Loading...
HomeMy WebLinkAboutBLD2000-00114 Geotechnical Report , .Au01'TO1l'r *Mc � �. (:)pY NOT oINoAw.usairnmes 432, vw Wbeo recorded return to: ' 0:6151:p V� N ..1. • • Jon Rose 406 C fv� .��1 Ats Olympic Resource 1 PO Box 1780 ' �P' s Poulsbo, WA 98370 di • o j� JETiCRS?iJ s� MTV *Olt a Y EPUT r Revised Report Addendum To Supplement GeoEaglne s Gevtechnleal Report For Port Ludlow No. I Reference to Related Documents: A Geotechnical Report dated April 5, 1995, covering Port Ludlow No. 7 recorded at Volume 557, Pages 933 through 964, records of Jefferson County, Washington, under Jefferson County Auditor's File No. 393727. • Grantor: Pope Resources, A Delaware Limited Partacbip Grantee: Pope Resources,A Delaware Limited Partnership Abbreviated Legal Description: • Portions of SE 1/4 of Section 8, SW 1/4 of Section 9 NW 1/4 of Section 16, and NE 1/4 of Section 17, Township 28 North, Range 1 East, W.M., Jefferson County, Washington. Assessor's Property Tax Parcel/Account Numbers: 82 1 11 62 00 t_ 821171 002 821 084 005 821 093 002 321 171 010 e nhe a inn • • February 11, 1997jigt . Ceaseldeg • a.r Oseeeiselist Pope Resources. Inc. vision is%itag P.O. Box 1780 Oregon,and slut Poulsbo. Wuhington 98370 Attention: Mr. Jon Rose, P.E. Revised Report Addendum Port Ludlow Division 7 Port Ludlow, Washington File No. 2378-041-03 INTRODUCTION This letter supplements Geognglnectrs'April 3. 1995 to include criteria for on-site 8e0 l report for the subject site and infiltration trenches for roof drab and clarify building setbacks from steep slopes. We understand individual lot dispersal numbers 14 through 22. The dispersal trenched will be constructein ng��are proposed for Lot the WDOE Stows Manual (Wes accordance with (Washington State Department of Ecology Storrnwater Managanerst Manual for the Puget Sound Basin) criteria and the attached drawing prepared by WestSourd Ems. Individual lot infiltration trenches are proposed for Lot numbers 1 through 7, also to be constructed in general accordance with WDOE Stormwater Manual criteria. Clarification Is requested regarding building setbacks from steep slopes for Lots 14 through 22. DISPERSAL TRENCHES Dispersal trenches are In our opinion acceptable for d of roof drainage lots 14 through 22 and lots 1 through 7. The trenches should beconstructedcon individual contours. Care anus be taken so that the parallel to the slope system Is properly constructed and that flow is evenly dispersed on vegetated slopes. We recommend dispersal trenches be setback a horizontal distance of at least 25 feet front slopes steeper than 3:1 (horizontal to vertical), or the roof drains may be tightiined to a dispersal trench located at the base of the slope. d•etrons.a lac 1101 Irma Ava, X10 /4...4i.. ear Wee Yak 595rsc„r483 r . • INFILTRATION TRENCHES tithe edon Mocha constructed in meal accordance with criteria and tlel designpevpatb by Weems w1�oe stotmwatu Manual 155 throesf4lN of die J as recorded In Volume 563, pea dfspoeei of root el�sao County Auditor an in our opinion generally appropriate be dlspopann a the on Individual lob I through 7. The trenches should be coos excavated. We recommendandinstalled in native ground which has ours as been filled or motion trenches be set beck a slopes steeper din 4:1 (horizontal to vortical). or the roof drainsof at least 25 feet from trenches at the base of the slope. may be ti�tetlloed to Infiltration BUILDING SETBACKS A distinct setback line, to be shown on the Anal plat, was not We raoomuhs�ded s setbech dtstaoo�from theIn our report. ont level fine. Foeedge of du footing to the ground surface measured slopes between 15 and 30 percent, the setback distance is 8 feet, we rtroamead this distance be increased to 12 feet for slopes inclined between 30 percent and 50 peperccent, and 20 test for slopes steeper than 50 percent. The suck can be shown only after the use footprint has been located, 4 0 to • VOL 595 4S4 We trust the foregoing fall your mune needs, should you hays auy questions or poed additional Information, plass Cry. Yours very truly, GcoEtylmars, Inc. • /,^ � 1 I�/'V • / V • 14-.f�0 A.EM4 Senior Engineer .. j Exprses 1Q/23/1 7- I 4• Ito, • Gsry W. Henderson, P.B. Principal OHSSGWK.-rc Drwwrn ID: 2371041 A.A4DD Attachment cc: westaouttd Engine dei Attention: Mr. Craig Baldwin • VOL 59519..485