater-Planing Bituminous Pavement The title of section 5-04.3(14) of the standard specifications is revised to read Planing Bituminous Pavement. The second sentence of the first paragraph of section 5-04.3(14) of yI the standard specifications is revised to read: The planer shall not be used on the final wearing course of pavement. The second paragraph of section 5-04.3(14) of the standard specifications is revised to read: The manner of performing the work shall be such that the pavement is not torn, broken, burned or otherwise injured by the planing operations. ` The first sentence of the third paragraph of section 5-04.3(14) of the I standard specifications is revised to read: 4 ? All cuttings or other debris resulting from the planing operations shall be disposed of by the Contractor to the satisfaction of the Engineer. The fifth paragraph of section 5-04.3(14) of the standard specifications is deleted and replaced by the following: The planer shall be approved by the Engineer prior to use on the contract. ° Weather Limitations Section 5-04.3(16) of the standard specifications is supplemented to include the following new paragraph: Asphalt Concrete Class D shall not be placed when the air tempera- ture is less than 60 degrees F. -8- _ ? r .. ,? ,. r Paving Under Traffic The last paragraph of section 5-04.3(17) of the standard specifications is revised to read: All costs in connection with performing the work in accordance with these requirements, except the cost of temporary striping, shall be considered incidental to the work involved and shall be included in the unit contract prices for the various pay items involved in the contract. Sealing of Driving Surfaces ` .. The second sentence of section 5-04.3(.19) of the standard specifications is revised to read: When the results of airflow and in-place density testing show that ' a seal is needed, or when the surface course is Asphalt Concrete Class D, the Contractor shall apply a fog seal of CSS-1 applied at the rate of 0.05 to 0.10 (0.03 to 0.05 residual) gallons per square yard. Measurement The ninth paragraph of section 5-04.4 of the standard specifications is deleted. The eleventh paragraph of section 5-04.4 of the standard specifications is revised to read: 1 Planing bituminous pavement will be measured by the square yard. I Section 5-04.4 of the standard specifications is supplemented by the following: j i ,- Temporary striping will be measured by the actual linear footage of stripes installed. Center stripes and lane stripes will be measured as a continuous line with no deduction for the unstriped area caused by the skip pattern as specified. Payment Item 2 under the first paragraph of section 5-04.5 of the standard specifications is revised to read: 2. "Asphalt (grade)," per ton. Item 8 under the first paragraph of section 5-04.5 of the standard specifications is deleted. Item 10 under the first paragraph of section 5-04.5 of the standard specifications is revised to read: 10. "Planing Bituminous Pavement," per square yard. The first line of the third paragraph of section 5-04.5 of the standard specifications is revised to read: -9- f . I ?Lj i Y J , r 1 { The unit contract price per ton for "Asphalt (grade)" for prime coat of the The eighth and ninth paragraphs of section 5-04.5 of the standard specifications are revised to read: If the Contractor is required to furnish the aggregates, all costs of furnishing, hauling and processing aggregates and blending sand into the complete mix shall be included in the unit contract price per ton for Asphalt Concrete Pavement" of the class specified, } except that blending sand when set up as a bid item will be paid I for in the manner described below. At the discretion of the Engineer, the Contractor may be required to include mineral filler in the mix. All costs of furnishing, hauling and incorporating the mineral filler into the mix will be paid for in the manner described below. If any of the aggregates are furnished in stockpile by the State the cost of hauling and incorporating those aggregates in the mix, { and all costs of furnishing, hauling, and incorporating the necessary blending sand and any additional aggregate in the complete mix shall be included in the unit contract price per ton for "Asphalt Concrete Pavement" of the class specified, except that blending sand, when set up as a bid item, will be paid for in the manner ' described below. At the discretion of the Engineer, the Contractor may be required to include mineral filler in the mix. All costs for furnishing, hauling and incorporating the mineral filler into the mix will be paid for in the manner described below. The twelfth paragraph of section 5-04.5 of the standard specifications is revised to read: I Mineral filler, if required, will be paid for at the price agreed { by the parties or by force account as specified in section 1-09. { The thirteenth paragraph of section 5-04.5 of the standard specifications is hereby revised to read: The unit contract price per square yard for "Planing Bituminous Pavement" shall be full compensation for furnishing all tools, - equipment, labor, materials, supplies, and incidentals necessary to accomplish the work in accordance with the specifications, including the removal and disposal of all cuttings and debris, and for all other costs required to accomplish the work. Section 5-04.5 of the standard specifications is supplemented by the following: "Temporary Striping", per linear foot. "Removing Temporary Striping", per linear foot. The unit contract price per linear foot for "Temporary Striping" shall be full compensation for furnishing all labor, material, tools and equipment necessary to construct and maintain temporary striping as specified. -10- d e_ 1 F c The unit contract price per linear foot for "Removing Temporary F Striping" shall be full compensation for furnishing all labor, tools and equipment necessary to remove temporary striping as F specified. ? a SECTION 9-03, AGGREGATES (October 13, 1978) ` I ' Grading I The table in the second paragraph of section 9-03.1(2)B of the standard specifications is revised to read: ` Percent Passing ire Sieve Number maximum Minimum 4 100 95 6 98 82 8 86 68 16 65 47 ( 30 42 27 50 20.0 9.0 100 7.0 0 200 2.5 0 Use of Substandard Gradings The table in the second paragraph of section 9-03.1(2)C of the standard specificati s i on s revised to read: Passing No. 8 . . . . . . . . . . 95% Passing No. 16 . . . . . . . . . . 80% Passing No. 30 . . . . . . . . . . 60% Passing No. 50 . . . . . . . . . . 20% Passing No. 200 . . . . . . . . . . 2.5% Grading and Quality The table in section 9-03.4(2) of the standard specifications is supplemented to include 100 percent passing the 1/2 inch square sieve under the column entitled 3/8 inch - #10. Gradation - Future Use Section 9-03(8)A of the standard specifications is revised to read section 9-03.8(3)A. The coarse aggregate and fine aggregate tables for asphalt concrete class B and class D in section 9-03.8(3)A of the standard specifications are revised to read: i j j j - YF AI } ? t I. r', r l i COARSE AGGREGATE Class of Asphalt Concrete B Size Designation 5/8"-1/4" % Passing 5/8" Square Opening . . . . . . 100 • % Passing 1/2" Square Opening . . . . . . 72-100 % Passing 3/8" Square Opening . . . 28-72 % Passing 1/4" Square Opening . . . . . . . 0-28 8 Passing U. S. No. 10 Sieve . . . . . . . . 0-2 FINE AGGREGATE Class of Asphalt Concrete B D Size D'esignatibh 1/4"-0 3/8'1-0 % Passing 3/8" Square Opening 100 100 % Passing 1/4" Square Opening . . . . . . 85-100 % Passing U. S. No. 4 Sieve . . . . . . . ... 30-50 % Passing U. S. No. 8 Sieve . . . . . . 5-15 8 Passing U. S. No. 10 Sieve. . . . 50-70 % Passing U. S. No. 40 Sieve. . . . . . 18-36 % Passing U. S. No. 80 Sieve. . . . . . . 10-22 % Passing U. S. No. 200 Sieve . . . . . . 5-9 2-5 Test Requirements The minimum percent fracture for Asphalt Concrete Class D table of section 9-03 8(2) f h in the first . o t e standard specifications Section 9-03.8(2) of the standard specifications is supple is deleted. mented to include the following new paragraph following the first pa the fi t b ragraph in rs ta le: For Asphalt Concrete Class D, the fracture requiremen ts on the U. S. No. 8 sieve and above are a minimum 75 percent least two mechanically fractured faces a d 90 with at n percent least one mechanically fractured face. with at Gradation-Immediate Use-Screenless Plants The gradation limits for Asphalt Concrete Class D shown in the table in section 9-03.8(3)C of the standard specifications are revised to read: SINGLE STOCKPILE FOR SCREENLESS PLANTS PERCENTAGE BY WEIGHT PASSING SIEVES SIEVE SIZE CLASS OF ARPHrr.m rnvrnvmn b s Blending Sand The first paragraph of section 9-03.8(4) of the standard specifications" i i s rev sed to read: In the production of mineral aggregate for asphalt concrete there is often a deficienc of x, y material passing the U. S. No. 40 sieve. When this occurs, blending sand in an am ount specified by the Engineer may be used to make up this deficiency, provided, { however that i , a sat sfactory final mix shall be produced, including i pertinent fracture requirements Th b . e lending sand shall be stockpiled prior to the production of the asphalt concrete or payment for aggregates as materials on hand. Proportions of Materials The grading and asphalt requirements for Asphalt Concrete Class D shown in the tabl i e n section 9-03.8(6) of the standard specifications are revised to read: D .. 3/8" Sieve (Square Opening) 100 U. S. No. 4 Sieve 30-50 U. S. No. 8 Sieve 5-15 U. S. No. 200 Sieve 2-5 1 l i Asphalt % of Total Mixture 5.5-8.5 {{ { i I i f 13- i I y 1 -- - ' ; v SPECIAL PROVISIONS } The following special provisions supersede any conflicting provisions of the a standard specifications, and the foregoing amendments to the standard specifi- cations and are nude a part of this contract. I ; DATE OF OPINING BIDS { Sealed bids will be received up until the hour os 10:00 A.M., Tuesday, August 1 1980, at the Office of the County Commissioners, Jefferson County Courthouse, 19, Port Townsend, Washington 98368, at which time the bids will be publicly opened , 1 and read. DESCRIPTION OF WORK The contemplated work to be performed under this contract consists of the improve- ment of 1.1 miles of Clearwater Road and other work, all in accordance with the attached plans, these special provisions and the standard specifications. STATE SALES TAX The work on this contract is to be performed upon lands whose ownership obligates the Contractor to pay State Sales Tax. The provisions of section 1-07.2(1) of the A standard specifications apply. E WAGE RATES In compliance With the provisions of section 1-07.9 of the standard specifications, a list of hourly minimum wate rates is incorporated in and nude a part of these specifications. SPECIFIC EQUAL EMPLOYMIENVT OPPORTUNITY RESPONSIBILITIES 4 Equal employment opportunity requirements not to discriminate and to take affirma- tive action to assure equal employment opportunity as required by the Governor's { Executive Order DO-70-01 are set forth in the standard specifications and shall F constitute the specc affirmative action requirements for project activities under this contract. The requirements set forth in sections 1-07.11(1) through 1.07.11(10) of the standard specifications shall constitute the specific affirma- tive action requirements for project activities under this contract. 4 EMPLOYAENT OPENINGS The provisions of section 1-07.28 of the standard specifications are deleted for this project. TIME FOR COMPLETION This project shall be completed in accordance with the provisions of section 1-08 of the standard specifications within 10 working days, PAVEMENT EDGE The Contractor shall protect the finished paved edge of pavement by utilizing the available roadside materials and reshaping the shoulder area. This shall be in- cidental to and included in the unit contract price for Item No. 2. -14- ?', ?; ???'? 4 ???? ? ???:??:u???,? i. •. _ . .:. ?, ?:1 ?. $: 'd"?d,?h?Af?'?fi? u;{?`r??4'f^„??^j??r??r?r'V???^ ? ? t , ? 2?'?1? ?i ? ? ?s ?r: ?i . ? t f`' v ?? ? .? sK" F? T ` W { :? ? ?. 111 ' h m ? T) -17??1'???'r . t y ? fry rlj-*--- 71 7 , i r C co ' 1 W J J Z J F?+ - ? - . ? ? 5.e ?a U W w.?Z _ r r a? ? ,r- r w }' t k r } q S .r4'r ? Q - ! f x° 178504 WASHINGTON STATE HIGHWAY COMMISSION Lab, No. s MAfERIALS LABORATORYW DEPARTMENT OF HIGHWAYS I Pit No.? - t / 1655 So. 2nd Avenue E Organization Code ? 3 Tumwater, Washington 98504 Place W Date r43 Rn Contract No. C.S. No, S/R. N . o. Rd. F.A. No. Contractor - 7 Errs °? : Section -C: e'Z' /T U`I ![t/i Ie2 Sub. Contr. Forwarded by: J Tl/T Control Sample No. Z of ?l G Brand I.D. No. Qu antity Represented ?Z-0 7r2n?.5 Sampled by 5? - q }? Date Sampled FBI Sampled at r Stkpl. No. ; Used a[: Sta. to Sta. - Stockpiled for: immediate ; future • use in Pit No, - Date Tested ? 9-/19- c9 6 Field: (Acceptance 1 (Rejection 1 based on -a d / , F7 j( / //G!' 7Ri A TI Material held pending laboratory report Aggregates: washed ; scalped ; neither ASPHALT ROAD MATERIALS (Fill out all columns) CERTIFICATE NO. TRUCK CAR NO. Mix D GATE RECEIVED PLACE REC esign Desired S• EIVED N E USE STA. _STA. ASPH, MIX CL. ;base :leveling ; wearing ;course In mix Asph lan % ext S• % I Field Test Results _ Report all screens used: - . . p ; . - . T #-, SClCenS 3 Z ?Q ZU MISCELLANEOUS % Pass [r G, R 3 F roctura: Fine % Coarse % Specs. ?) ?d ] 30 L - Send. Equiv. t {f O ther: Sieving: we[ ? dry ? k Remarks: f. FORM 35-56 HWY RE V ISED O/) 4IR.F. 36.a 1I PP/ act Eg (•--`-r-? ="14W Ii ¢ While Copy With Sam le 5 p /lphq ¢ No - 15 -z••^ Yellow Copy for Prol. Files I C.D. I 4- - S E P G 1980 ;IMC?T i! TEST OF ASPHALT IXTURE _ Lab No. 6 i .`, FIEL LABORATORY EXTRACTION ANALYS IS LABORATORY COMPACTION SIEVES 56 PASS CLASSE CL,ASS_13 - Cl-HSS_? 1.1/4„ Square ..................... S&e 100 I I r i. i- 1?4116 1" Sq uars ........................... 90-100 518" Squa ra ........................ 67.96 100 1/2"Square ........................ 60.80 90.100 3/8" Square ........................ 75.90 1/4" So.. re ........................ 40-62 55.75 US No. 10 ........................... 25<0 32-48 US No. 40 ........................... 10.23 11.24 US No. 80 ........................... 6.14 6.15 US No. 200 ......................... 2.9 3.7 Asphalt Cement % .............. 3.5.7 4.0.7.5 -• I 1 j RESULTS RECOMMENDED RANGE 5 011 or{j 7 etar Conesio meter ¢ Vold ""'D Calculated S/S Ratio Wt./Cu. FL Max. Density (RICO) 1785 03 WASHINGTON STATE HIGHWAY COMMISSIO Lab- Nod e MATERIALS LABORATORY DEPARTMENT OF HIGHWAYS Pi PS ?f N 1655 So. 2nd Avenuq Tumwater Washington 96504 A//1 t o. J Q (? q Organization C?adas . LsiC/Q /LtP! C" ! , Place . L Date Con[ra:t No. • 'jC? P 4?? C.S. No. No./CoRd. 7-? - F.A. No. Contractor n7f C _ - Section r -y ?'LL7?7 e4 ;a??e; C7 Y[tfJ r41 Sub, Contr. Forwarded by: 7r.f? dtr Control Sample No. of Brand I.D. No._ Quantity Represented Sampled by OAS Data Sampled 7 s?0 Sampled - , Stkpl. No, : Used at: Sta. to Sta. Stockpiled for: immediate ; future ;use In Pit No _ eta Tested 1 7 _ ? - Field: (Acceptance ) (Rejection / 1 based on U/ C K fCj( 7/G?.7 i UN l 1 Material held pending laboratory report Aggregates: washed ; scalped neither ASPHALT ROAD MATERIALS (Fill out all columns) Mix Design Desired CERTIFICATE NO. TRUCH CAR NO. ATE RECEIVED PLACE RECEIVED WHERE uT 2J STA.- 5TA. ASPH. MIX CL _ ;base ;leveling wearing _ ;course. Asph. i m x: pla -LAA; ext. - Field Test Results _ Report all screens used: - SCleCnS L / ?Q 00 MISCELLANEOUS % Pass /40 1 74 1 8 acturo: Fine %COarse % LP,-c',. 100 gn•-lae U - 1',5 Sand. Eluiv, 5 ? Other: Sieving: wet ? dry 0 r 7 S, 9 ? Remarks: ? FORM 350.056 (H.F.26.81 ) HWY REVISED 10/74 Project Engineer White COPY With Sample Uo ep One NO ?- ?? S? -1z- 3 Yellow Copy for Prbl• Fllef - 2 SEP ?- . f3 39??8 J I I TEST OF ASPHAL XTURE Lab No.B a?632 I (99 )LABORATORY EXTRACTION ANALYSIS LABORATORY COMPACTION 1 SIEVES %PASS CLASS E CLASS B CLASS 1.1/4•• SO us re ..................... ?CQ. 100 Sa • { 1'•SOuare ........................... use. 90.100 ?r t t/I - /T42O S7t 5/8•' Square ........................ 67-86 100 1/2" SOU. .......................... 60.80 90.100 3/8•• Sau• re ........................ - 75.90 1/4•'Square ........................ 40.62 55.75 US No. 10 ........................... 25.0 3248 US No. 40 ......:.................... 30.23 11.24 US No. 00 ........................... 6.14 6.15 US No. 200 ......................... 2.9 3-7 As halt Cement % ............... 3.5.7 4.0.7.5 RESULTS RECOMMENDED RANGE Stabllom eler A Coheslometer - IL ,. Voltl estud atetl S/S Ratio - Wt./Cu. Ft. 4. ansllY (Rlc11 - _- / / 1 ----_ Material meets specification requirements -- except where marked does not meet L-#-4. S34r.?ri;e? Ts7': ?eer. IQ ?? , OISTRIBUTIONt /? ? ' Mat'I, FIRS ....................................... R. V. LeCLERC, P.E. Gen'I. FINS ................ .. .....................y eriels Enp' ear Mat - - Dist. Admin............??.yy.w3.I . .. ..........x P E llfi Cf ?]L ?. ,. rol. nq ............. . ..............X Date SFP 3 0 1980 By t:nnsfr Ener . ....... . x Dht. Mat•I. Engr. p. G/L4R1?... ........71 ........................................................... ooT FORM 5e';P ,4 - ono No. 294.7107 . _ ;#. 7 I 41 ? r . t r V ,`? b Y., to ? I J a I 'Tumwater, Washington 98504 Place t QS N /JR - Organization Code 3?sFSi o 111lLY!_/Q H L A? Date 9_ 17 0 , ?,R Contra TTCt No. ??/APR `„C ? . o. /? R,NoCo. Rrd ?1- i S U 17P ^ F.A. No. Contractor..C[J 7 ?7E' i ect on l J pit t:/ YKU IfC Sub. Contr. F-arded by; J><-.74 r ?.f!^ Control Sam le No of G[ n B G 5-62 p , _.A_.? 7 rand - S $ J I.D. No. Quantity Represented Z C.. Sampled by _ cl Oata Sampled 9-/7-40 Sampled at 15 ?- i , Stkpl, No. ; Used at: Ste, _ to Sta, ? Stockpiled loc. immediate ? ;future _ • use in Pi[ No. Data Tested . Field; (Acceptance T_I(Rejection )based on .-P-L/??J -./m .?w1 1 Material held pending laboratory report Aggregates: washed ; scalped = either ASPHALT ROAD MATERIALS (Fill out all columns) Mix Design Desired CERTIFICATE NO. Tq UCH CAR NO. DATE RECEIVED PLACE RECEIVED WH ERE US p STA.-STA. ASPH. MIX CL. ;base ;leveling wearing _ ;course. Asph, in : pia %; ext. %. Field Test Results _ Report all screens used: - Screens % Pass - MISCELLANEOUS ... racture: Fine %Coarse % Specs. Sand. E9uiv. Remarks: While Copy with Sample Yellow Copy for Proj. Film TEST OF ASPHALTS z s.e s ) /Project Engineer - ?I t Phone No. ..1 ' wet -75>J SEP241980 Leb. No. FNId renemitbl TEST RESULTS ever No. / Cart No, Dete Sem led P Abe. Vie. of Rm. of 140 • F lee C.O.C. Flash Point • F Speciflamlon DISTRIBUTION: - Mel•I. Files Gen'I, Files Dist.Aslm' Proj, Engr, Dist. Met'l. Engr. 00T wiv mio 2 i L? ' WASHINGTON STATE Sheet 1 of 1 OEPARTAt EN-1- OF TRANSIICR'I-ATION _ Doe 9-2-80 CHANGE ORDER Ordered by Engineer under terms of Section 1 04. 4 ® of the Standard Spaufications ? Change proposed by Contractor ant,; t Nn Interstate Asphalt Co., ] P. 0. Box 208 Endorsed by: Inver xrate_Asphalt ?o , Inc _ Aberdeen WA 98520 r F'i- Numr Cu",-- ._ __ '' 09-10-80 arr mrr Co. Rd. 206, Stat lien Rout, Title Asst. aec.-Treas. Fraor UAtoN Cnuenrpina hvdurrry:/ulmnra•yuirrJ/ , o. prai%clnue -Clearwater-_Rosn4 f By. ''- ..... ............ .............................. ....................DESCRIPTION OF WORK ............. ......... .. ............. You ore ordered to perform the following described work upon receipt of an approved copy of this change order: Add Item No. 3 Quantity: 228 S.Y. Patching @ $10.00/S.Y. r, Special Provision: ' Patching shall be done at places as marked by the Engineer on the roa the area to a minimum six (6) inch depth. Patching area is to then be coo means to provide an unyielding base. Patch to be filled in with asphalt c in not more than three (3) inch lifts. All labor and equipment to be paid L'r bid price, "Patching" per square yard. Asphalt Concrete used will be paid ` price Asphalt Concrete,_Class F, per ton, as bid. All work, materials and measuromem to be in accordance with the proy,sions of the Standard Specifications and Special Provisia r tion involved, DISTRICT APPROVAL ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE E! ? REQUIRED AMOUNT AMOUNT THIS ORDER i( V HEADQUARTERS ? REQUREDL S 74,930.00 - $ 74,930.00 S +2,280.00 S 77; DISTRICT USE HEADQUARTER'S USE APPROVAL RECOMMENDED l'n jrar l.neinrrr Uem APPROVED: ? ?JLL4y- ?4YUFYGIi NO (j n•Qinear ? APPROVAL RECOMMENDED ? APPROVED / n / _ Jr.?FFER?•G ?o, 1 DISTRICT ADMINISTRATOR By Den.' - - P toe,. ,l m! DOT vIV Slp V lV K.ICRO DATA OLYMPIA 46R•J]Do T T ', e?nn ? v i? +0 5?1I "?':?A?t fSTIRp ; ^ r tF`:;tT? 759 , rt ' .r 'v ` w. x' i ORIGINAL ` Change Order 1 Number CRP 489 _. Log 10750 ding i ay by excavating cted by such (Crete, Class F, or at the unit the unit for the type of construo 1ATED CONTRACT L AFTER CHANGE - 10.00 Wa ',J ' h ?1r hr 4 a? IIr + ?J r y I J f T mn?R RESOLUTION N0. 104-80 w COUNTY ROAD PROJECT N0. 489 RPFOM THE BOARD OF JEFFERSON COUNTY COKIISSIONERS OF JEFFERSON COUNTY, WASHINGTON. In the matter of initiating a county road project designated as C.R.P. 489 It is hereby resolved that the Co. Rd. No. 206 . Clearwater Road, State Road Log # 10750 from Milepoint3.00 to Milepoint 4.13 be improved as follows: asphalt concrete overlay j It is further resolved that an appropriation from the officially adopted road fund budget and based on the county engineer's estimate is hereby made in the amounts and for the purpose shown: PURPOSE AMOUNT OF APPROPRIATION ` - Engineering 4,000.00 Right of Way Acquisition Sub Total 4,000.00 Construction: Contract 80,000.00 County Forces O Total 84,000.00 This project is included in the officially adopted annual road program as Item # ® The project is hereby made a part of the officially adopted annual road j program in accordance with RCW 36.81.130. It is further resolved that: g The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq. The construction is to be accomplished by county forces in accordance with R.C.W. 36.77/060 and WAC 136-18. Adopted this flay of August 1980 BOARD OF JEFFERSON COUNTY COMMISSIONERS Lr.?r i - I Chairman SEAL Dfe er ///??//? ATTEST: Member L ty an Ex-o fficio Clerk ooard _ r r, RESOLUTION NO. 104-80 COUNTY ROAD PROJECT NO. 489 srrOXE THE BOARD OF JEFFERSON COUNTY COKIISSIONERS OF JEFFERSON COUNTY, WASHINGTON. In the matter of initiating a county road pro Pct designated as C.R.P. 489 - It is herebyresolv?edthat the ?• Rd. NO. 206 , Cleaxwater Road, State Road Log # lam from Milepointd-uu to Nilepoint 4-13 be improved as follows: asphalt concrete overlay It is further resolved that an appropriation from the officially adopted road fund j budget and based on the county engineer's estimate is hereby made in the amounts and for the purpose shown: f PURPOSE AMOUNT OF APPROPRIATION tI`f Engineering 4,000.00 Right of Way Acquisition f Sub Total 4,000.00 Contract ® 000.00 Construction: County Forces O? Total 84,000.00 0 This project is included in the officially adopted annual road program as Item # The project is hereby made a part of the officially adopted annual road program in accordance with RCW 36.81.130. r It is further resolved that: t 0 The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq. The construction is to be accomplished by county forces in accordance with R.C.W. 36.77/060 and WAC 136-18. Adopted this Zu day of Aught 1980 BOARD OF JEFFERSON COUNTY COMMISSIONERS ai man ' Cir SEAL Me?er - ATTEST: Memt)er i Cou ty Auditor an Ex-officio C1 rk of the Board U <fi Ja r ? 2z S ?aa ?? n, /s ro e az Q k i V i 27 5 E9 2L 25 ? 30 ,29 Q ,? Z i ? r• '? ''; ? i , 3J 36 3/ 32 3 IPE_ /f.qy?' ? ? 1 ? 1 k ? orn . i ? ?, E Tab- rv 77 -f /V L? 00 AL AL K I / o C 5 jet, a 15 a € `a EN F PR CT n b22 ,J` 23 ?\ 24 7c e f 1 20 Al 013 2/ 22 ? ? ,? PC/?c^F S 2S / D z7 a _ -7,00 G CRAVSr RBOR COUN TY ?5 o r'°5 VICINITY MAP - ------ ------- ------ ] I a SUMMARY OF QUANTITIES R 2 /+sPN LT/C CONCgETF pIY ME yT . 2 /BOO ToN CLASS /A CE /O' /O, Y R/ SC'E.. (`yEAR/NC MURSEJ.. _ 9 k. _ /O COMP. OFPTN C?BB CCASS I CPRE[EYEG/AG) - YAq. f1oMP. OEPTN • 7' L&A a^'??p- r /S S'f •?6 ? CEX/ST/NG P.IYEMENT ??i? v<. ? I f ROADWAY' SECTION 1 F PR CT I ai zz ' R SALSS /FF LRJON 'CTf ???Of w?/?4?® aeon coaNrr w C.R.P. NO. 4e9 S1 CLEARWATER ROAD NITY MAP COUNTY ROAD NO. 206' C U Y, ENGINEER JEFFERSON COUNTY WASH. L? R FSO LUY"LN X 0..101.60 - .. : ? Co unty R? 1O ast No. 4D9 l ... Before ;..:i Board of Jef-' f ' Aff idavit of Publication erson County , ,. Commis- ;stoners of Jefferson. Court.' j 'ty, Wasflingn. STATE OF WASHINGTON) { ;Ins the matter of tn• COUNTY OF JEFFERSON)— Itiating a county rood pro, - ,? lect-designated as C.R,P,', FRANK W. GARBED, being sworn, says he Is the f 489. It Is hereby resolved' publisher of the Port Townsend Leader, a weekly that the Co. Rd: No„ 206;1 Clearwater Road, State shed newspaper which has been eslsbllrtimr usly as a In the English language and clrculatetl continuously as a weekly In said County news a er In the town of Port Townsend " Road Log No. 10750, from , p p and State, and for general circulation in said county for Mflepolnt 3.00 to Milepoint more than six (6) months prior to the date of the first 4.13:. be Amproved as u bIIcaton of the Notice hereto attached, and that the p ' follows:. aspholt. concrete said Pon Townsend Leader was on the 27th day of June, 1941, approved as a legal newspaper by the Superior Court Overlay. of said Jefferson County, and that annexed Is a Irue COPY I It Is furtharresolved that of the l{ an appropriation from'.the i officially adopted road, fund budget and based on Resolution #104-80 the county engineer's County Road Project #499 estimate is hereby modem the amounts and for the County Road #2061 Clearwater Rd purpose shown: State Road log #107501 etc. AMOUNTOF .PURPOSE APPROPRIATIONS asphalt concrete overlay - _ Engineering $4000 Sub Total 1,4,000 Construction: '-Contract 180,000 TOTAL: 184,000 as It appeared in the regular and entire Issue of said paper The': prefect is ,hereby itself and not In a supplement thereof for a period of -- made a part of the official- '. two conaecutlve weeks, beginning on the ly „,.oddpted annual' road a 27th day of A gt : t progr m in accordance andendingonthe Ird day of SEptember i - with RCW 36. It Is further 81:130. resolved 7980 , and that said newspaper was regularly distributed that:' to Its subscribers during all of this period. That the lull d The construction is to be amount of 3 1 5?60 -has been paid In full, at the d accomplished by contract rateot $aes par column Imp for each Insertlo . J9 in accordance wifhR.C.W, ,y _. T _ I 36.77:040 et. seq.,' /(,G ry i Adopted this 12th day of / August, 1 J e o Subscribed and sworn to before me this day of temhPr 1 g0 Se Board Board of Jefferson . p , 'County Commissioners; _? ?? 4 A.M. O'Meara,' Chairman'' e r n " 8:13. Brown; Member N tary Public In and for the State of Q Carroll M. Mercer,' Washington, residing at Port Townsend _.+Y Member', ATTEST:, Norine M. Gostfield. Deputy Auditor 1 393 9.3' e ' 1 'c?u Iln ' ?.... Notice'isby given !,that the f County Aff idavit"of Publication ! ?Comm(ssioners oners of Jeffer• I ? son County State of Wash- 1,mgton, will receive sealed STATE OF WASHINGTON) bids up until (he hour of COUNTY OF JEFFERSON)-- 10:00 a.m.,, Tuesday; August 19, 1980, at"theof,. FRANK W. CARPED, using sworn, -aye he Is the flee of the County Commis. Publisher of the Pon Townsend Leader, a weekly ?. ' s(oners, Courthouse, Port newspaper which has been a9la blf9hetl published in the Ir Englsh language and circulated rontlnuously as a weekly "Townsend, Wdshington, to newspaper In the town or Port Townsend, In said County be . opened . and ? publicly and Slate, ana for general c rculaUOn n said county for read at a meeting of the more than six (6) months prior to the data of the firm Count Commisslonors to publication of the Notice hereto anachod, and Thal the Y said Pon Townsend Leader was on the 27th day of June, ' be held that date for the 1941, approved as a legal newspaper by the Superior Court 'improvement-of 1.1 miles of said Jefteraon County, and that annexed is a true copy of the . Clearwater, . Road, of the < :County Road No. 206, State Call for bids - "Road LogNo.1075by.sur- facing and various other ' 1,800 tons asphalt concrete, ,? . work set forth in the plans class F ''and specif(catlonsof C.R.P, ;j I'.Nct. 489; now, oon file at the. JI '•office of the Jefferson- / County Director of Public 1 Works.' Major Items of work-wilt. be IBM Tons Asphalt Can- `crete;,Class F. Each bid'shall be in ac- cordance with plans and as It appeared in the regular and entire Issue of sold paper speeif(ealonts now on file Itself and not in a supplement thereof for a period of with - the County Public two i Works. Director, Court. consecutive weeks, beginning on the j' house, Port Townsend,- 6th day of A1Jpust ig B0, { WA, where copies may b e and ending on the 13th day of August J 'l obtained. 19 80 and that said newspaper was regularly distributed - '1 Each bid shol.bo accom-' to Its subscribers du ng all of this period. That the lull 59. t 5 panted byi.,cosh, certified amount of E has been pald in lull, at the check or bid bond payable rataol $2.65 per column In for eecn Insertion. i to the Treasurer of Jeffer- / ?,, t r 'son county ,,in the, sum of. '1 5% of the amount bid: to 3th Subscribe and sworn to before me this day of beforfeited to the 9efier• August 580 son County Highway: De , , pprtment by the successful n / ? f bidder.if he falls to enter into a contract and to file Notary Public in and for the Stale of 4 an acceptable'suretybond Washington, residing at Port Townsend in,the, amount of 100% of 1 the contract amount within ;.? AO days after award.: The Board of `.County Commissioners reserves f lh? right any or all bids and to waive ?,1ygr fve all infer- •- malities in lathe bidding, and to select theb(d `.deemed most advan. „ R'?.. .c. x. _ tageous to the County. Jefferson County _ Board of, Co mmIssioners `N J h ,r '' •.. - A.M. O'Meara, Chairman y r. " - B.G: Brown, Member 1 Carroll M. Mercer, F Member ;. ATTEST: Betty I Anderson County Auditor and °.'t officio Clerk of the Board ` Irr r o- 198-13 A' I Y'* r T r ! ,e ?rra t 1 , t i• , 1 41, A f l?. i. 4 SOURCE OF MATERIALS { J No source has been provided for any materials in this contract. The Contrac tor shall make his own arra i 1 ngements to obtain this material at his own expense, and all costs of acquiring, producing and placing this material in the finished k wor will be considered incidental to the unit bid items involved. If the sources of materials provided by the Contractor require hauling over roads other than State Highwa s or C y ounty Roads, the Contractor shall, at his own cost and expense, make all arrangements for the use of the haul routes. SITE RECIAMATION The provisions of section 3-03 of the standard specifications shall not apply to this contract. Site reclamation shall be performed by the co t ti n rac ng agency on all sites furnished by it. On sites provided by the Contractor, and where r t by law, the Contractor shall obtain a surface mini he ng operating permit from m the Board of Natural Resources. Prior to commencing operations at the site, the Contractor shall furnish id to ev ence the Engineer that this requirement has been net. ' All costs involved in complying with the requirements of an operating acquired from the Board of Natural Resources for Contractor d i rovid p e s tes shall be considered incidental to the materials to be produced from said site(s). FEATHERING ASPHALT CONCRETE PAVDIENT ' Where directed by the Engineer, the Contractor shall feather the asphalt concrete pevement overlay in a manner to produce a smooth riding connecti t h on o t e existing pavement. Asphalt concrete pavement Class F utilized in the construction of the feathered connections to existing pavement, shall be modified b eli i i y m nat ng the coarse aggregate from the mix at the Contractor's plant or the commercial source from which the Contractor obtains the mi b x or y raking the joint on the roadway, to the satisfaction of the Engineer. All costs and expense in connection with providing, asphalt concrete placing and feathering the pavement will be in id c ental to and included in the unit contract ' price(s) per ton for "Asphalt Concrete Pavement Class F." TRAFFIC CONTROL The provisions of 1-07.23 of the standard specifications shall apply. ROAD APPROACHES A minimum of 10 ft. transition shall be ' a ing asphalt road paved approaches. This work shall be considered incident l lt h v the p a o included in the bid for Asphalt Concrete Class F pavement. paving and shall be EXTRA PRELIMMING There are several localized areas in the existing pavement between the Queets Bridge and the Clearwater Annex and Sh i op n need of leveling. These areas will be identified with paint marks and shall be given a leveling course in the sa me manner as the pre -leveling for the 1.1 mile project area. The pavement shall be by the ton and shall be included in It N em o. 2. -15- ,??p."" e p QlI?A. fj Y ` M1y J ? r k Y ...m ...,, 01577 PROPOSAL I PROPOSAL: ! I To u all h tools, and necessaryftonco t a ? e p t s p f i n s ruct and co mplete the improvement on shown the plans and described in the specifications f or the County of Jefferson, State of Washington. NAME OF BIDDER F ADDRESS OF BIDDER To: Board of County Commissioners Jefferson County Port Townsend, Washington 98368 The undersigned as bidder declares: That he has personally examined the site and premises of the proposed improvement and determined the amount and character of th e work and material necessary to complete same in compliance with the accompanying contract, Plans and specifications. That he has been regularly engaged in contract work of h t e class re- quired for the attached specifications for years. The undersigned proposes and agrees if this proposal is accepted, to provide all necessary machinery, tools and equipment and ll a other means of construction to do all the work and in the manner therein prescribed and according to the requirements of the Engineer as therein set forth at and for the total sum set forth below which sum shall be adjusted in final settlement according to the amount of actual quantiti i es n construction are increased or decreased from the amounts given in th li e st of quantities } at and for the following unit prices. 31 t, , V r r y J 1 F r Unit Price,. Quantity Total Previous Present 1. Asphalt for Tack Coat Ton 950 00 3.93 3,733 3,733 150 11 0 1 11 3,733 50 2. Asphalt Concrete,Class F,Inc.Plevel Ton 41 10 2000.65 82,226 72 0 2,226 72 3. Patching S.Y 10 00 209.91 2,09 9 10 0 21099 10 4. 6. 7. t 8. 9. 10. 11. 12. 14. M 16. 17. 18. 19. 20. Totals 88,059 32 0 88,059 32 10% retained as per contract 8,805 0 8,805 93 ! 79,253 F39 11 0 79,253 T E fl ? 39 Warrant No. Total Amt. 79,253.39 I hereby certify on honor that the above estimate is based upon actual asur m nts and that the same is true and correct. County Engineer I, the undersigned, having first been duly sworn, do hereby depose and say that the above bill is true and correct; that the work was actually performed and material furnished as therein charged; and that there is due me this date, a cording to contract, the sum of $ 79,253.39 and that the same or any part thereof has n p H t r Interstate Asphalt (Sign ere) fo Subscribed and sworn to before me this Date- CCM Z 19 Q day of 19-. Ordered Paid , By County Auditor Chairman, noard of county Commissioners (SEAL) ya»e;.-;:?`{r'A r 1 ?.1 a r i I i 1 I Unit Prkea puanlity Total Previous Present 1 AS /t - r CeG? ?? oh O 00 93 33 16- 0 11 / Co C/.F. ?c% le 4? /0 2 Q. R u 7z 11 G 0z zz6 7z r t?c . - G J 9 rO 4. 5. 6. 8. 9. 10. I 11. 12. -- - i 13. 14. 15. 16. 17. 18. 19. -- -- 20. Totals 10% retained as per contract _ ?y O59 be L 93 D 0 $ L 3 i 3 o Z?' `t{ Warrant No. Total Amt.A'LS3_e 32 I hereby certify on honor that the above estimate is based upon actual measurements and that the same is true and correct. County Engineer 1, the undersigned, having first been duly sworn, do hereby depose and say that the above bill is true and d correct; that the work was actually performed and material furnished as therein charged; and that there is due me this date, according to contract, the sum of $ 0,9,&0, 39 , and that the same or any part thereof has not been paid. r (Sign Here) for Z??/`?sY9TE /?aPNA eT Subscribed and sworn to before me this Date 19_ day of 19_, Ordered Paid By County Auditor Chairman, Board of County Commiulanora (SEAL) 77777F7s j J ?. e . a 1' o- br am ' ?I'+ rr m`?? ?r ? ui P i?•r.«+I "' I SETTLED1ENT AGRI'EMEN'r THIS AGREEMENT entered into by and between JEFFERSON COUNTY and NORTH KITSAP GRAVEL & ASPHALT COMPANY (hereinafter "North Kitsap") as follows: W I T N E S S E T H: WHEREAS, Jefferson County entered into a conl,ract i wi.tb North Kitsap on or about November 14, 1980 for the roadway improvement project known as CRP478; and f WHEREAS, a dispute arose between the parties as to the entitlement of North Kitsap to recover certain sums from Jefferson County, which dispute led to the filing of a Complaint- J' ,.?. I in the Superior. Court of the State of Washington for Jefferson i ';e I County by North Kitsap under Cause No. 10526; and 1 ? 1 WHEREAS, the parties hereto are desirous of resolving their differences through this Settlement Agreement and providing for the dismissal of such lawsuit; ' NOW, THEREFORE, for and in consideration of the mutual promises herein contained, the parties do, hereby agree as follows: 1. Jefferson County shall pay't6rth Kitsap the sum r'y o? •P fty-one Thousand Nine Hundred Ninety-Three And 67/100 Dollars rLx?T .9 3 fT)j forthwith upon execution of this Settlement Agreement. j 2. Jefferson County and North Kitsap mutually release, discharge, and forever acquit each other from any and all claims, demands or charges of whatsoever kind or nature, and y. from any and all damages, actions or causes of action, either in law or in equity, which the parties may have or they may hereafter have, as the same be now known to them or which may hereafter arise, develop or be discovered or in any way whatsoever be connected with the roadway improvement- project on County Road ' 12, knoo-m as CRP470. ?4d? b Y - S TTLEMiINT AGREEMENT `'0!. J I!.!;r l? j a I ^ JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS 'f COURTHOUSE F PORT TOWNSEND WASHINGTON 98368 4 ; O PHONE - 385-3505 _ M f F E SUBJECT -MESSAGE _.T_ffL?._..?J_/SS-/<t/_.,lz___?•COP- 607? ?vr it 1 DATE SIGNED %r REPLY - --- - --- . -- ----- REMOVE PART 2 AND FORWARD PARTS I AND 3. SIGNED - DATE . PART3 WILL ISE RETURNED WITH REPLY. 091 LIFT THIS SHEET TO REMOVE FILE FOR FOLLOW-UP - I RI d G F M -- T - ` A Y - -- a t s a s p f lp L .a L )? NC9•IJ JG?f J ' . ; eyrKC, 1440 [( T 1' `??;`l f' Lr?} 112 , '? \.. ? r . paTT/JON Jea•1G //-G "< i. +149•? S7 •? lat, 111, /JS• ys IJn Jaf, He /I/, N? 1.s ls..,r /s I• /r/ /Ia, /10 .rn. i. <Y .vn /sl •- -- - - - - - p J.v. vr A t T : I I ? _ •. , te.. r «.r .er{ T<....r.re . 1 I 1 ti . >. 143 J SK J 7r+. lax, R.IW, NM. Ia; 1 146' , 145 144 n I ? ? ` ••• ` = . , 1 j I y ? ` : ._ 142 114 •+ wti 149 ? 4 ' • L 141 ?: , r, ? ? ' ? aQ,•1.,,./ y 48 "? . . ?• \ ??• .• / \ ?Z 1 G7 M .1 Aw : A \ 140 • _ ?• x .- : 14o .: <r. 1 ? y y? . F -zz ? L ' ? • 1 ? Ox 132 133 Z 134 I33 $ 138 + 137 : sw 139+ `\ , !r„?.+ • , O C B ? i7 ? ` 138 4 - - . i 1 t r FoJrGR - Je9' td /i'r•„ "• : i Sr ..=•.r.rl ? a kv .,« ..• ' I ' ' I I 1 .. 1 1 124 ly? .. 8 4 t 129 ; 128 1 127 126 123 123 ll.. l '. ? Z • A „l/r ICI ' ?. a 4 122 o ...„ +?r NI + 130 ZI .v s, ra•n•w• 1.,.., ` ? '?_ ? . 1 ?`r? ': 71 I I ' 1 . `Qr , o J s rr«< ..rw r.<, r . -? Y 1 , r r. t >S? tl WALTER E. HALL AT. 2 6o% 916 CRIMACUM, WA. 98329 ?....: ' pro ??. .nrA.' r Yw \ rr rr•wM1 ?w?,?.?? ???.•?.wrr w NCI .r w F .wr r?!_w w /a / r 7.• .-? ?Or'7' .. .. ,.?.?.. _ a. _ ? ' / r_ _ . _ _. __ . •i?' Professl onal Lo n d Swr_y ? rrr•o, 9/ r.m a.ac.? µNrSr•=r?n?o•- - -y?'\ rrN._!?- 1 < ra,•/,halo J l tia.... A ? ? L.1? ? j 'U?:?d%3o5"'?a:7? rw, \ ti i T r r 111 y„•.v_ _.._ ........?.........•...u:.,..... .c.....? :...._,.uy.. _,....:?......._? .... ? 29 w1 9 ? 21 SEP 80 1981 '61 ?c JEF'FER O Z? ) VLF 4g111i("n EN S q i Ch ke.lnotice that in accord with RCW - Please t _ I ekeb?psese.nt Y u-with North Kitsap Gravel & 3ss?Ti?a11 Co.'s claim csRP V?Y fozfiam gainst Jefferson County, with the information required to be given by RCW 36.45.020 as follows: 1. That the injury for which North Kitsap Gravel & Asphalt Co. claims damages against Jefferson County occurred as a result of a breach of a contract which was performed beginning in late 1980. 2. That said contract involved certain construction improvements to County Road 12 at the County Road 18 intersection (Community Shell) and at the County Road 12-1.78 intersection (Prospect Avenue). 3. That North Kitsap Gravel & Asphalt Co. claimed damages in the amount of $34,000.00 for work performed under the 1 contract for which Jefferson County has refused to compensate North Kitsap Gravel & Asphalt Co. 4. That North Kitsap Gravel & Asphalt Co.'s actual residence at the time of presenting and filing this claim is I, P.O. Box 490, Poulsbo, Washington, 98370. 5. That North Kitsap Gravel & Asphalt Co.'s actual residence for a period of six months immediately prior to the time that this claim accrued was the same as above. DATED THIS day of September, 1981. TAYLOR & ULIN, P.S. BY CHARLES G. HAMMOND Attorne North Kitsap Graved & Asphay lt Co. 1 -- 77 77 p 1 J J ? _ ^ ?. j ` .... SUBJECT, LetCC:T M upust A 1_981 Re: Sales Tax on Tnvoice J l?..469 - 7 ?niC:: of TeI t rt's 7' Enclosed n1.0•7?' 7 T--en`imle Havre .r.e rc.u'e ro vctr o pi-? - --'-- _ -- 1r i,e F, 5 r, ' cter Tl ;3 T{ vnu nP an', a icstio r,s p -7 --------- anP ,r - --- - -- --- - rte(-,aY. ail i•,• tike P, nOVO 1" nt- onp'3 T:. r1_7S , nl oa,c C. On t: c1 :7•r- 1 DA09/00/81, SIGNED p ? 1 sue Fenley Accountant REPLY ......... ... DATE j REMOVE PART 2 AND FORWARD PARTS I ANR 3. SIGNED PART 3 WILL BE RETURNED WITH REPLY.. LIFT THIS SHEET TO EMOVE • FILE FOR FOLLOW-UP 087 t r r 1 r I, 07 ?. NORTH KITSAP GRAVEL & ASPHALT COMPANY ® PO Box 490 §j{M2X)2AXRgO POULSEIO, WASHINGTON 98370 I ?• TELEPHONES; POULSBO: 779.4441 - BREMERTON: 373.8941 Uu U JUL 2 9 1981 JEFFERSON COUNTY BOARD OF ;OkIMISSILINERS July 28, 1981 NK #2-1922 Jefferson County Board of Commissioners Jefferson County Courthouse Port Townsend, WA 98368 Reference: C.R.P. 478-Intersection Improvements COMMUNITY SHELL/PROSPECT AVENUE Gentlemen: Enclosed for your records please find fully executed "Affi- davit of Wages Paid" on the sub ject project. We have retained a copy for our records. Respectfully, - ' I r i _ NORTH KITSAP GRAVEL S, ASPHALT COMPANY _/?f R 1 I ? ; I r l r Alvin T. Canning il Secretary-Treasurer , Enclosure - - °- --- I-- --------------?-_ FliE ??_ %f 7?; f I I? ?7. i A AN EQUAL OPPORTUNITY EMPLOYER ? t ti_ ?yS'? ? r u T i ? ' l i j e IVED r nEC ' S l&I.OLYMPA WA t I UL 9 1981 t S- DEPARTMENT OF LABOR AND INDUSTRIE AFFIDAVIT OF WAGES PAID INDUSTRIAL RELATIONS DIVISION Olympia, WA 99504 ON PUBLIC WORKS CONTRACT ) Awarding Agency._ dof., County_ Commissioners.-..... _.-..• [ Contract Numbec..........,Jefferson County.._..,. ...................... Date Contract Awarded .....Noveffiber...14....... 1..98Q .......................... . ._.... _..._....._ Date Contract Completed........... March ... 10, 1981 ? STATE of WASHINGTON County in Which Work Performed..._9efferson Ss. Location within County ...C.,.R.,.I?....4.78-CDrl11(l iy. Shell/Prospe - COUNTY OF ..... _...........T ................... ........ Was a Statement of Intent Filed? Yes :E] No ? Avenue 1 In compliance with RCW 39.12.040 I, the undersigned, being a duly authorized representative of NORTH KiTSAP GRAVEL & ASPHALT COMPANY, PO Box 490, Poulsbo, WA 98370 ._...._...........................................................................-........................................................._..............................................................._...._........... . . ...._.........._.. . ... .. ...... _...................... . .. . . ... . (contracta (Address) do hereby certify that the following rates of hourly wage and hourly fringe benefits have been paid to the laborers, workmen and mechanics employed by me upon the project described above and that no laborer, workman or mechanic has been paid less than the "prevailing rate of wage" as determined by the Indus- trial Statistician of the Department of Labor and Industries. List below each classification of labor employed by you upon the project described above and the rate of hourly pay and hourly fringe benefits paid to each classification. " Please Note If apprentices have been employed on this project, provide this additional information: name and/or regis- tration number and stage of progression. - - Craft and Classification of Labor Rate of Rate of Hourly - - Hourly Pay Fringe Benefits Paid Laborer Forafaft $13.91 $2.33- 61. 2 1 . Spreaders, Blaw Knox, Cedarapids 15.70 • Rollers, on plant, mad mix 15.70 ' 2.61- Motor Patrol Graders, incl. Model 14, 1 15.70' 2.61- non-finishing 1 General Laborer, Asphalt 12.93' 2.33 Durp Truck, up to & incl. 5 yds. 15.28, 2.53- Dump Truck, over 5 yds. to & incl. 12 yds. 15.50-' 2.53 Dtmlp Truck, over 16 yds. to & incl. 20 yds. 33 ? -" 2 . 13.41 Raker, Asphalt ? r f np GRAVES P T COMPANY NORT Noxe: Attach Additional Shoots as Needed. z n. .............................. By. .. ... Subscribed and sworn to before mearold L. n -Pees' nt (Title) 9 this........ 7th,,..,...., day of.......... AP.ril................... ,,,.. I hereby certify that according to the wage rata and fringe benefits herein - sworn to the prevailing wage requirements of RCW 39.12040 have Ixcn mtisfied. 198'1 ' INDUSTRIAL STATISTICIAN D INDUSTRIES DEPARTMENT OF LABOR NatarO Pubiic tt?fS /?nd the State of Washington va 7 ' , , residing in I flfgton. -? CI ... ..F..... .. Date; ...:1 ..V. 5 I I:I Us my INSTRUCTIONS: 1. Pursuant to RCW 39.12.040 copies of this form must be completed by the contractor and each of his sub- contractors. 2. Complete this form in triplicate and have it notarized. 3. Submit all forms for certification to: Industrial Relations Division, Department of Labor and Industries, General Administration Building, Olympia, Washington 98504. 4. File a certified copy with the Awarding Agency. CONTRACTORS ARE RESPONSIBLE FOR OBTAINIMG AND FILING AFFIDAVITS of the SUB- CONTRACTORS, This is required by law and payments can not lawfully be made until such affidavits are filed. .. - i 1.1.7067 Aradarlt of Waira t3-791 . ? r?.wsror«n.v^ome?«.? mr, rm*KCm^k?nR„a?. x?mznrsmmP^.wmr.?x..nc.Rau?•. _ __ ^-'^?raM?*r:xmwwwa..mur m4t? ., s' r r 1 ,, r ?r?uu?.Y t?v?.r?..-vlv ??vy?xrwv?.r: w . <?rr..?rtu .. Cincinnati, Ohio 45202 v A Stock Company ? /1 Py CONTRACT STATUS INQUIRY ?\/\(L:J/\?/?? Board of Jefferson Sounty r taaioners Date 7.27-Al (Owner, 06hgee or Architect) Coutthouse Conat Engi?aa* Bond No. ^13 95 75 (Address) Port Townsend WA 98368 Contractor: North ILitliiap-Grairel (Name and Address) Contract or Project No: -I Description of Contract: .Owner: 46 RRA_nA Contract Price $46 ' ARn rut Bond(s) $ 46 RAO nn Effective Date t t 14-8D Without prejudicing your right or affecting our liability under our bond(s) described above, we would appreciate such of the following information as is now available. Very truly yours, GREAT AMERICAN INSURANCE COMPANIES By: / !7 Cindy K. berg`, Bond Clerk 1. IF CONTRACT COMPLETED, PLEASE STATE: Date of completion of work (or final delivery) Acceptance Date f Final Contract Price $ 2. IF CONTRACT UNCOMPLETED, PLEASE STATE: Paid to contractor-net of retainage $ Earned retainage withheld $ 19 Covering work completed through Current estimate submitted but not paid, if any $ Covering work completed through 19 3, Do you know of any unpaid bills for labor or material (Check) Yes No - 4. Remarks (If any) - Date I9 Signature - Title It is understood that the Information contained herein Is fur- - nished as a matter of courtesy for the confidential use of and Is merely an expression of opinion. It Is also he Suret Address (If different from ahovel y t agreed that in furnishing this information, no guaramy or or correctness is made and no respon• ccurac f P EASE RETU RN ORIGINAL OF THIS INQUIRY TO y a warranty o sibility is assumed as a result of reliance by the Surety, L whether such Information is furnished by the owner or by an architect or engineer as the agent of the owner. i F,90I414-4/90 r ,. N w. Y r I / J r ?f ............... .... 4aEAT jy?`ERIGNN INSURMCE COMPANIES Cincinnati, Ohio 45202 A Stock Company CONTRACT STATUS INQUIRY Board of Jefferson Sountv Commissioners Date r- (Owner, Obligee or Archrtectl Coutthouse - Conet Engineer _ Bond No. 233 95 75 (Address! Port Townsend WA 98368 Contractor: North Kitsa Gravel & As halt Com an (Name and Address! Contract or Project Description of Contract: C.R.P. 478 Intersection im rovement Owner: 40 0 - S46.880 .00 Bond (s) S 46,880.00 Effective Date 11-14-80 Contract Price Without prejudicing your right or affecting our liability under our bond(s) described above, we would appreciate such of the following information as is now available. Very truly yours, GREAT AMERICAN INSURANCE COMPANIES By: Cindy K. berg, Bond Clerk j 1. IF CONTRACT COMPLETED, PLEASE STATE: ` Date of completion of work (or final delivery) I g- E j Acceptance Date ) Final Contract Price $ i IF CONTRACT UNCOMPLETED, PLEASE STATE: 2 . 7g7 9? Paid to contractor-net of retainage S ' S 6 Earned retainage withheld S 1Z7 2 Covering work completed through ? 19 Current estimate submitted but not paid, if any S Covering work completed through 19 3. Do you know of any unpaid bills for labor or material (Ch eck) Yes No r ) 7Tf1C If 4 any 4. Remarks ( Dace cT ZB 19 gl Signature Title_ LO.?/ST L?A/6/.f/Ed.G It is understood that the information theca d herein is fur- the confidential use of f eT Ol?S ?! U or niched a miner of courtesy the Surety ly and is merely an expression of opinion. . It is also . Address fit di/ferent from aboTO i agreed that in furnishing this informac on, no guaranty or tness is made and r 1 Cy or .- f e PLEASE RETURN ORIGINAL OF THIS INOUIRY TO warranty o 5ur ty, result hthey is ass u to as i of relan te by [h assumed j h Snfon at hn is furnished by the owner or by an ho[her suc w architec[ or engineer as the agent of the owner. ( 1 GREAT AME"hiC0 UM. CO. SEATTLE, WA 93111 r:,aoznrf-also t ` L Board of Tefferson SountyLGot?11-ionsra Date 7-97-R1 (Owner, Obligee orArchirecrl Coutthouse - Const Engineer Bond No. 711 75 /Address) Port Townsend, WA 98368 Contractor: North Kita$p_f- a_r vr1 & Aap 71-M) Contract or Project No: Description of Contract: G R P_ 478 Tnteraeetion imnroly-t Contract Price$46_SRO_00 Bond(s)S46-,8Rn_DO Effective Date 11-14-80 Without prejudicing your right or affecting our liability under our bond(s) described above, we would appreciate such of the following information as is now available. 1. IF CONTRACT COMPLETED, PLEASE STATE: Date of completion of work (or final delivery) Acceptance Date Final Contract Price S 2. IF CONTRACT UNCOMPLETED, PLEASE STATE: Paid to contractor-net of retainage $ Earned retainage withheld $ Covering work completed through Current estimate submitted but not paid, if any S Covering work completed through 3. Do you know of any unpaid bills for labor or material (Check) 4. Remarks (If any) Date 19 Signature Title It is understood that the information contained herein is fur- nished as a matter of courtesy for the conf den[ al use of the Surety and is merely an expression of op neon. It s also Address agreed that in funiishing this information, no guaranty o r (I/dillerenl from above) warranty of accuracy o correctness is made and no respon r P EASE RETURN ORIGINAL OF THIS INQUIRY TO s blity is assumed as a result of reliance by the Surety L whether such information is furnished by the owner or by an architect or engineer as the agent of the owner. 9024H-4/90 ' F . v ?A ds r a y t , . L Yes No 10 Very truly yours, GREAT AMERICAN INSURANCES COMPANIES By: Cindy K. berg, Bond Clerk 19 GZEEWAry ER1CAlV INSIlIir'WCE CCMPi'1NIE5 Cincinnati, Ohio 45202 A Stock Company - CONTRACT„STATLIS INQUIRY Board of Jefferson County Commissioners Date 4-30-81 - (Owner, Obligee or A.hitecd Courthouse Bond No. 233 HK 95 75 (Address) Port Townsend, wA 98368 Contractor: North Kitsap Gravel & Asphalt Company (Name and Address) - s Contract or Project No: Description of Contract: C.R.P. 478 Intersection Improvement - Owner: ( Contract Price S 46.880.00 Bond(s) S 46,880.00 Effective Date 11-14-80 Without prejudicing your right or affecting our liability under our bond(s) described above, we would appreciate suc h of the - following information as is now available. - - Very truly yours, GREAT AMERICAN INSURANCE COMPANIES Cindy K. begg, Bond Clerk 1. IF CONTRACT COMPLETED, PLEASE STATE: - Date of completion of work (or final delivery) Acceptance Date - i Final Contract Price .S ' IF CONTRACT UNCOMPLETED PLEASE STATE: 7e7 2 r , . Paid to contractor-net of retainage S $46 . 8S Earned retainage withheld $ 85, . 198.66 Covering work completed through MArnh 31 19 81 - Current estimate submitted but not paid, if any $ Covering work completed through 19 - 3. Do you know of any unpaid bills for labor or material (Check) Yes No 4. Remarks (If any) SEE ATTACHED Signature `- Date 19 Title Address (if different from above) - PLEASE RETURN ORIGINAL OF THIS INQUIRY TO 1 F.9024C- 1/77 Primed In USA Y DIEM AIVEit1CAN INSURANCE COMPANIES . Cincinnati, Ohio 45202 !;' ?J72 A Stock Company E CONTRACT STATUS INQUIRY 4-30-81 Board of Jefferson County Cottanissioners Date (Owner, Obbgee or Architect! 233 Xfi 95 ?5 Courthouse Bond No. } (Addrers) F Port Townsend, WA 98368 ? Contractor: North Kitsa Gravel & Aa halt C an (Name and Addreu) y Contract or Project No: Description of Contract: R P Intersection Im rovetnent ,j Owner:- Contract / 6 880 00 Bond(s) $ 46,880.00 - Effective Date 11-14-80 PriceSs t Without prejudicing your right or affecting our liability under our bond(s) described above, we would appreciate such of the following Information as is now available. Very truly yours, GREAT AMERICAN INSURANCE COMPANIES I ' Jry BBy- 0 Q? Cindy K. S?Abegg, Bond Clerk 1. IF CONTRACT COMPLETED, PLEASE STATE: Date of completion of work (or final delivery) j - Acceptance Date - Final Contract Price $ ' 2. IF CONTRACT UNCOMPLETED, PLEASE STATE: j Paid to contractor-net of retainag•S Earned retainage withheld $ rch 47 19 0 M a Covering work completed through Current estimate submitted but not paid, if any $ 19 Covering work completed through - Yes No 3. Do you know of any unpaid bills for labor or material (Check) i 4. Remarks (If any) I - Signature z0,,.-a_- 19 ru Title Date Address -7-11,11.n. 1 from above! PLEASE RETURN ORIGINAL OF THIS INQUIRY TO co, PO rI" )1,4a Svc„fLE, r,l 91222 F.90240 - 1/77 Primed In USA .. A N IF lam. - w 4 r ` t ,Y. 4 I r ----- ----- - - - COUNTY OF JEFFERSON TO North Kitsap Gravel & Asphalt STATE OF WASHINGTON Address P. O. Box 490 Poulsbo, WA 98370 ' Work done to March 31, 1981 County Road Proj ect 478 Date March 31, 1981 Estimate No. 3 I Unit Prices puantity Total Previous Present 1. Mobliization L.S. 9,400 00 100% 1 9,40 11 0 00 11 9,400 00 d? - 2. Clearing and Grubbing :Acr 1,500 00 1.34 2,01 0 00 2,160 00 -15 00 3. Removal of structures & Obstruction L.S 500 00 100% 50 0 00 500 00 4. Roadway Excavation inc. Haul C.y 10 00 100 1,000 00 1,000 00 j' 5. Crushed Surfacing Top Course C.y 15 00 80.05 7,200 75 6,930 00 27 75 .,I . 6. Asph. Conc. Pavement Class B. Ton 30 00 0 0 0 0 7. Asphalt Concrete Curb L.F 5 00 0 0 0 8. Adjust Catch Basin for Grade Ea. 200 00 2 400 00 200 00 20 00 9. Adjust water VAlve to Grade Ea. 100 00 4 400 00 100 00 30 00 i..10.Adjust Telephone Vault to Grade Ea. 200 00 1 200 00 200 00 11. Trimming and Cleanu 0 p L.S Ij- 2,000 00 0 0 p 12• Unsuitable Foundation Removal Item C.y 8 10 1260.00 10,206 00 9,639 00 56 00 13. Gravel Borrow New Item Ton 4 20 4029.90 16,925 58 16,711 80 21 78 q. 14. Filter Blanket in Place New Item S yd. 5 00 194.56 972 80 0 97 80 Airport Road Pavement Class B Ne m Ton 50 00 53.00 2,650 00 0 2,65 00 16. Airport Road Preparation. Sy Force A -3 121 44 100 121 44 0 12 4 ccount /10/81 New Item 4 17. 18. 19. - zo. Totals 51,986 57 46,840 80 5,14 . 77 1 loo retained as per contract 5,198 L 66 4,684 _ 08 5]. 58 46,787 91 42,156 72 4,63 19 i Warrant No. I hereby certify on honor that the above estimate is based u on actual m Total Amt. 4.631.19 e t d true and correct. p asuremen s an that the same is I, the undersigned, hnving first been duly sworn, d County Engineer o hereby depose and say that the above bill is true and correct; that the work was actually performed and material furnished as , therein charged; and that there Is due me this date, according to contract, the sum of $ 4.631.19 - and that the same or any part thereof has not been paid. (Sign Ilere) for North Kitsap Gravel & Asphalt Subscribed and sworn to before me this Date , 19-_ __..day of Ordered Paid WASIIINGI'ON STATE Show ?_ of...?_ DIiPAR•1•Af I-N'1. OF -I-RANSPOR'I'A-1•ION Dale CHANGE ORDER Ordcredfbhc 5-clord Specibcofons5ecl on I - Oa. a ? Change proposed by Contractor ORIGINAL k rlEaL, Change Order "All i ? ?'P Nan,ber 2 CRP 478 r„ North _KTtsap Gravel& Aspha-lt- Co. 010- Box 490 _ _-- North Ki tsap Gravel & Asphalt POU? Sb0 Endor,ed by: C+rnnwror Yirm Nom.• __-_._--. _.______ _._.. _.--- ;Rn.re.. °ara ,i?nHOtnr. __County.._Road No._12 ' - - THIe i J F'ed-I Aia ho. - .- Intersection Improvement CRP 478 re ) Grmenr Kinrn by .Purely: lu hen rr4e ._ . Pro,eel Title Oy' Arr.rncy-in•/xr UuA• .. .. DESCRIPTION OF WORK .. .. .. .................... .......... .......... Vau are ordered ID pod- the fallowing described work upon recmpt of an approved copy of his change order: Item No. 5 (revised) Crushed Surfacing Top Course.... Revised quantity ..... 230C.Y. Price....$15.00 per C.Y. Reduction in quantity is due to revision in geometric cross-section. Cross sections for Project A and Project B have been revised by reducing Crushed Surfacing Top Course I depth from 0.4 feet to 0.2 feet. i 1i I All work, mmer;als and meowremem to be.n accordance wah the pro, slop, of the Slanda.d Spaufccrions and Special Proyis oo, for the type of conslruc- - .-n-Ned. - DISTRICT ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT - i APPROVAL ? REQUIRED AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANGE HEADQUARTERS ? REQUIREDL s 46,880.00 s 51,245.00 s -3,000 46,245.00 s DISTRICT USE APPR VAt RECOMMENDED n• I) ?? ' HEADOUARTER'S USE APPROVED d,/?l:n,Sin ocr I) u .+jr.r / n,R+neer ? APPROVAL RECOMMENDED ? APPROVED (?(1 DISTRICT ADMINISTRATOR By. Dale: _. DOI rayy ,n nn ,,. L, yrwaoy , r - Y y! f J I r L - ------. - ? , DATE e PURCHAS„E ORDER N4 ? SHIP TOE] SEND BILL TO JEFFERSON COUNTY -?- SHIP TO El SEND BILL TO Department of Public Works DIRECTOR, JEFFERSON COUNTY County Shops, P.O. Box 284 Department of Public Works Chimacum, Washington 98325 Courthouse Port Townsend, Washington 98368 ORDERED FROM I G ? a ? ROADS ? PARKS n SOLID WASTE f-I _ - r-i OTHER DESCRIPTION UNIT PRICE AM OUNT 14. 12 13 i r 14 i I 16 17 18 19 20 11 STOCKS & STORES MAINTENANCE El EQUIPMENT NO_ ORDERED BY -TITLE _4?Sl ? ? J B.G. Brown MEMBER Jefferson County Department of Public Works COURTHOUSE PORT TOWNSEND, WASHINGTON 98368 Milton L. Sgnstrom, DIRECTOR OF PUBLIC WORKS January 6, 1981 i Roger Keyes, Field Engineer Puget Sound Power and Light Company P.O. Box 555 Port Townsend, A. 98368 Dear Roger, i Jefferson County has secured permission for Puget cable outside the road right-of-way from the adjacent Power to maintain t a pole anchor i proper y owner. Sincerely, 2? Gary A. Rowe Construction Engineer ' GAR:mcb i i' j 1 ;i . G? 1 ' r 4N s .r3 1 r NORTH ITSAP GRAVEL & ASPHAN COMPANY ® ROUTE 2, BOX 700 POULSBO, WASHINGTON 98370 TELEPHONES: POULSBO: 779.4441 - BREMERTON: 373-8941 223"61-N6• T-01 allW114 December 8, 1980 NK #2-1922 Jefferson County Department of Public Works Jefferson County Courthouse Port Townsend, WA 98368 Attention: Milt Sanstrom, P.E. Reference: C.R.P. 478-Intersection Improvements COMMUNITY SHELL/PROSPECT AVENUE : Gentlemen: t Pursuant to our November 24, 1980, letter we have received ; a fully executed "Intent to Pay Prevailing Wages (Public Works Contract)" from the Department of Labor & Industries and forward applicable copy herewith. Respectfully, NORTH KITSAP GRAVEL & ASPHALT COMPANY 1 i I Pat Pederson Contract Administrator :Pip Encl. as noted RECE1 ° er) & DEC 101980 JEFFERSO N COUNTY ENGINEER S OFF; C:E. 'rya; AN EQUAL OPPORTUNITY EMPLOYER I` --v j t .I? " ry M i Al. i ? / 13t" _ p Y o: ? a ah- DEPORTMENT OF LABOR AINDUSTRIES O Statement of rNDUSTRIAL RELATIONS DIVISION INTENT TO PAY Olympia, WA 98504` PREVAILING WAGES (Public Works Contract) Awarding Agency ...Board.-.0f...CAUnfy...GSA[AIU.SS7.4n..ex'S ................. '.r. Contract Number .....C.R.P....... 4Z8 ............................................................... Date Contract Awarded ...... November 14...... 1980 ................................. County in Which Work Performed .......... JeffersOn .................................. - - Location Within County ..C..Rr 12._4..C•.1?•...18 ................................. STATE OF WASHINGTON Prime. Contractor .....NORM..II7,W...GFAVZL._&.. A5PH_A-.L C.O IC?ANY ?. County of ......... .............. Do You Intend To Use Subcontractors? Yes ? No In compliance with RCW 39.12.040 I, the undersigned, being a duly authorized representative of NORTH, KITSAP GRAVEL & ASPHALT,COMPANY,.._Rt. , 42,. Box 7991...P9 ulabot.??....98370 ....._ i ontracwr obi (Add-.) do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to all laborers, workmen and mechanics employed by me upon the public works project described above and that no laborer, workman or mechanic will be paid less than the "prevailing rate of wage" as determined by the Industrial Statistician of the Department of Labor and Industries. PLEASE NOTE: If apprentices are to be used they must be registered with the State Apprentice- ship Council or they must be paid prevailing journeyman wages. ff L CRAFT QUALITY AND CLASSIFICATION OF LABOR RATE OF RATE OF HOURLY . HOURLY URL UIt1.Y PAY FItINC F. abNEFi7'S I Laborer Foreman 13.91% 2.33 I Spreaders, Blaw Rnox, Cedarapids 15.70% 2.61'' Rollers, on plant, road mix 15.70-' 2.61-' Nbtor Patrol Graders, incl. Model 14, non-finishing 15.70 2.61 I General Labor, Asphalt 12.93 ' 2.33 Dtmp Truck, up to & incl. 5 yds. 15.28 2.53- Dutap Truck, over 5 yds. to & incl. 12 yds. 15.50 2.53- Duinp Truck, over 16 yds. -to & incl. 20 yds. 15.61-' 2.53-' Raker, Asphalt 13.41 ? 2.33-- NOTE: Attach Additional Sheets as Needed. NORTKI VEL & AS T COMPANY ............................ nY me) Subscribed and sworn to before me By Farming P esident (TWO this.:.24th...... day of ..Iomil2er.......... , Far L'& I Una only APPR LED 19...80. Dept nt of Labor 8, Industries 4,1 i/„ , _ In s i¢I Stn2a?n_ . State of Washington' residing in Washington. ...••. ...... . BEFORE FINAL SETTLEMENT can be made on any public works project, the prime contractor and each and every subcontractor must submit form LI-700.7 "Affidavit of Wages Paid" to the officer charged with the disbursement of public funds. EACH AFFIDAVIT OF WAGES PAID MUST BE CERTIFIED BY THE INDUSTRIAL STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUSTRIES BEFORE IT IS SUBMITTED TO SAID OFFICER. PROGRESS PAYMENTS: Each voucher claim submitted to an owner by a contractor for payment on a project estimate shall state prevailing wages have been paid in accordance with the pre-filed statement or statements of intent to pay prevailing wages on file with the public agency. COMPLETE AND MAIL ENTIRE SET FOR APPROVAL TO: I Industrial Relations Division, Department of Labor and Industries, General Administration Building, Olympia, Washington 98504 w , CONTRACTORS, UINT11111U'I'Ii APPROVED STATEMENTS AS FOLLOWS: ' OINK COPY) 01RCINAL-AWAIMINO AGENCY I IIILUE COPY) DUPLICAT11-PRIME: CONTRAtrrolt { (YEI.LOIV COM1 T'ItIPI.ICAT'E-St114CONTItACTOIt `F IGRKE,N COPY) QUAIIIttJPLICATK-INOIIS7'ItICAI. STATISTICIAN (Rani-I by hrpartmrnt] 1.1.7W29 In11a11a Pay (11.7:1) ....._...............,,.......«....,..._:.,...,..,nw.......w.,. a??. ,. .. .+.:xsm.tnu.nn.....wrr w.nrvf't5Ex^.v.?r*x,nma.rnLCC.GiW:v+xa'ru.^"-'.,..,......_.-....,.-w...-.....?......_-...nn,,.,.. , 1 --1 r r NORTH KITSAP GRAVEL & ASPHT COMPANY q:.? i ® ROUTE 2, BOX 700 POULSBO, WASHINGTON 98370 ' t ? TELEPHONES: POULSBO: 779-4441- BREMERTON: 373.8941 t 1 22?-01f'?-Ri•HYh314ML9 1_°'f ?% ,y tr ( - ! ' 3 k December 1, 1980 NK #2-1922 Jefferson County Department of Public Works Jefferson county courthouse Port Townsend, WA 98368 r;LE?C?GP ¢jg Attention: Milt Sanstrom, P.E. E I j Reference: C.R.P. 478-Intersection Improvements COMMUNITY SHELL/PROSPECT AVENUE Gentlemen: Enclosed please find copies of "Additional Tonnage Permits" on our trucks. If you will recall we discussed providing you with these at the pre-construction conference. I Please advise if you have any questions. Respectfully submitted, u NORTH KITSAP GRAVEL & ASPHALT COMPANY f 4,11 Pat Pederson Contract Administrator :Pip •u Encls. as noted RECEIVED c " i DEC 21980 x JEFFERSON COUNTY OFFICE t 9 ' i ENGINEERS i ? AN EQUAL OPPORTUNITY EMPLOYER I 14 . M1 1 4 _ ? r p NORTH KITSAP GRAVEL & ASPHALT COMPANY ® ROUTE 2 BOX 700 POULSBO W O 8 0 , , ASHINGT N 9 37 TELEPHONES: POULSBO: 779.1141- BREMERTON: 373 B9dl I 243.Oif?RiNK-6314i1i•9 .S ? t 'ti_? r + f. ? f ? November 25, 1980 NK # 11922- Jefferson County Department of „ u'' j Public Works - 1- Jefferson County Courthouse Port Townsend, WA 98368 Attention: Milt Sanstrom, P.E. Reference: C.R.P. 478-Intersection Improvements - COMMUNITY SHELL/PROSPECT AVENUE Gentlemen: Enclosed please find North Kitsap Gravel & Asphalt Company's Traffic Control Plan as refers to the above project. - We are hopeful this meets with your approval. If you have any questions or we can be of further assistance with respect to this item, please advise us. Respectfully submitted, I NO KITSAP GRAVEL & ASPHALT COMPANY RTTH f / ? /CGZ ??Li?OG?? Pat Pederson Contract Administrator :pjp Encl. as noted I RECEIVED DEC 11980 JEFFERSON COUNTY ENGINEERS OFFICE +. W' e AN EQUAL OPPORTUNITY EMPLOYER -Al ?__ - - of « . ?',, yy C CoVSn2Krnp +f` • END CoN5TQU67/ok) - ISoo{t W?D-I BEG/ lNG OF PROJECT B :coym?W2D N \ \ \ STA. *00 L9 -') r S//2 NEl/4SE//4/VE//4 ??\ \\ ? ' • SEC. 33, T. 30 N. R. lW. W.1t9. I JL/L/A ROGERS \\ i W//e,SW//•4,WW//4 \? \\ m I coMBS 1,4mmy TRUST - y A v+ RoFH? CgN GEC o i? `?\ ISOO t• r \ mz \ S74 / ..?a, i_ ?? END ra Cc Z SE 114 SE //4 NE //4 T3N. R/ WWM. SEC. 33, ..\ S c. \ \ E D OF PROJEC T B \? \ \\ STA. 9f00 \ I SWNVY/ FU?,MhN 500 I wes>of co.RO. \ wzo.? WALT6RUeBE,PN/el-ler G r?• bNoooL.F r B r N NOTE: CoNSfR.yC71DN "SA \zC1 ru QE pRoTBCrED QY ` p? PLaeed ISM ph rv. CLASS n WAICOES f r i a"•. BND CONS WrtH pLASAE? )uaINC? F10495 OF )6 a or:SS C??D-2 Nd ROAD )Soo.( 144 i V r ?? ? ? \ END CoN$MgGT/o?l ? • K S+ \ BEG/ /NG OF PROJECT "B \? \ \\ STA. y-00 ?114SE114NE114 T. 301. R. I W. WiV. I r ?ULIA RoGERS `? ? ? I ?< W//2, SW//.,', 1yW114 COMBS FAM/L r TRUST - r u go" is C, It C &?,D o \\?m ?? IJOo ?- `; FLACAlAti Fr i O Z xx 5" ,? P. 1. w z.o•? ? , p?''??p??'? ?• ?? ^ y ST4 5+00 ?/ - IAIA END COaS7EUGTIL,t t ` ev 40 SE 114 SE 114 NE 114 SW //4 NW 114 SEC. 33, r. 30N. R./W. W.M.*\ o\ SEC.34,•T.30N. R.? ?UL /A ROGERS END F PROJEC T'B" \ \ STA. 9100 WESrOFCo.RIO, t WALTERU.IBEPN/CE(}?NQ r--bNOOOLB wt0?? CONSMtkCTION "GA ? \ \ (? 1e 1?6, E DRoTECiED QY p? PLaGed ISO- a"-oQ S n 10041CA?j ts A k PI.AL118P )uQING H0405 OF )RRµ?IESS I CND CONS ROAD CONSrRUCilora : + ??0•? N? i,. NORfr! KITSAP GRAVEL & ASPH ® ROUTE 2, BOX 700 P ALT COMPANY OU LSBO, WASHINGTON 98370 TELEPHONES; POULSBO: 779-4441. BREMERTON: 373.8941 223mna a)hxsa?a(?e ry November 24, 1980 i NK #2-1922 NK #2-1923 Milt Sanstrom, P.E. Jefferson County Departrent of Public Works Jefferson county Courthouse Port Townsend, WA 98368 REFERENCE: C.R.P. 478-INTERSECTION IMPROVEMENT, Community Shell/Prospect Avenue Supply contract for 500 tons Cold Mix Dear Mr. Sanstrom: Enclosed please find the following with respect to both of the 1. Certificates of Insurance, original plus one copy retained noted above: copy for our records); PY (we have retained { 2. Signed and executed Contracts, original plus two copies (please return 1j fully executed copy to us for our records); 3. Signed and executed Contract Bonds, original plus two copies (please return fully executed copy to us for our records). Also find enclosed State DOT form "Request we request you execute and return applicable ocopy to us of Material Sources" which PY to us for our records. ? North Kitsap will be forwarding to you "Statement of Intent to Pay Prevailing Wages" upon return receipt of Depar(Tient of Labor & Industries statistician's execution f of same. We will, likewise, submit our Traffic Control Plan upon completion by our Safety Officer. ? .j This letter will further serve to formally advise the County that the personnel ) listed hereunder are primarily responsible for this project: Alvin Tannin 9, Project Manager, 779_4441; Walt Kodiak, Project Foreman, 779-4441; Dan Stockbarger, Project Superintendent, 779-4441. If the telephone number listed for each one of these individuals is busy, you may use any one of the other telephone numbers listed above. Please advise me if you require any further paperwork from us at this time. It was a pleasure meeting you at the pre-construction conference. We all look forward to } %urking in conjunction with the County on the projects noted herein. If I can be of any assistance to you during the period of these contracts, please feel free to call upon me. Respectfully submitted, NORTH KITSAP GRAVEL & ASPHALT a)MPANY RECER/ Pat Pederson NOV 2 5 1980 Contract Administrator I ;pip JEFFERS01-4 C??UNTY ENGINEEfC S OFFICE Encls. as noted' AN EQUAL OPPORTUNITY EMPLOYER II I w. 7 . Y _J NORD KITSAP GRAV AL EL & ASPH T COMPANY ROUTE Z. BOX 700 POULSBO, WASHINGTON 98370 i9 TELEPHONES: POULSBO; 779.4441. BREMERTON: 373.8941 t .. Y23O1;IJ C;•E,( 6a1ti;11-9 November 24, 1980 NF: #2-1922 i Department of Labor & Industries F General Administration Building 2 Olympia, WA 98504 Attention: George May Industrial Statistician [ Reference: C.R.P. 478-Intersection Improvement Community Shell/Prospect Avenue, Jefferson County Rd. #'s 12 and 18 Gentlemen: Enclosed please find North Kitsap Gravel & Asphalt ' " Company s Statement of Intent to Pa Prevailin Wages (Public Works Contract)" with respect to the above named project. Please approve, execute, retain appropriate copy, and return the remaining docume t n s to us at your earliest convenience. We will forward pertinent co t py o the Jefferson County Department of Public Works. Respectfully, NORTH KITSAP GRAVEL & ASPHALT COMPANY Pat Pederson Contract Administrator :Pip Encl. as noted C.C. Engineering Department Jefferson County Department of Public Works i AN EQUAL OPPORTUNITY EMPLOYER 0. 4 p L - ,t .. . ? A 1 i' F r N >r ,v ,F ;r I ? Y? d .1 1 r. # rl!'GY?ecyiOn Z.s^??OJun G??? I:. .. PRECONSTRUCTION CONFERENCE I. ORDER OF WORK (Progress Schedule) II. UTILITIES or anizations time required by g A. Notification g, Insurance required, if any j SUB-CONTRACTORS AND AGENTS Ill . A. Request for approval must be submitted B. Nature of work to be performed by each via prime contractor C. Subcontractor's route correspondence ith authority on the Prime Contractor must have a representative w D . job at all times (designated by letter) IV. RECORDS AND REPORTS nd initi be handed al supply should ; A. Description of required forms a out or mailed to prime contractor e contractor's office rim h p B. All reports must be handled throug tee submitted as vial should be Request for approval of sources of ma soon as possible V. TRAFFIC CONTROL AND SAFETY will control signing anual , Uniform traffic control devices m A . should use standard round paddle and vest B. Flagman eed regulation of Contruction Equipment individual S c h p . e Engineer designate by name t and Project D. Contractor D onsible for Construction Traffic Control ter 1-2.2H(3) for specific s Cha p p re E. Safety and Health Requirements. See i items to be covered leaving) DISMISS DISINTERESTED PARTIES (List those VI . VII. REOPEN WITH GENERAL CONSTRUCTION DISCUSSION the work Contractor explains how he plans to Pursue sue A . f anticipated construction problems B. Review o r Y r , ? G - Y CANNING •. -,ALA. - • • •• - . , a w nyN K U i v v ? o A a NN?w. S U is G(G.. a( 7.u?{ I 1 a ?irr? : ?lia? u/?e/ a?ra . , frill e you ai wi// c S?c? a, I ll 7-7 4 N 1. ? $ t r r 3 JEFFERSON COUNTY COMMISSIONERS A.M. O'Mearo B.G. Brown Carroll M. Mercer CHAIRMAN MEMBER MEMBER Jefferson County Department of Public Works COURTHOUSE PORT TOWNSEND, WASHINGTON 98368 Milton L. Sanstram, DIRECTOR OF PUBLIC WORKS r November 12,.1980 North Kitsap Gravel & Asphalt Co. Route,2 „ Box-700 Re: C. R. PI 478-Intersection ' Poulsbo, WA 98370 Improvement Gentlemen: and Supplying County with 500 tons Cold Mix The Board of County Commissioners has awarded you the contract for the above j { referenced projects, at your bid prices of $46,880.00 (C.R.P. 478) and $13,072.50 (Cold Mix). Enclosed are six- (6) copies each of the Bond and Contract and a copy of your pro- posals. Please complete copies of the Bond and Contract, have them properly executed and return them to this office. i Very truly yours, M. L. Sanstrom, P.E. b Director of Public Works " Gle'" n-n-A-- BBa Tdy Assistant Director of Public Works -CTOR'S DAl1,Y DEPARTMENT OF HIGHWAYS T'1 - L 4 (?Z Book Page Contract No. Highway Co.R9.tDate 4- Z - 1 P.E. Ale- Section (Title) Comm •" 11 2U L Day es i-) tj I Weather A.M. ou: ReFts' P.M. 0 U 00 V Contractor's Representative(s) and Title 64A Location and Type of Work Nn ?(^ I Number and Classification of Contractor's Men and Equipment Status (in use and/or deadlined for main- y tenance, etc.) ----- 1 Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from ] Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate 1 /Uo Vjo&.K nAf CcuFRACI 2Ciujee,-J 2=/9-8/ AvvJ> _/ &,7L v,-A N•t<. P&p s, kIV 4U,-> RO U9?? e55 /0,1t :5. 4,,-3 4&-7 p p -k) Q.es o 1 ue 1=aD 131 em a f i9iU ' ,7L o ?.au?T NP Srn99e??e D to ?Kt ??wn f-r?v?st n? Ac ah?i/? ? > n"aI , Fassn' o u a?`?`A]4 /4niL '/o C'% AP-P- ?Rei2/FYI 64- &1L9AJVNSS rrnxn '?mnR ?u i2 CR.Apt' S? ? die uo wA 7?+F° ?L-R-iK aJC'_Q HWY REV 990 6 ]!(H.P. i].1l1 ` Y. (SIPPetl) ? InsPato( f 'r`T _.tq ?> r!( ^). ,r r{ v w n+nr il41GWWNecnvur.w+o.+??-??Y i, .... Y _. t 4 ? ? ?T/(.? 4 rte' W ? ?.',. "'y n• r it .. a y r. INSPECTOR'S D ALLY REP DEPARTMENT OF HIGHWAYS Book Page Contract NO. 'A-7 ? Highway S, ! r iZ Date '2 -i9-81 p. E. Section (Title) r r-m • ?he?1 + n c -rte /?? Z t Day -7-11 , , in I Weather A.M. St j ei,A q P.M. Contractor's Representative(s) and Title i2 :. l r r n J Location and Type of Work - ?• ?? 1 i i Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) -! ro tie , a / /-",;z Ro CC -12 j i Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate A ? 77 ./ 4? .L/ZJ r I HWY Rev secs 75 .I. 23 P r J. ' INSPECTOR'S DAILY REPO RUNUA DEPARTMENT Of HIGHW Y (7 A S s Book.- Page C' ?_ Contract No. l-7 Highwayc•c. ^D,1? Date P.E. Section (Title) Ci•--.-,t,ed .,cry ? oS??r=c•?' -c. -?-•?Y Day tycp, Weather A.M. S i w v f- eec P.M. fA Contractor's Representative(s) and Title r I l',. ,v.,, r 2 e r , eu,A„ ) M Location and Type of Work j a_, I I f Cle.a : u C e ,I . S i e II r u 1 E Number and Classification of Contractor's Men an d Equipment Status (in use and/or deadlined for main- tenance, etc.) ( T iD 6;,4?rt, t. / L( l:i •,?>Fr?S / n f? ?PucK- _ I INSPEC'TOR'S DAILY REP (... DEPARTMENT OF HIGHWAYS Book- Page ?k Contract No. Highway Date P.E. Section (Title) Qowm- 4-0 r v?->n1- }- 1 c ??? . Day WeatherA.M. // O• '?-t P.M. Uo!D Thy R. a yl tS Contractor's Representative(s) and Title Location and Type of Work' --__. Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.). "- Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate Al- wcP- 1( R l d ,t e 4c4-d,n- 44,1--,Q 1>,4kes - T,?..rTCti?ew 5.1a.1?ED 4? G,-f .v?o C.A Rt42n \jn 'rz f v a Z o / tic14Pe 4 Cc' &S--, c t-e?v 5 ? c r nR? c . ? )7 t ,v -?r I I HWY MRM (H.I. 2131 REVISED 6J76 (519aod) InspZor ,f INSPECTOR'S A D ILY REP(! DEPARTMENT OF HIGHWAYS Book I Page Contract No. ' Highway Q, 7 Date ? '1a S I P.E. III Section (Title) C; •a, j 1,7a _`T-, ;-1-:Da I y Weather A.M. P.M. Contractor's Representative(s) and Title I Location and Type of Work P c _'F? t_ - )\`r la ?; \ 4 \l.? 9 I Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance,etc.) ` c.P\-2 L-,20K VIE AC tIr )"z 1 •E1 v5r?;. noi.?s_I \ ?r°t?t 1 w r \ i ? - @AFa? i17 Rqt t { Diary (Report of day's operations, orders given and received, discussions with contractor visitors from I ! 1 , Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate p _ 1J\L .Y '•`: •F C4=-w . ? '.' c TY l.. C',i F ? C: A ? .. .'l R?.'' r l C +nr'.U T, Lz7 Cr, t-1rl Te mac [ r;.(--F ti u.SL T L-Ati ?O r? -r. .•I?C A,.I :. I` f\_ti ^,r? \..i ?'ti ?1.7t brlf.P 'l'-Sl-" I-?Ai-F c'i\'?E.n LA1/ ?\ 1C7? ?<? •R1YF• ?r.F?£. w.?tilr..f -CICil ?Q- LD CIA iJ Rq?'c i.? ?Y1 tl A1.)h 9 NWY Revmeca/aieh.r.zo.lei t t519natl) InsPatar ' ??I•,I'/,?SV?'?YaeCCE4?'LSiil'.- L51'A'4RY6'sR • m,ract No. _ Highway 0040. Q Date 7 - Q?_ P. E, i A??? n action (Title) co,n,nshell Ava ?Aosoecf .1Nf K Day XO,*V, Weather A.M. C 4e4A - FQi"j , P.M. 5c, n . y k Contractor's Representative(s) and Title X0-4 :e C5 _) ch? J= a1 40 ? k Location and Type of Work 14S 11417 644 /6 Comm St, ell T_ i, ?'KA?;wlo nRV..t\+Pe ???GLrntN? n!?'a?PP?Q,e.l fl-. ? /}? ate ?a 0 - Comm ti(ye.ll f' A.I?:u S lL/?I' I AI to - F66P2 i- 41,9. XAJ'I Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.)./ BL4bu K ox PF soo ?a o M@? r w ??e / 1 ys efZ 2?? t P? }yi/ r ,Leek -,hej\ A4 yo t &w6 Pp L:Q a )_jtZy/? P-e / s..ytct rfy f c.F 5fe Q/ WAPPl " Qal ee 2 EkR PeAs n/S-/ t n¢ep oDeC 3 !]AKePt Diary (Report of day's operations, orders given and received, discussions with contractor visitors from , , Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate 1D0 .r / r, alt- .f-/ ` o 4A-, QAltAl• 0 m. - 19 ???r? SEaerS A4a: ?r 9•?am, ? ?s*??.='n / z /oAns -?o R. ?S:_t??' S'/?. i?t+? 6roa, GN; as tea, ;o C the I s-Mz se,l-Il .07- ?7 _CiL?.4wr p,¢t,'w10 CO M•,t 41.P It R.ADitJS //'yam ?nl?s?e )7j¢ViNO /11q'/ ?P// ,4n` ? Q 0 8 `" , 1-1o F- < S Fr s t ns .1 2?F>?F_ Amp ?,C t-+,T ?.t ? iC, ?? .>r3 •t 2r? t?ECOti,?.eRB :?,? c.r?yltk? P?ro.,?tti .. "tIZAFFtc.. riZo?..,y? ?rG, nv.f_IJE'• L -+Jr G T - ? ' ` ,, Qtin a '11?t_ (n , A??? r tl r [?Fq ??lns ?? '?Gi. `n I n? `i'1\F Fi',cF? HWY wwlseo he(r .r. xx.,ei ./ ` °s-- (519netl) in lOCtal 'aA7Yi8}?V+YS^`_ .;_............. ^wwn?q P?4<V?rt L r f P .i INSPECTOR'S DAILY REPCjQ? DEPARTMENT OF HIGHWAYS Book / Page , S J , Contract No. LI 7'R Highway Cc,.2D I Date z - = $! P.E. Section (Title) cn. SL u n Day T/7tiA t J Weather A.M. eAR- Flo P.M. s NNN - S Contractor's Representative(s) and Title Location and Type of Work 1 i i . i Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- i tenance, etc.) Diary (Report of day's operations, orders given and received, discussions witli contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate 0-.9.)) ' 4V0 I ? ? n y T i e y? i HWY FORM.220O.JH.F. 23.161 RlVISO !/]2 ?IY oCJ ? InsppCt Oi i ?t• Kw ? .. r s. R ?J Y J l JI INSPECTOR'S DAILY REPS[ DEPARTMENT OF HIGHWAYS Book Page 6_ Contract No. 4, a Highway CO-RV-1Z Date ?y81 P.E. Section (Title)U-m,Kl,pu g-- t ?uc SN?r Day 7"u.FS Weather AX Oyeet.ASr - DRmn 'Vo Contractor's Representative(s) and Title -R j tkn C o.vuor (??aQ ngN) ,Q e _45 ate \ Location and Type of Work 1F2fi r NUTA19 - !Se- 0+00 {o t6fa6 - Co n +, 1. 1 CRA109.b rrze. 'NQ . VA., c are 7n + e Q r J4 Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance,etc.)_? -sao 214w KNov. pgvep/wa'<h o / Tq N e /--L-?.z?ste? Rotlet+ oel ' / ?eC 5 e c Fla9nee ovs 2 RA10052 2/awe < / seaogo i ? T s?o A Go_ a?ee w1 QR4.?/ 1 9 Sl 0 106t-00, yJ / r. o o l2 Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate RivAq N :3D, 7'vaK c x?oa 1r n P tl 'f- CO to Rp 4-4ct[ro ^ i,nd PO wAl -3 . f1Rn /n Sews / an .Zarlt t S'{. wb/? n S o coot. ne Rn A RR, ect 16 meant'";X"eC AQpRKD .V 4 Fkg t w.t Sf 0 ---'?- ? T t e26 I a/A/T rR ST/Q FO Ca S+'bo f St/o fo .L+ '/?sf N,ti o ?nr /*/., ? 't aka G ° r, ADe Ope/uI-ro/J veR4 po a 5&ee7.pvo 4r &vY A-jr) 1,&Ao A. r evew) v cA> e. AY- 4'.tt0 IN 0Rwwei roWA- <,,SPPA ..- (f1Rf` a) 40 ty'rpowN 3BCa r L A ?Pj en 0. HWY FORM 422- (H.F. 22.t 61 REV 15EO 6/70 (510 OO? IMO t01 L. / INSPECTOR'S DAILY REP(NzT rs DEPARTMENT OF HIGHWAYS 1 1 _ • Book Page ?Z 1 Contract No. G 7 Highway Co. Q> • tZ. Date P.H. Section (Title)CeMm• st+e0 /FNO rposp«t &e- s lt Day 4LJ e)A) - V WeatherA.M. 51.n/njN P.M. ?ti 4- N'aR C/-• n5C--mh) Contractor's Representative(s) and Title kick (Foxe maN ) i4 GvP (s Location and Type of Work _ c,'/04L c??D SV O _ r• e s/,.// 2;.,1. u.;,sh'(-gn t2 Ra evAL? Sfv. 7roo 9r 9aa6 RT-Aa r t Ave• 4" 97?e, t Pa n? I C 1 Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) / GRS ? e4ce ko e , T D S1 o 6:R.4 D ej ? / 7 ,4g hap Sro ? Rnll .2s / L-u,.,/, fK(ACk Z F/AOr? - sj I 4-,a/3 eea Cpob Hap" 1 ) / / 7Q /tC?OP BA-m !Je deft fJ? I I Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters District or FHWA unusual conditions d i , , , recommen at ons and statement for monthly estimate "CallRAdak keenau;9 z :'finRle MAT&Ot;4k p", IfeR ? Ou ?- ef= Ryr0QJ VA,* --'1- )C,6 r-4 J'ISO k RK<la/r7 i [/n?'?5/ gND SQR1?P mN n SA N T f f/j ?AQfj ?O kP.4D •GoQ .e<?I,a rl . ? 5?--,4xen ""t- EhQE n'F 7Q )e?eAft 1YND R404,5 ,St utt SIn I? K1f'A* on/ t Co.u`}a4e It o R n"D _S [,mP ?,Lr}piN 9 aN FP sperm d-r7,L-,Q Q m 1?9 I HWY RHV 42 {041H•r. 23.151 (51Ynetl) InsPeclor s; ' 1 ' ? w a ? ' Y 1 a ? p INSPECTOR'S DAILY REPIIPZ ?-1 DEPARTMENT OF HIGHWAYS Book ?- Pane S? Contract No. ti-? R Highway Cn. RD. tZ Date Z- Z7-81 P•E• i Section (Title)Comrn•5hP11 4r11, P2os?ec3 Awe Sao Day FRi t?AY ?I Weather A.M._5 t P.M. ,,1, ,,,?(6,2iy 1 0 ?acas> [ca s? I ' Contractor's Representative(s) and Title .?_',c\-i Co A,nR a eelm '4 ??}F (sum) Location and Type of Work r~Aan.,uq Cgs <r/eb n- r -? s L? os ecy ?4yr, RPYna?41 N?/Su ?A?/P ns ap _P?pox -5 a0 ?o Lee /?Y Joao ys?ecr' ? f?f I I j Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, 3 D, 57nA (SellOPP w4ep_i tM19Z/ <)fPP/ w/oP/or Q//PP _. I _2 LIAn/D nnPD. is nirs ? .C'!'4?O np_Q S,?.,,5 ? ? ?¢RO a-B? _/ /o ?? o.A ? •?-/r ?Mk ? I 480 Lo?nC?2 ? i I Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate i c SAP RRC1C •?A wet A1C TpDA /U Y ems, s?ti ?. s n ?o R A) t<, . CTA0.DiN9 RPiN4 Dd. (o v 0. 1ti-Pn sy&F4ci.11D ? F vA1 ?}2?A\P, _4&?n •L., D ? r1jk+ u.J `bYA C i'nA-T22i?-L. T. ?i? 7Y?e0Y1 'en 9'fOO ?'f A.Jn P?1A P W-i CvR AVfk RlIM-uW 4A L, Cl2 wSlF V su ?/4L/nI9 / - f p..r Ar ?n?_ Aa1ED ?I CRtA HPO r n?Ase, ?? (Rd e? Rn QO > Pa j wpti 1lnP t Ceuta nGC l n ?a ., O ekbs tnarh A,o 1 d 'Al I e\ l3nt?eo?ty /oor? ?oQ o?>r ?1??'t?ua i I ??- t o0o?'t-t S 1)'k4? ?Q et_Sf?? (`o J?Qa to li t c? kf -?.. 1 inr? '1?d'? ,rz.?ca_ j HWY RpORM EV 9422-4(H.P. 33.151 r? Inspector a s /ir:. r r ' _....,..:._._. :.:._ .,.. ..._ _..._.:,:._._. ' , 1 S DAILY RE INSPECTOR P r7 DEPARTMENT OF HIGHWAYS Book Page x Contract No. !?-! 7 R Highway cn. R>>. (7 Date ? -7!>-Pl P.E. Section (Title)C?1,2,s6e%k 1-2 t yf• Day 7% 1-4/2 WeatherA..M. c?ue?taS Bnm er`e4 Ks P.M. Contractor's Representative(s) and Title R; c c c ?n o 2 h,t t h e i Location and Type of Work i Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance etc.) , } I I r t Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate No woP__v I--DAV . 5 /: // 7nAvn n . I Cv,o*R4e nra? an ?a?le ?e a.?/ DlInA)r= 4.uD w;// -nom J'b Tpm.i ,Ck ,,W Q)oy.-D Nn w((,O--AoQ ?v2,n:>4s / Y i FORM egg .P. 23.111 HWY REVISED $115 6/70 (Signed) InspeC101 I- .. 1 4P s r 1 i F ! INSPECTOR'S DAILY REPG7 DEPARTMENT OF HIGHWAYS . III Book Page y2- Contract No. ={ 7 r Highway e-o- CP 1 ? Date 2_ S RI P.E. Section (Title)Co-m, ,L?? r7nlo ,'ua?tf eve. i .v I . Day 1,ue P. Weather A.M. P.M. F,•?-, oti ? ,1,:,, Contractor's Representative(s) and Title &L,- A C---, ? , Location and Type of Work f t i Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- ? I J { tenance, etc.) l r I Diary (Report of day's operations, orders given and received, discussions with contractor visitors from , Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate { 7' in J> -c- }-' T r k HWY nevlSe o 6/9e(H.r. 23.1 51 (Slg-d) Inspatol r 4 G.. 14 Y J r F7 I INSPECTOR'S DAILY REPO(,R.T f .., DEPARTMENT Of HIGHWAYS ) , Book -I Page 1 i Contract No. ?=1-7F Highway (In .00 12 Date Z-'?l P.E. (:e.nir74i?Ii•y Nti?>)?'C y/?rYY' ?,??. .T•V-+-_ Section (Title) 6i)(41 Day WeatherA.M. P.M. ?uEZr-r -,'7- I Contractor's Representative(s) and Title Location and Type of Work E i Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance etc ) , . I i i i 1 ` I Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate I A.) D 0 o 7-;-t n 4 ?- Y 1 HWY FORM 1RF. 23.101 REVISED 6/)J (519nad) Impw., - - ---- ---------- Y r ? Contract No. 14 -7 Highway Cc?•40, t2 Date 2-/9-81 P. E. Section (Title) CO.'Im, 1+_0 Day !.LI WeatherA.M. QUeQQ/t i - 12-S 60 p.m. ouel Qc,r9-?T- cgc Contractor's Representative(s) and Title Location and Type of Work Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate Cy 1'QAe?-a /"4- 1 J r .? J n W c? t wr12 K - ?r C•CI 1?1"2l (`?'? / 'S \?r1 S 70 .(1 Al A 141 n1- <,?t•?' /-/ 7p_sylnl7 AN17 /?17_ C' Onl,.?-. c¢.?`'1gD S s' I HWy .ORM 422O021H.P. 23.181 REVIBCD 6/]6 (510nea) Inspector a 4: y J NOW= INSPECTOR'S DAILY REPO?Zt r-. DEPARTMENT OF HIGHWAYS Book Page Contract No. H -7 R I'lighway ce An, I? Date Z -13 - P. I P.E. iN ^SRu`??ch 9?e Section (Title) COm n. It ' Day FR WeatherA.M. nueeQ-AST- Sear Dcizay_ P.M. ?,rr2rA?T - ?nmr RAiti Contractor's Representative(s) and Title i j Location and Type of Work Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) I i i Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from i headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate ,r l AA0 P <nAKf D J4 "A J?AiN % Lo f o i w.F?e/Z -S_A&I1'Ai T 4-D P_ I HWY REVISED she(H'F.:3.rei 4- 7 Z 7 &_ ed Im ? ?'?1F?iiTSuk?i'3AAR°a'wam?una_I' IS, J 1 INSPECTOR'S DAILY REPOt JaT DEPARTMENT OF HIGHWAYS Book-/- Page y/ f 1 Contract No. `A--2 I-iighwey ems. t(Z, t? Date z.-il-€'l P. E. CoMm?nN :-ly S{?Q\I Anr n ?r2nsrv,• .f Ave. Section (Title) * ?P n e • Day 1n.1 e i5 WeatherA.M. 00ej'cdd,r - Sn7rwiti'y P.M. 0A N Contractor's Representative(s) and Title - Location and Type of Work -- I Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) - j, Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from i Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate /V c u1n1? K Ton AY 13 Ce lo, q-k)-OP I j Qj AJ AX i t Mo R ?, ? v r to n n ? K A r? /n D/1•'l I I I I i i i j a i I i I I HWY rtiv s" a/ie "aoesl (S19ned) Insp ctor ??' di'N6?xINL?11949AYIWg4l •r Y V 04 7 _j r f ,r r r INSPECTOR'S DAILY REPO DEPARTMENT OF HIGHWAYS Book Page Contract No. 4 Highway ('4) .P,0,17 Date >- P I P. E. Section (Title) C mw` )N; ?? Si,zT \ e Pr?c`•??`c t /? e Da Q 17? Y Weather A.M. P.M. CL( wl-, Contractor's Representative(s) and Title W-1 7- K. n ; a K i Location and Type of Work 1 Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance,etc.) Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from ' Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate AZ a n P le C` I L L? A-c 7F 12- - ?- t C??I r - b?-{q-i4.}6' /-? -/-• e < n I i?F r) ' C?c N R o r P v )L e e .v C'r. nl ? ? $ _ _A?D Qr-1%, -C2A•`n ? G(wP en'cCS < /c rn -k'.9r io le L, gjg 71 Y Qp, ' s SPC4'-ONE tN ?2C S f7P -/-P P m'AC r T /3 I `? ? . 1 r 6 HWY RFORM EV B422 /G:IH,P, 23.151 i 1 (Slg-G). i.w.wr fff ? ?h??'?" 'r?1AT1?TrA'Rar1a?NUW .-,r u ? 4 w r Contract No. - Highway m • 0.a • tZ Date 27- P.E. - t 5llell Pnvs?eC1- f?VE r_4 E S - Section (Title) C:0 ••n4NN, Day T ` T'? ??rr r n.?f s Weather A.M. 472-5 r/ ? "J veRer9 s r P.M. Contractor's Representative(s) and Title Location and Type of Work Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate C°,??,7t2r1cro?' ? 7`- ?+•?/ or3 ?-e DAY 57- `// xK we7? ? ro on - I y i `NWY RFORM EVISED 4/75 \. (slanao( Insoactor y • ?y r , fi S. F. No. 8233-A-12-69. rN INSi ORS RECORD OF FIELD 13'"}T j Sample No ........................ .......... Pit. No ................ _...... Date ...?_.... .......... .............. _ Time ?._..__..:..._ Cont. No 4 .._..._ r s j i ..:... ...:... ......................Aggregate for .....::: ................ ._.: :. _..._.,..... _.......... _......... _...::..: ........... . ...................... ; ..._..: .............. [] State Provided Source; EJ Contractors Source; Informational Sample Only; El Material being j placed in stockpile; [] Sampled at point of acceptance in accordance with section 1-06 1 of the Standard . Specifications. E] Field test of Control Sample No....._ SIZES RETAINED PASSING SPECIFICATIONS FRACTURE { Fine Grading (%" Minus) t 21/2 ..................... Lbs .....% .................. % ._....._...................__._._..._.............. _....__..% I 1 U. S. NO. RETAINED PASSING 2 .._.._.._........ ................ . .......... _............ _.... ........ _._..._..... ..... _..._ lliz.___..__...._ .. ................. _.% _...._._._._% ............ _.. _ _ ._._ _ 4.......... ......._.Gros....._......_......._°J° ___--'••--% 11/4 ........ -..... " __...... _ % -% ofo 6.... _....... " % ° 10_............. ' .. ,... --% .._ ; r I •?s.._...---'--- ?? ._.._.---% -----% ___.._....__..__-.__..._..._.._._ _.__..?.7 16...... ................ ..... .._.._........... _% i/2._.............. - % 20 ......................... ° 2 i s ._------- 30 ....................... ., 40.......::... % - --- ° - d Pan _.......... _._ #4 50 .................. _.._... Total------- 10 80. _ .................-.. . . o { 20 __.__-'% - - -?-__? 100 ......................... " c 30 200........:: ......... ? 40 ___% _ Pan....:.-` -..::.. `.. 50 Total ............. •.• SPECIE ' . 80 % Organic p.p.m..,. 100 Sand Equivalent _,Min. i 200 % Fracture Fine Min. ' COARSE AGGREGATES Silt Test .... ....? ..... SPECIF Moisture Content ° ' Wood Waste- -% _" % Max. Sieving-[] Wet; ? Dry i Fracture .. % % Min. COMPUTATIONS i 1 - REMARKS 0 Satisfactory, Rejected; If rejected, describe corrective action taken and disposition of rejected material F i I ? . [] Written notification of rejection forwarded to Prime and Sub .F. 26.96) Contractor. (H ? t i INSPECTOR'S DAILY REKOai .? DEPARTMENT OF HIGHWAYS a Book Page_ Contract No. A-79 Highway Co.2A %z Date 1-7-2-PI P.E. Section (Title) PCoSPe& Ave. '-nr}eRSC ? o Day '-FII Ak Weather A.M, aUekeA6.1 =- 1?qh1- Sl n.- - P.M. Contractor's Representative(s) and Title Ie? o ??> Fc a a.na 1 Location and Type of Work a D/da 9><OU 1 12 .NG GRt.lc a.n SuRFAr) 9y-ec3 L11 V- ? t Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance,etc.) `I C7o V r,PAo,oQ? ? LMaP(ItS ? F/agpepsn Sf 1 +n r nu r n ?211nk ?? 1i C, i Cn4R1/ S4BPZ ti Aae/pP Rnaek `. Aw1O v'1 RQ AoIYC?P - 1 Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate (-o.t O"UP,S rKA-D%.u9 C/JA'1Ze B3 R4 1 ?fsV.D ,eo J/i6 + I kA?', i?n ?4 m?KJl Q01tek J A) <D2.PiF-bi 19 .¢A 1 lj c gjejD 'iJQ LK_ eD i CJ9c X0119 'w ,Q2C>r1t ePAr> 61 - T_ Ski Aj- DewAl ??oac -P ?7 hn P/h RPr .<.? m.QK 'qua ? 2R_'C ce fir, ua ? ? ?1Q.?.? A. Iso DSO `l-?iPAn ,yo7? ? I.uoRK ToinoQQO1.U ?1?%z?? p K ''4 we?f&eR ?H,P. 2].101 HWY A?Vyip 75 (519nstl) Ins Otlotor W ' wsiA'.sne'M.IS641LWY(a r• Y ' f J J r 1? l 'S DAILY REPO DEPARTMENT OF HIGHWAYS rr INSPECTOR Book _L Page 30 Contract No. 41'78 Highway CSR 1?- Date P.E. pkos-ect 4Lie Siv><eP--. la../ Day Section (Title) Weather A.M.(2tPL'?ORKT- o aaw 81,1- wF'Y P.M. 53u PCAS! - Contractor's Representative(s) and Title Q'.eh ('01-ok^ L7oRS-24IV i i Location and Type of Work &RAII 19 o'Z4 el RnkDn I 5f.4 0,'00 V-1 92-00 Ro?l+ S ' ? na ?fi? awo 9x©o l r-- A, Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- 3 L19uoaeRS / 6 n.2p2?a y Z F/4'0 / ) D X70 GR.oneR etc t ? . enance, t 4 } I q Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate i i Qa I " "_l _ ° 164 D ` fr h I o r n s*4 f4 ><o OR f-sd L-1 A-y,.2 Q %0J Ley 4AUu , Mv?e (rQ•sDe /off , T¢y?y ,4 n a ,?;?ch ahf ll n b'?r?, _ ? p 199-1e2 _R1,9e9n1 GRAr)'. j ( oeRO_ 1wfh ADr R RivD 4 f RD N 'id TR+FF'P R2v"srnnt .4#cQ4n L+Q.yS Ar cv,Ja1. 6,?k. AgfAe0-. o 7 c`au r< r R r i , ti N - (? 15491`1 XrA Gfi4 /</ t SO -66 /6+'-00 441c'g 9,w uu9TeA 5T7Rn/Diu9 yA QdnO felt W,±-',1N b-9 De(Q C-gv044 CnioT EvPN ?? -fo WeID rYeD SPC1P19o' a C Ru<1/-eD 5uRFAei i9 'N 4&eAt Reevny .swo aleve 7p e._-? FORM e22C O•IH.P. 33.Ie1 HWY Revised 617e _,_? ? 'x (Signed) Ins Oealor 7- -7 v Ir VA r a J J 7, DEPARTMENT OF HIGHWAYS Book / Page Z 9 Contract No. y 7R Highway Co. k0 ( Date -ZO - ®1 '? RoSPert i¢ve. ?. P.E. Section (Title) ?mmyv%Ey ShNll :C f. Day 7"?ne5. Weather A.M. S e AR - .v ` l D P.M. i Y Contractor's Representative(s) and Title _o na G e N Location and Type of Work n \ea? ?,o ,ti v? r e ga)Ng t[? '7 *-5-6 -1- ttt '9-boo RT Adze ?/4u/ rpm „ol ,3,,kpdw 'Sbq C"d ? 9?r,d <? a Ri t ?P ro ?1y v ? Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) C46 e T o , Qfl e s, >> l _?CS x r n -S ?AAh D > dwt? A Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from ` Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate d -e^??Ar'{nR ?` i? C lP ? 57?r4 ? 3 .? G.2 kR14 NO k'?e..D !` L` xrdl/A?cna_ A12vrS?o_ `7f so L 9 0 C 7t2Acn Yk T" 9u/cp I - I&V n-IATPQ I'AL_ B AHtP Ne n'n.u`v Ysc. 7L '/"0- 1064- f6BMLNAL Cb,,eQ ol.i 4- AS rh r L ?? ? M ! oQ JAI ATe O mA+PR' aL .CQ - </ ' iGYEP' /1L 1G m-Ij Lie Ab s e 1-n14c?R MCJA ><oR Pm?.1 .L1 eJ- welze e I I HWY FORM 422-4(H.F.31.151 RCV19[O 6/]e K 'A (519natl) Inf PPPlar 41 ? 01 INSPECTOR'S DAILY REPO( DEPARTMENT OF HIGHWAYS Book Page Z6- Contract No. 1429 Highway CO. RD. t?. Date I -/s- f3/ P.E. - CGYYIMNN I\? S?¢\? $N ?¢CSeCit\0? RN 17 - /? Section (Title) an?? gct /L t \, pSP U d -- g n r /. Day uP WeatherA.M. CC\_eAR 00?\7 P.M. r\E P -cool Contractor's Representative(s) and Title - R ,e h lzem,Rro Location and Type of Work Tv,; t o nT T { JC r oo C-OJ''I n1NN?4.\ Sh'Q„\\ ?N'?CR?S G? CSI, iOn1 -&PAvel BONED" S't4 5- ,-p 9' A P 0-,e1 &i7 ke- Sn f Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) L -4L460 4-,-M 12n7,Pn '? yt2e xupget, ? ? ar .4[L'S J c P? i ? \D.3 a.. ?Q.?,\lS uC nRrVp? 50_C1z5t9Pe?S01VZ L,.4eo2P 5? i Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA unusual conditions , , recommendations and statement for monthly estimate i '. IL'AA11M? End=E01 ?1 hair 13 nDr 'nir7 w'/-h ><a.ee ? i? tI AP??9 f?P.N . 71 Er 4A) D wvn '1U0 9 4119( R12Q .OU) oN t?2n5+? /?-JP -`IiJ? e D Gj]B.P?DNQi Lri-?\'t CASP N30 llD21 (2 'wr fJIQ A /QfPP/,i u !` ?N?-P P1? - 2Qe,P I r, ec* QJP ??U7 i HWY ronm axxao?(N.r. xxeer nev,seo s/re (SlpnOtll IniPar 1 "SPECTOR'S DAILY REPO DEPARTMENT OF HIGHWAYS ' Book___t! Page ZZ Contract No. L? Highway co.Rp. 12. Date 1-13-8/ P.E. r ¢u p Section (Title) 28 o 6 P P e / . sy f Day Tu es Weather A.M. A'i?, CL n S. Coo L - F q? a P.M. -, L _ r /c3.4 P Contractor's Representative (s) and Title M1417- Koa4k s to. Q)Sh Foaem/4 i i Location and Type of Work 6Mn:n, o SfA 6-100 ?n //-7100 -50 t•? SPO+S 4- / StA %-F?A? '7ts 0 ems 9 )? ??- y Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance,etc.) Z )n; tP wcDp -1A A S w?) nR'?J PPS, / snsu F•M+ /4LS GpAD L VSa ?oZPP ? RAua?, R? kSeg! a\\Q 3 L.4RoaPaS 2 GIAc??eRSnnts _ ?V tEe(z Pe a A-0,t- C 00 rArlnane 4 ke, i y h RS . I i Diary (Report of day's operations, orders given and received, discussions with contractor visitors from f , Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate j L-? ` T n.ICPO ! - .r1Rnr\-n R5 S??• RND FixPrnAn1 aR.? n?ol,ae?'c„J :p, cDHN-1 C,t .n r tirLa.a.-dnQ _l ?It-N.Se RV NQ 5I-n1?2i Gel-4•N? ?RaDP C?aSPe Arlo ?e+l. _? "fy C? e ?` N R?ec?P? &AD QA< Ai ske\ ,.r4ItL? PO\kQ Cn r ?eeH;* c .V 1 AND Rag NesieD A Pn_au nAT'e Ro//eI?, M1 tii L? roN+?Rc?R 4 7-/'ivroQ? R7'/N 6/AAV (2RWN q6"1, Ae Te KPpD T-,.7. onl R k(e,(' y QrZ ?e _hA1fP. rAN'\GM ?oL apej N7 t ?•1' ?J ? j.PPAD nn DD p Isf? l• NG?PD? ?S 4, _4(-t D;n ?4F' mH o 2wNPV %aD or 1, 4,G+ pPWre$5 mArE'CAL -Yo `Fd u! avn ,087" Rf?PR eo.n ?aN, , IlRnc\oR .5}1134• q f a C n oiofl wnR.K'ti0 cR cHP? j 4-4P < ui1,e RP a Rgx! nm' ?1CL' A `5 ? ? i ?T3Ari\P ANJ woQ.[:NQ 5 ?'1" SPot S m,-;L Hia 5.)Vt r m/ a. 41nw/y aq.e CNJ ( r l 2T T YZ 57.0 T<Y'As?IP LQ t? ?Q\ \V ( r`??r G\-A Pts-e.9 ANp 3f0 iL4,AIRn nu+' 1 ADC \u.. So. e a4-it, 0.q?. q Rml pA PC CP 4- {p Io4o N* NNSM (4M P bei RI.AP 4np s 4 ALj l ft 54-A ? o 7 HWY FORM Bhp 6'6(H.F• 23.161 RCV -,1 (Sign6d) Inspector ... - Cy i IVn K Y f . t, INSPECTOR'S DAILY REPO }tT t ) DEPARTMENT OF HIGHWAYS t Book L_ Page -3 Contract No. y2 ILE _ Highway OD- M t° Date P.E. Cowm t;41 ShOu s„t{eC?ec{ ate/ Section (Title) Day Web. Weather A.M. r', \PAR p _ P.M._c\PaR - crJC9L Contractor's Representative(s) and Title R%tb F-okpma r Location and Type of Work F rP- nrou,,l f S'/e 7 <no E1 p3 P 041 IN9 GQ ?H CD 5 . e Cnr'„J 0 - /r(,-np Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) _ /;s g s- 6 p ! -D _ B /gee, _/ 98oR CAY- a4DP/?. / fI,.FNR TiC A l n opeg4zmp Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from ' Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate 'Zj"Cy I-A A A0 e;L&Q(4A1C, 2m if p Al a..,. ,dd!dle> air ,44yej S-&R w 44.0 oPA 'Al n cad,Tlf/JLYfl 2-- Cn < 6-O/ih it/d 'f nor/ ?o QR <d-eo 5 ?-?------------ N 2 9 c i j9 ? {x/75 p pP, ? Cn t? Rn?21LL•(PRw. p ?l, uS-n 17 C P U 92..1 1^6 u r p !. f? r f D l j' - /core ,nrl nP -z /n D 1Ql4 el w / D2',/P?e ???? / 9 f0 R c.nr 4vA .o / EIA4 All < br, [&A ee i hnc t T D Ur P ?>p 2 hg2s -L 3r oN 1/ //dc i -' ?o .t tr r ---p ?M12 Sin P ,rv101•A10 Dol s Toa nAl nti? 'I-?QdP Sry`?-4 HWY RroRm EVISED a 7:1",F, 23.161 I IW etlI InsP?tPI I: ' Y/ a •7 II^ / r INSPECTOR'S DAILY REPORT I? Contract No. U Highway 0 tc_ Date P.E. Section (Title)?O "?'?+( She" 'rA) eRseC4?o?1 gtip Day Weather A.M. t? P.M, A Contractor's Representative(s) and Title _Q, C I F nRc'4 AN Location and Type of Work G co s S ? ? 7-F o ?wNrt [? -- ''R aer ?- r, Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) T. O. - e 3 p D, is- e F:n - (gpAbl-k a L5 / FI-1 soul o ` r I i Dia p g 1 ' Diary (Report of day's o operations, orders given and received, discussions with contractor, visitors from I J Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate -44e,4 o ? ..is CO. J.1 L> L1. Am 4D f2nt Lo N ow •ON ?.? ?y,? .?-?-o ? ?> r Svc K an iz:o o ..?coN _ r .vraacT P 1L,n?1- r P KiA< L f INSPECTOR'S DAILY REPO DEPARTMENT OF HIGHWAYS 1 Book -? Page I Contract No. Highway re. ea Q- Date P.E. Section (Title) Covnr..wro ?v ?? P ?? Z ?PCSPri;o J a„/o Day FR 1 ?co pest- 4ve r +. Weather A.M. BOLO%(pN C\ n iW-7-1y S vjtd _ P.M. nuPgj` ur2pAarl,{'SUAM/ Contractor's Representative(s) and Title 14 K o k R`I^\ L, Qh t4A) Location and Type of Work .u4 :,?-f 4- 8400 4,) /Xto n Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) 671) A rkaDaP-? / -S•D• 1150 Doz.ei_ wrTR_?le)y)- Romp 4R'Att 15 1w/ Dk;ueRS (& jqo PASCAL P 6\\eP (<+ePk NICe?e?1i= ?PL>savS 1 Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate C .r - 1-J19.7t?E9 CQ1+M(A14!S 1511J (VJAI+) 0C n QoaQQ -?.¢A?? C C nt /-An4 MS ont\? I F vPRSO 1 Fle 4coLK rape cF -"%b Nt9a c? wa4 Naw Adue JPQSon75 wleNevee R?• ,5 ?/ocK•eb? I Pc fow Q m,??;n70 ?OW PF 1'n?P.S o.. ?,,enspect- 4 1/e. T"-i?,4k.1SP-d-l`on/. ,nP A?v f5taKPS (`o nn.\P'MJ CQ?,}$]?A?o f ),- \en 6.tl.A\*Mn ,,.t e RA/SeK 9n kpW on, Co,.H-tAo4i 5Le\1 -?,.,?cP Q S ec?'• o ? '?-bZall ?-?; I/ fnl e C" ? i -h., (2 QI?a-- a•.v rs 20 ?v _ I -9ef ?,? e1??4,?` fnlPS 52Y Rtij a?:// wiP.eDS r6 i9/ov2 k?1285 ? ,o e:,u /moo l es . HWY FORM 42200+IH.F. 21.131 RKV15EO 6/15 Y (Srgn d) Inw.t- Ir.a?j'rt"I?xfC?'^'c4w?sn'vm?mrmmruuumreYr....,.^+^*?'^ r y ? ,f 11..1. A r J R r INSPECTOR'S DAILY REPORT ? 1 DEPARTMENT OF HIGHWAYS Book Page Q Contract No. 417? IlighwayCO•p0. (? Date P. E. Ii Section (Ti tic) c. ow,m4A)'._} „ ?I \\ T , } P Q Se C? ' o ?/ Day 7-/9 11 Q, Weather A.M, n, j p f, c .¢ T-c ti oC , L ? e AG??N°e^ s? oweCs I.M. _L`1LP_R Qns? - r?„? - re ..?10 sum>e.rs Contractor's Representative(s) and Title -IV IT: K -),nK - s ,? R ! r QN14?a t! Location and Type of Work UAi454il-ARIQ (r r I i Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) J 966 C ( ar ?PADPR - / TD acp Dv eR goon 13aoor" R"jk I - IONIC> D14alp .pNekC iv'fh 'Da'JC?QS 2 F/R9,nPN / GoaoerZ - eRA i i r_ L. i Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from ? I Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate 'r n..,-?R Pe?nR reN ?', n1.?e? FxcA /n?? n at iA,s4'4-54.,1? lP 1 0.tPP ni ?'? ?, ,an ? /,C ti f -29 Li }N? SO' ?2a?: C ?S?P!/ t 4/ C? tPQI QS ? y oc?mlt_ ? so c?{? '7 PPI> o lam ? ` 'S IO t>Q- _S- ?./J'K'N.?f`r r.IP ?PJ ?IAJ QI. P ?e ?S >`0 77-5"O ` CoNIR4, iPP ?i15 a Pp 01 CPAI/P Q?w Q ?JP +-(= TilQ ??KS ??A .1' 1 uAi t ,crr i 5? rK I R 1 i 22- (H.F.15.151 -f HWY FORM E4 4 ,i REV15DG175 i A '1 (Slynstl) InS. tOI L r l Y INSPECTOR'S DAI .. _ ? LY REPQRT r DEPARTMENT OF HIGHWAYS Book Page , v Contract No. z -l) F3 Highway C`n.Ro, L Date I-1- P. E. Section (Title)C'nm N'{ SIg1` T J'-?-r? R KPr+' 1 --Ms-- - i ? ? pay U/ o. D . WeatherA.M. A,lP?o n ZT P.M. (a c/?sr Contractor's Representative(s) and Title weolr Koo'AK I - S Ike- Q h _ FOR .nqN Location and Type of Work-- Gnlq 5-1-.4. Otno + StdO U ra '-i'4R\P Qom.-vtn\l,al S-I-A 17-Fnr, A, , It;+00 i i I Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) ! p. 17701 e _ / T o j - o - 9 a R • r'L :R - L.¢soCe _ F e s n/ I Ra?ror, ax,u_ R? \lra ? s>? I ? b ref 1 i` L i Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters District or FHWA u l , , nusua conditions, recommendations an d statement for monthly estimate ?Co,y{k/i \,nP n ??' ?nra 6"RA ' C I . II n) O?KPn r /-/A.u/1 a ,.. GRAveI 3oa u/ j 14N_ o SpPi?&n I? Uj'1 r. D. 4A-0 ,9,yo ZT10 ,of jr2 a ek 4k,- 9 f 6 eel wkeeleil PLO IIPR wl('c?1 i3n 7 ok - -Z,FoR e el19At h w;11 F, 1 LE jqA 6 RROPLAQW O•Z ( ,Yn) (? D)ACf an/ ? u (? Z.? aT C? Qu??.c 7 P C ,o I I ts- e T X1.1" O? I . ?' - OW Az 's Nb t ?QE?)e(`>`i \ 9 .fF Dr' PAP u ` f? r?/,acl? Pn.a-? Y.? ?fo.? ?/'u¢? W ?i Ceo 2. in o Co v' Ra R .a1-46- `waH. Z a RnJ Rlo f' G (? r il ?l.49rlt Pro ,I, Pn / P / A/J /Z P ' s a /ocl? ?p ? HWY FORM 422-(H.F.2].- REVI6CO 6/7 is i ` a (519nptl) Inspector ??id??w'?3?ifitq Wuuiw.«nv.'K'wm'kp'p?'+ypuiGYLiiryianab YYU1:yi:i?aKaWtvFtVkcsG:6iLiM5t4AYwumxewp:Kp? mnr-?y. -?..u n 1 INSPECTOR'S DAILY REPO?B? n ?EPARTMENT OF HIGHWAYS Book Page _.C-& i Contract No. ?A-1 is HighwayCO.RD.216Z Date p. E. Section (Title) Co+v myn'' ?y Sl"elf Se lei 5 ems} c Day Tues. Weather A.M. RRcj&enl C/Cd o S P.M. oL 1ii1M c1 x I cc Contractor's Representative(s) and Title R/a/f K .;>:.ok - $w• /l?ct1 ne 4N Location and Type of Work- G2n;A) 9 444D.-oo it. 6/00' /0 7 mow da ?`. a F _._ _ ?o n. Tv \ a t• . ? S / o R foo { ? r- i?,?-op Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- j; tenance, etc.) MO, 570-19 x&&Deiv - T D ern b n ?/?t?'?+ a?yQo RoiIBQ 1 _E? Na / n e g Alum !? 1:1 k1 CPO)- .A.s e 'F?i44?N -z /O ti 3 D I ? l 1 Diary (Report of day's operations, orders Headquarters, District given and received, discussions with contractor, visitors from I , or FHWA, unusual conditions, recommendations and statement for monthly estimate } L.,.jf. a :4 o C erP+ W'4!1 ielP P-"- 9,5- ,,.an l?' n wl? F tAP oe Do f L jJI D:/e{'i 2•. ///4/ 4.v5u:lAAIP /'(.{.}R n D'reN i? 4 [fc 9 N?fR4 i?a n„n,y.. II ' nn R• Yd.o nx:,.?? nn - nK o D o he C ?4.IJ. 1 f}i.of nu..,K De ,? i i!A n t .?, n D i t t, .ve / 3 tie tP 6e f icon Na ?" ?;lfPD h?l '+L ?? n f eD• coact. 4/k/in SjaN A). aND .,E tod< caavi r acK.o ne .? <g uD. nvs>.Ai/n wn_ _R,ue eev?t• <sds AeF,D Sri C.- CD b y v aFF P} C ..+len 1 n -III ?.x elH •r. xa.roi HWY a[v seo 6/7 _lZA K ,Sico.dl in.bector ,x ; ti f INSPECTOR'S DAILY REPr i? DEPARTMENT OF HIGHWAYS Book NO I i ? Contract No. y 7 HighwaycopQ I Date I -.5=8 / P.E. l Section (Title) C:0,,wN?u; 1y sS eOk i v }eesre? 6 J Day I? P.M. PgAj-Qj 5 N Weather A.M. Contractor's Representative(s) and Title Location and Type of Work ?s? TRale QPvn??lffL /Jn,n Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- w opP' / J D °!S6 DoZCR W/°PeR• / 9tt n R e^ t r /e.anpe tenance, etc.) T-,-.?---? w i3 OL . 1 I I i i ? r INSPECT'OR'S DAILY REPO', DEPARTMENT OF HIGHWAYS i 1 i Book--/- Page Z Contract No. _ HighwayQ)D kD?(2 Dateh' .9%'%-.OP.E. Co+w+mMN:Y'yS".W\ w PR.ePP,c.'?- .¢vg. Section (Title) r) 4e A. s r? k: o n! s Day M m,e< t Aj oD- Weather A.M. /J uEk tt^ - w,+h scw%e P-4iAI P.M. i Contractor's Representative(s) and Title j [f Location and Type of Work I I I? Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) I Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from I Headquarters, District or PHWA, unusual conditions, recommendations and statement for monthly estimate } '7 1Q. ec.rAF l4::s JJ- 90c'?QAJ 7 T I I i I I I i I HWY Hevlsco 4/75 N.v, 23J-1 gne K (SlpnaE) InspeCtpf 1 ? a r f r r 1 i e 11 ?j WeatherA.M. RU_!2t6CAUIT P.M. mo.PROA ---r Contractor's Representative(s) and Title t J ACT V- o;A K R-) Location and Type of Work GP,%Aa al., - IV -q-r-A. 0+00 -to Te\e>hoNc cAnL Q- R!21 nQA-r ;oN - SYQ fs 16 Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- ) / FORernAN I 4A9ozPR , L-fHe D n laK / IaAePe etc tenance . , , k Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate ' JA 3m.421L Z(/p.1 D-,P 'I'R CN?, I CON4l'AIU42< Gil./,IA.VDi y1A NI 'N9 w , _ - -T A'sKeo C N{'RAC4O2 'R 4o JA9-ee rtAAL I,yS R.s &4CA¢n 5 n O I (? ?M N. ?N I sNta 25rci1 .., Akin he ?A'o he .-,p het ul> Re?oa2 i+ e . e?\ 1 ` ( 11 / I - )ale Comp w RK5+A 9^- A M^' Re1DC. H'f?..r0 1:n,e i?e MA] oR e...rs ? corvs?auc'1,=? ?keA- .0/t? ?../o ca.,,P. ,•s haui%No ;N GRavel x..acol.. C?,u _ Cn +12A I,r,a < -go". o 5-?L4 Ofoa rlo 8x00 wi IIIt I -,ti// e*RRDeP- 50 A-'f' Iv /AtVnJ ..lnjra r..,n„„o .,lob- OHD?. 7: r.x3.rol HWY SED6 , REVI }L '/ - I? C -? =c f1C,?'U (519na0) InsDet:lol 41 A / INSPECTOR'S DAILY REP(,j DEPARTMENT OF HIGHWAYS f Book -/- Page Contract No. U :2 R_ Highway ee' R O. IDate l2 -/Fi-80 P.E. L'C.•n,nuNi 1 S Hell iN 1'• r- Section (Title) Att/e s10 1 Day 7Y:2 14/2 5 DA S/ Weather A.M.!M,!u_FaA-s7- -- P.M.,avrs S,wn, root Contractor's Representative(s) and Title u)A/? Kc7P;A K._ ?uP- Location and Type of Work GRAARR 'A?7 - C ,v nu // tN Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main ?a kemep-/ i /i480 P e e. S - n.2// !7?m .a r ie,rG K tenance, etc.) ? 1 Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate ing+ CA)'/-h UJA)T mzjAK vv /?Res??c ? ??B ? tf. ff p S4owe7 tit-A 3 -4'e es RgeA K,es os ?eom ?uq t 1oe8- &,*;,, ZA- /veeoe-p 6 e,4-Re? X1.1Q Wrt/t A?0 as :/::64f Te/e - Co +j;- - w/fS CQAJS%oeQ 'A n40%)e'," jele. /:,ee ?'?..?'}•S`De /4Re4 n-C CCAu34. a-, Shea i ? C" --lP-41 j?A 1>&-,j7_ Ac_$i3;,u? TL/ Li/GNp -^j ?" _ _ ,..??SL e? ? .?Ln)'I ?ir?."-/l jU 5i/ . L?t -SmG/??in `?• DUM?D 7?R K.. (n t?QAx?e? n?Fo2ne? ?tj ?-.4AY- :,4Q IV AJQt a. WORK J+'l t l?r 6-0 a£ J/fN• l9RI/ -Tole Ca.nT c4 .caKev 3 lele n,-e- O?j 461p/1,4/7- "All Q A2 kw n- c idA' .o c?ak v 3 y Reece ?o? EYTRrt- de VO V pi `s ?e•t)e6^? HWY nev.eeo a/7e( .r. 2335:1 (Signori) Inspaatar --..... ... r.nvnn. nin+e,...m ren...tA mz..!mf.*rni,?e:.ifiu.9?Lfiitimvz!¢4Vaw2 _ L DEPARTMENT OF HIGHWAYS S -? Book -?- Page ! ?- LA-7 Highway C& 0.o. tZ, Date I?.:-_- ? P.E. Contract No y . I c•1' /-J-J'_Z61* Day ([/ 19-13 Section (Title) S:cams? 5et\ .4- -tPRCZi'g ' -- S` Weather A.M.av"c"A-S -17 --r•ra•z1A P.M. Contractor's Representative(s) and Title Cornetw u' Skell ?'iv g ain( I 0191 ` 11 Q 11e P0 4 lip - Location and Type of Work :5 f d: p fl ?,??e1Z Coma me P D ? (? StA9f? 0 ANO 1.vc1AOR Jolt w,_Te• le SeC Ce -o Cam.., ? ? 8 Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance,etc.) tir e C R,40 i? e w eR• 1 i Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from mendations and statement for monthly estimate i ons, recom Headquarters, District or FHWA, unusual condit J 1 L"` Red ,?ROU7- !7alea ont P.2os?ec? /?!@• ?f:ao -?22 t w fti ?o o f how e? q,,y/ ,n,rl?asec?ioAJ Ne D c°oe -p d er ,Iae,)e o ./a t2ee? ?ema?rA17- ?X arr pk_ 6B146 ,e x1 )a }T 1°t ?rt?0 Moyina0 NCB Caen," Z162 11 C•omp f2 l n/ 14A1111 WQ.A?<A? 141"9 Jd"VP- p t oE 'S r`A• g"' ? a Gf k • {'1' n . , l. ? ?ZhL7 nC?.2. QP.Mov n,a .? m? 3 w .Al TFNI i.U A eA ??li?•t? fel(° IiNt'S) AAIP 488, ose gvn 4; ' i h Q ' - _ e ms i-kP! Wai irs a.n.Ql ( nn1? Q ere\e.? Se pyZaR llal?eAvi A<<a Q kP? ,4:?n?/.? D?!?°=---?:fc.1A :N .4d PA n?lwnl?#,QnrAD TP Ir2 u?ltk/T HWY FORM 622C061H.F. 21.101 RI-errs. 6/1! AAMM n?J/^t1 (SIOnOtl) inspector - -- { m+ u ,a .11 ' ? Y 1 T 7 M f - INSPECTOR'S DAILY REPORT n DEPARTMENT OF HIGHWAYS 71, i Book---t-- Page ?- 1 Contract No. P?3 Highway Date fZ-l6 tsr'JP.E. Section (Title) } -Sin -Pqrl- t 1L->- Day CLS { X Vt t-tLV-ALc,?- c ? S (--p Weather A.M. P.M. ?q? Q (r !? Contractor's Representative(s) and Title ` Location and Type of Work Yl-V t,,9c ti -o- b Q4A- nva ld,t7 L ^I bS+i k?` 65 n Gov??mctic(trr bco k? e?uk e ?? v? CuU r?? ?arMco??as t. 411 . -1 - nn 11 p Number aa5 Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) - 990 -R Cn 1 &e A n cGS- i ?c2d' 0.a ®>v`ct cti ?- ?q 4r-? / 6 L L n rt CG45CL SKOL? Il 1 /8 /T'- I? ?l 1-\: U; 1n r Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FFIWA, unusual conditions, recommendations and statement for monthly estimate -,i _ C-B(V.??s?•? ?o.1z`?t o-?..?- s? ? 1 S-Fa 3iS?S esv. ?or>.w? cz1 ©? u 5 ?. a ?uc?clwa 'i iQ erc ,.?L i r a ?o 24 A g;,-A?.. j 6•a•dd-(4 S ??o s c% di l f ? a d 4--m*. l cLr GPI U & ?` CTn_ -?t-os IQ Get ?Q ?l I??c J cr?_ct ?. S cs /1 n( c°L-? ,?4 ?? I ?6.A -?i2n}- Cr_ct cc= ??7?taS1 eI-? Gl ?V? .? C, tl- ?/Lv??ti N G?u.ct r-a.C? CLt'Q,0.5 HWY Revlfeo a/9e(? w. xl.tel / 1 (SIgned( Inspector - --------------------------- 4, 7 a ?? INSPECTOR'S DAILY REPO DEPARTMENT OF HIGHWAYS Book Page ZO Contract No. HighwayCn.kr).Iz, Date 1 ?OP.E. Section (Title) Day e22 r7,0 P2?s?ect /?ve• e-R.. Z"/O Weather A, M. a IiP Rf ??T pM ?. __Ae? ter i ? n l:A??:o G. 1l?. ?T- Contractor's Representative(s) and Title _.tAa-lT" ?C, Location and Type of Work CLeA.a; Iu wh 1 e T„ R pA20s.pec7- .4JC =.v7- top 0Ai RC??e!n ,tir,le 7'oa co,,, I •l steN s A f i i Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance,etc.) cAO R CAA- 40,4ne2 Lu/apgil, O 1? 7'A Dn>e& */on2A._ 105iQ Qod2p Ae .te F,'S W/ P&Io pS z F/ PenSoN< - /L&"geP___ 1 Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA unusual conditions recomm d ti d , , en a ons an statement for monthly estimate a 5 iS ..neQ ??NO I.t5- sp t iA rpkIV AV Zc -?ID T- L • .... •A'?r:R..-O n Pt± .4TFJ Q 'F?1 e4 1 '•("{?Pv t f- O? ? lLNS ?1 rk IL 4 W l?Q i '[• 4 ? 13?K??1 a ?n? c'e? ? : ? T . =Co?4ane4..4 ...n 1a? C'1yy ? c ? '-? 7ta Boos C C <?• - - mAL.IlPI 0A .-e CAR/CS PCO: t t3 A.QN <{•//jqc?2 M`gta_Q -?"?[y '} Q A_G4o ma,wn Tvt?l?eo <}A 3^•i?AerE ?• ? t 7 (a ",-441, NA!ak - . Remo nc Gt QN F41I A lala g U S .. Co?tLaR Ok9 cu? 13:G ti (•u.vl ? <FA ?+0 1 ?? P 6?P 'H 13 ? 1? ? D L/?S'IA ?' - Cei- 6?'Lx ? Kes Tnt?QeP,?• Rv/aa. ?c?'^?,", Q 4 ,' ss r A,W& Ra nAI P,04u5 TO c(6_4 0.14 S&P T, 1 ) '!91 HWY POHM 622 061H.P. 32.161 FEVISED6/)S ,. A I C ll e% aa) Inswtor a i 1, INSPECTOR'S DAILY REPO) > DEPARTMENT OF HIGHWAYS Book Page L- Contract No. flighway Q. Po 12 Date Q-1Z, Pio P E i Section (Title) Co .M mtiAi': 1f Day Weather A.M. o IJ gP- c YV n T P.M. n e r c q ,T Contractor's Representative(s) and Title L, D; 4 l( i Location and Type of Work G1 e4L og c, n G2 to in p e6M, le4c To (? Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance, etc.) 9510 9 CAh LodDQ w/n,A - 370, ?/rM R 12n o -J lop- 22 - Z \atio D l?2ticKl u?7QjJeRS / L?Ra?e? ? ??r19pe2so-5_ I I n; D f i ' iary ( eport o ay s operations, orders given and received, discussions with contractor, visitors from ; Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate rf9:NO deA-E'•AL C/E4 2 n N1, WA ?•s `? 1 ,ice r 5 &4,P'f ? - TeIe:,llcNe Cr T. zl'?/ aTtio ?' I?z ??.s yf-c-r? .s?.t.y 5fy `e. ('r•I?n• 2(, nn RTe0 pgg aoa R r•,. PhIA QA-k •- ?o cf 4,YA.Ir S><A A? , co,,,.n ?b.n ?-1? nA,hMp •(„I ?, .n ,Q?\ L:NZ 20V1 CA-Ie l AV uNN? (? p ? ?,( Tnf ?? r}21e1: A-Nr, A)op1•1,v H ,r 1. 1>oNe0 Extep3 ?nR 77 -IN' 5-{A ?3. (.,„{•arl.\ Crn,c , A-loy F.D?E o? P4V6,*1&1ly_ r- Tor. Ms.rlpT f-e <?4 -7 HWY FORM 6]2006(R.r-.151 RKV16CO 6/76 1 .(Slpn6tl ` YAM Unsp6ctor t1 . 1 INSPECTOR'S DAILY REPO " DEPARTMENT OF HIGHWAYS Book Page_ Contract No. F 1 Higliway rn. o z i , Date y P.E. Section(Title) Cn n +n .L ?t e?? la?ti }.. Day -T__I u ? 5 C Weather A.M. I Contractor's Representative(s) and Title ?,J 617- Location and Type of Work L _ _ INSPECTOR'S DAILY REPO n DEPARTMENT OF HIGHWAYS Book I Page Contract No. Lt -7 ti Highway ('t ka f1? Date I?- 11-F,O P.E. Section (Title)r mn+u-ry S1,e11 Day 7-/140 S. Weather A.M._?A;k7•k,o [{U'1 P.M.?RC1i-5r Contractor's Representative(s) and Title ,; /7- _K r„C? j,7 IS Location and Type of Work Iti <n,u Gam,. ;N o Spa 11+00 i? H, ek, J Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate TC\e. c? n ?rac N?_?a + o n one UPOO-eo are4 K6 Yc1P L•.ye -l ?wea t,-P. 5?-4lcPl aH't' Ne. Dt, 1.C SI-A n4-`U I - ?' '?'A•'?e 11 n ?'n s oIF?n G-/2,n t1R N9 ?An??•/t'S N 'f/t 9 a S;ze AND 1ve,'Jli nF LeArCI een,< For- ?QE4V- ;A) NIE I;u,2 YcsFcp.mu r,.Ar- ?Poicks SDawn) DPrp .- M.nn P gr,e ,I CIr p?•P qT.•A BecAm.Q A ha a cteaa! , n(irA,_ Hs Coo ?{ Ell toanP t .1 jencFae 6152 tsaul a -i F D' 27- t1 f l < da uu J`les o? e? T-a ti -P 4--7- _dn; :I ?t'n /i?A-F P.s../? c ?,a .tG,P?A?f•?i- aq 'C I- P V-z lzQ /5,4nin 21 /}}p 4 DnAll ??of13s /?DPA Cla rn InZ A,n HWY FORM 422001 (H.I. 22.161 W N ?', NwE J ,J?x {- d'9l?' RCvISCO 6I7tl A ? ? r ? ? TMf ), 06 1 Y .. 1 Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- ? tenance, etc.) 98-0 ? Cal- /040le Al n n eP T o 1/ 6-6 8 bn?P2 ri U z 1? o, ?cu KS w/ bA;v2-p 5 - I Z4,so aR 7 ?? 4 eesous I I i INSPECTOR'S DAILY REPO DEPARTMENT OF HIGHWAYS Book / Page I Contract No. Q78 Highway C(. A1) `,z Date U -N-80 P.E. Section (Title) Cc--!L,pS\ 10 Day td/(? a. Weather A.M. 610 RA,,J - C-I P.M. aA ^„ a arr. s _ Contractor's Representative(s) and Title W 4 A K c:. D;A V Location and Type of Work -S ?kAr'^rT? ??r.,w -Ad 2 SM M ^- AF1-en ??- Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- 980 N ca4 Lela e L d 0. Ne -. 7.0. N-snR Dczec '1- oae ;?. tenance, etc.) T) -A DP'ur P5 _ % ?.AdJbCC- 2, G`149ppQsrw> - / Rnr1<1,nC' Diary (Report of (lay's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate -- C ??enc{?C r• ,?' es c?P ac+` .a A,.rn ?RuR? rP mou.,up r?RCIC l„ S?iI. /6 ?- .s-.vU O TS; Yo?/?1 PV?S r3 i'r 7 `' T PAN ?Cl L' RS AND - ('.,.,?t.a•L..R Rrt^..y?.i c. t BRrK\.?l' -ID F:.,,n Zaeae Tele• L:wreti FoC TEI?, -y,y?,+?a?•1-r;c ?..r?ev .n?- r.rn ar -sl?r?U SfA•i >iNe>nep 7' ??T gRA.rP\ 4r ;7; It I.,o\C' C r.r{?rcAr_(... t> 1=yr.^.n gn L''Gnl SSA. ?-/-';-0 T Clhy.?i?n r..11- SOr Aa A?w4 n?ru..r? </,rr/ SF4 f:c.N '4ni:1 ?pw -?-e R?.,` kC?ut? L.c/K: nip fn Cn of '[iG efo C? C'n it-eAC+n t•_ Q,a_.r ?1an ?l,e>rlL <:r?? ,? 5n .a? ;f- C.wv?vc Re REr ,ePa HWY REVISED•//1!'N.?. ]].101 / / INSPECTOR'S DAILY REPQ&T n DEPARTMENT OF HIGHWAYS L \r..` Book Page Contract No. '7 Highway r• r i Date /2 - F4 -PQ P.E. Section (Title) C??• ?,?? : ?, ?? ed r„ 1-,k i; o n 1 Day /mil nr/ Weather A.M.., ??ra?? ?u< P.M. ?ai• ?,T- c?,?? Contractor's Representative(s) and Title Location and Type of Work i, f J f r . ~ .... IN P ' S ECTOR S DAILY REPOfw? DEPARTMENT OF HIGHWAYS (` )) Book Page Contract No. - i:I Q Highway CL-0.n1 Date 12 P.E. Section (Title) crw o nra s Sl Ptt :vcs F a Day k),,' s 9 Weather A.M.OeaPIN? P.M. er+rli rlcunu -rOO? ?? ' Contractor's Representative(s)and Title L4 M IT (< ? ? ( , , „? AN Location and Type of Work _c\e ?R'N•, ti , C ,^ ?3 ; ?q S} (??f.•t•., S+N y i I. I Number and Classification of Contractor's Men and Equipment Status (In use and/o d dli r ea ned for main" tenance,etc.) / j-. o. urn t? a•»n 4 -L -28n r ra L-w n exz d Anon „i cRa?..?+ - / i/t O D M?IPtic 1L a,?n ?R• 1 n ? LA Inc^r-R g r . S i I t 1 aj On, -S ,?.s Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA unusual conditi m , ons, reco mendations and statement for monthly estimate C.?14?t:1) Llsc a]n?.E'e ' Jl ' le ti -/?? ' Lca ? a ? ( ?,IN Ia -40. .:.K X1'1-l? Ffi !`1 C 4n•R e 1 /Ra ? u??= 512 _??ay1?o,.sa- a 1?'.n.a Io ,a t? e f-aa4r• i,'/ 1-?+y k `s ??':vy L ?FOea ^ ? 9 1I7e4- •U.y6f}P i an u/?it /(' nCFP?n l r-El,0V A)?warll ?9af-.a SID 7 p .? p S G"S" FXC A IA.i en. t bl. ( ` , .?-? t 5A n ?Ip ul t?1 . p truyyl' ??' fL A n .J4 r AdPA 1 4Re 5t PII t?A r oNr1 yep alp- ?."JQ el?v 410 14- •:5; c e CR,nSNO> Rn? c.+ 9., r,•.,.laacV,Ifi Pe?? rSt" -k? tl-s ? Nn Ra `' 'f" ,a. pn: ni? ORni i 5 5G . / '5 nern^ -kc i v zyr mac eK HWY RBVIBCD 6I+e(H.F, 2]Jel (Slpneo) Inspector . mui?Glv%>mP.K.4';dL:F?uwu"w""'• (`V 4 INSPECTOR'S DAILY REPO (7) DEPARTMENI`0_F HIGHWAYS Book Page Contract No. Highway •ikn i? Date 17 -y -Hn P.E. Section (Title) Cc.,, „,tiA,', 'A"Y' -T,J e e(4,, -j Day J-A 1, 0 , Weather A.M. RUK- clo?os -en?t mU_Tly L\ obey - P4" •t Sr,c.o P.M. al Contractor's Representative(s) and Title 'j I ? 1/ Icon, K Location and Type of Work Q IP a re y'?R n q <?o /a. ro ntnP I Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- .. i tenance,etc.) Z Poyo,,,.Rn! - 98o R CR- 1?,4.nea ?R as •c r',ee\ T--O. Nso R V 7et, / 16" i? ?i tie e i z G4 Ptn2a,QSi r i Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate - A,?-4- -,-B\ waL'L L r, 4v , NF A5Veo r 4go T- avt NAhig'N? -/-/tecS 4nln ! 35. r I,lo u' -fo tare ,1 l I' s Ire Co ,D Perko w'-r-l. 80 L-4A n,? R . d,, Riso warm-, 7-APCt w't1\ 6-1)-e,r a 1 -1.,7760t-J. Rh Cc 5-F 411-in 4,yp Nn en Is?'?u r' N Ape AJ. ' ap ON ('01 kb 19 T-AQQ C'--Jaan Ica %I Ah E*nec<n s An n4 4 AID age FtiN ' ^ o I° I ri N rk6c-cto /r,aa? t ecw,i. AnAa - Cle r „gCiNa mAYtniAL •slo?fu ID Lnanrn dAPLI _?-o ?y-gti AwR? 11.OM A0.eAs Th,s•'1 ye'1 y° n, ?A?/ HWY nFORM ev9co s/7eln.F. xaeei INSPECTOR'S D AILY REP(JiM ! DEPARTMENT OF HIGHWAYS Book Page Contract No. !-? 7 9 Highway Date P.E. { Section (Title) C)M,n,.n,: ITShe?\ 'P<HC ?i (n1 Day WiR0, Weather A.M.Cont.-- 'gpcXem c•/,uns P.M. OVPPrv sl- cooi, ' Contractor's Representative(s) and Title Ivor P_ar_s.-.V Ir I i Location and Type of Work C,P" po? K X-/? /-0/?6 ?n? • v 9 v 151-4 9 // .rR??[ aanl I 1 Number and Classification of Contractor's Men and Equipment Status (In use and/or deadlined for main- tenance,etc.) J.D. 46n-aa,,112 npe A-6Q Cot ?Qna e,13?ag_??P Loa?N2 An,r? ?p? arnQ t /due. 12,4Y p TRk Q r 6o DRi % ? 1 ' ;j _ aRn??.R.S f ? •?'S?-??s?8 '?noo.-ri 1 r Diary (Report of day's operations, orders given and received, discussions with contractor, visitors from Headquarters, District or FHWA, unusual conditions, recommendations and statement for monthly estimate - Rnap rn -^-4Q..tcarn t ID ?°^in Z.u12 so Al o?c 2 F?Agrnen/ /¢l } 4 ! '1 ?` Ri o (Z 1 tom 41 5 PP ue erl x I eat ?-?- -!QO/M TN'I'e ` V!O. CONS- .Q AA. 4AV2 iGND nN Cn RD 17 l JoLAA Pa54,P ' ? • 2 00o c1' . S};(( NtQO M9in.fv PAP D1. e$ /ri A/P /Ro. can,sT• RHaAD? l R ? END Ces+• V. Co. aj. I 3 ?}bn ?. Qn N.ac1?N' h Q RAn 4 HWY gevlseO6/75 v.zz.tsl (Slpnatl IpSpBCt I 1 MM Mtnw.bl,FUi `iad4.wlN.l?'?bVNjh"l$v -•p?f pv.? W l?{11?'.{?n_AV .. 17'n .,/q A?kmxN'i1}.??br?Zn°??N?SK?{n?f+?M{n'L?YY??v M?ar+??r?r?udw.,?sCypi ?T? ?0e7ae K9 1N x , f J V 14 FORM 350.071 gg DOT gEVI5ED7-7B WASHINGTON STATE MATERIALS LABORATORY f DEPARTMENT OF TRANSPORTATION 12869 REQUEST FOR APPROVAL OF MATERIAL SOURCES Date 11-24-80 ?t Cont. No. C.R.P. 478 F.A. No. City/County or S. R. No. Jefferson/C.R. 12 & 18 Section C rm=itv,9 Te11/Prosnect Avenue Bid Item -- DESCRIPTION OF MATERIAL SOURCES OF SUPPLY Appiovoi No. local Si,ppl", M.nvtc- er s Bound ar P,I No. Anion 5 Crushed Surfacing Top Course North Kitsap Gravel & Asphalt Conpany/ Hadlock Pit, Hadlock, VdA Y-132 6 Asphalt Concrete Pavement, Class B AR-4000 U.S. Oil & Refining CoLnpany, Tac i WA rock Hadlock Pit, Hadlock WA Y-132 7 Asphalt Concrete Curb AR-4000 U.S. Oil & Refining Compalay, Tacoma, WA rock Hadlock Pit, Hadlock V? Y-132 Contractor: NORTH KJTSAp GRAVEL, & ASPHALT CoMpANY Submitted by: aro d L. lihfijff-Presid)?fit I• have reviewed the above items and I I concur, I I do not concur (attach comments) Project Engineer - DEPARTMENT OF TRANSPORTATION MATERIALS LABORATORY USE ONLY 'Sources of supply for all items checked I ? 1 in approval column are approved for use on the above improvement provided the materials delivered comply with all spec iticanons. Action on items indicated by number in the approval column is ident fled per the following code. I. Source Approved. Approval for Change of Source must be secured from the office for Construction and Materials per Sec. 3.1.7 of the Construction Manual . 2. Approval withheld; submit samples for preliminary evaluation. 3. Approval withheld; submit brand name, name of manufacturer, or treating plant. 4. Approval withheld; submit Transportation Department pit number (if known( and legal description. 5. Approval withheld; please submit catalog cuts and/or shop drawings. 6. Approval withheld; 7. B. 9. 10. Malls File _x Dist. Admin. Reviewed by_ Project Engineer will submit control samples of m aterials Gent File % Marls Engr Phone No. as covered in Construction Manuul, Chapter 9. - ' Pool Engr R.V. LeClerc I Seattle lnsp Office % Materials Engineer Date By SEE REVERSE FOR INSTRUCTIONS soro w..r 8 Moor. e....... roan.. IM:. . ?pppppp j ?W',ttf Pl'. wf l?. srAu? Y^'?,1„JI, tl '•?'?"?dF?.?s?<, t ?l' xy ord ? ? qq ? . ? ???/ .ma?yy.rr.. F(`fl"?% I -J s J f r DIRECTIONS FOR USE Request for Approval of Source of Supply of Materials shall, be prepared by the Contractor and forwarded to the Proj ect Engineer promptly after award of the contract, The Cntractor shall provide all informatio n requiredonthe the form Project Identify the project and describe his Intended sources of supply, sign the form, and submit ALL copies to Engineer. The Project Engineer shall review all items for conformance to contract requirements; he shall then sign the ap.. Provo', making appropriate notations, and forward: (1) the white copy to the Headquarters Materials Laboratory, (2) the Pink copy to the District, (3) the Green copy to the Contractor and (4) retain the Goldenrod Copy. Copies 2, 3, and 4 are information copies only. Notification of approval or rejection by the Materials Engineer will be forwarded to the Project Engineer by copy of this completed form. The Project Engineer will inform the Contractor of the approval action on the proposed sources. I Approval of source of supply does NOT constitute acceptance of materials for incorporation into the work. *The engineer will conduct such tests as he deems necessary on representative samples of each material before approve Ing such material for incorporation into the work. See Section 1.06 of the Standard Specifications. In general, the Contractor must request approval of source of supply for ALL materials required on the work except where he intends to use sources provided In the Special Provisions for the project. Identify Items by Bid Numbers when applicable. It is not necessary that a separate approval request be made for each different type or size of the some material or product where bid items for several different type or sizes are included In the contract; for example, request for approval of source of culvert pipe should be combined !n a single source request unless more than one supplier will Cret be furnishing the pipe. Request for approval of ready-mix con• r e must include the brand of cement and identification of the aggregate source. If the Contractor desires to use a source other than that provided in the Special Provisions, the request for approval of the alternate source must be accompanied by a letter from the Contractor requesting the change in source. The lerter should be addressed to the Project Engineer and forwarded with the District's recommendations to the Motenols Division. "s?1'a?'i>"7rnru r'?sssan;?u' ' 13040 I LICENSE NUMBER 19,20 ST,ln- TV 6698 WA L - I pA1E -171118 -TEE PAID 4 /24/k I$ 84.38 CASH i EXEsU'T ' VOID 000 1 ADDITION(' TONNAGE PERMIT = WASHINGTON STA1'I:" lRTMENT OF TRANSPORTATION HIGHWAY ADMINISTRA=TION .DING - OLYMPIA. WASHINGTON 98504 .,.an authority of section .6.1!.095, the Del w named is aulAOrltad to operele fne yehlcla dascriDeO Aereon undar re9 lellgns adopted by the W4shin lon State Trans t o C g na ion ommission un111 the p espimrion dare /nomeled neredh. Wlreeb- of -Inw/"'binabon must meet vehicb wel0h1 table Its Of... weight r4lwrtiad and meal I t l n erna wneowao roomer m. I« -to nla ar Drpga of .Ito. Wheelbase of sob -11 must comply wllh Vehicle weight !abb. This Pormlt does not eulnwr onor=lion Over any toed or sirucl era In .rte=s of Posted Ilmlll Ihateal. Purmlt Is void on any slrucluiu poatpd "Logs! Leads Only', This Permit validon Slalu Highways when Rogul=r winter posted for such hlghwaye road roalrlcllons are In torte ONLY for wNghls This Permit not valid on State Highways when Emergency winter terf,ict... ere In le,ce . This Pormlt valid only on SDp;OS v ud Washington State Highways. Not Valid on county ro=ds or city =treat, which era not 1 eute1 tela Hiohwaya See Attached Map of Restricted Highways 41 COMPANY NO. NORTH KITSAP GRAVEL & ASPHALT CO. 1 119 Rt. 2, 8oz..706--._..._.-----------......------ POU1Sbo, WA 98370 ADDITIONAL 3,000 Grose w.lghl on SINGLE oat; not to ..d 20,000. . 'r Gloss w.lghl on TANDEM ..l. not to eac..d 74,000 Tbs. . . . . . Gross welghl for each TIRE -1 so ed weight provided by RCW 46• 44.042 . WEIGHT LIC. GROSS WT. 80,000 LBS. "", LIC. GROSS WT. 80,000 18. LIC. GROSS WT. 80,000 LBS lll Irur4 it LIC. GROSS WT. 40,000 LBS. Z Iwa L f Trv •• O O O ?J I Q? Ril • O 1w Not -id unless monim m gM Purchased in ou9rdon<e wen RCW. MAXIMUM SPEED SHALL NOT EXCEED POSTED LIM175 FOR TRUCKS AND COMBINATIONS NOR[f: Thir .rmi1 mu,t net be r,p,.d.,.d end net -Hd vni.cs rerri.d an th. r.hid. it .... b .d. r BOOST•A•LOA. 40' 13039 I] ITC[ SE NUMBER 19170 STAN TV 6697 1W/ ')) bAIE 27,2B_ FEE PAID 4 `2480,$ 84.38 CAIN EXTMPT VOID 3 B. 1 i], x j 2 121 L-1- '35vji.DO.a037,38 j[OORARY NUMBER 000 _ ftS tusrl"1 ,9 }OIOUfi515) TRANSFER N( 03551. 6 LC. GROSS WE. 80000 LOS. LIC. GROSS WT. 180,000 in. _ 1 Arle Ir.u.r /ill !ties wilt r 3o A.I. end I II tre?lwlC 1 A.I. frmi•N.il.r v O• •• L O O O n LIC. GROSS WT. 80,000 LBS. _ ,? I l Vrhid. C.mbinsll.n V1 LIC. GROSS WT. 40,000 LBS. ] A.I. fete frvis •• ' Ilot •ebd unless m9.imum .eaten! Purrhmed in arrmrdpnre with RCW. MAXIMUM SPEED SHAH NOf EXCEED P05tL0 llMliS FOR iRDCKS AND COM MORCH This permit be net b. .is dvr.d and net ..I id vn I.sr ,.r ri.d on Hi BINATIONS. s ..hide d.srribad. 00051•A•lOAO 40' DOT 560-070 REV. 6.70 DOT 560.070 REV, 6-78 j ADDITIONAL TONNAGE PERMIT WASHINGTON STATE DEPARTMENT OF TRANSPORTATION I HIGHWAY ADMINIST=RATIO=N BUILDING - OLYMPIA, WASHINGTON 98504 Under authority of Socl/on 46.44.095, the below named Is eolhorised to opemI. the vehicle described ?'. hereon undar r 9ulellons adopted by the Washington Slate Transportation Commission until the eapir.6itit dale indicated hereon. Wheabese of veNCb/combinnlion must meal vehicle weight table far gross Weight authorized and meet Intomel whe.bui cf.ile...is for weights on groups DI nabs. Whoebase of sob unit must comply with van" weight table. This Purmlt does not authorize operation over any road or structure in ores of posted limits thereof. Permit is void on any altucl ulu posted "Loyal Loads Only". - This Permit valid on Slate Highways when Regular winter road restrictions are In force ONLY for weights posted tar such highways. This Permit not valid on State Highways when Emergency winter restrictions are In force. This Permit valid only o approved Washington Slate Highways. Not valid on county roads or city - shoots which ere not routes of Slate Highways. , See Attached Mp a of Restricted Highways NO I10 "•'re _ . -•... -\ 42i COMPANY I I 1 118 NORTH KITSAP GRAVEL & ASPHALT CO. - Rt. 2, Box 700 r --•____.- . Poulsbo, IJA 98370 j ADDITIONAL 3,000. I. WEIGHT I - Grass weight on SINGLE ogle not to .s<.ad 20,000. . Gress w.Igh1 on TANDEM sal. not to .a ad 34,000 tbs. . Gteascw.lght for each TIRE rot to . (sad weigh! Provided by RCW 416- . . . . . . . . .... AllDI I'I r ONf TONNAC,I P1:1U11 f' 1198G WASHINGT a ON STA KTMFNTi F TRANSPORTATION HIGHWAY ADMINISTRATION BU ) Y "r MPIA, WASHINGTON 17 IICINS[ huMB[R 19 ,20 STATE 71 ' ""- -- -.._... 98504 Under n - ouf olllyo! Seefien +B++.pp5, The IT hnen below neme0 is Tinsfo oprrule fhe r0nrO On dascnbed i H 17598 nreon under regulations adoplntl by the Wushinpfan Stole fnle Trunporlalron Commrs WA expuaflon In md/caled he " reon. slon un the 77 DAI[-77'70----f[E PAI UY--57' wnoobeao of veNCb/comb nolbn must ..Of veNCb wof0nl table la fit 2 `4 :'80 j5 75 0roaa weipnl aulho ]ed and m 00 lnt-al wh.Bba.B req.1-nents fa we Ms n 1 o a . . o s of b le. Wrlueboso of nob unit must tom veNOo r weight table. i [A]L1 [A(MRi VOID Thi P s ll ermit 11 a not -p author ]e opmmi ah a-or any road or alrucl uro In Cacgss Of poslotl Ilmib moron. 1 12 17a r7 13, rermu le raIU ro an n any aNUawre paawtl Leg.a1 l Londe only ThIs ' a Highwa s wh R 1 I J 1 -all y en hlh oguIs,went or road restrictions ar o in force ONLY for weight a ]SvInG0aNO777B'"" ' - ' -- oastodfm h I[MPORARY NUMBER g Ys. '' This Permll not valid on Stale Highways when Emargoncy winter roslr ctions are In lotto. 1 000 This P slid r only on aneraved Wesh1n01en Stare Highways. Not valid on county loads Or ally aNeale whim a aS f f I fl aO?olOU1r e157 7RANSf ER NO SB are not routes of Slate H'Ohwaya. [A e P3411 : 6 See Attached Map of Restricted Highwa s y VAHDAI(D BY. 117 NAME y a7i. MV N15., 1 / 1 T .118 ease wal ht SIN g,0 00, an GLE -ale net to NORTH YITSAP rRAVEL A ASPHALT asd 70 , ^ Gr .si weight on TANDEM oala 1 Rt. 2 Box 700 n . = fa nand 7A,ooo Int. Poulsbo; WA 98370 .? Gross woff for each TIRE rw1 to and weight prorldad by RCW AB• ADDITIONAL 2 r 000 ?. WEIGHT .,t - LTC. GROSS WT. BO 000105 LIC GROSS WT. BO ODD LB LIC. GROSS WT. 80,000 LBS. LTC, GROSS WT. 40,000 LBS. ? ] A I. T.auar Irll Tr.rl w,rb ] ] Arl.- a ] A.I. S.I. ?? ] A, . Sr li 'I.r M1 ]„II I.a,l., [.r„y;nunen I ,. ] V.bir 1. C.mb,noli.n ir.rl I ? Note of UN SPiin t w^?btvpv¢noud i o;donn with RCW. nA HAn H l ..11 I I(I I 7 f i r `1y y Y.. ?J t ! J ? d "-.."-_"..A. nil - __-__.----- - - ?: - '-• .ri ? ? , _ x" 71 aw.' Z ? r '^ n • QF6 n O a i u t ' 8 E CAS Z I g 0" Z u„ J yy z• Z ?° _ u • _ Z (( = ` a S Q ? F o eg g N u - 'dad s ; a _ ? B e ` s 4 a O ` f ? I a E Z' W v . SZ f i $ o ? ? / ? O. Z Ec sa 00?_ :y W ? Z$( E J O 2. r ::fix I aom o°• $fi=?=¢ ;?c p ?orn > ?m 10Z' aaa a oa °;„, . C t ?r.O H ?4P a . a . ?a ' Y ??Z onc` ' SNn _ • i. qq? ?rn CJ . ax ??i=iiQ ovo U og V ZCd Q 83 3Q `ee=oo_?c7? ? ? s j v ' ?g?i-: Cam: s ?a°O , c n ? •• ? l _ ?.. ? . O r;, W j zi P 8 7y LO ' CL,., 4 1 . Qp N O u ' F y a 0 ? pt e-I C) CN t -M GM X °o , c^ij o z°+ ? I °?d i J z*x g r 9 Qo I H w --8 E j °o C'sa I2? S E ® F ?S o o '-C Z ,S ° off; ? ' moo= o ? a ? = xI ? g jN C O r, R. F- O ^c :Oi sa?o°= fy+ k.?QO oh Ey LU C) V oz J, x B: O Z oac 3 ce it 0 8 " of° "'+ NH o _ r no N.:?8a t o6 y m o o. oz li-H Q HOC 2 p CD -d u C, A =P I r - e 0 3'% 8 .f 4? Q wee a - E .•?b E•?_ ? ? 10 $n O xr°. E, .. -???77.2 48 ?g3E° AIL p 30± •_? r p 2?N . ? . • - F C. I S6? • • 4x1 i et O _ f$ ?? " y E 7 p r •i 8e Sg b k ? n 2 p Eo7 s°o i? es so s r ? v v?? y{ iii i; , -» a a: V. U .. 3 r h t: °a u E"r Z Z` 8 e j Cd $ t • s W?= c a x '?- _._ I z IT, GI .5 ,OQp ;N ? oc°; Ew ? ? O O m ° $ u g =c ohm ED ern. O 0 z?3a?§?gSBr agy V) xo3 ! ' 3 o- C? [?, £@ Y O O° ?("e r?1' N Q O ?b g O L ==m C's E f..U' `eo 3gE-`€ESI - 10 cif O 8 i !F F ,1 ?c°ot }tia00F?8?-r`. C/J^.?' = O 'o_ f c? O p a„e _ i?j M??I • a Wei . $Wt 00 C-0 A Iti ~ E oOgC ge ?03'? 2 p", W ^ y ap. w :3 =36 = al;? . ?N14 ego i -- „ - - -- - :T?- --r?- r I ? r M m E ° r? g n° _l 25 ie rI (] ? to h - = e T ? R c o $? O b e ? ? pq S 9 `` I I j Z Q bA ? °' gg (W =:o $ s N W x u g I o -4 =3 00 - _ _ 44 E g ; 4 ; . a T . xh - N VY ~ O u ¢ i + v Yo ?? o' i o - .02 E O ? Q S ?f , a ? iw ?' .gg o 3 EN W O t = €aom `? ssgoP ?z o ? ` W g ° C s ? u ? E o ? 0 F O $ =°° ° r#? cy ?°¢ Li 3 i 0 In L m o ? n? C?Z oc <aav e CJ ?, _ E? I - F B# c cz ° f i ! o V u ? _ boo a d`ag88e QJ S En @ CJ V `•. ; _ ??? - ] ?? F O_ Q aN ? i ylYw M W - 3 5 W _ ? t.: C t!> ^ T • x,11 y? t f.. z f^-\CV o?fro $ ?? i E<; Eo; PC; 73 r a k ? r I ?I O M O X ?1 g .? g; 8 y Igo $ s • 3 • I ? P bo ? E ? Cd ??O ? = i • 20 ?WJ a O ecrzi _ o ? N O q ? 1 ? Yom/ ? 99 ? ? Or T$ • Fi i ?y ? £ ? $ 1 ??? ti ? ? _ r V • s a m ? .' ? ?v ? I 1?--1 W $c9 a•E$ ?x ° I N ? Q Z f e ? i ??.. sa?QO_ Oe ? $ - c rr W uo +bv8 ;_G Q f0 = C, > O _o > 4 -3:. z $ ?: T N n 3 J Y , y F4 8 a v Qe _ O OZ 54 O cc 0 -0 ci= 4 v ? s V Ii cOj T 0-4 ^ 0? Axo N ? E 2 N 1 © £ .;; ?? ` og A?, ? o s ` ,? a;jg =a ' x'33 4? ? o coi Q 25 ? ? of j _ i ? xe 1 ?, 02 .. 1. , ? 1 Scc t n LY{ N.I . I • ( rt: n. Q X o I z ?. .KSt 3 .. LO 1 Ch z? i W N I LL r` r ? N I ?. . -• OO O .^. s a-I = 07 N oC? ; _ W co Ln W N ? to ? W co ? .r o? X i S o = .'". lo :gin - p M d0 ? I ` u o" C I d " $ Os 3 iC ` 2• E W i . ?: V eo O S S? U:090„'?. J o'sg F • iii I ?„ .. i ° ~ I I C p I r P bo `o v ? W $ E 1} o O = a O S O t , I 2o o .w iE . .4 . i Z to 1 aw.o •b o g 1 Q • I i F?"Yq? ? Q b w b I O > ? ? ? s ?t? a F O P4 s ?z ? I ?.a o m a ?? a o? `< ?I ? ? ? w= ?:.Q7li r O { ,dole B 3= c? o i '. cd L Li Y r`0 2 o°h o8: °aw'rCj 3 N HOvi :?8 a _•.oa I o o? Q £ ' ?A Q A moo: ? c v? i v• cd p ?> O ? R I ? r I - -1 Gv? " ?ec3 gv> _?? `cS.EJE. ES€E: •? :$Sa- .? 2$S r N O g (? id ?EqS ! - i i y F i 5 G.voev:1. II a k' _L R 3 : N C7 z 3u a E , fX ' ' LI I 2 ? i ?' o . r I •? • ? on C {? _ F? N $ e? E a M o V ; W`o Y ?• 8 `OO r? t s2" W vYl <2 '< rr ? '? W s si sr s ss a ` ` S ° u :u ?$S zi z n „ r 1 fi ? •? a , 4 r w al l p!?,3 0= t ?s x J 8 W a 6 C p 'C7 °° a 4 zO "ti So u vii t Lv E' N o ? $y V) 3 Qz Zn.b 8gr x " .¢ R "a .~' aU-5 2.`-co4 v 3't n { w 87 ;j z z o : o I 04, J, c 'Y CD F y - er 3I3E. i7{EES : 8 I ? y O xCc I I it92 ?codE a$d d' O r i?7 i g gi- t 31 .i? t o a =3 ! 5W? `o Cl) ax- Ol O N Oi•l0 i i ?- '; E7j ' r...i .., 0 0 co ~ „ 6 r F i x t f O E' w vMn ? xIi ?iw t? .$•p .8?4o sit - -ar-- --7-7--777-77 ? - r A l now H a s 1 1 1 11 Nei 1 aoR_ a ° ..x ? NQ s° 8 1 W •-0 0 m j (1 m aC o a C Ib Cb p • ? Z ??z _D J C 3 w `? Ol @ I 0 9;. f Qa? o g Yy x 3 g ? ao -6 m O z. V =Q ova lLuc `A°-v U •'-+O fE ? ? e y J-1 i 3 a >' ° _° ?o• ?a 3 E Eo E E; C $ i p ?? I pr G f o d dd_ - J. r? ice t f?a°!?8r???? yy F > r o X:; no j I f oe3 s , • _W co 3o. E!; W h - o ?+ 2 O En _ , .. W Flo ? e N So Aye '`'` - s = t 1Yy' I r ?; O ? 7tl} d, ?A.I t ? o I ?`Q ? m ? q 3 AA4 : A. ,n , 2 u H ??v °° ? ? ft 25 p 9 m ? 3 be a i ' b i _ a ?U 0= RI C 1 4-1 ' I °o O E t t PI Eo s_° O O i W h s O ' i a ry ge ? abpg CQ rFa ? m ^ e? ` cj co O? e W Z • qqEo? a (? Y l O= 02 OC 8 g T = °y w o - Q r .:q8 g m as }} y R. ??Z D e 2 °l ? co o $ I n on p? ? 2 e?• +: Z O, ys`3 a y o o 'L'i N Y 1. © _. ; F$ 4n . 4.1 ? ? O 8 ' ?:5 i?o 3333E_ EE E EM ? _ y. C,): _- O 'ioa r F i O $ ?.b 06 i 3 ;3 ` O WI c° - 3 5W _ o f 3 ° W 1Y ;' F t = S • .4s i o i h? F y R O 0!J a. I ( P CM _ of = WZ? ou ? 8= I ? U r?h1?ea ?? - _ '? v ? ? V?-a = b ei. ? J I i pf,•Z Fe° 3?'Oc off °° I+ 1 j'?Oma? 'g???°oY `•?s O ? ? i ? i 'V YIZ G EE i?. ;moo (? yy ~' -'o Rd ? J p 1 cd -C f:.?o ? ee8 a o8c = oa ? ? o a 4 -w M Y CJ .O go Z,' 1.5 S2 j= C C' O O i j Cb * Q 413 I'S q7 i I ii ` e `3 .. a ' - N j • W r [ to! CEO .-- ,? m ?'F.b'• yz a o? _ bll a \ s= • Zit; s ? .t 4' r -M. 1 1 ?s ?F cE ?8B• ? p o. ?o H I.: 00 2R o z ar' $?„ z W S me _ g ? - N r? Q+a < oq fi' ?++ J 8 N t ??Wh4? Z QIe« a _ _ t LL ea 3 w m ° r g.J J - i W o ? rn t r? Q O „?o : i C3; «S C) V = - a (n x "eu C- m C:) 41 0 ZC'n. O pmt s p ?rr?'r S a g o a$ ? YE? E 5 E CE s ? M ?? u ? '? E I Yy pqqp? Xul? 0 u„i ' C\j SA i•! L i t f ° .1- _ :?y?Y $S?f • cog q l =c co x n\f• so iii oo: i 0 Ep? ; yy it U] o\ p O VV a? s - "i + f vl ?g o 5" ':1 +Y wry, + I ?1 7 ' ? ~ i litilf ? 1 i9 • ra 1 r , i? j nc E °e ?` 1 P. F a':o I I H a °a ? ?' ° 8 ? ? z3 g -zc * LO, z g° sad °o' S °y w w o w 41 F a O sr :1 E M _ 12011 2' 131 1:1 O Z 'dra Y h - 33 Y O O C?zf YOB Qa a - as ^ti '?: mar '?f cn F £ c• S nF-Y i-: F IL i.n - gr • gvt w N N o W 'F6. ?L ?? F 7 co 1 11 no \, ff, !^, « Fa Y 8 ??s e?4 Oto 'In .ro x -+ Y o°?az e3 y 3 m rp I I r ? F. y '5° i F ?'' •'4 fps ., i ? ? .? ar 1 Jfr t F i ;ry 4 r ? ? 1 I ti ? ..: o? ?xd 0 Z .+ o a $ E ? Cd I i x a 3~? ay O O> E ?. o u g 3 f= U ° E 'o 21 WQ $ ° «mz .. r?Cd h = V t•" s _ ..V•I J vi f J mm ? ? ? o Z O m o T,a .O -°o ? Py 9 V '? r-. a Oa? i^ z .oY m- .i J O i f Y . ? O y M 0 W 1•-a O z A o: a 3 5 0 m co 0 L T ?i di 0 `a n J° r 3 e cd cm CD 3 Oo s?snoao a= _ -2 ,-mss ? '? .n° ©:z• o$ i¢{E ?i e3 O o`'Z.1 SN'N't Y Aa ? ree x?$.g ?? ? g - ME -it • .. V eat aE ya,B i°: u 888 ? ? TO. ? + ? of - 8 '?: - •°? ? ' ,q •?' i -u 'lot I -V EN y3, Gz 6 C4 z i 10. RK, J?q .-+ ?1 O h i4z , u`: u9u`E ?6r ? OWEN 4fA 44 Q W ? 7 1 a` a ? e? o aor TF, ?Woay:° $ a _ o u 8 a? I o m ?' ° ?° w J - (•?wI H CO e` - O> o g ? c ? ? N ¢ ul [ O?V Eo ;°900° a• n Fi/ Q $ i H O ? v? 6 y 4 W W Z TN CD C) Cd L) QZ?Zaeh$a8• °°gyrc ¢ ?Q x 7c O-Lo ! E"1 t-= OnC °`u?ie? V. 1~i 6] w OL Y /?'? 2 rn 4J ? {'?'? _. ?•:.HZD Ni3 :T ?a O? V ?ci © Zw v=i Q o'ac c5 oc - cog Cd A a, wee .. o u o m F s 7 ,pia o ? e°5?;? +•? zcro_ Sys ?: ? I + ?':_:>o aaEa ?`3 EEV? o ` it I? ? Ey! Ep• e C o ?"• I 1 Y,?. Ca ZS SF6 h?•G!?-1-i I? i ? ? ? 2 0 •T?° j. ga ?°' F Q Q: ' W I it _ 8 ". H",? •=oZ 'riE. W . ' 3 't S to FUR Q7 • 1~ O '?? Y1 •Fa p x -t O TOE GO ?> $ : <3 6Y 8 ??7 e?? ?-{ o -Ito Y - o ?° go S? ??: ?` a ?oi ? r ml< rt x M„t0 o yn sy 3- 10 C, rv, - 1 .? y ? 14. t t t k w i.' 17 r t J;4?' j ?, • w ti a 0 2. at! a o 3 e C y ? I aox a a \ I ?.Waa d< ? - z a z [o_, E u s a w .O ? c W ? I C O Q ? 3 n ? g c°? E In °C -a-7- CD Q L'.1 m i ? i QO moo' s:?i S? cd c?o°°+ ? Y E og. IV a? g ace GGb 08: w , ¢ ¢ .?U. Z GSL c°Ij.N c? m? - ti 'I 4 Y O _ A3'ar`'°aa?> ° %? 2 'a8u 3 3 E:'E b E E; O $« V O <? : jet-? a°tl°: L? g-a$8°? LLl ^ m ? ? _ ?,e ! Iry - r? C ey #s Fat ., =3 Ot oNP SO? 3 c N 1 W i ii S A4 gW ' !00 ~ o S w 'Fb'. 0746 a .'o= .? 3 a cV '.- O m _ _ .. y 7 W L to ? ? _ a 7Xe( a S.. M u O H < IQ = I Z O e?? W co CCDI ... z°fz t4 I w t '+ a N 1 ? r. i FFERSON COUNTY, P,,AsH. T ION REPORT ROAD CONSTRL1C C. R. P. Q 715 DATE ?-23-?0 ROAD NA,Yr- 1?6AD 110. _ /2 STATE LOG NO. 9., X70 } 5EGrIOPJ TO SEE /r:'Pr70VEDr P::.r? 6.9G TO PA. P. ? 20 ANNUAL AV. PF.OGRAdI NO. TOTAL LENGTH o,2¢ PR1OR1TYARRAYA'O._= EXISr/NG ROAD: (FROM STATE LOG) l?IOTH 8 -z2 - 9 SURFACE I- Z- t GRADE 4ZZl ALIGNMENr 41 r TRAFFIC COUNT: STA.PIO. 2a ADT a/o6DATE 7,f PROJECTED ADr '7o.ao YR. PROPOSED IMPROVEMENT: ? NEW ALIGAIMENT [] REGRADE [_-] DRAIN DENS. D L.B.S.T. p?C. PAVING R/W [J?l'/- /.z.? to 'I ESr/MATE: ?DAY LABOR E ONTRACT i GRADING ; r'/i • - l r ! s irv a sao r r / _-ESI:COST 4hoo DRAINING EST..COST SURFACING "f0 C. Y. @ /o. 7yo EST. COST s'/na OTHER S EST. COST •d-ao CO ST FOR DAY LABOR------SUBTUT44 x LOCATION AND DESIGN ENGINEERING ? .r.. c,,,. ES7COST isno R/ly EST, COST T .tea a CONTINGENCIES Es7,cosr TOTAL ESZCOST o" I o od aQ REMARKS /N/T/A r APPROVFD FOR ASST ENGINFER PRELIMINARY ENGINEERING ROAD SUPERINTENDANT R/W-r/rLE REPORT ,? cop/sr. ENGhA'EEH 7 2IZ-OFF1Cl. ENGINEE CONSTRUCT f/ N 21 APPROVED ?v dY w , , UU T ENC+/NrErf GAR., 1979 /ttv. ,-/s-BO V'r. , ' j - a,.,.r Sp:"?' ?°".^,?=up;? +-+-"---^.A.,nan•u:?C°s.,,xr?,A.,?':'--^ J?? aaut??',:a r v r ? r , CHECKLIST FOR COUNTY ROAD PROJECTS (PRIOR TO CONSTRUCTION) C.R.P.II 7A date !7e hr S.E.P.A. Checklist date Plans Completed & Signed date Right-Of-Way Complete date Road Construction Agreements Obtained date f//4 Hydraulics Permits (Where Applicable) date. y14 Shoreline Management Permit (Where Applicable) -date rJ/4 Forest Practices Permit PARTIES TO BE NOTIFIED OF ROAD PROJECTS (WHERE APPLICABLE) date Puget Power -date Pacific N.W. Bell Telephone F : date/LA United Telephone date City Water date P.U.D. Or Other Utility Districts date d? Post Office (When Road Is To Be Closed) date Sheriff 7 i I 1 r I r 4E? I D r }{ I ? cy l r E. I , r U rU, i,' a M EAU 2 C?o r y r i L? j° f f? 4 a (rfry n + a ?I ? Y a r w r a? 41 r { j Mill r ' f ar?r ? ' t,?7 U.5. DEPARTMENT OF LABOR WAGE AND HOUR DIVISION STATEMENT OF COMPLIANCE J - App -rd B Igel Ba p ..rp R1093 \ Data 11 2 (Nom f P S P rl ) (T1tl c) (I) T at I pay pp v c t or a Payment f tlepersons empl Dyad bCCy.?11 7 d hereby state: ?/ <. ! 'r - -? / , ? / the ` / , that during the payroll period comae acing on the ?' day r5?r / // ?1j l9.1L'. iaudins or w and end rkj f f tag the --!fd / lq E,. L t y & all persons employ y wa •s earned th b W eak ed on said project have been id the full i - • C? h , ates have been or will be made either directly or at/noo re / -? / / Z 7 ? indirectly to or on behalf of sa d/ '^ ' C/ ?, ( 9 C4fF/kL ? (La r from the full weekly wages earned by any person and that no deductions have or) been made either directly or indirectly from the full wages -mad by any person, other than permissible deductions as defined in Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor under the Copeland Act, as umonded (48 Stat. 948.63 Stat 108, 72 Stat. 967; 76 Stat. 357; •10 U. S.C -76.), aad d-enbe below; dd ? - (2) That any payrolls otherwise under this contract required to be submitted for the above period are correct and Complete; that the wage rates for laborersor mechanics contained therein are not less than the applicable wage rates contained in l any wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechaniccon- form w ith the work he performed (3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Depanment of Labor, or if no such recognized agency exists in a State, are registered with the Bureau of Apprenticeship and Training, United States Department of Labor. (4) Thou (a) WW.H?(E E FRINGE BENEFITS ARE PAID TO APPROVED PLANS FUNDS, OR PROGRAMS - In addition to the basic hourly wage rates paid to each laborer or mechanic is listed in the above referenced pay- , all, payments of fringe benefits as listed in the contract have been n will be made to appropriate programs for the benefit of such employees except as noted in Section 4(c) below. I I (b) WHERE FRINGE BENEFITS ARE PAID IN CASH ?- Each Laborer or mechanic listed in the above referenced payroll has been paid as indicated on the payroll, mount not less than the Sum of the applicable basic hourly wage rate plus the amount of the required fringe benefits as listed in the contract except as noted in section 4(c) below. - 1_ (c) EXCEPTIONS E ANp TITL/E/ '// ??? 51G .TURF THE WILFUL r/ LSIF CATION O ANY OF THE ABOVE STATEMENT-AY SUaJCCT THC NTRACTOI OR SUBCONTRACTOR TO CIVIL OR CR MI IAL PROSECUTION SCC SECT ON 1001 OF TITLE 11 AND SECTION 231 OF TITLE 31 OF THE UNITED STATES CODE FOrm WH•34B 11/SSI PURCHASE T.I. FORM DIRECTLY FROM THE SUPT. OF DOCUMENTS 1 r+ tie ?? Y sj14i?a,. : INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE This statement of compliance meets needs resulting from the amendment of the Davis- Act to include fringe benefits i i prov s contractor ons. Under this amended law, the is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the ninimum t ra es. The contractor's obligation to pay fringe benefits may be met by pay cent of the fringes to the various plans, funds, or programs or b in k the I g y ma - se payments to the employees as cash in lieu of fringes. 1 The contractor should show on the face of his a roll all monies aid to the em Io ees whether as basic rates or as cash in lieu of frin es Th g . e contractor shall represent in the statement of compliance that he is paving to others fringes required by the cont n t id t o rac pa and as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits: A contractor who pays fringe benefits to approved plans, funds, or programs in amounts nofless than were determined i th n e applicable wage decision of the Secretary of Labor shall continue to show on the face of his payroll the basic cash hourl rate a d i t i y n ra overt e pa me d to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of the stateme t t i n o ndicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as frin e benefit f g s or each craft. Any j exception shall be noted in Section 4(c). Contractors who pay no fringe benefits: A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of hi s payroll an amount not less than the predetermined rate for each classification plus the amount of fringe tt fication to the applicable wage decision. Inasmuch asitis n t necessary f to a ltC a h t lf p y me an a d on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of the basic predetermined rate, plus the half ti i f me prem um on the basic or regular rate plus the required cash in lieu of fringes at the straight time rate. To simplify computation ov f ti i i j t ` o er me, t s suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column thus $3 25/ 40 I , . . . n addition, the contractor - - shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits in cash directly to his em lo p yees. Any exceptions shall be noted in Section 4(c). Use of Section 4(c), Exceptions Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination i at requ res is obliged to pay the deficinecy directly to the employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b) hi th h , w c ever e contractor may check, shall be entered in Section 4(c). Enter in the Exception column the craft, and enter in the Explanation l co umn the hourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans funds o , , r programs as fringes. For x,de by the Suparintuldent ofDorummlta U S. Gov, nment Printing Olnee 15'nahlnlrton, n C. _040p . r'riva $2.75 per pad of 100 Stark NUnlbcr ll:!I_III15-11110 1 5-11 j Catalog Numba•r 1.22. FORA w'li-148 Y ? f Wry 11 00 ?ZZ ~w¢O Iz Q -^ Z W OEZ J O C ri) ? u u ow W i r I o r- ¢¢} Fwa m a z? f i i h Iii ¢ J ~ o ° z f - j ¢ ry O E W w U a I y VTR LL ¢ U J? c H ? I r'_- a a ?I 7 ow 5 m Q . z ? ~ ? ?Q Z u z2 L L wt J q i - ° z •- 2 ° - O r o LLI r _. z Y auz o s - z r o J Z Z ¢2?? L L Z Z a: - .f > L L W z { E a a a m P ? Z w i Q g E w t- (E] . j E J 60 Y V oO LL 71 O _; J Z° A 7 m 3 N _ 4 J W O W -0 ' s r6 <o¢ W W a8 .r J .?wm ? I? I ? ? C t L R ° ° e • 1 o w W U Q p U v w J U J W U J 1 V J a ¢ 3+ l/ ?.E ' cJ f ?'E=g' E 3 = a¢ O m w 2. 6 a O u m m? =aa ~O m z w p w w o ma m a¢~ N F '- z (( y ar¢ H °acc H w N I T p V ?o d ? ? Z w Z Q O ? ? E_' ¢ s j 5- L I 7 . a a cc ~p Z ? a $ - J 5- o A 4. . . -.. -.. -..nom ': ..., ^'.. ? U.S, DEPARTMENT OF LABOR F mA d .. / ? 93 STATEMENT OF COMPLIANCE ^. Blexri B u as No. 44-R1093 WAGE AND HOUR OI VI910N ? ate do h-c y State: (Nome siE er purl (TI le y (! hat I ay ar su c• tt to peYment of the persons employed by r vt a 7 ' l thaw (? `. -L Ihal Duri n g the payroll peNUJ comma ncing ott Ih1. of I 1'1w( ?y?,, ?? ? y ? 19 d d atha' t t ?y!' L d A an ra io g ay o l rt 1 all persons employed on said protect have been paid the full cekly w uFes earn r? e4ale s tha/tno r h?r been or will be made either directly or indirectly to or on behalf of ,omit / ? [ /? ? ? / from the full meekly wages earned by any person and that no deductions have 7' (coaunc er or xuo • a or7 i b •• made etcher directly or w indirectly from the full ages earned by any person, other than permissible deductions as defined in Regulations, Part 3 (29 CFR Subtitle A), i ued by the Secretary of Labor under the Copeland Act as amended (.18 Stat. 9.18.63 Stat. 108, 72 Stat. 967; 76 Stat. 357; 40 U.S.C. 276e), and described below: (2) That any payrolls otherwise under this contract required to be Submitted for the a bave period are correct and complete; that the wage were' far l.b,rersor mechanics contained therein a tot less than the applicable wage rwites contained in any wage determination in orporated into the contract; that the classifications set forth therein for each laborer or mechanic con- form with the work he performed. (3) That any apprentices employed in the above period are duty registered in a bona fide apprenticeship program registered - with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of Labor,or if no such recognized agency exists in a State, are registered will, the Bureau of Apprenticeship and Training, United States Department of Labor. (4) That:. J i AF EFRINGF BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS ) j addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above we [e renceJ pay- l, puymants of fringe benefits nslisted n the conlraat have been or will be mode to npprop noe progru ms the benefit of such employees, except as noted in Section 4(c) below. (b) WHERE FRINGE BENEFITS ARE PAID IN CASH Each Laborer or mechanic listed in the above referenced payroll has been paid as indicated on the payroll, an amount not less than the 'um of the apphcabte basic hourly wage rate plus the amount of the required fringe benefits as listed in the contract, except av noted in section 4(c) below. (} (c) EXCEPTION'S EXCEPTION (CRAFT) EXPLANATION R EMA H1cs NAS ANO rI TL ? THE WI LFULr FA c 1' O OF O G STATEMENTS M SUBJECT THE FONT CTOR O • HCON TRAG TOR TO c1 OR <RIMI ALr PRC'CU II- ON Nt EE Sa:C TION 1001 OF TITLE 1n ANO SCECTION 2J1 OF TITEat OF T UI E TGO STATES CO. r. DE r INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE This statement of compliance meets needs resulting from the amendment of the Davis- Bacon Act to include fringe benefits provisions. Under this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the .minimum rates. The contractor's obligation to pay fringe benefits may be met by pay aent of the fringes to the various plans, funds, or programs or by mak- ing these payments to the employees as cash in lieu of fringes. The contractor should show on the face of his payroll all monies paid to the employees whether as basic rates or as cash in lieu of Fringes. The contractor shall represent in the statement of compliance that he is paving to others fringes required by the contract and not paid as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits: A contractor who pays fringe benefits to approved plans, funds, or programs in amounts not less than were determined in the applicable wage decision of the Secretaly of Labor shall continue to show on the face of his payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of the statement to indicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as fringe benefits for each craft. Any exception shall be noted in Section 4(c). Contractors who pay no fringe benefits: A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of his payroll an amount not less than the predetermined rate for each classification plus the amount of fringe benefits determined for each classi- fication in the applicable wage decision. Inasmuch as it is not necessary to pay time and a half on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of the basic predetermined rate, plus the half time premium on the basic or regular rate plus the required cash in lieu of fringes at the straight time rate. To simplify computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column, thus $3.25/.40. In addition, the contractor shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits r in cash directly to his employees. Any exceptions shall be noted in Section 4(c). Use of Section 4(c), Exceptions Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination requires is obliged to pay the deficinecy directly to the o employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever the contractor may check, shall be entered in Section 4(c). Enter in the Exception column the craft, and enter in the Explanation column the hourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans, funds, or programs as fringes. For xuIo by the Supe rinWndent of Docunu,nte, U.S. Govern me nt Pri ntgng Omec W-W.gton, DR, 20402 - Pei- $2.75 pcr 1 d of 100 - Swek Nu,n her 020-005-00015-0 Colnlog Number 1.22. FORM WIT-348 _ r.. r gr y T r i J =ism A - - a Form If +n,IK"` u i+•Rta°' U.S. DEPARTMENT OF LABOR STATEMENT OF COMPLIANCE .u r t WAGE AND HOUR DIVISION do here'by stare ` is me f u nu y Puny ac r Y /? U? That I p y p •rvi e the Payment of the persons empl Dyed b1 o uuvo aclor 2< (I ) ?daY C/ dI ; that during the Pu11oll Period comment ing on the h uileinK ark> ?., ?f t have been paid die full ? r 19f all person, empto,•ed on sold p y/ . of `f//A/iL,(? " - `?I p{ r?II1 d. . on y r-_- and ending the l9 to or on behalf of Bald ?6rv l y that no rebates have been or wilt be made either directly or indirect es earned wa kl , g y e Yl?'/LA?? from the full v.eekll' wages earned by any person and that no duducUOns have ?lX? l 1 . u n (?l eea oth t•r than permissible dcductrons as defined es earned ded (18 Slat. f ll d alJl g u irectly directly from the f Labor under the Copcl.]nd Act. IT- amen been made either ,llYby it" Sec ebiry A) issue b l S .. e tit u in Reuulations, Part 3 (2) CI R frc), nnl1escrilnd below: S C ? 40 U - ; . 948.!3 Still. 108, 72 Stilt 967; JO Stat 357; C', d to be submitted for the above Plod are correct and comPlete; urwa e. rates contained in any e under this contract require bl i 'Y g e s tica (2) That any payrolls otherw for laborers or mechanics contained therein a not less than the app r moch.ni. con th therein for each laborer o f 1 or es t [hat the wage rat orated into the contract; that the Cla ssdlv.tions se r age rates i p nco w del age form with the work he performed liceship program registered pren . fide . b on P (3) That any apprentices employed in the above period are duly regis e red in a United prenticeship and Trainor g, ntied States Department of of A d U p nite a Slate apprenticeship agency recognized by the Bre.u re registered with the Bureau of Apprenticeship and Training, S tate, a Labor, or if no such recognized agency exists in a _ States Department of Labor. (;) 'Chat: FUNDS, OR PROGRAMS OVED PLANS , (a) WHERE FRINGE BENEFITS ARE PAID TO APPR nced ay- re ve re fe bo h e a basic hourly wage' rates id to each laborer or mechanic listed in t ro-g r .ms le p ve n a PiJ ll to made to app the I we er, p additiayon me to nts In ot( of (Hoge benefits ns list d dc tioin]4( )eb elow tt5 nh . - , ec in e r the benefit of such employees, exc eps as no fo (b) WHERE FRINGE BENEFITS ARE PAID IN CASH ted on the Payroll, di ' ca d as in Each Laborer or mechanic listed In [he above referenced payroll hu sa teplus the amount of the required fringe c hourly ' ge r b a 8 asi Dent not less than the sum of the ripplica ble tetow t as noted in sectionI(c) e p benefits as listed in the contract, exc (c) EXCEPTIONS EXCEPTION (CRAFT) REIIRKS r,A•,E AND TITLE / 'CT T E CWJT PCT OR 5 ON TRAC TOR TO TFa H [ 'T TiI L F4L '10? t ON TF AuVI%rJF THE AaOVE STATCMEN Ts •nAr - P. OS ON f f SECT ON 1001 OF TITLE ix AND SECT ON 3,, OF TITLE ]1 F THE UNITED STP Clr M NAL {r [ C VIL OH GOOF F t Form WH•348 11/Oat PURCHA- THIS CORM DIRECTLY FROM THE SUPT. OF DOCUMENT! -owl I ' ? dC rT ?+ % _- . Y fir ?.-. Y /., ?• Y I •? - y a1 C' n 1 .. d .. '? I r A Y O l? f F f INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE This statement of compliance meets needs resulting from the amendment of the Davis- Bacon Act to include fringe benefits provisions. Under this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the ,minimum rates. The contractor's obligation to pay fringe benefits may be met by pay- lent of the fringes to the various plans, funds, or programs or by mak- ing these payments to the employees as cash in lieu of fringes. The contractor should show on the face of his payroll all monies paid to the employees whether as basic rates or as cash in lieu of fringes. The contractor shall represent in the statement of compliance that he is paving to others fringes required by the contract and not paid as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits: A contractor who pays fringe benefits to approved plans, funds, or programs in amounts not less than were determined in the applicable wage decision of the Secretary of Labor shall continue to show on the face of his payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check j paragraph 4(a) of the statement to indicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as fringe benefits for each craft. Any i exception shall be noted in Section 4(c). Contractors who pay no fringe benefits: A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of his payroll an amount not less than the predetermined rate for each classification plus the amount of fringe benefits determined for each classi- fication in the applicable wage decision. Inasmuch as it is not necessary to pay time and a half on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of ti the basic predetermined rate, plus the half time premium on the basic or regular rate plus the required cash in lieu of fringes at the straight time rate. To simplify computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column, thus $3.25/.40. In addition, the contractor shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits in cash directly to his employees. Any exceptions shall be noted in Section 4(c). Use of Section 4(c), Exceptions s Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination requires is obliged to pay the deficinecy directly to the employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever the contractor may check, shall be entered in Section 4(c). Enter in the Exceptioncolumn the craft, and enter in the Explanation column the hourly amount paid the employees as cash in lieuof fringes,and the hourly amount paid to plans, funds, or programs as fringes. - For nnle by the Sup-intondent of D-nu-nw, U.S. Government Printing ofllce w•n.hintnnn• D,C. 20402 - r'rice 82.15 per Pnd of 100 - Stook Numher 1120-005-0001 5-0 Coadog Number 1.22. FORM WTI-345 N .,-f 1 I" U.S. DEPARTMENT OF LABOR Form AP-1v1-- STATEMENT OF COMPLIANCE na,f Derr u 10. i4 R1093 .WAGE AND HOUR DIVISION ate --/ ?/I.?J do hereby 1: te: (Nome of Rnnter a lY) (T I ?? ?ygry?, ? ? per isa• the payment o[ the persons e,I oy ed by (1) 'hat 1 {iay or tha .-- that during the payroll period commencing on the day ol? . L - ?/ (RU11din work) ?? 19? and ending the?da}. of ?? 19r L. all persons employed on said project have been pclid the fall ( d? e?n ar will be made either directly or indirectly to or on behalf of sai hav b bale s e d , t no r ges earn e tha weekly w r _ /a / ? / ? L. _ / - '/ ? ?, y ? lit f r,.G(T UG/L'A?f "Ti' from the full weekly wages earned by any person and that no deductions have ? (/ r er tree (Centrucro xubc tor) defined ermissible deduclet ither directly' or ind uectly from the full wages tamed by any person, other than d b ded p een ma e e in Regulations, Part 3 (29 CFR Subtitle A), issu 1 by the Secretary of Labor under the CuLind Act, as am n (48 Stat. 948.63 Stat 108, 72 Stat 967; 76 Stat 357; 40 U.S C 276c), and described below: (2) That any payrolls otherwise under this contract required to be submitted for the above period are correct and conlpleto; that the wage. rates for laborersor mechanics contained them in are not less than the applicable wage rates contained in any h i an c con wage determination i orporated into the contract; that the classifications set forth therein for each laborer or mec form with the work he performed. (3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of United d Trainin i h A g, -s ip an ppretu Labor, or if no such recognized agency exists in a Slate, ara rev, Elered ith the Bureau of States Department of Labor. (4) That: - (a) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS OR PROGRAMS In addition lO the basic hourly wage rate. paid to each laborer or mechanic listed in the above referenced pay- . roll, payments of frinP,c benefits as listed n the contract have been or will be made to appropriate programs Se tion 4(c) below d i . n c for the benefit of such employees, except as note (b) WHERE FRINGE BENEFITS ARE PAID IN CASH t Each Laborer or mechanic listed in the above referenced payroll has been paid as indicated on the payroll, an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required fringe . benefits as listed in the contract except as noted in section 4(c) below. (c) EXCEPTIONS EXCEPTION (CRAFT) EXPLANATION 1EIARIS L' ANO TITLE &WZ M"& SIGN RE F• IFICaT ni n O HE Aa VE STATEN EN.25 •a V EU1111 TH EOC TRA OR OR SE NTRACTOR TO TH E W L STATES CIVIL IORFUcL .a., AL PROS _CUT OF ON EEEFS EC TION 1001 OF TITLE 1+ AND EC T1.11 231 F TITLE t OF THITEO CGo C _ _ __ .r w r wl/1 A INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE This statement of compliance meets needs resulting from the amendment of the Davis- Bacon Act to include fringe benefits rovisio U p ns. nder this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor in addi- i , t on to payment of the ninimum rates. The contractor's obligation to pay fringe benefits I may be met by pay cent of the fringes to the various plans, funds, or programs or by mak- ing these payments to the em lo e p y es as cash in lieu of fringes. The contractor should show on the face of his payroll all monies paid to the employees whether as basic rates or as cash m lreu of f ringes. The contractor shall represent in the statement of compliance that he is paving to others fringes required by the contract and I not paid as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits: A contractor who pays fringe benefits to approved plans, funds, or programs in amounts not less than were determined in the applicable wage decision of the Secretary of Labor shall continue to show on the face of hi s payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of the statement to indicate that he is also paying to approved plans funds , , or programs not less than the amount predetermined as fringe benefits for each craft. Any i except on shall be noted in Section 4(c). r Contractors who pay no fringe benefits: , A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of hi l I s payro l an amount not less than the predetermined rate for each classification plus the amount of fringe benefits determined for each clossi- l fication in the applicable wage decision. Inasmuch as it is not necessary to pay time and a half on cash paid in lieu of fringes, the overtime rate shall be not less than th f i e sum o the basic predetermined rate, plus the half time premium on the basic or regular rate plus the required cash in lieu of fringes at the strai ht time r te T i lif i i g a . o s mp y computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column., thus $3.25/.40. In addition, the contractor shall check paragraph 4(b) of the statement to i di n cate that he is paying fringe benefits in cash directly to his employees. Any exceptions shall be noted in Section 4(c). Use of Section 4(c), Exceptions Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination re uires i bli f q s o ged to pay the deficinecy directly to the employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b) whichever `i , the contractor may check, shall be entered in Section 4(c). Enter in the Exception column the craft, and enter in the Explanation colum th h n e ourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans, funds, or programs as fringes. F'or -1, by thv Superintendent of I)ocumenta. U .S. Government Prinunl; Omn• Wn..h,nwton. RC. 20401. Price $2.75 per pod of 100 Stook Number 029-00.5-00015-0 Cotolog Number 1.22. FORM W11-345 1 r ? ? i r: x,' rf ?., G or , r .wry 4 Y Y _ . * ,• f J 1 WAGE AND HOUR DIV 91AOOR STATEMENT 0? COMPLIA ? y NCE nn d qq .,?? oa A pK.©areaa N aa•k7o? t J . Dite.3 ?i Nome or n'to.Y [y) x (1) That I p o h + y r m,. o ere Gy state: t P r /s th-• payment of the persons vmPloyed b • th tL:O!! /1l//!0/?( S? 'l ? y7? 1 " " ` ? ' - ' i t L Y i ? E o, ,ft ItA+ s k) that ruling the payroll period conunencln vt a, t con ray . n 1 91E and cndmg thew '?/ g on the day o all y , - Persons employed on sold pro eeklY wag is arned, tint no ject have b reba yi . - e, . paid the full ? es' have b on or will be made either direct! /r x=iLLK.L?+`/Ar/irK? ?.S/` pqr•-'?/ Y ar indirectly to or on Geh lf d a of sai -? limn the full w (C aubcot kl ee ISr3 y wages eamed b • a bsea made either drectiy Or'ndi > nY person and that no ded • uo tioms have rectly from the full m Requlauons, Part 3 (29 CFR Subtitle A , wages earned by any Peron, other than 94813 Scat issued lOg , , 72 Sta[ 967: 76 Stat. 357; 40 U s.C 27Gce Secretary of Labor under the C Pola es ?chons as defined d A - n ct and described below: mended (48 Stat. - - - - - - - - - - - - - - L (2) Th ny P 1 Otherwi ll se under tI ntract `V at the wage rates for I required to be submitted f l or the above age determination incorporated into t pcriod are correct and complete; hencontract;+tha form with the wo h n k h i ? o s + ll r t e c lassific tio e performed. rat ontnmed in c any ns set fo rth them in e o r ach la borer or mechanic con- (3) That any apprentices employed in the ab wi a S th { ta ove Period a c duly registered in a bona apprentic eship agency recogned A Labor, or if te iz by the Bureau of fide ; no such recognized a P'anticeshiP pro Pprenli ra o S g g rae m registered ip and Train in tales Department of labor Y exists in a Sm te, are registered with tba D g' United States De a t p r umou of A ment of (4) Thar. PPro ntic eshiP and Training, United - RE FRINGE BENEF ?W :: Z ITS ARE PAID TO gppf20V[?U PLANS, FUNDS OR P I , ROGRAMS n addition to the basic hourly Wage rat roll. Payments of ( es paid to each lab . range benefits a orer or mechanic Ita[ed in for the benefit. of such employees listed in the rostra ct have been or will the above referenced Pa •- xc h y e t n be ma s de P t note o a d in Section 4(c) below. PP oPnete programs (b) 17 HERE FRINGE BENEFITS ARE PAID IN C I ASH Each Laborer or mechanic listed in an amount the above left rencud P Payroll has been of th O- b O no l h [ e appl enefits as as Gle basic ho st ed in he contraet the r ex Y wage .to plusnthe am Sept as not n d ured (ring, ou e t of the req in section 4(c) beta,, (c) EXCEPTIONS XCEPTION (CRAFT) EXPLANATION i ff i I NATURE 10, 00 T??T",rN TS MAY T THE c.NTHA1 on OR S A'. SEC R31 OF TITLE 31 OF THE UNIT IT For. WH-348 PURCHASE THIS FORM DIRECTLY PROM THE SU PT- 0 P DOCUMENTS zr?-m-NO-Ar•mc•s3ra?n-! , ? f ,?„ W J This statement of compliance meets needs resulting from the amendment of the Davis. Bacon Act to include fringe benefits provisions. Under this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the minimum rates. The contractor's obligation to pay fringe benefits may be met by pay rent of the fringes to the various plans, funds, or programs or by mak- ing these payments to the employees as cash in lieu of fringes. The contractor should show on the face of his payroll all monies paid to the emplovees whether as basic rates or as cash in lieu of fringes. The contractor shall represent in the statement of compliance that he is paving to others fringes required by the contract and not paid as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits: A ' contractor who pays fringe benefits to approved plans, funds, or programs in amounts not less than were determined in the applicable wage decision of the Secretary of Labor shall continue to show on the face of his payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of the statement to indicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as fringe benefits for each craft. Any exception shall be noted in Section 4(c). Contractors who pay no fringe benefits L A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of his payroll an amount not less than the predetermined rate for each classification plus the amount of fringe benefits determined for each classi- fication in the applicable wage decision. Inasmuch as it is not necessary to pay time and a half on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of the basic predetermined rate, plus the half time premium on the basic or regular rate plus the required cash in lieu of fringes at the straight time rate. To simplify computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column, thus $3.25;.40. In addition, the contractor shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits I in cash directly to his employees. Any exceptions shall be noted in Section 4(c). .0 Use of Section 4(c), Exceptions Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination requires is obliged to pay the deficinecy directly to the I v employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever the contractor may check, shall be entered in Section 4(c). Enter in the Exception column the craft, and enter in the Explanation column the hourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans, funds, or programs as fringes. For xole by the Superintendent of Dneun,ent?, U .S. Government Printing Omcn W-hmgton, D.C. 20402 - Pnto $2.7.5 per pod of Io(1 SLnek Nunl Fier m20_11115-110111 5-11 Cntning Number 1, 22. FORM W11-348 .. I? Y' .a. 4 ?. Y r cf ? T INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE S woo t t a r <C C>. am° D - I rod g =w I J? CuJ 0 m w t w C1 w< 2 J Q Z .1^ W ¢ U L N W }l7 r ? a j ¢ ? ^ r 5 cc _ _ a- O C IO Z E UQ¢y LL U U 2 Q = a ... a J O G o cc??i,, - d la a 7 ? E oLLw " m z = a w g Y F T _ f 0 a°. F Y W 6 uz ( = O U ^ J l' F? f a ft r ? oc W 6 ? FF T F F 2z A dD (? r a J y U J ? U J p ' ! O J ' i cc : j, C E z E cc ;R , ¢ r; N W Y N i 2 O 3 N U w J ¢ U 40 ,/ i w y w J LL w ° /h' ^ Z Z < z { ¢ I a Z ¢ Q Q U O r O r O )- O 3 = C T s K \? U I `I r V 1 r I T. ? ? LL - 1I ow ?C ) I o _ p 0 ? J"I 7 -!pSl I /ILL I Y Z j Y a I -_ r , I Iw I LL I O ? 1 I Q 0 x IY 2 21 `l <I p ? ? J c V' ?G l s ?1 G 1 i Z Y _ U cOw (5i°LLa I }w LL Jpl- (2 o Y - - O < Z z-w 2 F w p m _ - p J e a ~ z z w, ? / u J Q W ow L U ? '/Il " ' =w ? I I I ? - 7 1 I V U U w LL _ _ I . -r- '? o ? I i •? TF I T LL F [ i L J w p LL •t Y Q I pW i..._ ?._ i I _ __ - _ U = o > w w H > W 2p > 2 w 10 p , ? p ? p > W= O z Z ? ?` p h Q 1- Q v i 't i- I ir t H v 1 •( r• w o ? 2 e? `•.n r- n I n /`rJ I ? ? I p ? ? I c1 ? ? G1 u ? J lyl I ? > w j O w H z a Q w ; y J? < p j ? F I o C ? i i J J i J zli c ,? ?' ,, ?. . U.S. OEPA RTM ENT OF LABOR -?-""'?--- WAGE AND HOUR oivimo F A STATEMEN •? N pp J / T OF COMPLIANCE B Jxei B u Nu aaR1093 . , a (Nam o enatory u y) do hereby st te: (1);?rat I pay or=uperv' • y Payment of the persona em l.. d b Jv r '? / - p " y r `?1 an 7 ( o.tpetar er aauvant ?em n that during the payroll period commerical (D Idi h - n .n,) Eon t e . day of 19 and ending the d y • 1? all persons em lo d ) of p ye on said project hate bean ((pp id the f//ell weekly wages earned, th t Sb tea havq be en or will be made either directly or indirectly to or on b h lf f e a o said' ??? ? ? from the full weekly (Can, rue for or nub or wages earned by any person and that no deducUOits have been made either directly o i d -0 from the full a in Regulations, Part 3 (29 CF R Subtitle A), issued by es aS.c w t ) r a d t n - f e 7 ry of Labor under th Copeland Act. os um en led (48 948.63 Stat 108, 72 Stat 967, 76 Stan. 357, 40 U.S C 276th), ec described below: . Stat. - (2) That any payrolls otherwise under this contract required [o be submitted for the above that the wage rates for laborers.r mechanics d are corr ct and com l i r e p a n, contained therein a not less than the npplica blf wa wage determination incorporate d into the contract; that the class ificatio.. set f fo h h e y ort t erein for e•aeh rm with the work he performed on to borer or mechanic e (3) That a v pp-"Ii cyed n the above period are duly registered in a b i h w t ona fide apprenticeship program registered e a State apprenticeship agency recognized by the Bureau of Apprenticeship and T Labor o i f i U , ra r i n ng, nited States Department of no such rec. grazed agency exists in a State, are registered with the Bureau of A States De a t i f L p ppront r ment o abor. ceship and Training, United (4) That: (a) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLAN'S, FUNDS, OR PROGRAMS - \.f- Ion addition to the basic hourly wage rates paid to each laborer echanic listed in the above referenced payments of fringe benefits as li pay d er ste in the contract hav been or will be made to a for the benefit of such employees, except as noted in Section 4(c) below. PPropnate programs (b) WHERE FRINGE BENEFITS ARE PAID IN CASH - • Each Laborer or mechanic listed in the above referenced payroll has been paid as indicated on the payroll than f th n s } , e applicable teba sic`iourly wage rate plus the amount of the required fringe benefits as listed in the contra ct o except as in se !(c) below. (c) EXCEPTIONS EXCEPTION (CRAFT) EXPLANATION REMARK3 C: I TITLE .1 T HE CODE Form WH.348 I I/- 1URC.-C T.11 FORM DIRECTLY FROM THE 5UPT. OF DOCUMENTS t * A `-H_j r l A INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE This statement of compliance meets needs resulting from the amendment of the Davis- Bacon Act to include fringe benefits provisions. Under this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the minimum rates. The contractor's obligation to pay fringe benefits may be met by pay lent of the fringes to the various plans, funds, or programs or by mak- ing these payments to the employees as cash in lieu of fringes. The contractor should show on the face of his payroll all monies paid to the employees whether as basic rates or as cash to lieu of frnnges. The contractor shall represent in the statement of compliance that he is paving to others fringes required by the contract and not paid as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits: A contractor who pays fringe benefits to approved plans, funds, or programs in amounts ' not less than were determined in the applicable wage decision of the Secretary of Labor shall continue to show on the face of his payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of thestatement to indicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as fringe benefits for each craft. Any f exception shall be noted in Section 4(c). I Contractors who pay no fringe benefits: A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of his payroll an amount not less than the predetermined rate for each classification plus the amount of fringe benefits determined for each classi- fication in the applicable wage decision. Inasmuch as it is not necessary to pay timeand a half on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of the basic predetermined rate, plus the half time premium on the basic or regular rate plus the required cash in lieu of fringes at the straight time rate. To simplify computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column, thus $3.25/.40. In addition, the contractor shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits in cash directly to his employees. Any exceptions shall be noted in Section 4(c). Use of Section 4(c), Exceptions JJ I Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination requires is obliged to pay the deficinecy directly to the employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever the contractor may check, shall be entered in Section 4(c). Enter in the Exceptioncolumn the craft, and enter in the Explanation column the hourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans, funds, or programs as fringes. For enle by the SuPerintendenl of D--nte, U.S. (inrernment Printing omeo wuehmgtnn, D.C. 20402. Pare $2.75 Per p I of 100 Stuck N-b-02:1-011,-00015-0 C.wlog Number 1.22. FORM WII-edb - L a ..? Sip ?s{?- ,•?p' 7 x 4 J j r; r r d 7 U.S. DEPARTMENT OF LABOR ----'??^'--• -- 3 -- _ ;?.; , wA ce AND Nouw oivieioN ` STATEMENT OF COMPLIANCE i r 4JR109! pate ` . (Name of rnry iy ' by tata (1)?hat I pay or s p vii the pay (7 1 )?,? do hur ,rnt f the pe rsans empl ,rd by f! ? ?d,? ??1?'?L(: ? n ar . that duri h . - ng t <Bw to e payroll period cammc nc ((//'' o.k) ing nn the day of 196L and endin th 'V - ' ' g e do)- of / / r K(. q(g( r ) persons employed on surd project hove been eekly wages earn d, that no rc8 t s ha been or will "he 'all , he made either direct! ,c?. y or indirectly to or nn hchnlf f fiS? _ o . said tc f?? from the ...... full weekly wages earned b feC j 1 any person and that no d been mad d t e ci[her e directly uctions have indir ect in .63 Sations, Part 3 (29 rCFR S brit le from A hc (soli wages earned by • d 948 63 tat ]08 ductio Secr t 72 S c o o r u I' - e , e ary ns as defined f Lo tu1. 967; 76 St t. 357; ar under the Copel:md Act D U. S.C 276c , as • mended 08 St ) and described b at. elow; r, (2) Than an`• Payrolls otherwise under this contract that the ge ates fo lla'orers or m chaa - required uo b osu bn,itted for the above eril d P re. nre correct a complete; the rk ge detenot n me r orated into the convar;r it f >,7t the rein ad "PP' cable e form nh the w work h tained f s e a t e per n s s t to n h t ormed in f achlab orer or m m h n h y ec an c ec anic con (3) That any apprentices employed in the above with a S eri d p o are duty registered i a bomi fide apprenticeship pro tate aspu rcnticeship ogrncy recognized by the Bureau of Apprrntwesh Lobar, or if no ch recognized gram registered d t' ip uni n agent Tra minx, United States De States Department of Labor. Y exists in a State, are registered with the Bureau of Ap partm en t of rc•nti oitm ' p p a n d Crn win g, (d) Tha t: U ni ted FRINGE BENEFITS A RE PAID TO APPROVED PLANS FUNDS O , . R PROGRAMS addition to the basic hourl y \\f °l1, Payments of fringe benefits As laitc alit to each laborer or mechanic listed in the above refe a l n renced pay- the benefit of such employees exce no t"dean Slaet hall. be below will be made to appropriate programs _ as (b) 4'FiERE FRINGE BENEFITS t^ ARE PAID IN CASH - E tJ ach Lab methcha an amount not t Ic e nic listed in the above referenced payroll has been paid a indicated on the ss an the sum of the applicable basic hur! e Payroll Ben eftts as listed i Y wa h g , n t e contract, ex rate plus the amount of therequired except fringe (c) EXCEPTIONS EXCEPTION (CRAFT) EXPLANATION Il 'I i of AND TIT— L 1. 1, cr, A, OF T" Form WH-348 it/es) PUR..-E -1 FOR. DIRECT- FROM THE _,.. T. OF DOCUMENTS -71 ' i G t ? J INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE This statement of compliance meets needs resulting from the amendment of the Davis- Bacon Act to include fringe benefits provisions. Under this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the ninimum rates. The contractor's obligation to pay fringe benefits may be met by pay lent of the fringes to the various plans, funds, or programs or by mak- ing these payments to the employees as cash in lieu of fringes. The contractor should show on the face of his payroll all monies paid to the employees whether as basic rates or as cash in lieu of fringes. The contractor shall represent in the statement of compliance that he is paving to others fringes required by the contract and not paid as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits: A contractor who pays fringe benefits to approved plans, funds, or programs in amounts not' less than were determined in the applicable wage decision of the Secretary of Labor shall continue to show on the face of his payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of thestatement to indicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as fringe benefits for each craft. Any exception shall be noted in Section 4(c). Contractors who pay no fringe benefits: I A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of his payroll an amount not less than the predetermined rate for each classification plus the amount of fringe benefits determined for each classi- fication in the applicable wage decision. Inasmuch as it is not necessary to pay time and a half on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of 1 the basic predetermined rate, plus the half time premium on the basic or regular rate plus 9 t--` the required cash in lieu of fringes at the straight time rate. To simplify computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column, thus $3.25/.40. In addition, the contractor shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits in cash directly to his employees. Any exceptions shall be noted in Section 4(c). Use of Section 4(c), Exceptions b Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination requires is obliged to pay the deficinecy directly to the G_ employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever the contractor may check, shall be entered in Section 4(c). Enter in the Exception column the craft, and enter in the Explanation column the hourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans, funds, or programs as fringes. For xnlc by the superintendent of Documents, U.ti Government Printing; Omee wn.hln,;t-, 1),C. 20402. PH- $2.75 per, p 1 I or IN 1 Stock N-her 11::1-11115-IIIIII11-n Cntoloti Number 1. Yt. FORM w11-3I8 1 Ix ", Y i r r7' ¦ U.S. DEPARTMENT OF LABOR ......F A" .-d MADE AND HOUR DIVII.ON STATEMENT OF COMPLIANCE B ixr, Bureau Na. 44-R1a9J ? ^+ /Date / rJ ??`?'EC C /LL •=i- [ ( j t do hereb { fnam r . x rr aer rj -? lr>??S. t/:ne: / .( (1)?That 1 pnY ors pc se the payment of the pu?rs employed bY?/. »r/' r ??.r?MC a?on that during the payroll period commencing ml the ?_day oif?, Bul tai x or ork) / 19 and ending the Aay of 19J??, all persona employed on said pro{act hove been d the full E•ekly w g s ear dJ /the, ' pa?te?s-h b een or will be made etcher directly or indirectly to or on behalf of set s rraue ??•?1( l? from the fall weekly wa es g earned by any person and that no deductions have been -d' of th dire tly or indirectly from the bull wages earned by any person, other than permissible deductions as defined in Regulations, Part 3 (29 CFR Subtitle A) issued by the Secretary of Labor under the Copeland Act, as amended (48 Stat. 94&63 St t. 108, 72 Stat. 967; 76 Slat. 357; 40 U.S.C. 276c), and described below: i , ZeLl, (2) That any payrolls otherwise under this contract required to be submitted for the above period arc correct and complete, that the wage rates for laborersor mechanics contained therein are not less than the applicable wage rates contained i any wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechanic con. form with the work he performed. (3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of Labor, or if no such recognized agency exists in a State, are registered with the Bureau of Apprenticeship and Training, United States Department of Labor. (4) That: (a) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS Ix? - In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced pay- . l` roll, payments of fringe benefits as listed in the contract have been or will be made to appropriate programs for the benefit of such employees, except as noted in Section 4(c) below. (b) WHERE FRINGE BENEFITS ARE PAID IN CASH - Each Laborer or mechanic listed fn the above referenced payroll has been paid as indicated on the payroll, 1 - an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required fringe benefits as fisted in the contract, except as noted in -tion 4(c) below. (c) EXCEPTIONS EXCEPTION (CRAFT) EXPLANATION R EMARKS A - O TITLE ?-J, / ,??// "TUr1EG / ?•. l7pN ?G' /'`l! ..-. tr?G%i/'/-' L-lcjl?' ..?,N " .{.' r !/ CJl?)t THf. WILFUL FA IFICA? N OF A O '_T C STA TEM'N TS MAT SU Ul ECT T 11t CON ACTON ]Uric " TRAC TOR TO CI VIL OR CRIMINAL PRO ECU TI ON SE ESEC THEION 1001 OF TITLE In AND SECTION -I OF TITLE 11 OF THE UNI TEO STA1 COD E 'E5 7 Form WH•34E 11/011 PURCHAgE THIS FORM DIRCCTLV FROM THE -T. OF DOCUMENT] i This statement of compliance meets needs resulting from the amendment of the Davis- Bacon Act to include fringe benefits provisions. Under this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the minimum rates. The contractor's obligation to pay fringe benefits may be met by pay rent of the fringes to the various plans, funds, or programs or by mak- f ing these payments to the employees as cash in lieu of fringes. The contractor should show on the face of his payroll all monies paid to the employees whether as basic rates or as cash in lieu of fringes. The contractor shall represent in the statement of compliance that he is paying to others fringes required by the contract and not paid as cash in lieu of fringes. Detailed instructions follow: „j Contractors who pay all required fringe benefits: A contractor who pays fringe benefits to approved plans, funds, or programs in amounts not less than were determined in the applicable wage decision of the Secretary of Labor shall continue to show on the face of his payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of the statement to indicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as fringe benefits for each craft. Any exception shall be noted in Section 4(c). i Contractors who pay no fringe benefits: A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of his payroll an amount not less than the predetermined j rate for each classification plus the amount of fringe benefits determined for each classi- fication in the applicable wage decision. Inasmuch as it is n t o necessary to pay time and a half on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of L the basic predetermined rate, plus the half time premium on the basic or regular rate plus the required cash in lieu of fringes at the straight time rate. To simplify computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column, thus $3.25/.40. In addition, the contractor shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits in cash directly to his employees. Any exceptions shall be noted in Section 4(c). a Use of Section 4(c), Exceptions Any contractor who is making payment to approved plans, funds, or programs in amounts s less than the wage determination requires is obliged to pay the deficinecy directly to the employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever the contractor may check, shall be entered in Section 4(c). Enter in the Exception column the craft, and enter in the Explanation column the hourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans, funds, or programs as fringes. Fay „n r.> the 9upnrintendeot or Uorun,oot', U.S. Government Printing Office woun ottnn o.c 20402 - Pnre $2.75 per pod or inn stork Nmm?rrn•:a_unr-nnnis-n - Cnddng Numhor t. 22. FORM Wii-a-lfl 0 INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE U.S. DEPARTMENT OF LABOR Farm Appeared%s? . i. WAGE AND HOUR DIVISIO STATEMENT OF COMPLIANCE D dK tBureau Nq -R109? Z ,r lllfi'-C«?? - _ ) late: ro nIa t . ny>rt dye/1) 6/ e " (I) That I pay 6r su p' yin of the t rrsons employed b} p "' + ! actor nrr c ) .. J? - l that d ri th ll r/1 i d I ' u ng e o per lLrt <- i cummencrng no he du) f ( u+rdinK?j? w rk) payro C/ 19 and d' th it, d f g e ay o 19 all pers... emplu)ed an sold project have be'. id the full 1 •ekly wage. --L th [ q b t h... beL•n or will be made either directly or indirectly to or on behalf of sate!" /, p f ? t?? /? ???? { 11 „ ' ' ` / • from the full weekly wages earned by any person and that no deductions have (C ecea r ar) been made either directly or indirectly from the full wages earned by any person. other than permissible deductions ox defined to Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor under the Copeland Aot. as amended (48 StaI. c 948.63 Stat. 108, 72 Star. 967; 76 Stat. 357; 40 U.S.C. 2776 ), and described below: - ? ^ (2) That any payrolls otherwise under this contract required to be submitted for the above period are correct and completa; that the wage rates for laborers or mechanics contained therein ore not Icss than the apPlicable wage rates contained in any wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechanic con- form with the we rk he performed i (3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State appron ticesh+p agency recognized by the Bureau of Apprenticeship and Training, United States Department of ' Labor, or if no such recognized agency exists in a State, are registered with the Bureau of ApprL•ntic whip and Training, United - States Department of Labor. --- (4) That: (a) R?'H/Ej2E FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS - y? In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced pay- - 4011, payments of fringe benefits a% listed in the contract have been or will be made to appropriate programs - for the benefit of such employees, except as noted in Section 4(c) below. (b) WHERE FRINGE BENEFITS ARE PAID IN CASH i 1 Q • Each Laborer o mechanic listed in the above referenced payroll has been paid as indicated on the payroll, an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required fringe L benefits as listed in the contract, except as noted in section 4(c) below. i (c) EXCEPTIONS EXCEPTION (CRAFT) EXPLANATION INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE I This statement of compliance meets needs resulting from the amendment of the Davis- Bacon Act to include fringe benefits provisions. Under this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the minimum rates. The contractor's obligation to pay fringe benefits may be met by pay lent of the fringes to the various plans, funds, or programs or by mak- ing these payments to the employees as cash in lieu of fringes. r The contractor should show on the face of his payroll all monies paid to the employees whether as basic rates or as cash in lieu of fringes. The contractor shall represent in the statement of compliance that he is paying to others fringes required by the contract and not paid as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits: A contractor who pays fringe benefits to approved plans, funds, or programs in amounts not less than were determined in the applicable wage decision of the Secretary of Labor shall continue to show on the face of his payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of the statement to indicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as fringe benefits for each craft. Any exception shall be noted in Section 4(c). Contractors who pay no fringe benefits: A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of his payroll an amount not less than the predetermined rate for each classification plus the amount of fringe benefits determined for each classi- fication in the applicable wage decision. Inasmuch as it is not necessary to pay time and a half on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of ,. the basic predetermined rate, plus the half time premium on the basic or regular rate plus the required cash in lieu of fringes at the straight time rate. To simplify computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column, thus $3.25/.40. In addition, the contractor shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits in cash directly to his employees. Any exceptions shall be noted in Section 4(c). Use of Section 4(c), Exceptions Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination requires is obliged to pay the deficinecy directly to the 'i r employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever the contractor may check, shall be entered in Section 4(c). Enter in the Exception column the craft, and enter in the Explanation column the hourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans, funds, or programs as fringes. Fur -le by the Superintendent of 0-cutnentr. U.S. Government PrITILing Office W-hint;tnn• U.C. 20402 - r'rice $2.75 per and of 100 f' - Stm•k Number m21r-0115-0001 5-0 Cm .1l,; Number 1.22. FORM WH-:NS _ ..?, . .. _ e_ ,. k Yo 4. 99?? l? •r. t ? r r l i v JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS TO COURTHOUSE F PORT TOWNSEND WASHINGTON 98368 R p PHONE - 385-3505 M j i(AOY /iCG_?Oi?t3 .???Z????.? •??!S/1'?s !1 -?T /.S /?o? A/YliA?0.2 ?6-%h,?J?Kf'FdCt-• ?? ?NT/?GT !E //ft!S_T1Z o ?T T yf/L ?PVT.?9CT POiIE C}/S??) . Z? ?tE?J64 ?x bF GGrJSUIT/?3tG ". irlnl?ie.R? WG" HAD Zt?-??,e/ROtJ ?cm? ?Qlfa L4?pf ??urc-l3°'?'-?G•?`J-?--g?',?-:?L Gocs6r?d >iFS o fc' /?t?s? To6 uic sri« au?r.??iv E' /o-tom °?o ??? SIGNED '+ - .. -. DATE' REPLY Y -------------- ,7:ER M El L, PART3 W, P??T3 WILL B,P,RET?41?NEDWITH REPLY. oat f i. . K + r? _ r w v F ? MMMIRE 00ce-esvtllawM1io vyva ona/w ? • • • ?? e e e ? e n e c+ e • • • ? ; ,f et a .ISiAIa _ CW i[r WTOI 104 Jln A 8 NOIVBISINIWOV 0I81SI0 03A08ddV 030NIWWOJ3d 1VAOdddV E ''?"r ' l lduurb u:j uuparslJSUU? •tbmgbSjj ,^ 12 03AObddV ? 030N3WWOJ3d 1VAOaddV 35n S.M31tltlnO0V3H . s ? s ?((?}?'}??(y}yi?•• YX"'-yaT 00.9Z` L5 s 3sn 01misla 03a ? r 00. 088`9 s .. 7i131iV ivioi 1JV8 NO7031VWI1S3 _ U G >130i105?H1 3`JNVHJ 13N 031VWI1S3 1Nr10WV 1JV8 INOJ 1N3a V AOb 1AOMV3H Stl31MtlllOOtl3N 1Nl10WV 03MInwm bf17 1JVb1NOD 1VNI`>IMO 1VAObddtl olaula nnsuw to dAj aq, ,ol '-!s!-Old lon.dS puo suopmypadS p,opu.,S ayl to su no,d q, ylus .-p-- u a q o,Iua P-10 .1 UOIJ wansoaw puo sl.u.Inw •1,e, IIV I ? ?aa} 2,0 04 3aal V-0 WO.Aj g3dap asanoo do} 6uLoej,ans pagsn.Lo 6uLonpal 4q pasLnaa uaa an tt e 103. suOL33as-ss0a0 •uoL?Oas-ss0.l0 OLJ4@WOa6 UL uO S nae ; y 4 a p e L L o anp SL 4 u 4uenb i uoi}onpaa A•3 uad B5=3R$ aOL-Ad •A•0 OEZ-..44 4uenb pasLAaa Os? gl asano0 dol 6uLOe.4ans pa4snl0 (pasLnaJ) 'ON MU .mp,o a6uoyo s!yl 1. Ado panoiddo uo to Idiwa, uodn om paq nsap 6ulmo _..... ....... _... ./ .. IIo) -41 w,ol,ad oI Pmap,o a,o noA . ... MMOM AO NOlldltl7530' . . . :Aq 2uaU0Awdui uoT??asaa uI -`81v d210? °'I°'d °N P!1/ I-PaJ /?TU,nhTU uT,A.nA :djaunt M1'y v nT'!u, vn•? Zl oN Peoa dqunoj- T,n. °,, rs °uu l^rl .nm Tty -- - ---- -fig - 8 - j ??7?0' /U`onp- - ----?__ OL£86 VM `ogsLno --??qds ^v n,,.r , r d N pos,opu3 . C?j . _ 06V 00 '0 *d '. ; ? ?Legdsy ?ane.lg des3ij? 'y;,?oN nl J01-41uo7 Aq pasodo,d o6uo4J atn day uollominndS p,opuolS aql to V 'v0 - I uo63oS to sw,.l .pun .... IBu3 Aq po,op,p Q 3-q-N 2134210 3JNVHJ = o J N0W.V.LN0JSNV2I.I.:IO.LNiILV.L21Vdei(I _w.ys 1° H.W.1.S NO.LDNIFISVM i i 1tlNIJt80 h Iy!? ?f?!HI ry{ q?p a 1?^ I.i?wAti ' V'?.. ?Lr?1IF.'?:' u++1 ?i.'J?i •Mr??i?J?.IA%M?AufinniM ?M"a .. q ..v ..;Ylw(u ,-.t:?4:`a}?.43TNii??.411irL?:u',1!",? .. '. ^?" w.vrtMw e'e?MfNd', .... A r y` NOR H KITSAP FI GRAVEL & ASPHALT COMPANY "I ® ROU TE 2, BOX 700 POULSBO, WASHINGTON 98370 TELEPHONES: POULSBO: 779-4441 - BREMERTON: 373.8941 12NAJ Pi-fil C1171117-9 ' January 8, 1981 NK #2-1922 Jefferson County Department of .: Public Works n- Jefferson County Courthouse Port Townsend, WA 98368 , Attention: Milt Sanstrom, P.E. Reference: C.R.P. 478-Intersection Improvements COMMUNITY SHELL/PROSPECT AVENUE Dear Milt: I I have executed Change Order No. 2 and enclose it herewith. Due to the quantities being reduced b th y t the e County, please processing and finishing required regarding crushed br k v oc that was figured geometrically has been deleted. To finish and process a lesser amount of rock will i ncrease the costs approximately $3.00 per cubic yard. The wedging effect that i s required to increase the channeliza- tion starting from stations on either ends and widenin are ll g a costly rock placing demands. The equipment and time required on these items because of it s geometric shape increases costs not incurred during ordinary highway lain construction. Therefore North i , K tsap Gravel & Asphalt Company has reflected the changed unit contract price from $15 00 1 . per cubic yard to $18.00 per cubic yard. Respectfully submitted, NORTH K SAP GRAVEL & ASPHALT COMPANY gyp Harold' ing J President I :Pip Encl. as noted Iv ?w 1981, JAN '2 C r i - S O I - j AN EQUAL OPPORTUNITY EMPLOYER V L L? r r ?, I 'If o 1' i COUNTY Of JEFFERSON ?tw? TO North Kitsap Gravel a d Asphalt ' STATE OF WASHINGTON ( Address P. O...Box 490 "" Poulsbo, NA 98370 1 Work done to Intersection Improvement 478 1 County Road ProjectP Date January 5, 1981 Estimate No. 1 ,- 1 f ' l f Unit 11 Prices OuantitY Tatal. Previous Present 1. .1%bbilization 1L.S .11 940 0 00 100% 11 9400 00 0 9400 00 2. Clearing and Grubbing APer cre 150 0 00 1.05 1575 00 0 1575 00 Removal of Structures and 3. Obstructions S. 11 500 00 100% 500 00 0 500 00. 4. Roadway Excavation inc. Haul C.Y. 10 00 0 0 0 0 5. Crushed Surfacing Top Course C.Y. 15 00 0 0 0 0 6, Asphalt Conc. Pavement Class B Ton 30 00 1 0 0 0 0 7. Asphalt Concrete Curb L.F. 5 00 0 0 0 0 8, Adjust Catch Basin for Grade Ea. 200 00 0 0 0 0 0, Adjust Water Valve to Grade Ea. 100 00 1 1 0 0 0 0 10. Adjust Telephone Vault to Grade Ea. 1 1 200 100 0 1 1 0 1 1 0. 0 . Trilr.•' and Cleanup - - L.S.1 1 2000 00 0 F 0 0 0 Onsui<,•;e roun anion emova I 2 _ (New Item) C.Y-1 1 al 10 0 0 0 0 13. Gravel Borrow (New Item) Ton 20 0 0 0 0 14. (New items from Change Order kl) 15. 16. 17. n 18. 10. - -- 20. Totals 11 ,475 00 11,475 00 10% retained as per contract 1,147 50 1 ,147 50 1 0,327 50 10,327 50 Warrant No. Total Amt. 10,327.50 I hereby certify on honor that the above estimate is based upon acty?l me s remcnts and that the same is true and correct. ?? County Engineer I, the undersigned, having first been duly sworn, do hereby depose and say that the above bill is true and correct; that the work was actually performed and material furnished as therein charged; and that there is due me this date, according to contract, the sum of $ 10,327.50 and that the same or any part thereof has not been paid. a (Sign Nere) ;7= lee- for North Kitsap Gravel and Asphalt Subscribed and sworn to before me this Datc 10 3S_I day of 19_. Ordered Paid - Dy--- - County Auditor Chairman, noard of county Commi„lonorn (SEAL) st r;°i°da; k ?0 9Tt ra.d;+.y r? eCw"'4.I? Gi+k?7tr?i77?Y't7w1'?3 SFw",: " 1 a r r , N: i COUNTY OF JEFFERSON TO h, i A k. STATE OF WASHINGTON x Address I'-; - P" ., -16o Work done to r•,„o ,..d• 1-'p n 7 County Road Project Date j - S 1 Estimate No. 2. Ctano - 3. Rn A 4 a 5. Co"4"D 7, 7. i - A?r1 aH C' \- c• 8. 9• Qn • t Ul s? .c dnl F J 10. ?n ,..sF i 1 5 11A -T r 12. 13. 14. 15. 1 16. Prices Quantity Total -..a Preaent '. 1 E ? n I575 00 0 U l ` LS Cc) rO`' D0? n SGYIFV> /D OD C•/? ') 11 G ? J .? r 0o j PG ?J r- _ c? %) o r) t rJ i - 5 Oo 00 /H SO SU 377 SO /O 2.7 r, O I hereby certify on honor that the above estimate is based upon actual measurements aand athat the same is true and correct. I, the undersigned, having first been duly sworn, do hereby depose and say that the abovebill isxtrue and a correct; that the work was actually performed and material furnished as therein charged; and that there is due me this date, according to contract, the sum of $ and that the same or an thereof has not been paid, y part (Sign Here) for Subscribed and sworn to before me this Date . I9__ day of., 19_. Ordered Pnirl 17. 18. 19. 20.t Totals 10% retained as per contract By Ceuoty Auditor ?4m.ZLao.(1wre•ArcPfz4Rwawr?en.w?+,M:F.^ria <Z? ?_' wLL V a O 6 0 00 U C? iJ a . 0 H V O I V ? O L Ow ? F- r1 O ' u x CC1 F ? i I i la I Q Z ? z?Z i ' R : o r1 4! c f ; - o ? c 41 o . ? E O L 4 u OFaJ ~O OOJ ' rw 1 t z -- u c w aw' - J}ozu` -- u Ja aW W u LL¢ a - - - - - -- - -- - - ? Ali ?. V >. a H ¢w O ZV tw ^az au LL ? - - _ - u' G ¢OO J? ` Z a7 • ? ? - - oYw LL T - I ? 1 - - • - - - LL t w _ - _- - - _ I ' I I I I W 7 ?. o LL I I I ? W LL Q ? - ? N 1 o O I - y V _ C c O 9 y ? I LL w w o aaa _ (_y(I r I "I I O _ I o b . °I NA ?_ - I 0 V J , a F- AY U Q v u J a v u ~ w a 11 ul " a ? ?- w F 9 w = o ? z o i o Z r z r V -°. a H 4 F •C H N 6 H• N -°, a 1- Y ?- U1 O W t,7 i U F p I Q 2 w Z 6 °a {] P4 H ? I I O a G 0 ? p ? I p] [y? I O J J p 4 I 1 O O O? r rl r n ) U.S. DEPARTMENT OF LABOR Form App--1 WAGE AND HOUR DIVISION STATEMENT OF COMPLIANCE e`er Uaddluel 0I No. 14-RIO93 ? ?2 ?? ? Date /// - do he by [ate: (Nom at x a Patty)/,//-t-- (TI ? ? ?? l (/ r ?(" ? l( ? ?? 0 • on (1) That 1 pay or so •rvia - the aym-nt of the persons employed by ? ? [ha 1•; that during the payroll Period rommcncing on the LIIaY oT A-` CCira.f?a- Build— 0 -1k . I the roll I9/1) and ending the Ld y or<? % r. l< 19?(' all persons employed oa said project have be'.. . eekly wage earned e been or will be made either directly or Indirectly to or on behalf of snd' L., t rebat ar, es haav ,, !h / ea ? te ve 7-1L 4/ < L - -G from the full weekly wages earned by any person and that no deductions have . (Contractor ar aubcontr tor) been made either directly or indirectly from the full wages earned by any person, other than permissible deductions as defined - is Regulations, Part 3 (29 CFI? Subtitle A), Issued by the Secretary of Labor under the Copeland Act, as amended (48 StaI. ' 948 63 Stat 108, 72 Stat. 967; 76 Stat. 357; 40 U S C. 276c), annd descrihed below: / (2) That any payrolls otherwise under this contract required 1o be submitted for the above period are correct and complete; that the wage to for laborer or mechanics contained therein a not Icss than the apptica ble wage rates contnmed is any wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechanic con form with the work he performed (3) That any apprentices employed in the above period are duty registered in a boon fide apprenticeship program rc•gis to red with a State apprenticeship agency recognized by the Burcuu of Apprenticeship and Training United States Department of - - Labor,or if no such recognized agency exists in a Siate, are registered with the Bureau of Apprenticeship and Training, United L . States Department of Labor. , _ (4) That: (a) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS - In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced pay- - - roll, payments of fringe benefits as listed in the contract have been o will be made to appropriate programs _ for the benefit of such employees, exce•Pt as anted in Section 4(c) below. (b) WHERE FRINGE BENEFITS ARE PAID IN CASH i Q - Each Laborer or mechanic listed in the above referenced payroll has been paid as indicated on the payroll, - ' amount not less than the sum of the applicable basic hourly wage ra [e plus the amount of the required fringe ) benefits as listed in the contract, except as noted in section 4(c) below. - t .:.-? (c) EXCEPTIONS INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE Thi Bac is r tion may ing The i whe stat not i Con 1 A c not shat rate para or pr exc Cont c s trai rate ficat a ha the b the overt sepa shall in ca Use s statement of compliance meets needs resulting from the amendment of the Davis- on Act to include fringe benefits provisions. Under this amended law, the contractor equired to pay fringe benefits as predetermined by the Department of Labor, in addi- to payment of the minimum rates. The contractor's obligation to pay fringe benefits be met by pay ient of the fringes to the various plans, funds, or programs or by mak- these payments to the employees as cash in lieu of fringes. contractor should show on the face of his payroll all monies paid to the employees ther as basic rates or as cash in lieu of fringes. The contractor shall represent in the ement of compliance that he is paying to others fringes required by the contract and paid as cash in lieu of fringes. Detailed instructions follow: tractors who pay all required fringe benefits: ontractor who pays fringe benefits to approved plans, funds, or programs in amounts less than were determined in the applicable wage decision of the Secretary of Labor 1 continue to show on the face of his payroll the basic cash hourly rate and overtime paid to his employees, just as he has always done. Such a contractor shall check graph 4(a) of the statement to indicate that he is also paying to approved plans, funds, ograms not less than the amount predetermined as fringe benefits for each craft. Any eption shall be noted in Section 4(c). ractors who pay no fringe benefits: ontractor who pays no fringe benefits shall pay to the employee and insert in the ght time hourly rate column of his payroll an amount not less than the predetermined for each classification plus the amount of fringe benefits determined for each classi- ion in the applicable wage decision. Inasmuch as it is not necessary to pay timeand if on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of asic predetermined rate, plus the half time premium on the basic or regular rate plus required cash in lieu of fringes at the straight time rate. To simplify computation of ime, it is suggested that the straight time basic rate and cash in lieu of fringes be check paragraph 4(b) of the statement to indicate that he is paying fringe benefits rately stated in the hourly rate column, thus 53.25/.40. In addition, the contractor sh directly to his employees. Any exceptions shall be noted in Section 4(c). y of Section 4(c), Exceptions contractor who is making payment to approved plans, funds, or programs in amounts than the wage determination requires is obliged to pay the deficinecy directly to the oyees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever ontractor may check, shall be entered in Section 4(c). Enter in the Exception column :raft, and enter in the Explanation column the hourly amount paid the employees as in lieu of fringes, and the hourly amount paid to plans, funds, or programs as fringes. For -le by 0o, Sup pmt, odent of D--ntn. U.S. cove ent P nuns; Onin• w'n+h netnn D,C 20402 I'riec $2.7 5 per pmi of 1110 Stork Number 021r-uufi-I1001fi-Il Catoloe Number I. a. FORM WH-348 -L... / Y 77, U.S. DEPARTMENT OF LABOR Fa App ea/O? WAGE AND HOUR DIVISION STATEMENT OF COMPLIANCE /1 Nuac •t Bare:,a no. ,,-Rtozy - ??r D D t a e C t[„ y!1!/f?c ??? LCc' a tereb y State: / I th / (Nome o IY P (T ?` ? T l' „/ i /. /?on supupvs'''?"Y the aymc•nt aa[ the persons •Inpl oy ed bit (1) hat I ry,y or y FNS i Y LL-+ Se + ' f hat 'furmL • the payroll period commencing on (' (1 Rainy; rkl ?a 190 d d h d 19? C ay o % an en ing t e all persons employed on said project hate been paid the full ` ?veckly earned, that no rebates have been or will be made either directly or m:Itrectly to or on behalf of said _ t / ?,L•4:?hCl`Jh?' "?- LCa?!_/" 3 ?? from the I.I. weekly wages a nned by any person and that no deduc if... have (con o ory c i been mad. either directly or indirectly from the full waives earned by any person, other than permissible deductions as defined in Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor under the Copeland Act as amended (48 Slat. 948.63 State 108, 72 Stat. 967; 76 Stat. 357; 40 U.S.C. 2276c), and described below: ? l y ZZ/ / c (2) That any payrolls otherwise under this contract required to be submitted for the above period are correct and complete; that the wage rates for la borers or mechanics contained therein a not less than the applicable wage rates contained i any wage deteminat ton incorporated into the contract; that the classifications set forth therein for each taborer or mechanic con ' form with the work he performed. (3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of Labor, or if no such recognized agency exists I. a State, are registered with the Bureau of Apprenticeship and Train;n V,, United States Department of Labor. -- (4) That: (a) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS - ??CL- In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above re-,-.c-d pay- ,J-roll, payments of fringe benefits as listed in the contract have been o will be made to appropriate programs l for the benefit of such employees, except as noted in Section 4(c) below. I ? (b) WHERE FRINGE BENEFITS ARE PAID IN CASH ?- Each Laborer or mechanic listed in the above referenced payroll has been paid as indicated on the payroll, .- { an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required fringe - - benefits as listed in the contract, except as noted in section 4(c) below. I ?- (c) EXCEPTIONS INSTRUCTIONS FOR PREPARATION OF STATEMENT OF COMPLIANCE This statement of compliance meets needs resulting from the amendment of the Davis- Bacon Act to include fringe benefits provisions. Under this amended law, the contractor is required to pay fringe benefits as predetermined by the Department of Labor, in addi- tion to payment of the minimum rates. The contractor's obligation to pay fringe benefits may be met by pay.ient of the fringes to the various plans, funds, or programs or by mak- ing these payments to the employees as cash in lieu of fringes. The contractor should show on the face of his payroll all monies paid to the employees whether as basic rates or as cash in lieu of fringes. The contractor shall represent in the statement of compliance that he is paying to others fringes required by the contract and not paid as cash in lieu of fringes. Detailed instructions follow: Contractors who pay all required fringe benefits A contractor who pays fringe benefits to approved plans, funds, or programs in amounts not less than were determined in the applicable wage decision of the Secretary of Labor shall continue to show on the face of his payroll the basic cash hourly rate and overtime rate paid to his employees, just as he has always done. Such a contractor shall check paragraph 4(a) of the statement to indicate that he is also paying to approved plans, funds, or programs not less than the amount predetermined as fringe benefits for each craft. Any exception shall be noted in Section 4(c). Contractors who pay no fringe benefits: A contractor who pays no fringe benefits shall pay to the employee and insert in the straight time hourly rate column of his payroll an amount not less than the predetermined rate for each classification plus the amount of fringe benefits determined for each classi- fication in the applicable wage decision. Inasmuch as it is not necessary to pay time and a half on cash paid in lieu of fringes, the overtime rate shall be not less than the sum of the basic predetermined rate, plus the half time premium on the basic or regular rate plus the required cash in lieu of fringes at the straight time rate. To simplify computation of overtime, it is suggested that the straight time basic rate and cash in lieu of fringes be separately stated in the hourly rate column, thus $3.25;.40. In addition, the contractor shall check paragraph 4(b) of the statement to indicate that he is paying fringe benefits in cash directly to his employees. Any exceptions shall be noted in Section 4(c). Use of Section 4(c), Exceptions' Any contractor who is making payment to approved plans, funds, or programs in amounts less than the wage determination requires is obliged to pay the deficinecy directly to the employees as cash in lieu of fringes. Any exceptions to Section 4(a) or 4(b), whichever the contractor may check, shall be entered in Section 4(c). Enter in the Exception column the craft, and enter in the Explanation column the hourly amount paid the employees as cash in lieu of fringes, and the hourly amount paid to plans, fonds, or programs as fringes. For I by th.• Supenntondent of Document, 11.5 Government Printing omee .. W-hington• D.C. 20LIII2 . PH- &1.75 per wad of 100 Stm•k N..1- 029-00.5-001115-0 - t'otolou Number 1.22, FORM WII-319 i . i n Q I j II _? - ? ORI GINAL ?,.' WASI 1INGTON.S I A'j I tL?l S1U P AR I VIIiN'1 OI TRANSPOR TAI ICJN Ch„??c ,,,, CHANGE ORDER?v ai fc ,.1 SFi i.. 0.1 .t c -I 1,y.CO CRP 478__.. ---- North Kit sap Gravel S Asphalt Co T_ S'?P G `f 0 ASPELILT CO. Route 2, Boy. 700 --- ?l ;.. ..,. - - Pouls6o, .,,. 94370 .-yT 12 11-80 - --- I;,Ir, County Road No. 12 President ? _ CRP 478 Intersection Improvements - rr, , n..„I,.,..d ro form rV,.. Ioilnw?ng rl<.xrbed wn.1 DESCRIPTION OF. WORK - pr.r o{,on r,.c !,P, of on ",P•o+cd copy of rhin ehon Ier g,? or< I tent No. _ (new item) Unsuitable foundation removal Estimated quantity 150 c.y. @8.10 1 Item No. i= (new item) Gravel Borrow Estimated quantity 750. Ton @4.20 3, I t? y_ I? - -- - - - ID f .;-j -- 71 "1 ]( ? t I IF, c 1. ( 4 8d0.Ir0.0 _ 4 365.00 51, 2-17.00 _ I _ _ II HEADQU-TER'S U _-- --- + SE - If. I i I • _, Li J ,215.00 150.00 U W 0 w' P4 is is i1 z 0 H i C H A H F E. E. 2 O U iC is tx W H 7. W 0 U i O W F wa w0 wo ^] U a a g '1 F p y H? U?' a 0 0 H A4 - F H r o ? o? ? a U O F ? a ?.? w o o ° +i °o l e o 0 0 o y E Q o o 6 0 ?i o 0 o e ?aaaj F ?o b ? h h V ri ; h M n ? o j Q w V E-i o 0 o N ? M b° b ° °o .? .L ^Ex H ? ?w o O O ? ,,..a? ° O o O o O o o v o v O s O v c C ce O VO O O ti \ h e° O H ? . F a' W¢ 0 O in O 0 O 0 O 0 O 0 0 Cl C. 0 C. 0 0 0 0 O O ?? H O O O O O O O O LCl m r- CO cY co co O O o O o l1') O O r f+ H O r O r C7 Cl V C7 "*- N O O to r N l0 a' N z C4 M N cT M z W o 0 0 0 0 0 0 0 O 0 0 0 ?n 0 o 0 0 0 0 0 0 0 O a If; N t0 to O In C O H N C co O N 0 Y V G 11 L 0 = U O m U' .0 C. U3 $- 41 x aa u E s... Y M C yr O c Cl O QI > X., L ' C. 4- 0 Y 7 _ .Z O .O .O 7 Y C O Ol d U C • N > ? G r0 H H O U _ .F.[. • al 41 4! Y Vf . y O o M ~ t D 7 L 41 > > U i Cl nJ [ef= . L U U 0 ° v In ?c Cl u u L) o L L N n. O c b In Y A r.. CF ' T 'p Y Y U 3 {- C N O m 9 N Y Y Y E • b E 10 N L CL L 7 7 7 E O E r U w w a K L U N d VI Q 6 'O Q V Q L F H E. U Y C W 7 T U U U N ` U U F- J a 7 N E O w w cu _ J J m ct M V' m kO N r N d' J r 4 j O N M '7 V1 'O n w IT O r ti 0 N N N N N H i4 -1 N H [ A O H H o y .O x N I I i f a Il, 4 I i • r n1 'y 1 CONTRACT BOND JEFFERSON COUNTY, WASHINGTON KNOW ALL MEN By THESE PRESENTS: That North Kitsap Gravel & Asphalt Company of Poulsbo, Washington, , as Principal, and Great American Insurance Company as Surety, are jointly and severally held and bound unto the County of Jefferson, the penal sum of Forty-Six Thousand Eight Hundred Eightyn910oollars ($ 46,880.00--------- ), for the payment of which we jointly and severally bind ourselves, our heirs, executors, administrators, and assigns, and successors and assigns, firmly by these presents. THE CONDITION OF'THIS BOND is such that WHEREAS, on the 14th day of November A.D. 1980 the said North Kitsap Gravel & Asphalt Company Principal, herein, executed a certain contract with the County of Jefferson, by the terms, conditions and provisions of which contract the said North Kit sap Gravel f & Asphalt Company , Principal, herein agree to furnish all materials and [!f do certain work, to wit: That the Principal will undertake F and complete the construction of a portion of C.R.P. 478-Intersection Improvement Jefferson County, Washington, between Station I and Station , as per maps, plans and specifications made a part of said contract, which contract as so executed, is hereunto attached, is now referred i to and by reference is incorporated herein and made part hereof as fully for all purposes as if here set forth at length. NOW, THEREFORE, if the Principal herein shall faithfully and truly observe and comply with the terms, conditions and provisions of said contract in all re- spects and shall faithfully and truly observe and comply with the terms, conditions and provisions of said contract in all respects and shall well and truly and fully do and perform all matters and things by North Kitsap Gravel & Asphalt Company r undertaken to be performed under said contract, upon the terms proposed therein, and within the time prescribed therein, and until the same is accepted, and shall pay all laborers, mechanics, subcontractors and materialmen, and all persons who shall supply such Contractor or subcontractor with provisions and supplies for the carrying on of such work, and shall in all respects 1'aiLhfully perform said contract according to law, then this obligation to be void, otherwise to remain in full force and effect. WITNESS our hands this 18th day of November , 1980 , Contractor: North K' a G 4ve & As It Company By: SURETY CO: Great_ American Insuran 7o ,pant' By. _ BY:Ronald L. Perrault Attorney-in-Fact '- - Address of Local Office and Agent of Surety Co. Shapley Agency, lnc. 3901 S Fife Tacomu WA 98409 Approved as to form !:his day of 19 Proneuutinl.; AtLornry ------ - ` ? t`f? r a r r CONTRACT JEFFERSON COUNTY, WASHINGTON THIS AGREEMENT, made and entered into this 14th day of November 19 80 between the COUNTY OF JEFFERSON, acting through the Jefferson County Comm- issioners and th D e irector of Public Works under and by virture of Title 36, RCW, a's:i amended and NORTH KTmGpn ORA SFr c x hereinafter called the Contractor. PHA COMPANY WITNESSETH: That in consideration of the terms and conditions contained herein and attached and mad e a part of this agreement, the parties hereto covenant and agree as follows: I. The Contractor shall do all work and furnish all tools, materials and equipment for _C.R,P, 478-Intersection Improvement Jefferson County in accordance with and as described in the attached plans and specifications and the Standard Specificati f ons o the Washington Department of Highways, which are by this reference incorporated herein and m d a e a part hereof, and shall perform any altera- tions in or additions to the work provided under thi s contract and every part thereof. The Contractor shall provide and be at the expense of all equipment, work and labor of a ny sort whatsoever that may be required for the transfer of materials and fo s r con tructing and completing the work provided for in this contract and every part thereof exc t , ep such as are mentioned in the specifications to be furnished by the..(,.' q County of Jefferson . II. The County of Jefferson hereby Promises and agrees with the Contractor to and do employ l , es emp oy the Contractor to provide the materials and to do and cause a to be done the above des ib d cr e work and to complete and finish the same according to the attached plans and specifications and th e terms and conditions herein contained, - ; and hereby contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices hereto attached, at the time and in the l - manner and upon the conditions provided for in this contract. The County further agrees to employ the Contractor to perform any alterations in or additions to the work provided for in this contract that may be ordered and to pay for the same under the t f erms o this contract and the attached plans and specifications. III. The Contractor for himself, and for his heirs, executors, administrators s , uccessors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. IV. It is further provided that no liability shall attach to the County by reaso f n o entering into this contract, except as expressly provided herein. IN WITNESS WHEREOF, The Contractor has executed this instrument on the day and ea fi y r rst below written, and the Board of County Commissioners has caused this in- strument to be executed by and in the name of said County of Jefferson the day and year first above written. Executed by the Contractor Novem er 14 19 80 NORTH KITS GRAV L AS ALT COMPANY Contract r Harol Canresiden Foregoing contract approved and ratified November 19?_ i l Gren.t-AmFrican .T.nsuran?e Comnnnv + Surety BYL_i!//??,C Attorney-in-Fact Ronald. L. Perrault OOUNTY OF JEFFERSON SEAT, IIOARD OF C0121ISSIONERS i l ' - -?? t?s?dt!'?4 Chairman ` r Itemer Member 'rt"L51?T'?• - -"'"^^"^+'w'v,%?uM'Fr.1fTAS6k9 ?.?R!G''.?,;,"NnawfYrettM',R'N'?n+tC'i?. ry'['71f?'ti,Ggn. ^'?,"?;4'?5,Ti76ARr'P311YM!`7 %iM' rkK? +ry?fni? '^.'Y ?C l y, ' r _ - MM_. "I PROPOSAL ?- TO: The Board of Jefferson County Commissioners Courthouse Port Townsend, Washington 98368 Gentlemen: The undersigned hereby certifies that he has examined the location of the inter- section of County Road No. 12 and County Road No. 18, and the intersection of County Road No. 12 and County Road No. 12-1.78 (Prospect Avenue) project in the east end of Jefferson County and has read and thoroughly understands the items of work and the specifications governing the work embraced in this improvement and the method by which payment will be made for said work and hereby proposes to undertake and com- plete the work embraced in this improvement in accordance with said items of work f and specifications at the following rates and prices: i i Item Quantity Unit Description Unit Price Amount No. Proj. A Proj. B Total Lump L.S. Mobilization Bd D 1 Sum 2 0.85 0.37 1.22 AC. Clearing and Grubbing < l m Lump . Lump L S Removal of Structures 4A.9-0 ? 3 Sum Sum . . and Obstructions Roadway Excavation C0 V? 4 330 100 430 C.Y. including Haul ' E Crushed Surfacing 5 290 140 430 C.Y. To Course 6 343 350 693 Tons Asphalt Concrete Pavement Class B ED 22 F L Asphalt Concrete , 5 mo (?lD 7 122 1 . . Curb 2 Ea Adjust Catch Basin ? ? 3 2 • for Grade a 4 Ea djus hater Va ve -- 9 4 . to Grade ` Adjust Telephone W bo 7,04)"L 10 1 1 Ea. Vault to Grade Lump S L Trimming and Cleanup 11 . . ! FF t GZEATANERICAN INSURANCE COMMANY OHIO Bond No. ( BID BOND Approved by The American Institute of Architects, A.I.A. Document No. A 310 February 1970 Edition KNOW ALL MEN BY THESE PRESENTS, that we North Kitsap Gravel & Asphalt Company -a Washington Cnrriorat' as Principal, hereinafter called the Principal, and the GREAT AMERICAN INSURANCE COMPANY, a corporation duly organized under the laws of the State of Ohio, with Administrative Offices at 580 Walnut Street, Cincinnati, Ohio 45202, as Surety, hereinafter called the f Surety, are held firmly bound unto Jefferson Countv Board of oim y Qommi c; onPrc as Obligee, hereinafter called the Obligee, - 1 J in the sum of Five (5) percent of the total nt the proposal dollars ++? (S ------------------ ), for the payment of which sum well and truly to be made, and the said Principal and the f said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by I these presents. € _ !t WHEREAS, the Principal has submitted a bid for.Intersect ions of Co Rd 1 and o Rd 18 "Community Shell" and Co. Rd. 12 and Co. Rd. 12 - 1.78 _ prn nPct A en„p NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a _ Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not T to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee - may in good faith contract with another party to perform the Work covered by said bid, then this obligation shag be null and void, otherwise to remain in full force and effect. ! Signed and sealed this loth day of 19 An - In the presence of: Nort?? 4y'?y halt r?A(Seal) (Hinc(pa() (T(IIeJ GREAT AMERICAN INSURANCE COMPANY (Seal) Sure // Robert F. Shapley BY ?r f"? G I F,96320 - 1/77 PRINTED IN U.S.A. (Arlomey(n• act) d• 1 ,, r To furnish all labor, tools, equipment and materials specified and necessary to construct and complete the improvement shown on the plans and described in the specifications for the County of Jefferson, State of k Washington. NAME OF BIDDER Al, ADDRESS OF BIDDER /?? ?j J?j o x 7 UCI Pn u ?5 !o a ?1?/? $ 3 7 d i To: Board of County Commissioners f Jefferson County Port Townsend, Washington` The undersigned as.bidder declares: F 'That he has personally examined the site and premises of the proposed improvement and determined the amount and character of the work and material necessary to complete same in compliance with the accompanying contract, plans and specifications. That he has been regularly engaged in contract work of the class re- quired for the attached specifications for years. I[ The undersigned proposes and agrees if this proposal is accepted, to l provide all necessary machinery, tools and equipment and all other means of construction to do all the work and in the manner therein prescribed and according to the requirements of the Engineer as therein set forth at and for the total sum set forth below which sum shall be adjusted in final ~ settlement according to the amount of actual quantities in construction are increased or decreased from the amounts given in the list of quantities at and for the following unit prices. 5 J ? j - 1 f r i PROPOSAL,, continued... A proposal quaranty in the sum, hereto in the amount of $ p / -3 7 fv Firm Name 6.- 5'5o Address R .? o x 7D0 r Po?,iSho, wA 9g3 Signature of Authorized Official__( Dated this jO ? day of lV a-I"-- f i c, Notice is hereby given that the State of Washington, will receive seal, November 10, 1980 at the office of the Washington, to be opened and publicly be held that day for the improvement o the Irondale area by grading, gravel si set forth in the plans and specificati EBRO FOR BIDS d of County Commissioners of Jefferson County, ids up until the hour of 10:30 A.M., Monday, my Commissioners, Courthouse, Port Townsend, at a meeting of the County Commissioners to 41 miles of Jefferson County Roads located in cing, asphalt paving and various other work as for C.R.P. 478 now on file at the office of the Major items-of work will be excavation, crushed surfacing top course and asphalt con- crete paving. Each bid shall be in accordance with plans and specifications now on file with the County Public Works Director, Courthouse, Port Townsend, Washington where copies may be obtained by depositing $10.00 for each seta Deposit will be refunded if plans-are re- - turned in good condition within 10 days after bid opening. Each bid shall be accompanied by cash, certified check or bid bond payable to the Treasurer of Jefferson County in the sum of 5% of the amount bid; to be forfeited to the Jefferson County Highway Department by the successful bidder if he fails to enter into a contract and to file an acceptable surety bond in the amount of 100% of the contract amount within 20 days after award. The Board of County Commissioners reserved the right to reject any or all bids and and to waive all informalities in the bidding, and to select the bid deemed most advan- tageous to Jefferson County. BOARD OF JEFFERSCON COUNTY COMMISSIONERS C ha-flrn n ' ?s+?-rJis/ E Membe / Member » \ r, SEAL ATTEST:T i etty er o , Aunty Auditor and Ex-Of c Clerk of the Board Dated this ay of 1980 W y , A r . r r 4' ?n CONTENTS INTRODUCTION AMENDMENTS TO STANDARD SPECIFICATIONS SPECIAL PROVISIONS DATE OF OPENING BIDS DESCRIPTION OF WORK AWARD OF CONTRACT FUNDS PREVENTION OF ENVIRONMENTAL POLLUTION AND PRESERVATION OF PUBLIC NATURAL RESOURCES STATE SALES TAX ENGINEER . GAME AND FISHERIES LOAD LIMITS UTILITIES TRAFFIC CONTROL TIME FOR COMPLETION CLEARING AND GRUBBING CLEARING AND GRUBBING DEBRIS i I REMOVAL OF STRUCTURES AND OBSTRUCTIONS WASTE SITE FOR EXCESS MATERIALS AND DEBRIS COMPACTION SOURCE OF MATERIALS SITE RECLAMATION HAULING ON OTHER THAN STATE HIGHWAYS OVERLOADED TRUCKS SURFACE SMOOTHNESS FOR ASPHALT CONCRETE PAVEMENT FEATHERING ASPHALT CONCRETE PAVEMENT TRIMMING AND CLEANUP STANDARD PLANS MIN! '1 INTRODUCTION The following amendments and special provisions shall be used in conjunction with the State of Washington Standard Specifications for Road and Bridge Construction adopted in October, 1980. i. AMENDMENTS TO THE STANDARD SPECIFICATIONS ' a The following amendments to the standard specifications are made a part of this con- tract and supersede any conflicting provisions of the standard specifications. For informational purposes, the date following each amendment title indicates the imple- mentation date of the amendment or the latest date of revision. Each amendment contains all current revisions to the applicable section of the stan- dard specifications and may include references which do not apply to this particular project. SECTION 1-07, LEGAL RELATIONS AND RESPONSIBILITIES October 6, 980 Flagmen, Barricades and Signs. The last sentence of the first paragraph and the entire second paragraph of section 1-07.23(3) of the-standard specifications are deleted and replaced with the follow- ing: The Contractor shall implement the Traffic Control Plan(s) appearing in the contract plans, as applicable. If the Contractor's plan of operations is in conflict with the contract Traffic Control Plan, he may propose modification of the Traffic Control Plan 'by showing the necessary construction signs and barri cades required for,the.proj_ect _a.nd submit,it.to,the Engineer for approval_ at 1Rd,'_??ad?iRee a€Ltmifs?aErffs¢a?11 be__rec The signing plan will include warning signs as detailed in the plans to identify No Passing zones that are to be obliterated in excess of 150 feet by paving operations. Unless otherwise specified in the special provisions, the Contrac- tor shall provide posts and install State-furnished signs for this purpose. Y j The signs shall be maintained by the Contractor until construction operations ` are complete. Unless otherwise specified in the special provisions, posts and signs will become the property of the State and will be removed by State forces when the No Passing zones are re-established by striping. SECTION 1-08, PROSECUTION AND PROGRESS October 6, 980 Time for.Completion The sixth sentence of the first paragraph of section 1-08.5 of the standard specifi- cations is revised to read: Recognized holidays shall be as follows: January 1, the third Monday of Febru- ary, Memorial Day, July 4, Labor Day, Presidential Election Day, November 11, Thanksgiving Day and the day following Thanksgiving Day, and December 25. SECTION 5-02, BITUMINOUS SURFACE TREATMENT January 28, 1980 Application ohAsphalt The table for application Rate of Asphalt in the first paragraph of Section 5.02.3(3) of the standard specifications is changed to the following: -1- r S Y '. ?, Application Rate of Asphalt (Gals. per sq. yd.) - Specifications Residual Aggregates per sq yd ) (Lb . . . Class A Prime Coat 0.25-0.50 0.15-0.30 3/4"-0 - 27-33 24 3/4"-0 - 20-25 Tack Coat 0.25-0.40 0.15-0. Class B 0.25-0.40 0.15-0.24 1/4"-0/4°9_125-35 d Class C .0.25-0.40 0.15-0.24 1/4„_0 4"8.125-35 Class D 0.25.0.50 0.15-0.30 See Spec. 20-30 Prov. Class E 0.10-0.20 0.06-0.12 3/8"410 - 8-20 Pre=Seal 0.05-0.12 0.03-0.07 1/4"-0 - 8=12 The application rates tabulated above shall be used for cutback asphalts. When te of asphalt shall be in- i on ra asphalt emulsions are specified, the applicat table and the application of aggregates th i e n creased to 50% above that shown ,.._ shall be increased by 25%. The table for asphalt materials in the seventh paragraph of Section 5-02.3(3) of the standard specifications is changed to the following: Type and Grade of Asphalt Distributor Spraying Temperature degrees F. Max F . . Min. Degress LIQUID ASPHALT 120 180 SC, MC, RC70 Viscosity 165 220 SC, MC, RC250 Viscosity 200 255 SC, MC, RC800 Viscosity 250 300 SC, MC, RC3000 Viscosity ASPHALT EMULSIONS . RS-1, CRS-1, SS-1, CSS-1 ' 70 140 ? SS-lh & CSS-lh 125 185 RS-2, CRS-2 & CMS-2S The following paragraph is added after the table following the seventh paragraph of section 4-02.3(3) of the standard specifications: Should conditions warrant removal of excess aggregates prior to the completion As soon as this h removal . of the five-day period, the Engineer may direct suc the Contractor will be relieved of further maintenance. d li h s e , removal is accomp Section 5-02.3 of the standard specifications is supplemented by the following new section: 5-02.3(11) Anti-Stripping Additive d for in the special provisions or ordered by the Engineer, asphalt ll e When ca material shall be treated with an anti-stripping additive meeting the require- -2 I '.. ! f 1 MEMO"- - J imam ?777 ments of section 9-02.4 of the standard specifications. Payment The first paragraph of section 5-02.5 of the standard specifications is supplemented by the following: 7. "Anti-Stripping Additive", by Force Account. Section 5-02.5 of the standard specifications is supplemented by the following: "Anti-Stripping Additive" will be paid for in accordance with section 1-09.6 of the standard specifications except that no overhead, profit, or other costs shall be allowed. Payment will be made only for the invoice cost of the addi- tive. The quantity of asphalt material shall not be reduced by the quantity of anti-stripping additive used. For,the_purpose of providing a common proposal for all bidders, and for that purpose only, the State has estimated the amount of force account for "Anti- Stripping Additive" and has arbitrarily entered the amount in the bid proposal to become a part of the total bid by.the Contractor. SECTION 5-04, ASPHALT CONCRETE PAVEMENT October 6, 1980 Conditioning of Existing Surface The second paragraph of section 5-04.3(5) of the standard specifications is supple- mented-to-include the following: _ When asphalt concrete pavement Class G is being constructed as a wearing course overlay, upon approval of the Engineer, asphalt concrete pavement Class B may be used as an alternate for preleveling, provided that there is no increase in cost to the state for preleveling. General Section 5-04.3(10) A of the standard specifications is supplemented by the following: Between October 1 and April 1, no wearing course shall be placed without written. permission of the State Construction Engineer. Control Section 5-04.3(10) B of the standard specifications is supplemented by the following: Cores of the finished pavement may be substituted for nuclear gauge readings to determine densities provided the cores are taken within 48 hours of placement of the mix. If this alternate is done at the request of the Contractor, the State shall be reimbursed for the coring expenses at the rate of $50.00 per core. Control lots not meeting the prescribed minimum denisty standard shall be removed i and replaced with satisfactory material. At the option of the Engineer, non- complying material may be accepted at a reduced price. Heater-Planning The third paragraph of section 5-04.3(14) A of the standard specifications is deleted and replaced by the following: The planer shall be approved by the Engineer prior to use on the contract. -3- r. . *a . ;y ev 4 i 0 SPECIAL PROVISIONS Special provisions hereinfater contained supersede any conflicting provisions of the standard specifications, and the foregoing amendments to the standard specifications and are hereby made a part of this contract. DATE OF OPENING BIDS Sealed bids will be received at the following location before the specified time: Office of the County Commissioners Jefferson County Courthouse Port Townsend, Washington 98363 until 10:30 A.M. of the bid opening date. The bid opening date for this project shall be November 10, 1980. The bids will be publicly opened and read after 10:30 A.M. on this date. DESCRIPTION OF WORK The contemplated work to be performed under this contract consists of improvement to the intersections of County Road No. 12 and County Road No. 18, and County Road No. 12 and County Road No. 12-1.78 by clearing, grubbing, grading, surfacing and other miscellaneous work, all in accordance with the attached plans, these special pro- visions and the standard specifications. AWARD OF CONTRACT This project contains two areas of work: Project "A" - Intersection of County Road No. 12 and County Road No. 18; and Project "B" - Intersection of County Road No. 12 and County Road No. 12-1.78. The contract will be awarded to one contractor for both sections. FUNDS County Road Funds are involved in the construction of this improvement. k 'E PREVENTION OF ENVIRONMENTAL POLLUTION AND PRESERVATION OF PUBLIC NATURAL RESOURCES In addition to the requirements set forth in Section 1-07.1 of the standard speci- fications, the Contractor shall comply with the following environmental provisions: Olympic Air Pollution Control Authority STATE SALES TAX The work on this contract is to be performed upon lands whose ownership obligates the Contractor to pay State Sales Tax. The provisions of Section 1-07.2(1) of the standard specifications apply. ENGINEER 1 The term "Engineer" as used in these specifications or in the standard specifications, wherever they apply, refers to the County Engineer, County of Jefferson, who is in charge of this work or in his absence, the County Engineer's representative. The Engineer may be contacted at the Courthouse, Port Townsend, WA 98368, Telephone number (206) 385-3505. GAME AND FISHERIES REGULATIONS No hydraulic permits are required for this project unless the Contractor's operation will use, divert, obstruct, or change the natural flow or bed of any river or stream or that will utilize any of the waters of the State or materials from gravel or sand bars, or from stream beds. -7- LOAD LIMITS Except for the load limit restrictions specified in Section 1-07.7 of the standard specifications, the Contractor may operate vehicles which exceed the legal gross weight limitations without special permits or payment of additional fees provided such vehicles are employed in the construction and within the limits of this project Sub-paragraph 1 of the second paragraph of Section 1-07.7 of the standard specifica- tions is deleted for this project. UTILITIES Section 1-07.17 of the standard specifications is hereby supplemented by the follow- ing: .Locations and dimensions shown on the plans for existing facilities are in accordance with available information without uncovering and measuring. The County does not guarantee the accuracy of this information or that all existing underground facilities are shown. It shall be the responsibility of the Contractor to contact the utilities in the contract area to verify the location of the utilities' facilities. The following is a list of utilities that have facilities within the area Of the proposed construction: Port Townsend Water Utility City Hall Port Townsend, 14A 98368 Phone: (206) 385-2700 Pacific Northwest Bell Telephone Company CALL 48 HOURS Midway Business Center Suite #1 BEFORE YOU DIG Port Angeles, 98362 Phone: (206) 45 457-9441 441 1-800-562-6478 Puget Sound Power and Light P. 0. Box 555 Port Townsend, WA 98368 Phone: (206) 385-4352 All reference to the restoration of utilities by the Contractor under IS. 1-.07.16 of the standard specification, "Protection and Restoration of Property", shall be changed to read that the restoration of a utility will be done by the utility involved at the Contractor's expense. The Contractor eha71 3. The Contract .- hall furnish and maintain all` nstruction signs, barricades and other devices as deemed necessary by the Engineer, at his own expense. Flagmen and flagging equipment, when required, shall also be furnished by the Contractor at his own expense. 4. Disruption of traffic shall be kept to a minimum at all times. 5. The Contractor shall implement the Traffic Control Plan(s) appearing in the contract plans, as applicable. TIME FOR COMPLETION This project shall be completed in accordance with the provisions of Section 1-08 of the standard specifications within 20 working days. CLEARING AND GRUBBING Clearing and grubbing on this project shall be performed in accordance with Section 2-01 of the standard specifications and within the following lateral limits: Only where necessary for construction and as directed by the Engineer. Payment for "Clearing and Grubbing" will be made on a lump sum basis in accordance with section 2-01.5 of the standard specifications, and shall include all special requirements as herein set forth. CLEARING AND GRUBBING DEBRIS As specified in Section 2-01(1) of the standard specifications, clearing and grubbing debris on this project shall be disposed of in accordance with Disposal Method No. 1, Open Burning. In the event requirements of the State of Washington 'Department of Ecology prohibit open burning, Disposal Method No. 3, Chipping shall be used. " REMOVAL OF STRUCTURES AND OBSTRUCTIONS l Section 2-02 of the standard specifications is supplemented with the following: The existing "Shell" sign and old sign pedestal along with any appurtenant struc- tures, devices, utility lines, etc., shall be removed. Salvageable materials shall be stockpiled on the service station site by the Contractor as directed by the Engineer and ownership shall remain with the property owner. Unsalvageable materials shall be removed and disposed of at the Contractor's expense. All materials, equipment, tools and labor necessary to remove said structures and any other structures encountered and not designated to remain shall be paid at ' the lump sum --id price "Removal of Structures and Obstructions" which shall be full compensation for all work specified. ? WASTE SITE FOR EXCESS MATERIALS AND DEBRIS { A waste site has not been provided by the County for the disposal of excess materials and debris. COMPACTION All references in the standard specifications requiring compaction of embankments, subgrades, surfacing materials and structure backfill to 95% of maximum density are deleted for this project. Embankments shall be compacted in accordance with the requirements for Method A com- paction as specified in Sections 2-03.3(14)A and C of the standard specifications. The contract does not provide a bid item for compactor units and the Engineer may require supplemental compaction in which case the work thereof shall be incidental to the construction of the project and the costs thereof shall be included by the Con- tractor in other items of the work. -9- - - -------- - - ------- ? F ` i Y SOURCE OF MATERIALS Na source has been provided for an ' any materials in this contract. The Contractor shall make his own arrangements to obtain this material at his own expense, and all costs of acquiring, producing and placing this material in the finished work will be con- sidered incidental to the unit bid items involved. If the sources of materials provided by the Contractor require hauling over roads other than State Highways or County Roads, the Contractor shall, at his own cost and expense, make all arrangements for the use of the haul routes. SITE RECLAMATION The provisions of Section 3-03 of the standard specifications shall not apply to this- contract. Site reclamation shall be performed by the contracting agency on all sites furnished by it. On sites provided by the Contractor, and where required by law, the Contractor shall obtain a surface mining operating permit from the Board of Natural Resources. Prior to commencing operations at the site, the Contractor shall furnish evidence to the to the Engineer that this requirement. has been met. All costs involved in complying with the requirerenis of an operating permit acquired from the Board of Natural Resources for Contractor provided sites shall be considered incidental to the materials to be produced from said site(s). HAULING ON OTHER THAN STATE HIGHWAYS If the sources of materials provided by the Contractor require hauling over roads other than State Highways, the Contractor shall, at his own cost and expense, make all arrangements for the use of the haul routes. OVERLOADED TRUCKS The following actions will be taken where overloaded hauling vehicles are observed and where statutory legal load limits (see Section 1-07.7 of the standard specifi- cations) apply: 1. Trucks weighed b WSDOT scaleman - The actual Y gross weight of the loaded truck shall be recorded in the proper space on the Item Quantity Ticket. If this weight exceeds the legal gross weight displayed on the side of the truck, the scaleman shall draw a line through the actual gross weight and record the legal gross weight immediately adjacent. The net weight shall then be recorded by subtracting the tare from the legal gross weight. The Contractor's representative shall be notified as soon as possible and he shall have the option of reducing the truck's load and having it re-weighed before sending it to the jobsite. 2. Trucks weighed by Contractor's or supplier's scaleman - The material re- ceiver at the delivery site shall compare the actual gross weight recorded on the scale ticket with the legal gross weight displayed on the side of the truck. If the truck is overloaded, the material receiver shall draw a line through the actual gross weight and the actual net weight and record the legal gross weight and revised net weight im ediately adjacent. SURFACE SMOOTHNESS FOR ASPHALT CONCRETE PAVEMENT The second sentence of Section 5-04.3(13) of the standard specifications is amended to provide that the completed surface shall not vary more than o inch from the lower } edge of a 10 foot straightedge placed on the surface parallel to centerline. -10- ; r. 4, e 1 f f r FEATHERING ASPHALT CON(. ETE PAVEMENT " Where directed by the Engineer, the Contractor shall feather the asphalt concrete pavement overlay in a manner to produce a smooth riding connection to the existing pavement. Asphalt concrete pavement Class B utilized in the construction of the feathered connections to existing pavement, shall be modified by eliminating the coarse aggre- gate from the mix at the Contractor's plant or the commercial source from which the contractor obtains the mix or by raking the joint on the roadway, to the satisfaction of the Engineer. All costs and expense in connection with providing, placing and feathering the asphalt concrete pavement will be incidental to and included in the unit contract price(s) per ton for "Asphalt Concrete Pavement Class B TRIMMING AND CLEANUP In cut areas, the outside edge of pavement shall be trimmed with Crushed Surfacing as shown on-the "Typical Roadway Section". The unit contract price "Trimming and Clean- ((( up" per Lump Sum and "Crushed Surfacing Top Course" per ton shall be full compensa- tion for all labor, tools, materials and equipment necessary to complete this portion of the contract. STANDARD PLANS The State of Washington Standard Plans for Road and Bridge Construction transmitted under Publications Transmittal No. 80-34, dated May 30, 1980, is made a part of this contract. In case of discrepancies, plans shall govern over standard plans and stan- € dard.plans shall be considered the same as plans as set forth in Section 1-04.2 of r the standard specifications. For informational purposes, the following list of Standard Plans applicable to this contract is included for the Contractor's con- venience. Any Standard Plan that has been omitted from the following list, but is clearly implied elsewhere in the contract documents, shall be considered applicable . to the contract as though it had been specifically stated. j STANDARD PLANS LIST 1 + F-2b Asphalt Concrete Curb -11. 1 PHI ? z ??F '• F a 1 ? g I a? aL _ wproP UCPW P OP3 'o y :f r-_° k u mr t? v. n. rWY-R32320-AA FREVAILING MINIMUM HCUPLY WAGE (RATES SEPTEVUER 02, 1980 OCCUPATION: LABORERS LOCATION: CLALLM4, GRAYS HARBOR, ISLAND. JEFFERSCN, KING , KITSAP, LEhIS, PASON, PIERCE. SAN JUAN ,•SKAGIT, SNOHOPISH, THLRSTGN AND WHATCOY COUNTIES AND PACIFIC COLNTY - NORTH OF THE. WAHKIAKUM COLNTY NORTHERN BOUNDARY EXTENL'ED CUE WEST TO THE PACIFIC CCEAN. FRINGE BENEFITS HEALTH AND wELFARE .95 $/HR. PENSION 1.30 $/HR. TRAINING FUNC OP. $/HR. WAGE RATES OCCUPATION OCCUPATIGN STATE COCF DESCRIPT'IGN RATE GPOUP 1 350-0300 CHANGE-HOUSE PAN OR DRY SHACKYAN 12.93 . 350-0320 CHCKER SETTER 12.93 350-0350 CLEAN-UP LAI=ORER 12.93 350-0360 CCNCR0E AND PONOLITHIC LAdCRER 12.93 359-0390 CCNCPETE FCRP STRIPPER 12.93 { 350-0160 CRUSHER FEELER 12.93 350-•OA70 CURING CONCkETE 12.93 350-0520 DEPCLITION, ORECKING ANC MOVING (INCL. 12.93 CHARRED t•'ATERIALS) 350-0530 DITCH DIGGEti 12.93 350-0550 ORIERMAN 12.93 350-0,60 DUM.FMAN 12.93 35O-0700 FLEVATOk FEEDER 12.93 350-0750 FINE GRADERS - 12.93 K 350-0760 FLAGMAN 12.93- 350-0780. FORD SETTER )2.93 350=CP20 GES4ERAL-LA2CRER 12.93 £ l 350-CA70 GROLT MACHINE HEADER TENDER' 12.93 350-0940 HEADER LAECRER AND GUARD RAIL ERE.CTCR 12.93 350-OQ70 HOUSE WRECKER 12.93 350-1100 MATERIAL YAHOV-AN (INCLUDING ELECTRICAL) 12.93 350-1160 NIPPER-SWAPPER 12.93 350-1760 PILCT CAR 12.93 350-1350 PITPAN 12.93 350-1370 POT TENDER )2.93 350-1530 RIPRAP PAN 12.93 c ? e q J n PREVAILING MINIMUM HCUkLY WAGE RATES SEr'TENNEl< 02. ISHO HwY-832370-AA OCCUPATION: LABORERS ON LOCATION: CLALLAN, GRAYS HARBOR, ISLAND, JEFFERS. KI SKAGIT, SNOHONISH. LEwIS, NG. KiTSAANU THLRSiUN , i NASON, PIERCE, SAN JUAN, ANU PACIFIC COLNTY - NORTH OF THE WAHKIAKLM MHATCON COUNTIES CRTHERN HOI:NDARY EXTENDED CUE WEST T O THE PACIFIC CCEAN. COUNTY N WAGE.RATES OCCUPATION STATE OCCUPATION OESCRIPTICN RATE . CODE GROUP 1 12.93 350-1640 SCALEMAN 12?.93 350-1680 SIGNALMAN 12.93 350-1590 SKIPMAN, 12.93, 350-1720 SLOPEk SPRAYMAN 12.93 350-1790 STOCKPILER '350-1PE0 TIMEER'OUCKER AND FALLER (BY PANG) 12.93 12.93 350-1P70 TOOLROON MAN (AT JOB SITE) 12.93 4 350-1890 TRACK LABORER 12.53 I 350-1Q30 TRUCK SPOTTER , I GROUP 1 -OCCUPATION INCLUDED IN , GR.GUF 4 PRICr TO 6-1-80 12.93 i 350-1080 MAINTENANCE MAN GROUP 1 - OCCUPATION NEW TO GROUP 1 (6-1-80) _ 12.9'`. 350-0730 FENCE LABORER 350-0770 FORN.CLEANING MACHINE. FEEDER, STACKER 12.93 12.93 350-1755 ST"ACKER 12.93 350-1600 TAILHOSEMAN SANDBLAST 12.93' ' 350-2130 VINYL SEAMING 12.93 350-2065 WATCHMAN GROUP 1 - FEDERAL HATES ONLY 350-2100 WINDOW CLEANER r GROUP 2 13.27 350-0010 ANCFOR MACH NES BALLAST REGULATOR MACHINE 8 13.27 .0 j 350-00 • r r r/ r %^NY-R323?0-AA FkEVA1LING MINIMUM HCUPLY V,AGE RATES SEPTENBF_k 02, 1980 OCCUPATION: LABORERS LOCATION: CL.ALLA1,. GkAYS FARHOR, ISLANC, JEFFENSCK. KING, KITSAPv LEWIS. . MASON. PIEkCE, SAI< JUAN, SKAGIT, SNOHCMISH- TH LRSTON AND (%HATCOV COUNTIES AND PACIFIC CCLNTY - NORTH OF 'TFE WAHKIAKUM COLNTY NCRTrFRN BOUNDARY EXTENDED DUE aEST TO THE PACIFIC CCEAN. WAGE RATES OCCUPATION OCCUPATICN STATE ' COCF' DESCPIPTICN RATE GROUP 2 350-0310 CHIPPER 13.27 350-0330 CHOKER SPLICER 13.27 350-0340 CHUCK TENDEK 13.27 f 350-0420 CONCRETE SAw OPERATOR 13.27 ! 350-0640 DRILLER WACCN AND AIR TRACK HELPEh 13. 27 350-OAIO GABION BASKET BUILDER 13.27 . 350-OR60 GRINDERS 13.27 ,350-OPFO GROLThMAN (PH,ESSURE), INCLUDING POST 13.27 TENSION EF.A.•S 1 350-OOPO JACKHAMMER 13.27 350-1P50 PAVEMENT fs4_AKEF. UNDER 90 LBS. 13.27 350-1320 PIPE PUT TEPOEK 13.27 350-1340 PIPEWRAPPER 13.27 350-1390 DCi}CERMAN HELPER 13.27 350-1400 POWER BLGGY OPERATOR 13.27 ' 350-1410 PCWER JACKS 13.27 350-14PO PAILROAC'SPIKE PULLER 13:27 350-IS10 RIBEON SETTER, HEAD 13.27- 350-1550 PIPRAP MAN-. HEAD 13.27 350-15PO RCOCER 13.27 350-1710 SLOPEk (OVEN 201) 13.27 350-1750 SPREADER - LLARY POWER OR SIMILAR'TYPES 13.27 350-177(r STAKE JLMNEk 13.27 350-IAIO SWINGING SCAFFOLD OR BOATSWAIN CHAIR-OVER 13.27 WATER OR ?5' IN HEIGHT 350-IR40 TAMPER (MULTIPLE AND SELF PkOPELLED) 13.27 350-1P30 TAMPEk (MULTIPLE) :.p 13.27 { 350-IS20 TAMPER AND SIMILAR ELECTRIC 4 ND AIR 13.27 OPERATED TCCLS j 350-IP20 TOPPAN - TAILNAN 13.27 1 350-1000 TRACK LINER 13.27 350-2030 1 VIBRATING SCREED (Alit, GAS CR ELECTRIC) ' 13.27 I i I . .`'Y d ? w y r ? ----- ----- - - ? r - HWY-R32320-AA PREVAILING, MINIMUM HCURLY 1AGE RATES SEPTEvI)Ek 02, 19f+0 i 3 OCCUPATION: LABORERS ' LOCATION: CLALLAN, GRAYS F,ARBOR, ISLAND, JEFFERSON, KING, KI TSAP, LEWI S, MASON, PIERCE, SAN JUAN, SKAG;IT. SNOhONISH, ThLRST ON AND WHATCOt/ COUNTIES AND PACIFIC COUNTY - NORTH OF THE WAHKIAKLM COUNTY NCRTHERN BOUNDARY Ex TENDED DUE WEST TO THE PACIFIC OC EAN. WAGE RATES OCCUPATION OCCUPATION STATE COCE DESCRIPTION RATE GROUP c" { 350-2nSo WELL-POINT MAN' 13.27 350-1450 WHEELHORROW- POWER DRIVEN 13,27 i GROUP 2 - OCCUPATION INCLUDED IN GROUP 1. PRICK TO 6-1-80 350-0710 EPOXY TECHNICIAN 13.27 GROUP 2 - FEDERAL RATES ONLY . 350-2000 VIBRATOR 1 -- GROUP 3 350-0050 A5P1-ALT RAKER 13.41 350-0250 CEMENT DUMPER - PAVING 13.41 350-0?60 CEMENT FINISHER HELPER 13.41- 350-0570 DRILL DCCTOh AND BIT GRINDER 13.41 350-OA50 DRILLER - WAGON AND AIR TRACK OPERATOR 13.41 350-0720 FALLER AND BUCKER - CHAIN SAW 13.41 350-0240 GRACE CHECKER AND TRANSIT PAN 13.41 ' 350-0c)50. HIGH SCALER ' 13.41 LASER BEAD: OPERATOR 350-1000 13.41 3S0-10;0 MANHOLE BUILDER 13.41 350-1700-N'OZZLEN.AN (CONCRETE PUMP, GREEN CLTTER WHEN 13.41 USING CCMb1NATION OF' HIGH PRESSURE AIR AND WATER ON CONCRETE AND ROCK, SANDBLAST,, GUNNITE. SrCTCRF.TE) WATER BLASTER 350-1?F.0 PIPF.LAYER AND CAULKER 13.41 350-11RO POWCERPAN 13.41 350-1A70 SEWER TImSEKMAN 13.41 350-1740 SPREADER (CARRIES GkADE WITH'RODDER) 13.41 4 .fit r S ? f ' ? ?t zk Y i 0 I•iJY-f?32320-AA PREVAILING MINIMUM HCU?,LY WAGE RATES SEPTEMBER 02, 1980 OCCUPATION: LABORERS LOCATION: CLALLAN+ GRAYS HARBOR- ISLAND, JEFFERSON, KING. K1 (SAP, Lt.4,I5+ NASON, PIERCE, SAN JUAN, SKAGIT, SNOHUNISH,'THLRSTUN AND kPATG04 COUNTIES nnU PACIFIC CCLNTY - NORTH OF THE +7AHKIAKLM COUNTY NCRTHERN EOU!'aDARY EXTENDED CUE WEST TO THE PACIFIC OCEAN. WAGE RATES OCCUPATION OCCUPATION STATE CODE DESCRIPTICN RATE GROUP 3 13.41 350-1940 TUGGER CPERATOr GROUP 3 -.000UPATIGN NEW TO GROUP 3 350-09ES HOD CARRIER 13.41 13.41 •,350-1145 MOTAR MIXER 13.41 350-1752 PAVEMENT BREAKER, U:UER 90 LOS; 13.41 350-2005 VIBRATORS, ALL GROUP 2 - FEDEFAL RATES ONLY 350-2020 VIBRATOR, 4 INCHES AND OVER 1 GROUP 4 350-0200 CAISSON WORKER 13.51 13.51. 350-1030 LASER BEAM•CPERATUR (TUNNEL) . 13.51 350-1110 mINER 13.51 350-1.481 POWCERMAN 13.51 350-1500 RE-TIMbERMAN 13.51 350-1730* SPACER (TUNNEL) OTHER i? 350-5354 STATE: FOREMAN, .50 5,/HP. ABOVE TF•E HIGHEST RATE SUPERVISED WITH THE EXCEPT ION CF SAN 350-5355 JUAN COUNTY STATE: ALL LABORERS IN SAN JUAN CCUN7Y+ 6.65 S/HR. WITH NO FRINGF UENEFITS .. f a •,? . Vii,' - r , ,y s C i r h,.x HWY-k32370-AA FRLVAILING MINIMUM HCUkLY WAGE RATES SEPTENUtk 02, 1980 000UPATION: FAVF.MENT STRIPERS LOCATION: STATEWIDE EXCEPT CLARK. COV)LIT2, KLICKITAT, SKAMANIA AND MAHKIAKUM COLNTIES AND PACIFIC COUNTY SOLTH OF THt WAHKIAKUM COLNTY NCR71iERM rsOUNUARY EXTENL'F.D CUE NEST TO THE PACIFIC CCEAN,. F FRINGE BENEFITS HEALTH AND WELFARE N4 5/HR. .25 S/HR'. PENSION -'WAGE kATES 1 OCCUPATION OCCUPATICN COCF DESCRIPTICN 470-0010 FCREMAN 470-0030 HELPER.- 1ST 6 MONTHS 470-OQ40 HELPER 2N1, ' 6 MONTHS 470-C050 HELPER - 3RU 6 MONTHS :470-OQF0 HELFEk - 4TH 6 MONTHS 470-C070 HFLFER -.5TH 6 MONTHS 470-0020 JOURNEYMAN I ? I STATE t RATE (7) n PREVAILING MINIMUM HCUkLY WAGE RATES SEPTEMHE:R 02, 19i•o •%-IY-R32320-A CCCUPATION: POWFR EOUIPMENT OPERATORS LOCATION: CLALLAM, GRAYS FARHOR. ISLAND, JLFFERSCN, KING, KITSAP, LEWIS, SNOFONISH, THLRSIUN, WHATCOM. T , MASON, PIEPCE. SAN JUAN, SKAGI PACIFIC COUNTY NCRTH OF A STRAI0-T LINE PACE'RY THAT PORTION OF THE SGUTH BOUNDARY LINE OF LEWIS COUNTY NEST IC THE EXTENnING FACIFIC OCEAN AND THOSE PARTS CF TFE FCLLOWING CCUNTIES LYING hFST OF THE 12076- MERIDIAN: CHELAN, DOLGLAS, KITTITA59 OKANOGAN, ANC YAKIPA COUNTIES. i FRINGE BEN= FITS HEALTH AND WELFARE .85 $/HR. 1.50 R/HR. - PENSION .11 S/HH. ` TRAINING FUM.C WAGE RATES OCCUPATICN STATE OCCUPATION RATE CODE DESCRIPTION GROUP 1 570-0010 "?ECFANIC+S rELPERS, HEAVY CLTY 13.10 Asti. j GROUPc 570-0020 OILERS, GkAUF. - OILER cCN+BInn1ICN AND/OR 13.20 i BRAKEMEN GROUP 3 570-0040 FIREMAN, HCT PLANT AND CRIEK 13.31 13.31 . 570-0030 FIREMEN I I • -GROUP 4 570-0040 CO.k'PRESSORS: EXCAVATING AND GENEROL PURPOSES 13.36 36 13 H . AN 570-0060 ROLLERS. TAMPERS AND VIERATCRS: 07HER T t-EFE S t w PLANT, BOAC MIX OR M.ULTILIFT MAM41AL TOWED, TO PAY RATE OF. ECUIPtFNT USEC TO PLLL) 36 13 . 570-0070 TRACTORS, FARMALL TYPE, 60 HP AND UNDER L f GROUP 5 A' 4 r t r _ ;,WY-832320-AA PREVAILING MINIMUM HCUkLY WAGE RATES SEP1ENbER 02, 15N0 OCCUPATION: POWER EOUIFNENT OPERATORS LOCATION: CI ALLAN, GRAYS HAkPOR, ISLAND, JEFFERSCN, KING, KITSAP, LEWIS. SNOHUNISH, THLRETON. WHATCUM4 T , NAc0N., PIERCE, SAN JUAN, SKAGI • FADE 'HY. PORTION Of PACIFIC COUNTY NCRTH OF A STRAIGHT LINE A T TH ExTEN01NG THE SCUTH BOUNDARY LIRE OF LEwIS COUNTY WEST TO THE PACIFIC CCEAN AND THOSE PAkTS OF THE FCLLOWING CCUNTIES LYING NEST OF THE 120TH NERIDIAN: CHELAN, DOLGLAS, KITTITAS, OKANOGAN- ANC YAKINA CCUNTIES. WAGE RATES OCCUPATION. OCCUPATION STATE RATE COCE OESCRIPTICN GROUP 5 570-OOP-0 OILER DRIVER ON TRUCK CRANES OVER 45 TONS UP 13.3P. TO 100. TONS GROUP 6. 570-0090 FLOY+ER GISTRIEUTOR AND NULCF SEEDING CPERATCK 13.43 13.43 570-0100 OIL DISTkIdIaTOPS GROUP 7 570-0110 LOCCMUTIVE: DONKEY-AIR. ELECTRIC, STEAM, CAS 13.44 1 t j OR CIESEL 1 GROUP E ? 13.45 . 570-G120 CEMENT HOGS I GROUPS 570-0130 FOUIPMENT SERVICE, AND FUELING OILER 13.1,8 4e S AND 13 . 570-0140 OILER DRIVER ON TRUCK CRANES 100 TON OVER GROUP 10 13.50 570-0150 PUMPS: WATtR TRACTORS, FARN.ALL TYPE, OVER EO HP 13.50 . 570-0160 d? ?r y K tL . 1 r ,ti I PREVnIIING MINImum HCURLY %-,AGE RATES SEPTE ?'bER 02+ 1SNU PWY-1132320-nA CCCUPATION: PO„ER EOUIPMENT GPERATCRS S LOCATION: C LALL " ESNOHOMISHKITHLkSTuN T C HO S AP, LEWI- . w hATCON, , SKAGI JUA)a. SAN PIERCE MASON, C COUNTY NGPTH OF A STRAIGFT L INE MALE HY THAT PCP,TION OF rACIFI EXTENDING THE SCUTH BOUNDARY LINE OF LEWIS COUNTY WE CCUNT ST TC THE IES LYING PACIFICCCEAN AND THOSE PARTS CF TrE FCLLOWING : CHELAN, DOLGLAS. KITTITAS+ OKANOGAN• WFST OF THE 120TH MERIDIAN AND YAKIMA CCUNTIES. WAGE RATES • j OCCUPATION OCCUPA`TIGN STATE RATE OESCRIPTICN COCE GROUP 11 570-0170 POST HOLE DIGGERS, MECHANICAL 13.63 - GROUP 12 570-0180 BROCMS, POWER (WAYNE, SAGINAW OR SIMILAR 13.6E 570-0150 TYPES) RULLOOIER+ UNDER D9 OR S1bILAR LUVEER STACKER 13.6tr 13.66 570-0200 LCACEkS: FORK LIFTS OR UCTION SITE), D'1CTT TRAVEL LIFT CONSTP j 570=0?10 . (ON ROLLERS, TAMPERS AND VIP-RATCRS (TWIN ENGINE) 13.66 570-0?20 SAWS, CCNCRETE SCRAPERS: CARRYALL TYPE, SINGLE 13.66 ; 570-C230 GROUP 13 570-0240 BATCH PLANT OPERATOR: BATCF• AND MIXER, 200 13.69 YARDS PER HOUR ANU.UNDER 13.69 570-0?60 50 CCNVEYGRS CRANES: "A FRAME TRUCKS- SINGLE PCWER DRUM T 13.64 65 13 570-0? 570-0?70 S CRUSHERS (RGCK).. WASHING AND SCREENING PLAN CCNCRETE PAVING R . 13.69 570-C?80 . FINISHING MACHINE OPERATO R TUGGERS, STRATC TCWER HLCKET, 3.69 1 570-0?90 HCISTS. AI ELEVATORS. AND DECK WINCHES (POWEh) 69 13 570-C300 LOACERS: ELEVATING - ATHEY. HARBER GREENF- . AND SIM•ILAk TYPES kS: OVERHEAD ANO'FRONT END, UNDER 2 112 13.66 570-0.110 LOACE 570-0.120 YARCS MIXERS: ASPHALT, UP TO 4 TONS-PER BATCH 13.69 r I ! r r` 1-WY-832320-AA PREVAILING MINIMUM HCUI<LY WAGE RATES SEPTEVHER 02, 19PO OCCUPATION: POWER EQUIPMENT OPERATORS LOCATION: CLALLAM, GRAYS F•ARBOR, ISLAND, JEFFERSCN, KING, KITSAP, LEWIS. MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THLRSTON, wHATCU}', THAT PORTION OF PACIFIC COUNTY NORTH OF A STRAIGFT LINE MADE BY EXTENDING THE SOUTH HOUNOARY LINE OF LEwIS COUNTY HEST TC THE PACIFIC OCEAN AND THOSE PARTS OF TI-E FOLLOWING CCUNTIES LY114U WEST OF THE 12oTH MERIDIAN: CHELAN, DOLGLAS, KITIITAS, OKANOGAN, AND YAKIMA COUNTIES. WAGL• RATES OCCUPATION OCCUPATICN STATE CODE DESCRIPTION RATE GROUP 13 570-0330 MIXERS: CONCRETE MIXERS AND BATCF• -.200 13.69 YARDS PER F•CIIR AND UNDER -570-0340 POWER PLANT OPERATORS 13.69 570-0350 PUMPS: CONCRETE AND PUMPCRETE' 13.69 j 570-0360 PUMPS: FULLER KENYON 13.65 570-0370 RCLLERS, TAMPERS AND VIBRATORS: ON PLANT, 13..65 ROAD MIX OR MULTILIFT MATERIALS 570-0320 SCREED MAN 13.65 i 570-0350 SPREADERS, FLAW KNOX. CEDAR - RAPIDS, JAECER, 13.69 FLARRETY OR SIMILAR TYPES 570-0400 TRENCHING MACHINES INCLUDING UNDERWATER - 13.69 - REMOTE CONTNOLLED UNITS: UNDER 16-INCHES ' GROUP 14 570-0410 MOTCR PATI l 1 SIMILAR 570-0420 TCUPNAPULI SIMILAR T' ( GROUP 15 570-0430 COMPRESSOR INCLUDING 570-0440 HOISTS CN AIR TUGGEF 570-0450 LOADERS: G G ;L GRADERS, INCLUDING MODEL .14 AND 13.76 ;, CATERPILLAR, ELCLID SCRAPERS ANO 13.76 -E EOUIPMENT - 25 YARDS AND UNDER ;: STEEL ERECTION OR TANK EREC71CN 13.78 ;AND BLASTING, PAINTING OF THE SAMt TEFL ELECTION, TOWER MC8ILES AND 13.78 CRK LIFTS WITH TOWER 13.78 • II r 7 i 777? r _r 6WY-R3?.310-AA PREVAILING MINIMUM HCUkLY V;AGE RATES SEPTEN(iEk 02, ISRO CCCUPATION: POWER EOUIPNENT OPERATORS LOCATION: CLALLAN, GRAYS hARBOR, ISLANC, jEFFERSCN, KING, KITSAP, LEvIS. MASON- PIERCE, SAN JUAN. SKAGI7. SNOHONISH, ThLRSTON, wHATCON, THAT PORTION OF PACIFIC COUNTY NORTH OF A S7kATGlT LINE MACE HY EXTENDING THE SOUTH HOUNDAFY LINE OF LEWIS COUNTY v.EST TC THE PACIFIC CCEAN AND THOSE PARTS OF THE FCLLOWING CCUNTIES LYING AFST OF THE 1201h MERIDIAN: CHELAN. DOUGLAS, KITTITA5. CKANOGAN. AND YAKINA CCUNTIE5,. WAGE RATES OCCUPATION, OCCUNATICN. STATE COCE DESCRIPTICN RATE GROUP 16 570-0460 MEChANICS Ck WELDERS, HEAVY DLTY• 13.79 GROUP 17 570-0470 LOACERS: ELEVATING GRACER TYPE - ULMOR AND 13.N1 SIMILAR TYPES f 570-04P.O LOCCMOTIVES: ROD OR GEAREC ENGINES 13.01 13.01 • 570-0450 P iXERS: PAVING t 57070500 SCRAPERS: CARRYALL TYPE, DCuOLE 13.81 GROUP 1R 570-0510 PUMPS: TRLCK MOUNTED CCNCRETE.PUNP W/NOON 13.84 I ATTACHMENT 570-0520 TRACTORS. FARM-ALL TYPE, USEC AS BACKHOES, 13.84 R.U8EER TIFEL; (FORD. FERGUSCN, CASE ANG SIt4ILAR TYPES) 60 HP ANC UNCEK GROUP 19 570-0530 BULLDOZER, 09 OR SIMILAR 13.8P. GROUP 20 570-0840 TRENCHING MACHINES INCLUDING UNCEkwATER - 13.55 REMCTE CONTHOLLED UNITS: 16 INCHES AND OVER I I o j r r ? ?r 1 07 j AILIN:G MINIMUM HCUIiLY WAGE RATES SEN7ENUER 029 1550 FREV )?41Y-R3?.320-AA OCCUPATION: Fo'v:FR EOU1FNFnT OPERATORS NOHOrISH).ITHLRSTLN.FW'HATCOM. ON: CLALLAM, GRAYS E S B , S LOCATI SKAGIT. JUAN SAN, NSOn. PIERCE. CIFIC COUNTY nCRTFt OF A STRAIGHT LINE NPUE FSY E T rP H THAT PORTION OF PA EXTENDING THE SOUTH BOUNDARY LINE OF LEWIS COUNTY WEST •TC E FCLLOWING CCUNTIFS LYING PACIFIC CCEAN AND THOSE PARTS OF TH LAN, DOLGLAS, KIT717A5, OKANUGAN. : CHE . %FST OF THE 120TH NERIOIAN AND YAKINA CCUNTIFS. WAGE RATES STATE OCCUPATION OCCUPATION RATE DESCRIPTICN COCF GROUP 21 CUiTE.R (CONCUT, CRISIIANSON CR SIMILAR 13.5E RUNE . -i 570-0550 TYPES) GROUP 22 570-0560 PATCH PLANT OPERATOR: P.ATC`OAND vIXER, OVER 14.01 p00 YARDS PLR HOUR THROUGH .01 wLTCRETE WITH PCWER PACK AND 14 570-0.570 CONVEYORS, v i SIMILAR TYPL5 cLEVnTING BELT TYFE - ELCLIO AND 14.01 E 5: 570-0550 LOAC SINILAk TYPES 0-05GO MIXERS: ASHHALT, 4 TONS AND OVER PER BATCH 14.01 00 14 V C 57 HOUR PEF 570-0600 00nYARDS k E C S 4 THROUGH HCUR PER 14.01 YARDS 570-Of-10 MIXERS: PAVING DUAL ' 1 GROUP 23, -0630 SULLDUZERS ENGAGED IN YC YO OPERAIICN ('WHILE 14.0E 570 CLEARING AND SCALING) 14.0E 570-0640 CABLEWAYS - 3 YARDS AND UNDER 14.06 ot ( PCWER DRUN 14• 570-0650 CHIPPER. WA" FRAME TRUCKS. DOUBLE 06 S: 14 . 570-0650 CRANE 570-0660 CRANES: CRAWLER, TRUCK TYPE, FLOATING. ER 3 YARDS AND UNDER ' I LOCCMOTIVE, WHIHLEY, EITH M INCLUDING JIBS ANC LNDER CH OR 1501 OF VOC 45 TONS AND UNDER 14.0E 570-0700 DF.RRICNS, ALL 1 ---------------- l? r I ? - hwY-k37.3?.0-AA FREVAILING MINIMUM HCURLY WAGE RATES SEPTEVtER 02. ISF 0 CCCUPATIONr POWER EOUIFMENT OPERATORS ? LOCATION: CLALLAM. GRAYS hAPO OR. ISLAND, JEFFFRSCN. KING. KITSAP, LEWIS. ' MASON. PIERCE, SAN JUAN, SKAC-IT, SNOhOMISH. ThLdSTON. WHATCOK. THAT PCRTION OF PACIFIC COUNTY NORTH OF A STRAIGFT LINE NAVE 8V EXTENDING THE SOUTH HOUNUAk.Y LINE OF LEwIS COUNTY wEST TC THE PACIFIC OCEAN AND THOSE PAkTS OF TPE FCLLOWING CCUNTIES LYING kFST OF THE 120Th MERIDIAN: CHELAN, DOLGLAS, KITTITAS, OKANOGAN , AND YAKIMA CCUNTIES. WAGE RATES OCCUPATION OCCUPATION STATE-- 000F DESCRIPTICN RATE GROUP 24 570-OS30 LCACERS: OVERHEAD AND FRONT ENC, 4 YARDS 14.28 UP TO 8 YARCS - GROUP 25 570-OP40 BATCH PLANT OPERATOR: 8ATCF- AND MIXER, OVEk 14.32 400 YARDS PER HOUR THROUGH C-00 YARDS PEP FOLK 570-CASO MIXERS: CCNCRETE MIXERS AND 8ATCr. OVER 400 14.32 1 YARCS PER FOUR THROUGH 600 YARDS PER FOUR GROUP 26 570-OS60 TOUHNAPULL-S. CATERPILLAR. EUCLID SCRAPERS 14.37 AND SIMILAR TYPE EQUIPMENT - CVFR 40 YARDS THRCUGH,55 YARDS GROUP 27 570-GA70 CABLEWAYS: OVER 3 YARDS 14.45 570-CAY.O CRANES; CRAWLER, TRUCK TYPE. FLOATING, LCCC- 14.45 MOTIVE. WHIRLEY, EITHER OVER "3 YARDS CR OVER 501 OF ROOM INCLUDING JIdS OR OVER 45 TONS UP TO 100 TONS 570-0900 HF.LICOPTEP r.INCH OPERATCR 14.45 570-0910 PEMCTE CONTHOL OPERATOR ON kUBBER-TIRED 14.45 FARTH MCVING EQUIPMENT 570-0920 SHOVELS: CHAT+LER AND TRUCK TYPE, ALL 14.45 ATTACHMENTS. OVER 3 YARDS UP TO 6 YARDS p - x« 77 . _ Fr Y ti I r VAILING MINIMUM HCUkLY WAGE RATES 5EN PRE 7ErBER 02. 1980 . 6wY-R32320-AA OCCUPATION: POWER EQUIPMENT OPERATORS LOCATION: CLALLAN., GRAYS hARBOR. ISLAND, JEFFERSGN. KING, KI SKAGIT+ SNOHOVISH. THLF.ST N TSnP, CO'S+ LEVl Cr. a:hATCUF. , MASON, PIERCE, SAN JUA PACIFIC COUNTY NORTH OF A STRAIGF-T LINE FACE-NY THAT PORTION OF E SCUTh BOUNDARY LIRE OF LEWIS COUNTY T WEST TC THE G H r EXTENDING PACIFIC CCEAN ANG,THOSE PARTS OF THE FCLLO%nING CCU : CHELAN, UOLGLAS+ KITTI NrIES LYIN TAS, OKANOGAN. IFST OF THE 1207F• PEPIDIAN AND YAKIVA COUNTIES. WAGE RATES OCCUPATLON OCCUPATION STATE RATE DESCkIPTICN CODE GROUP 23 0-0710 nRILLING MACHINES, CORE, CABLE, RCTARY AND 14.0E 57 EXPLORATION 14.06 :570-0670 HYDRA LIFTS 70-C6B0 HYSTEP. CAT CRANES AND ATTACHMENTS AND 14.06 14.06 5 570-0720 LCACERS: FORK LIFTS 'rtITH POWER BCON ( SwING ATTAChMEN7 L AND FRONT END, 2.5 YARCS OADERS: 570-0730 L V 06 14, YAHDS 4 AND UP TO 14.06 ' i 570-0740 MECFANIC LEADNAN TYPE 'WITH 1-CIST CCMBINATICN 14.06 I MCv-ILE 570-0750 MIXERS: 570-0760 MOTCR PATROL GRADERS. UVEA NOI:EL 14 AND 4.06 1 SIMILAR NG MACHINES. MOLE. TUNNEL DRILL AND CR 14,06 570-0770 MUCKI SrIELu AND LINKED PUSI-ER. OUAC 9 AND ER 14.06• S 570-0620 PAY DOZ SIMILAR PILEDRIVER ENGINEERS. L.3. FOSTER PLLLER CR 0-072 14.06 0 57 SIMILAR. PAVING BREAKER kYPE+ ALL . AL,R 14:0E 570-0750 AND UNDER ATTACHMENTS. 3 YDS kOTONILL AN D 14.0E CURRIES. CMI AND CMI 570-0800 SUB GRADER, SIMILAR TYPES TOUFNAPLLLS• CATERPI(_LEF• ELCLID.SCRAPERS 14.06 570-0820 AND SIMILAR TYPE EQUIPMENT - OVER 25 YARDS TI-RCUGH 40 YARDS FARMALL TYPE. USED AS BACKHOES, 14.06 570-0810 TRACTOkS, RUBEER 7IRE0 (FORD. FERGUSON. CASE AND SIMILAR TYPES) OVER 60 FP ' i I , i :j N II 1 .. n r r NY 1 .. S + ? ?` , •. W .i ? p.. ? `? r Y ti V y? 4r r ' ? .. at. f - l U L !-1 0 WY-k32320-AA PREVAILING MINIMUM HCUNLY „AGE RATES SEPTENHER o2. 19Ro CCUPATION: POViER EQUIPMENT GPEPATORS OCATION: CLALLAM. GRAYS hAREOR, ISLAND. JEFFERSCN, KING, KITSAP, LEWIS, MASON, PIERCE, SAN JUAN. SKAGIT, SNOHOMISH, THLRSTON. WhATCOM. THAT PORTION OF PACIFIC COUNTY NORTH OF A STRAIGr-T LINE MACE EIY. EXTENDING THE SCUTH BOUNDARY LINE OF LEWIS COUNTY WEST TC THE PACIFIC CCEAN AND THOSE PARTS CF THE FCLLOWING CCUNTIES LYING t %FST OF THE 120TH MERIDIAN: CHELAN, OOLGLAS, KITTITAS. OKANOGAN. ANC YAKIMA CCUNTIES. WAGE RATES OCCUPATION OCCUPATI.CK STATE " COCF DESCRIPTION RATE GROUP 27 570-0930 SLIP FORM PAVER. ZIMMERMAN, CMI AND SIMILAR 14.45 j ;570-ORSO TYPES TOWER CtiAhlES, PECCO, LURRATf.E, EUCYRUS ANC. 14.45 SIM'ILAk TYPES , GROUP 2A 570-0440 TOURNAPULLS• CATERPILLAR. ELCLID SCRAPERS ARU 14.67 SIMILAN TYPr. EQUIPMENT - CVER 55 YARDS f THRCUGH 70 YAriOS t i GROUP 2Q 570-0950 LOACEkS: CVERHEAD AND ERCNTEND. E YARDS ANC 14.87_• OVER GROUP 3R 570-OQ60 TOURNAPULLS, CATERPILLAR. ELCLID SCRAPERS ANO 14.9P. SIMILAR TYPE. EQUIPMENT - OVER 70 YARDS THRCUGH 65 YARDS .I ' i GROUP 21 570-0970 CRANES: CRAWLER. TRUCK TYPE, FLOATING, 15.00 j LO00MoTIVE, WHIkLEY,•EITHER 6 YARDS AND OVEN.' 2001 OF NOCN INCLUDING JIHS AND OVER OR 100 TONS AND OVER 570-09PO CRANES: ROLLAGON, TRANSPORTER 15.00 I r HWY-[(32320-AA PREVAILING MINIMUM HCURLY WAGE RATES SENTEPBEk 02, 19P0 CCCUPATION: PowER EOUIPMF.NT OPERATCRS LOCATION: CLALLAM9 GRAYS HARBOR. ISLAND, JEFFERSCN. KING, K1754P, LE,•II,S. MASON. PIERCE, SAN JUAN. SKAGIT. SNOHOVISH, THLRSTON. WHATCOV. THAT PORTION OF PACIFIC COUNTY NORTH OF A STRAIGHT LINE VALE HY . EXTENDING THE SCLTH BOUNDARY LINE OF LEWIS COUNTY WEST TC THE ! PACJFIC OCEAN AND THOSE PAkTS OF THE FCLLOWING COUNTIES LYING WFST OF THE 120Tr. NERICIAN: CHELAN, DOLGLAS, KITTITAS, OKANOGAN, AND YAKIMA COUNTIES. WAGE,RATES OCCUPATION OCCUPATJ.CN STATE COCE DESCRIPTION RATE GROUP 31 570-049O SHOVELS: CHAwLER AND TRUCK TYPE, ALL 15.00 ATTACHMENTS, 6 YARDS AND OVER GROUP 32 r 570-0993 TOURNAPLLLS. CATERPILLAR. ELCLID SCRAPERS 15.2P AND SIMILAR TYPE EQUIPMENT - OVER 85 YARDS 1 THRCUGH 100 YARDS ?. I GROUP 33 i 1 570-0996 OILER TRAINEE 8.37' GROUP 34 i 570-C999-GRACE CHECKER AND STAKEVEN 11,61 OTHER 570-5574 STATE: ALL POWER EQUIPMENT CPERATCRS IN SAN JUAN COUNTY, 8.40 $/HR. WITH NO FRINGE BENEFITS 570-3575 STATE: TOURNAPULLS. CATERPILLAR. EUCLID, i SCRAPERS ANO SIMILAR-TYPE EQUIPMENT-OVER 100 YARCS (TO EE NEGOTIATED) wIJH THE EXCEPTION OF SAN JUAN COUNTY j 'Irv 31 r <f ". L? ? r / ;•t•IY-k32320-A6 FREVAIL.ING MINIMUM HCURLY WAGE RATES SEPTEVRER 02, 19PO OCCUPATION: FOkER EOUIPMFNT OPERATORS LOCATION: CLALLAM, GRAYS HhPBOR, ISLAND, JEFFERSCN, KING, KITSAP. LEe.IS, MASON, PIERCE, SAN JUAN, SKAGIE. SNOFOI+ISH, ThLRSTON, WHATCON, THAT PORTION OF PACIFIC COLNIY NORTH OF A STRAIGHT LINE MALE HY. r t EXTENDING THE SCUTH BOUNDARY LINE OF LEWIS COUNTY WEST TO THE i FACIFIC CCEAN AND THOSE PARTS OF THE FCLLOWING COUNTIES LYING WFST OF THE 120TH MERIDIAN: CHELAN., UOLGLAS. KITTITAS, OKANOGAN. AND YAKIMA COUNTIES. OTHER 570-SS76 STATE: MASTER MECHANICS -.j.00 S/CAY OVER SHOVEL SCALE WTH THE EXCEPTION OF SAN JUAN COUNTY 570-5577 STATE: FOREMAN, .40 4/HR. CVEk THE FIGHEST CLASSIFICATION UNDER HIS SUFF.kVISION WITH THE EXCEPTICN OF SAN JUAN COUNTY If _! r ti r t r` r; i1VIY-k323?0-1,A FREVAILING MINIMUM HOURLY !AGE RATES SEPIEVBER 02, 14t!0 OCCUPATION: TEAMSTERS LOCATION: CEALLAV, GRAYS HARBOR, ISLAND, JEFFEPSCN, KING. KITSAP, LEWIS,. MASON. PIEPCE, SAN JUAN:, SKAGIT, SNW-ONISH. THURSTON. wHATCON. THAT PORTION OF' PACIFIC COUNTY NGRTH OF A STkAIGt-T LINE VALE BY Ey7ENDING THE SCUTh bOUNDARY LINE OF LEWIS COUNTY WEST TC THE FACIFIC CCEAN ANG THOSE FARTS OF THE FCLLOwING CCUNTIES LYING i UFST OF THE 1207H MERIDIAN: CHF.E_AN, OOUGLAS, KITTITAS, OKANOGAN. ANC YAKINA CCUNTIF_S. FRINGE HENEFITS HEALTH AND-WELFARE 1.06 $%Hk. PENSION 1.33 $/HR. 1 TRAINING FUND .14 $/HR. WAGE RATES OCCUPATICN OCCUPATION STATE COCF DESCRIPTIC:n. • RATE GROUP 1 730-0400 FSCCRT CRIVFrt 15.18 730-0650 LEVEkMAN AND LOADERS AT HUNKERS AND ' 15.18 BATCH PLANTS ! 730 1010 PICK-UP TRUCK 15.1N 730-1020 PTLCT CAR 15.1? 730-1700 SwANPER 15.18 730-1810 WAREHOUSEMAN AND CHECKERS 15.18 GROUP 2 730-1300 TEAM DRIVER 15.23 GROUP 3 730-0110 BULL LIFTS. OR SIMILAR EOLIPMENT USED IN 15.28 LOADING OR UNLOADING TRUCKS, TRANSNCRTING MATERIALS ON JOB SITES:wAPEHOUSING 73D-0140 PUS OR EMPLOYEEHAUL Ih.2P 1 . P 'o A 4. Y 1 f J y r - , OWY-8323?_0-AA FREVAILING MINIMUM HCUHLY v,,AGE kATES SEPTEMBER 02. 19+?U OCCUPATION: TEAMSTERS LOCATION: CLALLAM, GkAYS HARBOR. ISLANC. JEFFEPSCN, KING, KI f TSAP, LEPIS. % j MASON. PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THLFiST UN, WHATCUM.. THAT PCRTIUN OF PACIFIC COUNTY NGPTH OF A STRAIGHT LINE MADE HY EXTENnING THE SCLTH HOUNDAkY LINE OF. LEwIS COUNTY WEST TC THE FACIFIC CCEAN AND THOSE PARTS CF THE FL'LLOWIIVG COU NTIES LYING NEST OF THE 120TH MERIDIAN: CHELAN, DOLGLAS, KITTI TAS, OKANOGAN. AVE) YAKINA COUNTIES. 1 WAGE RATES I OCCUPATION OCCUPATICN STATE j CODE DESCRIPTLCN RATE. - GROUP 3 730-0200 DUMPSTERS. AND SIMILAR EWUIPMENT:TOLRNO- 15.2P ROCKERS. TOLRNOWAGUN, TCUHNCTRAILER.'CAT. Cw pp SERIES, TERkA COBRA- LETOURNFA.U, aESTINGHCUSE j I ATHEY WAGON, EUCLID, TviO ANG FOUR-WHEELED POWER TRACTCR WTH TRAILER AND SIMILAR TOP- LOADED EQUIPMENT TRANSPCRTING MATERIAL ANC PERFOkMING NORK I(. TEAMSTER JLRISL'ICTION:CUMP j TRUCKS, SIDE. END AND k3GTTCN DUMP. INCLUDING I SEMI-TRUCKS AND TPAINS CR CCMdINATICNS TPEREUF:UP TO AND INCLUDING 5 YARCS 730-0460 FLAE-EkTY SRkEADER 1S.2A r 730-0490 FLATBED TRLCK, SINGLE REAM AXLE 15 2E 730-0610 FUEL TRUCK. GREASE TRUCK, GriEASF_R, BATTERY , 15.28 SERVICE MAN.ANO/OR TIRE SERVICE MAN 730-1100 SCISSORS TRUCK 15.28 730-1350 TRACTOR. SMALL RUBBER-TIRED (WHEN USED WITHIN 15.28 TEAMSTER JLkISDICTION) 730-1750'VACLUM TRUCK . 1528 ? 730-2000 WATER WAGON AND TANK TRLCK: OF TO lEDO 15 .28 GALLONS 730-2200 WINCH TRUCK: SINGLE PEAR AXLE 15,28 730-2220 WRECKER, TCW TRUCK AND SIMILAR EQUIPMENT 15.2N GROUP 4 f 730-0500 FLATBED TRLCK. DUAL REAR AXLE. 15.39 GROUP 5 - • IS, J ? . I I i r IrWY-832320-AA PREVAILING MINIMUM HCUkLY WAGE RATES SEPTEMBER 029 1960 CCCUPATION: TEAMSTERS LOCATION: CL.ALLAM, GRAYS HARBOR. ISLANC, JEFFENSCIV, KING, KITSAP. LEV.1S. MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THLRSTON, WHATCOP, THAT PORTION OF PACIFIC COUNTY NCRTH OF A STRAIGHT LINE MADE NY . EXTENDING THE SCLTH BOUNDARY LINE CF LEWIS COUNTY WEST TC THE PACIFIC CCEAN ANU THOSE. PARTS OF TrE FCLLOWING CCUNTIES LYING HEST OF THE 120TH MERIDIAN: CHELAN, DGLGLAS, KITTITAS, OKANOGAN, AND YAKIMA CCUNTIES. WAGE RATES OCCUPATION OCCUPATICN STATE COCE' DESCRIPTICN RATE GROUP 5 730-0080 AUGGYMOEILE AND SIMILAR 15.45 730-0(,70 HYSTEk OPERATORS (HAULING BULK LOCSE 15.45 _ AGGREGATES) 730-1190 STRADDLE CAKRIEk (ROSS, HYSTER AND SIMILAR) 15.45 730-2610 WATER WAGON AND TANK TRUCK: 1600 GALLONS 15.45 TO 3000 GALLONS GROUP 6 730-1500 TPANSIT-MIX USED EXCLUSIVELY IN HEAVY 15.45 j CCNSTR.:O TO AND INCL. 4.5 YDS. _ I GROUP 7 730-0210 nUMPSTERS. AND SIMILAR EOLIPMENT:TOLRNO- 15.50` ROCKERS, TCLkNOWAGON. TCUNNOTHAILER, CAT' Crn SERIES. TERkA COBRA, LETOURNEAU. NESTINGHCUSE ATHEY WAGON, EUCLID. TWC AND FOUR-WHEELED POWER TRACTOR wTH TRAILER AND SIMILAR TOP- LOADED EOUIPMENT TRANSPORTING MATERIAL AND Y PERFORMING WORK IN TEAMSTER JLRISCICTION:CUMr TRUCKS, SICE. END AND BGTTCM DUMP. INCLUDING SEMI-TRUCKS AND TRAINS CR CCMHINATICNS TkEREOF:OVEk 5 YARDS.TO AND INCL. 12 YARDS 730-0410 FXPLOSIVE TRUCK (FIELD MIX) AND SIMILAR 15.50 FOUIPMENT 730-C710 LCWEED AND HEAVY DUTY TRAILER: UNCEF 50 15.50 TCNS GROSS 730-0910 OIL DISTRIBUTOR DRIVER (ROAD) 15.50 W?l k i 1 iv;Y-k3?_32O-nA PREVAILING r4IrllMUr•+ HOURLY v,nGE RATES StrTEvUEk OR, 19t+o OCCUPATION: 7EAMSTERS LOCATION: CLALLAM. GRAYS hARBOR, ISLAND, JEFFERSON. KING, KITSAP, LEWIS, MASON. PIERCE, SAN JUAN, SKAGIT. SNOHOMISH. THLRSTON. WHATCOm, THAT PORTION OF PACIFIC CUUNTY NURTH OF A STRAIGF•I LINE MADE HY• EXTENDING THE SOUTH HOUNDAkY LINE OF LEWIS COUNTY WEST TO THE # FACIFIC CCEAN AND THOSE PARTS OF ThE FCLLOWING CCUNTIES LYING %FST OF THE 1207h MERIDIAN: CHELAN, COLGLAS, KITTITA59 OKANOGAN. AND YAKIMA COUNTIES. WAGE RATES OCCUPATION OCCUPATION STATE I CODE DESCRIPTION RATE f$ ! 71 GROUP 7 - j 730-1140 SLURRY TRUCK DRIVER 15.50 1 730-1160 SNO-GO AND SIMILAR EOUIPM-ENT 15.50 _730-2210 WINCH TRUCK: DUAL REAR AXLE- 15.50 GROUP E 730-0?20 DUMFSTERS, AND SIMILAR E0UIPr•+ENT:TOLRNO- 15.56 POCKERS, TGURNOWAGON;, TCUPNGTRAILCR. CAT Cvf SERIES, TERPA CONrA. LETOLRNEAU, HESTINGhCUSE ATHEY wAGON. EUCLID, TWO ANU FOUR-wFEFLED POWER TRAC7OR wTH TRAILER AND SIMILAR TOP- 7 -LOADED EOUIPMF_NT TRANSPCRTING MATERIAL AND PERFORMING WORK IN TEAMSTER ,JURISDICTION:CUMN 'TRUCKS, SIDE. END AND NCTTCM DUMP- INCLUDING SEMI-TRUCKS AND TRAINS OR CCMdINATICNS 'THEREOF:OVER 12 YARDS TO ANU INCL. 16 YARDS . ! GROUP S 730-010,3 BULK CEMENT TANKER 15.61 t 1 r u p M! o Y 1 1 r r '• c L i 'WY-P3232()-AA PREVAILING MINIMUM HOUPLY WAGE RATES SEHTEVUER O[, 1480 J CCCUPATION: TEAMSTERS LOCATION: CLALLAM, GRAYS hARBOR, ISLAND, JEFFERSCN, KING. KITSAP. LEWIS. VASON, PIEkCE, SAN JUAN, SKAGIT, SNOHOMISH, THLRSTON. WHATCOM, THAT PORTION OF PACIFIC COUNTY KORTH OF A STRAIGFT LINE MACE HY EXTENDING TnE SOUTH BOUNDARY LINE OF LEWIS COUNTY WEST TC THE FACIFTC CCEAN AND THOSE PARTS GF TFE FCLLOt,ING CCUNTIES LYING _ WFST OF THE 120Th MERIDIAN: CHELAN, dOLGLAS, KITTITAS, OKANOGAN. AND YAKIMA COUNTIES. WAGE RATES OCCUPATION OCCUPATI.CN STATE: COCE DESCRlPTICN RATE GROUP 4 j 730-0230 DUMPSTERS. ANC SIMILAR EAUIFMENT:TOLRNO- 15.61 ROCKERS, TCLRNOWAGON, TCUPNCTRAILER. CAT CW SERIES, TERti,A COHPA. LETOL*,EAU, WESTINGHCUSE ATHEY WAGON. EUCLID. TwC-ANU' FOUR-vrf-EELEU POWER TRACTOR WTH TRAILER AND SIMILAR TOP- LOADED EQUIPMENT TRANSPCRTING MATERIAL AND PERFORMING wOkK IN TEAMSTER JURISCICTION:CUMN TRUCKS, SIDE. END AND BCTTOM DUMP, INCLUDING r. -SEMI-TRUCKS AND TRAINS CR CCMOINATICNS j THEREOF:OVER 16 YARDS TC AND INCL. 20 YARDS 730-2015 WATER WAGON AND TANK. TRUCK: OVER 3000 GALLONS 15.61 GROUP 10 730-0.120 BULL LIFTS, OR SIMILARY EQUIPMENT USED IN 15.63' LOADING OR UNLOADING TRUCKS. TRANSPCRTING MATERIALS ON JOB SITES:CTHER THAN WAREHOUSING 'GROUP 11 , • iy y 730-1510 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 15.6E CONSTR.:OVEN 4.5 YDS. TC AND INCL. 6 YDS. GROUP 1? 730-0010 A-FRAME OR FYDRALIFT TRUCKS OR SIMILAR 15.76 EQUIPMENT WHEN A-FRAME OF HYDRALIFT OR SIMILAR EQUIPMENT IS IN USE l Al •? Y al r al i'WY-832320-AA FREVAIt.ING MINIMUM HGUkLY WAGE RATES SEPTEV t OCCUPATION: TEAMSTERS LOCATION: CLALLAP, GRAYS HARBOR, ISLAND, JEFFERSCN, KING, KITSA PASO", PIERCE, SAN JUAN,•SKAGIT, SNOhOPISH, THLRSTON, THAT PORTION OF PACIFIC COUNTY NORTH OF A STRAIGHT LII EXTENDING THE SCUTH BOUNDARY LINE OF LEWIS COUNTY WES PACIFIC CCEAN AND, THOSE PARTS OF ThE FCLLOkING CCUNTII IT HEST OF THE 120Th MERIDIAN: CMELAN, DULGLAS, KITTITAS ANC YAKIMA COUNTIES. WAGE RATES OCCUPATION OCCUPATICN cl COCF DESCPIPTICK- F r GROUP 13 730-0?40 DUNPSTERS, AND SIMILAR EOUIPMENT:TOLRNO- is POCKERS. TCLRNOWAGON, TCURNOTRAILEk, CAT Cw POWER TRACTOR WTH TPAILER ANU SIMILAR TOP- LOACEO EOUIPMF_NT TRANSPCRT'ING MATERIAL ANC U2, lsr,p LEWIS. ATCUP, PACE, Fly C THE LYING KANOGAN. E A `dWY-P32320-AA PREVAILING MINIMUM HOURLY WAGE RATES SLt'TFNDER 02, 19$.s0 I CCCUPATION: TEAMSTERS LOCATION: CLALLAN, GRAYS HARHOR. ISLANC, JEFFERSCN, KING. KITSAP, LEY.IS, MASON, PIERCE, SAN JUAN. :SKAGIT, SNOHOMISHt THLRSTON. WhATCON, THAT PORTION OF PACIFIC COUNTY NORTH OF A STRAIGHT LINE MALE NY EXTENDING THE SCUTH BOUNDARY LINE OF LEWIS COUNTY WEST TO THE FACIFIC CCEAN AND THOSE PARTS OF THE FCLLOHING CCUNTIES LYING pFST OF THE 120TH NERICIAN: CHELANt OOLGLAS, KITTITAS. OKANOCAn, y AND YAKIMA CCUNTlES. t WAGE RATES OCCUPATION OCCUPATION CTATE COCE DESCRIPTICN RATE GROUP 1S 730-OPE0 DUMPSTERS, AND SIMILAR EOUIPMENT:TOLRNO- 15.94 ROCKERS. TCLRNUWAGO(v. TCURNOTRAILER. CAT CW I SERIES, TERRA COURA, LE70URNEAUt %ESTINGHCUSE ATHEY'WAGON, EUCLID. TWO AND FOUR-'WHEFLED POWER TRACTCR WTH TRAILER AND SIMILAR TOP- LCACED.EOUIPMENT TRANSPCRTING MATE'kIAL AND PERFORMING WORK IN TEAMSTER JL•RISCICTION:CUMP TRUCKS, SICE, END AND BOTTOM DUMP. INCLUDINC SEMI-7kUCKS AND TRAINS OR CCMNINATICNS THEPEOF:OVER 30 YARDS TO AND INCL. 40 YARCS i 730-0730 LOWNED AND HEAVY DUTY TRAILER: OVER 100 15.94 TONS GROSS GROUP 16 730-IS30 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 15.98 CONSTR.:OVER 8 YDS. TO AND INCL. 10 YDS. GROUP 17 j 1 •I; ri i 1 :+WY-R32320-AA PREVAILING MINIMUM HCURLY WAGE RATES SEPTEMBER 02, 1580 CCCUPATION: TEAMSTERS LOCATION: CLALLAN. GRAYS hARBOR, ISLAND, JEFFEPSCN, KING, KITSAP. LEl%jS, MASON, PIERCE, SAN JUAN,.SKAGIT, SNOHOMISH, THLRSTUN. WHATCOM. THAT PORTION OF PACIFIC COUNTY NORTH OF A" STRAIGHT LINE MACE BY t EXTENDING THE SCUTH BOUNDARY LINE OF LEWIS COUNTY WEST TC THE FACIFIC CCEAN AND THOSE PARTS OF ThE FCLLOWING CCUNTIES LYING y NEST OF THE 120TH MERIDIAN: CHELAN, COLGLAS, KITTITAS. OKANOGAN'. A.NC YAKIMA COUNTIES. r WAGE RATES OCCUPATION OCCUPATICN STATE. COCE DESCRIPTICN RATE GROUP 17 730-0?60 DUMFSTERS. AND SIMILAR EOUIFMENT:TOLRNO- 16.10 RCCKERS, TCURNOWAGON, TCURNCTRAILER. CAT CW SERIES. TERRA COBRA, LETOU•RNEAU, kESTINGHCUSE. ATHEY WAGON, EUCLID, TWO ANC FOI:R-wHEELED POWER TRACTCR WTH TRAILER AND SIMILAR TOP- LOADED EOUIPMENT TRANSPCRTING MATERIAL ANC PERFORMING WORK IN TEAMSTER JURISCICTION:CUMP TRUCNS, SICE, END ANO BCTTCN DUMP. INCLUDING SEMI-TRUCKS AND TRAINS CR CCMPINATICNS THEREOF:OVEk 40 YARDS TC AND INCL. 55 YARL'S GROUP 1n 730-1540 TRANSIT-MIX.USED EXCLUSIVELY IN HEAVY 16.15' CONSTR.:OVER 10 YDS. TO AND INCL. 12 YUS. GROUP 19 730-1550 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 16.31 CONSTk.:OVER 12 YDS. TO AND INCL.' 16 YUS. GROUP 20 730-1560 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 16.47 CONSTR.:OVER In YDS. TO AND INCL. 20 YDS. GROUP 21 .. • kereF . 3 141 a. 14 v r r f r r l I' k HWY-832320-AA PREVAILING MINIMUM HCURLY WAGE RATES SEPTEMBER U2, 1SN 0 OCCUPATION: TEAMSTERS LOCATION: CLALLAN, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEivIS. SNOHONISH, THURSTUN, WHATCOrl. T , MASON, PIERCE, SAN JUAN, SKAGI PACIFIC COUNTY NORTH OF A STRAIGFT LINE MATE BY THAT PORTION OF EXTENDING THE SCUTH BOUNDARY LINE OF LEWIS COUNTY WEST TC THE F.ACIFIC CCEAN AND THOSE PARTS OF THE FCLLOVIING CCUNTIES LYING KITTITAS. OKANOGAN. REST OF THE 120TH MERIDIAN: CHELAN, DOUGLAS, ANC YAKIMA COUNTIES. WAGE RATES OCCUPATION OCCUPATION STATE 1 HATE ' COCE DESCRIPTION .? GROUP 21 730-1570 TRANSIT-MIX USED EXCLUSIVELY IN HEAVY 16.E3 CONSTFI.:OVEk 20 YOS. GROUP 2? j i 730-0810 NECF4NIC HELPER 15.03 j GROUP 23 , 15.62 730LOPOO MEC-ANIC OTHER 730-5732 'STATE: ALL TEAMSTERS IN SAN JUAN COUNTY. 7.SU 5;/HR. WITH NO FRINGE. HENEFITS 730-5735 STATE: FOR OCCUPATION 730-0260 IN GROUP 17 ARD INCREMENT CVER ADD .15 S/Fk. FOR EACH 10 Y 55 YARDS WITH THE EXCEPTION OF SAN JUAN COUNTY 730-5736 STATE: ALL TYPES OF TRUCKS OR EQUIPMENT USEC TO i-AUL PORTLAND CEMENT READY-MIX SFALL BE GOVERENED BY THE TRANSIT-"IX SCALES WITH THE EXCEPTION CF SAN JUAN COUNTY - 1 • r f ? r Y 6 P > % S ? A ? ? ?? ? ; s w . .. .. d a .: may..,,: CRP 478 INTERSECTION IMPROVEMENTS r $-s *vah. Y?'? -' ? H 1 PRFLIMINARY ENGINEERING E To r?, , -.?, / +:•. -. !; ' , ;. F i p O i `SUBJECT JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS COURTHOUSE PORT TOWNSEND WASHINGTON 98368 PHONE - 385-3505 _- -MESSAGE {. - --- ---------- I /% SIGNED f?// ., ?f. ?q/sy? ,mss-rv-?i../ ,/,fi <r, ?c DATE o{%.L1,?/• /I: 3r; //'..?=fi'C a REPLY r-' - -- ?.- - ------- --------- REMOVE PART 2 AND FORWARD PARTS I:AND 3. SIGNED - DATE . o PART 3 WILL BE RETURNED WITH REPLY. 081 LIFT THIS SHEET TO REMOVE - FILE FOR FOLLOW-UP i i 4,'4 1 ?- f 4 y f t A Mr. Milton L. Sanstrom Director of Public Works Court Ouse, Port Townsend, WA 98368 Irish Beach Manchester, CA 95459 November 1, 1980 Dear Mr. Sanstrom: Receipt is acknowledged of yours of October 24, 1980, which just reached me here in Yuma, Arizona. With relation to the County's offer of $1,100 for a ten foot strip of my property incident to C.R.P #478, we have no objection to selling in the interests of the commonweal. However, I do have two points I wish to discuss. First, The quitclaim deed should show the Combs Family Trust as the grantor, with Walter V. Combs and Bernice C. Combs, as trustees. Second, I have been advised that the final clause is unduly permissive in that it would permit limitless encroachment on the remainder of the property. We are reasonable people and I feel that any future expansions could be resolved at the time the need therefor arose. Further, such a vague clause would be considered by any possible buyer as severely detracting from the value of the remainder of the parcel. Accordingly, cannot this last clause be deleted from the proposed ouitclaim JEFFERSON COUNTY COMMISSIONERS Carroll M. Mercer - "s A,M. O'Meara B.G. Brown MEMBER ?P CHAIRMAN MEMBER ?}`• - Jefferson County Deportment of Public Works, r COURTHOUSE AF ` tisaY+ls + a_ . . PORT TOWNSEND, WASHINGTON 90368^}. G I, Milton L. Sanstrom, DIRECTOR OF PUBLIC WORKS October 24, 1980 Mr. and Mrs. Walter V. Comb's Irish Beach Re: C.R.P. 473 Manchester CA 95459 ' Co. Rd. No. 12 and Kala Point Road t , Dear Mr. and Mrs. Combs: The Jefferson County Department of Public Works plans to install left turn rder to do this I , n o channelization at the above referenced intersection. r ownership is needed. This is the t o you additional right of way adjacent The size of the parcel involved lan hed tt . p ac area shaded in red on the a is 0.10 acre. We have had all the real estate involved in this road project appraised by fferson Appraisal Service, f J e an independent appraiser, Mr. Jeff Ingman o He has valued your acreage at $11,000.00. We are authorized send t T . own Por to offer you $1,100.00 for 0.10 acre based on the appraised valuation. If you would please contact me at this office, the telephone number is an resolve any W e c 385-3505, we may discuss the project in greater detail. Than]: you for your cooperation. our parcel to i l . y ar cu problems that are part Very truly yours, M. L. Sanstrom, P.E. for of Public Works re D W ? :f Glenn A. Brgley Assistant Director of Public !forks GAB:ejs J Enc. Appraisal, Plan - cc: County Commissioners r 'x r , JJ` r r. F ? . JEFFERSON COUNTY COMMISSIONERS ? A.M. O'Mwra B.G. Brown Carroll M. Morcer MEMBER CHAIRMAN MEMBER Jefferson County Department of Public Works - COURTHOUSE PORT TOWNSEND, WASHINGTON 98368 WIN Milton L. Somtrom. DIRECTOR OF PUBLIC WORKS f October 24, 1980 c - t Mr. Robert C. Harper + 1206 Water Street Re: C.R.P. 473 Port Townsend, WA 98368 Intersection Improvement County Road No. 12 and No. 18 Dear Mr. Harper: The Jefferson County Department of Public Works plans to install left turn der to do this I , n or channelization at the above referenced intersection. ownership is needed. This is the t o your additional right of way adjacent The size of the parcel involved is attached plan th d . e on area shaded in re 0.07 acre. 1 We have had all the real estate involved in this road project appraised by an He has valued ttached i . s a independent appraiser. A copy of the appraisal are authorized to offer you $780.00 W e your acreage at $11,000.00 an acre. raised valuation. a th d pp e on for 0.07 acre base If you would please contact me at this office, the telephone number is We then can resolve tail d . e 385-3505, we may discuss the project in greater our parcel. Thant; you for your coopera- lar to ti y cu any problems that are par tion. Very truly yours, M. L. Sanstrom, P.E. Director of Public Works Glenn A. Bagley Assistant Director of Public Works GAB:ejs Enc. Appraisal, Plan cc: County Commissioners ?? y ,, f A +? 1 ? -01 r1` M J - JEFFERSON COUNTY COMMISSIONERS A.M, O'Meara B.G. Brown Carroll M. Mercer CHAIRMAN MEMBER MEMBER ?"- r S Jefferson County Department of Public Works : ' COURTHOUSE I . -: PORT TOWNSEND, WASHINGTON 98968 Milton L. Sonstrom, DIRECTOR OF PUBLIC WORKS - April 29, 1980 1 - Mr. Harry Drake 3660 E. Fremont X1228 Re: C.R.P. 478 Las Vegas, Nevada 89121 Intersection Improvement ! County Road No. 12 & No. 18 Dear Mr. Drake: i The Jefferson County Department of Public Works plans to install left turn channelization at the above referenced intersection. In order to do this, addi- tional right of way adjacent to your ownership is needed. This is the area shaded in red on the attached plan. The size of the parcel involved is 0.10 acre. We have had all the real estate involved in this road project appraised by an independent appraiser. A copy of the appraisal is attached. He has valued your acreage at $11,000.00 an acre. We are authorized to offer you $1,100.00 for j 0.10 acre based on the appraised valuation. If you would please contact me at this office, the telephone number is 385-3505, we may discuss the project in greater detail. We then can resolve any problems that are particular to your parcel. Thank you for your cooperation. Very truly yours, M. L. Sanstrom, P.E. Director of Public Works Glenn A. Bagley s Assistant Director of Public Works CAB:ejs r I Enc. Appraisal, Plan cc: County Commissioners i j p, i r i,= t 3 I JEFFERSON COUNTY COMMISSIONERS t r A.M. O'Meara B.G. Brown Carroll M. Mercer CHAIRMAN MEMBER MEMBER u% fT ?A? Iff Jefferson County Department of Public Works COURTHOUSE r PORT TOWNSEND, WASHINGTON 98368 Milton L. Samtrom, DIRECTOR OF PUBLIC WORKS April 29, 1980 ?. Mr. Jerald Jensen 419 S. W. 327 Place Re: C.R.P. 478 Federal Way, WA 98003 Intersection Improvement County Road No. 12 & No. 18 i Dear Mr. Jensen: The Jefferson County Department of Public Works plans to install left turn channelization at the above referenced intersection. In order to do this, addi- tional right of way adjacent to your ownership is needed. This is the area shaded in red on the attached plan. The size of the parcel involved is 0.08 acre. We have had all the real estate involved in this road project appraised by an independent appraiser. A copy of the appraisal is attached. He has valued your acreage at $11,000.00 an acre. We are authorized to offer you $880.00 for 0.08 !I acre based on the appraised valuation. If you would please contact me at this office, the telephone number is 385-3505, we may discuss the project in greater detail. We then can resolve any problems that are particular to your parcel. Thank you for your cooperation. Very truly yours, { N. L. Sanstrom, P.E. Director of Public Works ^-?? ??? Glenn A. Bagley II Assistant Director of Public Works GAB:ejs Enc. Appraisal., Plan cc: County Commissioners II _ A r , '? wY r r J _..-.. '_........ _.. w.w AIN- JEFFERSON COUNTY COMMISSIONERS ?d ' A.M. O Meara Brown Carroll M. Mercer L CHAIRMAN B - ME MEMBER MEMBER a Ir_ Jefferson County Department of P bli W k u c or s' y COURTHOUSE ?rr^? I - i PORT TOWNSEND, WASHINGTON 98368 ." : , Milton L. Sanstrom, DIRECTOR OF PUBLIC WORKS . " i April 29, 1980 w Manke & Sons i 1750 "Marine View Drive Re: C.R.P. 478 Tacoma, WA 98422 Intersection Improvement County Road No. 12 & No. 18 ? Gentlemen: -- The Jefferson County Department of Public Works plans to install left turn I channelization at the above referenced intersection. In order to do this, addi- tional right of way adjacent to your ownership is needed. This is the area shaded in red on the attached plan. The size of the parcel involved is 0.16 acre. We have had all the real estate involved in this road project appraised by an independent appraiser. A copy of the appraisal is attached. He had valued your acreage at $11,000.00 an acre. We are authorized to offer you $1.760.00 for 0.16 acre based on the appraised valuation, j If you would please contact me at this office, the telephone number is 385-3505, we may discuss the project in greater detail. We then can resolve any problems that are particular to your parcel. Thank you for your cooperation. Very truly yours, M. L. Sanstrom, P.E. Director of Public Works 9 Glenn A. Bagley Assistant Director of Public Works r , CAB:ejs Enc. Appraisal, Plan cc: County Commissioners r ? w, ? f r y , y t t ? W Jefferson County Department of Public Works COURTHOUSE PORT TOWNSEND, WASHINGTON 98368 Milton L. Sonstrotn, DIRECTOR OF PUBLIC WORKS September 29, 1980 i Ms. Julia Rogers Route 1, Box 92 Re: C.R.P. 478 Port Townsend, WA 98368 Co. Rd. #12 and Kala Point Road k Dear Ms. Rogers: The Jefferson County Department of Pub lic Works plans to install left turn channelization at the above referenced intersection. In order to do this, additional right of way adjacent to your owner- F ship is needed. This is the area shad ed in red on the attached } plan. The size of t.te parcel involved is 0.193 acre. We have had all the real estate involv ed in this road project appraised by an independent appraiser. A copy of the appraisal is t attached. He has valued your acreage at $11,000.00 an acre. We are authorized to offer you $2,125.00 for 0.193 acre based on the appraised valuation. If you would please contact me at this office, the telephone num- ber is 385-3505, we may discuss the pr oject in greater detail. We can then resolve any problems that are particular to your parcel. Thank you for your cooperation. Very truly yours, M.L. Sanstrom, P.E. Director of Public Works Glenn A. Bagley Asst. Director of Public Works GAB:ejs Enc. Appraisal, Plan cc: County Commissioners JEFFERSON ODINTY 'i DEPARTMENT OF PUBLIC WORKS FILE ACTION REQUEST REQUESTED BY- ?eY.4.CD ADDRESS- /!F /d S ?O owrE - _ T9 cp /H. //df Id ? ! NATURE OF REQUEST- IN PER'ipN ALT. PH. NO.- BY PFIDIVE ? BY 'yj PERTAINING To. ?OFFICE I?• IXl LETTER TAKEN By. p? ENG/SURygY El ROAD MAINT ? _ REgt?gr p_ -?:451LS . EGUIP. Mq INT. El SOLID WASTE _ r'Si S./T 7ifTiYit7if A J LOCJIT I ON- ROAD NAME ! _ - . Lo. f PROJECT' PROJECT TITLE ROAD NLMBER M. P. DESCRIPTION. / PROJECT N LMBER- iA S %AFtt 4tX?e2 L Sly'- T 3 0 N-? / W ? ATT Q ' ? I ACH MAP OR SMTOi Y Cfi /; '? ? REFER TO- RESPOND BY- RESPONSE- REVIEWED BY. {rt DATE - i CONTACTED RECAE'STER ? IN PERSON ? BY PHONE ? BY LETT ER CONTACTED BY- RECOMMME MAT10N. PREPARE EST IMATt FOR- _ ROUTe T'D- INITIAL ? DIR ECTOR ? ? ASSIS CONSTRUCTION ENG. ? ACCOUNTANT TANT DIR. ? ? ROAD -W'E PLANNING ENGINEER RVI- __ ? ? ADMIN. ASSISTANT -, 40 f J t r 3 tiS'TR?IIT OF JCT??V?E I>'UC1i (S-n Ec?)) Rd55wt r- --- t Y4 ,... ° nJ u,u Iii;J n'7i? ?F,L i ??<ul O?V?y.]f MeCurd Point t z .. l L l j [?' [ UO C D .?$ I d (y`'`?v ? m µ: r u Q c Jrpp, ?,'1??JjJ.?^I' 1InI ? c ?1?I1 ? k` ?L I uy1 `>Ju niCv; ek ?ETT xe olz aL7u R Elm fit _ ?s +Y 1?? ? u ?R[ np w a o u +y °° 7,b6 s ? cs?ic rr,,?tp7,Q'r?tab? n?Qn .6 ' rV otl5oSP >v,T<t s ». ,,np_ey ?a RC;B/ » s ,?_ //I [/f?_?Q 2h 5LT?,? ?'Gs'nJga'Y?`I PP? n..^' eii "•r- ..1. T??ir 5 L.(K ?fi'? p u?6j a°' 9 6l IfIU q?rM ESBEac [? e? a a ; ie <;: °o- ?c 3 i{{.. • ?_. ?{?f C ?'ra? O O L? o ui? 0 6 J° ''?4 `? '? o? 3 o4 MD{,=SK "' :.: a?4b°,r?, c1Ld?vi?P.?u o?????°.?°,'3"rii ,.,7t' 'C s? 'moo ,r. r{E r tym rPa 7 qr?b [Y a O ?Y?y? j y I ' : .t ? ay > t^?itS=N'Yin }sPriLK ZZ c ° vC f /e ? I6 < Rr fY ;? ?,.r ,? I c ,•°'`,,, 3 I, / e r? Y• 6 i(yyy((? ?,,.7j 4.7 "`d?'I(>F s?? ?' c Buck?n?L]w ?n?C? ?° Ir3?.??1<51 aFn _" ;m?jdp?'{P';?? P dry a[akes ,0.r v r} aq( r Ce <c<y?a ;(? ggqq 9 VgPow p--? g0r1p??p ? ?? ?? NJ rcz T N; F. ?.yQE iun J oil iJ? G7S7}9? o' 11 ? iM c 'zai z tia*[eq ? .. ` c °p? J?,,• I `y???rJrrL?,f o Ort ?'V?[9?3jJ-1 r ? 'n n ?IeG`i1,L'Wi fJ Q Cl ?,?cGLl . 7¢] ? ? "4? _ -Ctr ,t• I Pi ` 0 n fJ•r}D?fL ]s?yr??. ? ^P ?LA2 5!gTE o-?Pf?P 1k-?` JWjR...L'77 y QO^? I'? o4`J ° fy E Pi.P¢<Y 1.??1',? 1???{t?V O??GQJ- ???r 1? 1 ? G ' ' Q fJ '~ q'_ s /o', W /r?z oa ? _?- ? 7r?,]j;P" ???t?l ?' o o ?J?J? i Sc HOO. La c . ?? °?MA,L. 1 c? ren 1'L•iJ a1?? r sF r Gil ? 'S LI51?aJQ b ' A Pp_ `P? ' ?6O J o-i t ? N ` a nM . ? rr 1 Tv P 'e 6 .., `i N _t .1 ??'?'' 7 >? ^;• 4iq ?t_ `iea p? ;? ei CROWN 2ELLERSACH COR t PaP? 4,,a?,-* 9: "'i , : '' ` _ •? . Pf w s o? xis r $+ EI ? c,q LnrFp C7 E pU G Y ?F co? C O 7 r7iuc cove 1 0 B" rj? ?? ogY 7?r =f ?.<,o P ? y ?? ?? Py <.?,yl, 3 I a a.5 0 ; 2 FO RT Tow : J ' f r ?r f 2520 -- ' REAL ESTATE CONTRACT Y THI$ltl}fh12ACT? male ud..-d W. thb ISTH ar of JULY,- 1979 ]' CARL LINDSEY AND LANA M..LINDSEY,.HiS WIFE A p om , ?. ... I - f t - Lc;-' ""m0`d m` o '°d RICHARD D. ROMANO AND KATHY J ROMANO HIS WIFE .. - tt ? 1 fi • I.. ? / ei 4 MJvJw g7kd l4 twrtL,xr, k1I\GSiml: Th" Ib rLsr tree to r0 ro IW pu"harr ,nd Q. hucr, rec. la N•' C pue<hu, f th rikr h W ..W &-,bcd rW nl,re, {th th, ,ppunewa? b JEFFERSON C..mr, sw, a Wu bncl : f AS HERETO ATTACHED AND BY THIS REFERENCE MADE A PART THEREOF ' '7ME EAST EL£VEWACRES'OF THE FOLLOWi NG DESCRI BE D' TRACT: ?r y 'j- - y= _ THAT PORTION OF."IRVING DRIVING PARK", AS SHOWN ON THE PLAY.OF-"IRVING PARK ADDITION TO. THE CITY OF PORT TOWNSEND,,AS PER THE PLAT' THEREOF RE- C ' -- ,,, ORDED AN VOLUME 1 OF PLATS, PAGE 42, RECORDS OF JEFFERSON COUNTY, WASHINGTON, IN SECTIONS 16 AND 17 OF TO WNSHIP 30 NORTH ' R ' , ANGE 1 WEST, ; W.M., DESCRIBED AS. FOLLOWS:• .. BEGINNING AT A POINT ON THEWEST LINE QFSAID DRIVING PARK A DISTANCE ' OF 650 FEET SOUTH OF THE NORTHWEST CORNER- THEREOF , _ THENCE SOUTH ALONG THE SAID WEST LINE 545.FEET; ,. THENCE-EAST 1300 FEET TO THE EAST LINE OF SAID DRIVING PARK,BEING COIN-• 1 CIDENT WITH THE WEST LINE OF THIRD STREET AS PLAT ` r . TED IN SAID -" . IRVING PARK ADDITION, ,; •, - ' ! " - -'? THENCE ;NORTH ALONG SAID EAST LINE 545 FEET] .'., THENCE WEST-1300 FEET TO THE POINT OF BEGINNING j EXCEPT THAT:GORTION THERE OF: IN SECTION 16 WHICH LIES NORTHER l i ` LY OF AN• " EXISTING FENCE NEAR THE NORTHERLY BOUNDARY OF SAID PARCEL; e!i' - C7 SITUATE IN THE CITY;OF PORT TOWNSEND;,COUNTY. OF JEFFERSON, STATE OF WASH- { <t INGTON._ ._ . , ALSO EXCEPT THAT PORTION TNL•R EOF IN SfECTi ON17 WHIC j --4 H LIESNORTHCRLY OF AN CO EXISTING FENCE NEAR THE NORTHERLY BOUNDARY OF SAID PARCEL;..: r,,.,. ,.. :.!. SI TUATE.IN THE CITY OF PORT TOWNSEND _ , COUNTY OF JEFFERSON STATE OF WASH- INGTON. - ALSO EXCEPTING FROM ALL OF THE ABOVE DESCRIBED, THEWEST FIVE ACRES THEREOF AND ANY PORTION WHICH MAY LIE WITHIN THAT 60 FOO T COUNTY ROAD CONVEYED FEBRUARY 6, 1950 UNDER AUDITOR'S FILE NO.;120796, IF ANY. t i i A 17. 197E!_ i rS z ? A' ?#'Yt ?u"• i, t,L ?./3 `Y ?FwM^"`I? ?. ' i' ? :y? q a5 i? $?` y :?`? c?Wm a• Ft?? 1 f '. I "'^?'?^'wuFSf.3 ? .- '? 7Vµ to rry.: v .. ...? f ` i. ` . f, . r. , .?? 6 w r r ?Qy PARCEL No. ?r I - Sec. Lot Twp Rge - Block !4: District Code = ?6 r sQW1 m.k MELVIN WI IAMS •, SACD 04 5?l X L?Q /?? 3Q I 0ao -i e4'gz v &4i'l C? u x " Description 221131 { TBR CO DO Grade Ac OS AO. OS? TO Grade Ac __ Refor ? Ac YEAR IMPROVED UNIMPROVED TIMBER LAND TOTAL IMPS TOTAL VALUE Comment: ?-° ACRE VALUE ACRE VALUE CRE VALUE ACRE VALUE " : VALUE ' l? 000 ,0 r! 0 l?/Ay o0 ? u 0 / OO d ? J O d fib F °o - OrJ '.15000 S' /,? G y? / s. a ?sso ) y/ eCnk rtdi { C I i 1 1 l SENIOR CITIZEN EXEMPTION - J YEAR Codel Code II JEFFERSON COUNTY ASSESSOR PORT TOWNSEND WASHINGTON 96368 • n " y P, , ' , yR r .F - . i r ` r `I yy; i 1 a k i i -1 ;.. GLL f08 BIDS ' ---- ?Notice Is- hiveni ?, that the 9aard .._aar,tyi Affidavit of Publication r Commissioners of ; Jeffer-i son County, State of Wash- receive sealed - Ington,will STATE OF WASHINGTON).. , bids.up until the hour of COUNTY OF JEFFERSON) 10:30 a.m: Monday,; No- FRANK W. GAPPED, being sworn, says he 13 the er l0, ? 1980 at the of- . Leader, a weekly Publisher of the the Port Townsend • ,lice of the County'Commis . newpaper which has been established. Published In the s sioners, Courthouse, Port sh language and clrculated continuously as a weekly Engl newspaper in the town or Port Townsend, In said County -Townsend, Washington, to and State, and for general circulation in said county for be opened: and publicly more Ihan six (S) months prior to the data of the first read at o meeting of the publication of the Notice hereto attached, and that the County, Commissioners to said Port Townsend Leader was on the 27th day of June, al newspaper by the Superior Court d as a le beheld that day for the im- g 1941, approve Jefferson County, and that annexed Is a true copy provement of 0.41 miles of of '„e Jefferson County Roads lo- cared In the irondale area' Call for did. -improvement . grave L ;sur- by grading, asphalt paving and facing of0.41 miles of Jefferson County , varlous other work as set' Roads in the Irondale area by forth in 'the-plans, and' grading, gravel surfacing, etc. specifications for C.R.P. 478 now on file'at the of- fice of the Jefferson Coun - ty Director of Public Works. Molor items of work will be'eiccavated; cru,b,d sur- as It appeared in the regular and entire Issue of said paper Itself and not in a supplement thereof for a period of two consecutive week., beginning on the _? day pf October gLO , andendingonthe 5th-dayol Tf r hP^ 19M, and that said newspaper was regularly distributed to its subscribers during all of this period. That the lull amount of $ 68.40 has been paid In full, at the ?. 1 - rateof $765 percoiumn Inch foreach insertion. / J ' Supg dribetl nd sworn mare ma this St'h day of do a• '1'a I .11 LZ9. :eSl Saf y 1VOVemoOr 9 , - '1fu,4x d J n4d ` -sr crugd rc) /Notary Public in and for the State ol OLPTLIS'oj0q j Washington, residing alPortTownsend j. NOTICE OF PUBEIC NEARING " 1'" - '• REGARDING THE PROWAD I 0 Coverage: This or, approval of such has If l Idce shall apply to all given in compliancc ADOPTION OF THE j c., ping. - club this ordinance. Should a "JEFFtRSONCOUNTY C"PER developments established plan be filed. without such CLUB of Publication r: CLUB within the unincorporated compliance, the Jefferson!. l ORDINANCE". area of Jefferson. County County Prosecuting At. It NOTICE IS HEREBYand shall be In compliance torney shall apply for a ?N)e9' it GIVEN, that the Jefferson with applicable laws of the writ of mandate in the j County . Board Of Commis.. stoners will State of Washington and. name of and on behalf of',eing sworn, says he is he conduct. a 6 - proceed in compliance the Board of County Com• Townscend Lasde,. a weekly public hearing on Monday, herewith.. missloners directing the 'n aed continuously as a in the May 5, 1980, at 11:30 a.m. No developer, manager, Count lulort owsend, a weekly In the -Commissioner's y Auditor and Port Townsend in said d county Cho b promoter, or associated Assessor to re f I - L m ors, Courthouse, agent shall conve, move ram 9 mrcuiat on n said county for -{ Port Townsend, y pro- their. files or records the prior to the date of the nret - mote, advertise, or other- unimproved development ',: h rel. attached, and that me Washington, for the pur• wise represent the plan. r was on the 27th day of dune, i pose of obtaining com- availability of camping No bulldin ewspaper by the Superior Coun ments of all Interested per. memberships in a camping tic tank permit, oritother and that an neaed is a true copy sons on the proposed development in Jefferson development permit, shall 80 adoptlon of the Jefferson County until such camping be Issued for any site, County Camper Club Or- development is In full com- parcel, or tract of land in dlnance. Any person may pliance with this or. violation of this ordinance dJect #478 submit oral or written com-t' dinonce.' menu at this public hear-' 3.20 Com llance with or R.C.W. 19.105 , unless i P the authorized d au authorities t r Ing with respect to the con. Comprehensive Plan: All to issue such permits finds tents and adoption of this camping club the public Interest will not 1. ordinance., Sections of the' developments subject to beadvorselyaffected ther- ordinance'..ore presented this ordinance shall be in by. .y below, in full, or. In sum• conformance with the Jef- 8.20 Remedies: The Jef• -I mary. Information pertain-.ferson County Compreheri ferson County Prosecuting 1?1 ingao,-and copies of, the save Plan and any other of- Attorney shall have access d proposed ordinance may Hcial control adopted. pur to all remedies provided inl be obtained from the Jef• suant thereto. ular and entire Issue of said papa. - foraon County Planning Atrtko this ordinance and R.C.W. clement thereof for a period of .i Department Courthouse,( A10rY) fResPom68Ny (sum- 19.105 as it now exists or is , nsecutlve weeks, beplnnlno on the b hereafter amended i, ' ort Townsend, This section specifies the 8.30Severability: If any i April 19 80 WaPshington 98368, during authority and respo May— subsection, or '-day of ;.regular business hours. 'ty of the Jefferson County other portion of this s gmarry mstrmuted TITLE: JEFFERSON pa y w Paper was re - De rtme health, dinance is, for an reason, 3 all pit this Period. That the fun ORDINANCE nfs of or- COONNANCE UUB Public Works, and Plann- held invalid or uneonstifu- -nes been peed in ull, et the -OR , ing;. the Jefferson County tional by any court of cam- lg for each Inseruo i Section 1: Purpose (Sasserery)' n ct ran rid r? m This section 'states enjoin such use and com- T e consruc ono • I a reasons the' Jefferson accomplished contract K-Lee pal compliance with the in accordance wi with R.C.W. ? ^. County Board of Commis- provisions of this or• 36,77,020 et, seq, o afore me this_.t p1__day of - stoners is proposing the dinance and' every State Ado ted this 28th da of adoption of sold 'or• and County law applicable April, 1980. y ' dlnance, and the general thereto, or with such terms V 2,-L le, 1_1 purposes of the ordinance. and Board of Jefferson - .? conditions. The costs Seetion t: 'DefWtion Count Commissioners dorary Public in and 1.r me Statecf - w-.- (Sirs- of such action may be A,M. O'Meara, Chairmanhington, residing al Port Townsend _ taxed against the violation B.G, Brown, Member a. Y The definition of key as,a result of such pro• Carroll M. Mercer, words and. terms used in ceedings. the proposed ordinance The Jefferson CountY ATTEST: Batty Member C are listed in this section. and E Auditor shall refuse to ac• County Auditor r and x. . Section 3: Stolle (Cosphfe cept any camping develop- officio Clerk of the Board ,Mv acesizaia }° 41 menu t T. Plgn ,for filing until +zvus,66oaos s'.. :. r ... .r 9 110 t .i>q'itv f suchha? - h ' s o - ...> his or - aPProva o ai Coverage: T. all given in complioncc o'. 1 \ . hall apPIY-1o d s hout s fit" or ca s I-c 'club thi bllshod Plon be filed without such .cL,np In9 ' t Jefferson - I a plian Pce, 016 developm - d onts loaco,-s At Porate "- county ! within the ff or. a shall apPIY t :i area of: Jefferson.. Cliance tomey the - d m ta in e - a p writ of ., and shall be in co ith oppllcablI laws of the name of and on'be I w State of Washington and fiance the Board of county Cthe mpli ecting di r proceed in co 'missloners ditor and herew th., -County Au nager ve f F No developer ma , laled Assessor 10 remo the erds oc thou flies or rac promoter, or ass nt hall convey, pro' m unimproved dovelopment ,II• - aga t or. other- plan. ,- moe, advertise, Ian. rep resent the P ermiL sop' No building I'- wise . ' ther . or o camping ovailabillty of. tic lank permit, t shall " ermit, In a camPin9 t ' ,. developmen 'mem berships for p 1 . In 1 --flarson any Ill., volopmant be Issued d d ce e - , i County until such camping - areal, or tract of lan f this ordinance t cam- P. l in i _ t 1 or. violation o developm0nlt unless his thi h pl area ar R.C.W. 19.1051 i "arb _ ed a ? x dlnance.' with the author - mhs fin ds '?"• _ ------JJU Q JJU -? 3•?,_ _`gmplionca wih to Issue such po All terest will I ive Plan' • ----- r n Comprehens b the public -- t he clu affected rsely . pln act. to be adve lapmonis subl r e !d b ev YB 20 Ramadios: The. Jef- jthis ordinance shall ba in _ the.jet- Prosecuting ith 1 ., _ , :conformoncew ?1 ?mrehan- ferson County hove a ccess,. sonCovn tY Attorney 1 if t er other,of• rovidedin ;sive Plan and anY t Pur" to all remedies p [ act dinance and R.C.W I l control adoP, ' t .. or (ficia this suantthereto. 19.105 as it,now exists or Is; amended. f e an ?6 . t r P patkodryl herea awry) 8.30 Severabllity-- If. any ( .: . This section specifies thesection, 'subsection,: or or ; --' iblli- ` - ons other portion o1 this authority o p ": ' Jefffefers rson County _ for any reason, - dinance ia,. Iy of the . or unconsiltu• ' Departments of health, held invalid - f 1 . . Public Works, and Plann• onal by any court oFcom• - j ; the Jefferson ceunty such ` nt Jurisdiction, t t t e op par- Planning ?COmmisston: and,. pa ard section, subsection, B b ' - {? n o ' 'am'en the Jefferson County tlon;shell-. b adds- I - - n of Commissioners. o aralo portion oI this or It outlines ad- sP d such'halding e a _ n ilon, ministrative procedures . hall n hall nofaffect the validity Ata Plan s SscNon 5, filedur9 of the remaining portion, 1 -: (Summary) of this ordinance. ` - This section includes : (a) ,,. 840 Repealer: Jefferson theprocedure for apPlico- :Cam in 'Club Or• - A w ` " "Lion and reviow of a site dinance No P1J3,: and all a comper club : (b) ns; and ors ti f l o or a -.; pion rules,.regu standards : sped of, Jefferson design ces na r , - _ , .. n di nggenaral requirements, County in conflict with this ' " b.,eby • s ? which include density, are cam- Ordinance. - screening, buffering, - 'fadlitles, recreation repealed. 50 Effective Date: This mon ? 8 , . . '. areas, aopeK space, and• ehicular' access and . clr- ordlnanca shall become of'- n the dole of t e ehic i o v lon7 (c) - specific :.re- fectlv adoptlonby the7offerson '}. quired - improvements,: County Board of Commis-:. •, lude -roads, • - Inc which . - sI ns, aloners, . I '! drainage facilities, -. g p ssilh, pt Prellml"ary ' e pp ' ,, , Plan OtarkBd `water system., , sewag ". kilimset rvices r mory) t , se disposal 'systems (a buildings ;- lira protection ? rAA'chacklist spedfying he - q maasuros, olocirlc ulilitlas FArmatlon requiral on the ` .. t (d) F In e; - rolimin.ry site plan. and solid was tlon requirements; P p Mang She Plan - eas qq spec 1-and (a).. bonding '.re•..:Woat(S) - , quiremerrils. ..Specifies the'Informa• 6 ded in the l i u Ilan to be inc (Svowery) Ian and,. th ? t l I a . which this Itaqulrements }or err in o n mant , and con• the m . be wp• ?. ll h , a as+ign camping vahl- Information s ance of ' i I . vey 'de sltss rlra specified In plied, BOARD OF . "- the ro• this Section, as ore COMMISSIONERS FOP ' quiremeMs:of tltle ownsr• JCFFERSON COUNT sftYlpnd moJnlinanu'ond .WAS HIN ement bonds s31 ?r ?' r F S " ? M ! ?? `' t fSummary) ^argt8b s"i"?'"IF+•. ?+'1 kryy4T ? ld L„ Is,hrb ?rnMieSC . ?'....""-n'?+ar• j.k.g5't+.n.'°?,? a'. PMt4 ,?Ti {.'Na,d.'f1Dr111? . V r , t, RESOLUTION NO. . COUNTY ROAD PROJECT NO. 478 ARPOttL THE BOARD OF JEFFERSON COUNTY COKtISSIONERS OF JEFFERSON COUNTY, WASHINGTON. In the matter of initiating a county road project designated as C.R.P. 478 F It is hereby resolved that the Port Townsend-Beaver Y Road _ Valley State Road Log 95170 from P(ilepoint 8.96 to MilepolnC 9.20 be improved as follows: Widen, surface and channelize the intersection of County Road No. 18 and County Road No. 12, M.P. 9.04 . It is fetrther resolved that an appropriation from the officially adopted road fund budget and based on the county engineer's estimate is hereby made in the amounts and for the purpose shown: PURPOSE AMOUNT OF APPROPRIATION Engineering $1,500.00 Right of Way Acquisition $5,500.00 Sub Total $7,000.00 Construction: Contract ® $14,000.00 County Forces O Total $21,000.00 This project is included in the officially adopted annual road program 15 t as Item U O The project is hereby made a part of the officially adopted annual road I program in accordance with RCW 36.81.130. It is further resolved that: The construction is to be accomplished by contract in accordance with E R.C.W. 36.77.020 et. seq. IE The construction is to be accomplished by county forces in accordance with R.C.W. 36.77/060 and WAC 136-18. Adopted this 28th day of April , 1980 BOARD OF JEFFERSON COUNTY COMMISSIONERS z 9 l ' ` < i/. O .? Chairman / 1 SEAL Me er ATTES Member county or and Ex-officio Clerk a Board ' T H s 1 i Y. a ?7 r , - ?? -"'La: COAGfISSIONERS OF JEFFERSON COUNTY, In the matter of initiating a county WASHINGTON. th road project designated as C.R.P. 478 State e Road eb Log reso # lved 95170 at t h e Port Townsend-Beaver Valle .1. be improved as follows: . from Plilepoint 8.96 Road, to Milepoint 9.220 Road No. Widen, surface and channelize the intersection of County 18 and County Road No. 12, M.P. 9.04 . It is further resolved that an budget and based on r appropriation from the officially adopted road fund and for the he county engineer's estimate 1s hereby made in the amounts purpose shown: PURPOSE AMOUNT OF APPROPRIATION Engineering Right of Way Acquisition $5,500.00 Sub Total Construction: Contract ® $7,000.00 County Forces O $14,000.00 Total $21,000.00 This project is included in the officially adopted annual road program as item # 15 O The project is hereby made a part of officially adopted annual road program in accordance with RC[J 36.8181.130. It is further resolved that: i The construction is to be accomplished b R.C.W. 36.77,020 et, seq. Y contract in accordance with The construction is with R.C.W. to be accomplishes: by county forces in accordance 36.77/060 and WAC 136-18. Adopted this oo_._ - F