HomeMy WebLinkAboutBLD2000-00155 BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
(360)379-4450 FAX(360)379-4451 (800) 831-2678
PERMIT#: BLD00-00155 Received Date 03/6/2000
SITE ADDRESS: 3051 PARADISE BAY RD Issue Date 03/15/2000
PORT LUDLOW, 98365 Expiration Date 03/15/2001
APPLICANT: GEORGE EDWARDS PHONE:
KAREN EDWARDS
26055 SE 156TH ST
ISSAQUAH WA 98027
SUBDIVISION: TALA SHORES#1 Block: Lot: 11
PARCEL NUMBER: 998200110 Section: 22 Township: 28 N Range: 01 E
CONTRACTOR: JEFF SMITH ENT PHONE: (360)582-1348
PO BOX 161
JOYCE WA 98343-0161
Contractor's License: JEFFSE*027ML Expires: 12/03/2000
LOAN LENDER/ WASHINGTON MUTUAL
BOND HOLDER:
PROJECT DESCRIPTION GARAGE
REQUIRED INSPECTIONS:
[ otings/Setbacks (Shoreline Setbacks): d k #1-3- 0 0 -�� Ce,
to)
[ ] Foundation:
[ ] Underground Plumbing/Underground Insulation:
[ ] Shear Wall:
[ ] Framing/Plumbing:
[ ] Propane Tank/Lines:
[ ] Insulation:
[ ] Sheetrock: Q-, ,n-c r0 cc,// 0(<,5 f O(
[ Final/Occupancy Approval: 60 ' 7-2 ttt ^ , J
HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION.
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
Inspector's Phone Hours 8:00 a.m. - 9:00 a.m.
SPECIAL CONDITIONS MAY APPLY - SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
BUILDING PERMIT APPLICATION
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00155 Received Date: 3/6/2000
SITE ADDRESS: 3051 PARADISE BAY RD
PORT LUDLOW, 98365
APPLICANT: GEORGE EDWARDS PHONE:
KAREN EDWARDS
26055 SE 156TH ST
ISSAQUAH WA 98027
SUBDIVISION: TALA SHORES#1 Block: Lot: 11
PARCEL NUMBER: 998200110 Section: 22 Township: 28 N Range: 01 E
CONTRACTOR: JEFF SMITH ENT PHONE: (360)582-1348
PO BOX 161
JOYCE WA 98343-0161
Contractor's License JEFFSE*027ML Expires 12/03/2000
ARCHITECT/
ENGINEER :
PROJECT DESCRIPTION: GARAGE
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION 7,680.00 MAIN:
CODE EDITION: 1997 ADD'L: HEAT TYPE: UH
OCCUPANCY: U 1 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
CONST TYPE: 5N OTHER: ;60 SHORELINE:
CONST TYPE: GARAGE: SETBACK:
DECK:
BANK HEIGHT:
SEWAGE DISPOSAL:
WATER SYSTEM:
STORMWATER: YES NO AREA
BEDROOMS: BATHROOMS: Wetland Erosion
Exist: Exist: Seismic Streams
Prop: Prop: Flooding Landslide
Total: Total: F&W Plat Conditions
Routing Date: Shoreline Aquifer
Forest: Commercial Rural
Proximity
Type Amount Paid By: Date: Receipt: Approved/Date
Permit $153.25 MAM 03/06/00 25337
Plan Check $45.98 MAM 03/06/00 25337 APP.' OVE
State Building Code $4.50 MAM 03/06/00 25337
Total: $203.73 VP 1 5 2'0 1 , • 1/4 ,-
(c
‘, °' on C,unty Nanning
& Building Department
I:\F_BLD_App_Bld.rpt 10/29/99
-- Jefferson County I ,,1 artment of Community Development
+ °� 621 Sl lan Street,Port Townsend WA 08368[360]370-4450
iz rY YZ
`! FC ° Aii],p, -
° ot /� PeriooN2 :�O a o0
0000�
Project Description:
Building Type: Project Type: Frame Type:
Single Family % New ' Wood
Garage Attached/Detached I Addition E Steel
Modular Alteration/Remodel i Concrete
Ci Commercial LI Repair i Masonry
Multi-family/#of Units _ Demolition 1 Other:
Industrial
Other:
Bedrooms: Bathrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: Existing: ❑ Sewer E Community System Electricity Oil
Proposed: Proposed: Individual System E Woodstove Propane
Total: 0 Total: e0 If not sewer,fill out the following: Heat Pump
Conventional I Alternative i Other
Permit # SEP
Water Supply:
ii Private well I Two Party Well I Public:Name of water system:
Square Footage: For Office Use Only
Main Floor UBC OCCUPANCY GROUP i p
2ND Floor —' �S C
Base fee / ) �- ( (O(• �� I'�
L� q
3rd Floor Plan Check fee 7 1J� ` / �j I
Htd Basement State Surcharge fee 7 i S� "1,5 0
Unhtd Basement CCD Subtotal 6 (3• 3 `). o' 5
Garage Carport /6 Pot Water Review fee
Dec 911/Rd Approach fee
Commercial TOTAL L O,3 . 3
Industrial Receipt # cQ S 3 3 -
Other Cash/Check# 9/Y
Total Valuation: Initials Q
f;)?
Or Date (o 3— / _CS )
v
Estimated Cost:
If within 200' of the Shoreline, {
Distance to Bank or Ordinary High Water Mark ft.Bank Height ft. t
.,v
By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any V
omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. \I-i
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue '3 ('
against Jefferson County as a result of or in consequence of the granting of this permit. IV
I further agree to pro -access ate . t of, • to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. .-0�
':
Access and right of- ri to the p can . .. or structure shall be requested and shall occur during regular business hours. `7
Signature: I) 1 0 Date: •0 0 �`
4 �50velopme
�o�f Jefferson Canty Permit Center * Department of Calamity De
re; Sheridan Street,Port Townsend WA 98368136U1379-4AA��nt
b 1-t=. .t' 1�
0
%s �,_,0Y UvrdD D
kg
'cll ca de tollou ucq !'laida as aufggetelf ad fzew1le
Project Description: ,--,
r
•
9 Digit Parcel Identification Number (from your tax statement):
Site Address �7 n
911#: SOS( Parcx&Ive Road Name: nn Op
Pa�racQ,`sl`�SQ. /�4� Zi Code: 3 65
Legal Description
Subdivision Name:
Section: Block: Lot s :
Township:
Parcel Size (acres or square footage): Range:
Property Owner:
�r►� '' _ �,t�9q,�d Phone:
Mailing Address:
aC 0Ss fL 156 at-r :1- 5sg ; a.k _goa
Applicant/Occupant:
if different from owner �lit.t Phone: —
Rl � •
Mailing Address: 361iip �
so /6 To c-r USG. 4E-34/3
Authorized Rep:
Phone:
Mailing Address:
General Contractor:
Or Manufactured Home Installer: SO' -08 ` S
Mailing Address: Sim . - Phone:
Contractor's State License Number: c e g 3 y 3
J t,F r`r/LL Expiration Date: I-2/3/ p 9 I
Septic Designer: lot
fig ,p_c ..A-, if_ q2 Phone:
Mailing Address:
Architect:/Engineer:
Phone:
Mailing Address:
II Loan Lender/General
Contractor's Bond Holder: Phone:
IMailing Address: f
0.1V IL•
FOR OFFICE USE ONLY
Fire District: Planning
Area: School District:
4/98 H.\home\pincntr\forms\universal plot plan `2- Zone:
COO- 000g7
y BUILDING PERMIT APPLICATION
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00155 Received Date: 3/6/2000
SITE ADDRESS: 3051 PARADISE BAY RD
PORT LUDLOW, 98365
APPLICANT: GEORGE EDWARDS PHONE:
KAREN EDWARDS
26055 SE 156TH ST
ISSAQUAH WA 98027
SUBDIVISION: TALA SHORES#1 Block: Lot: 11
PARCEL NUMBER: 998200110 Section: 22 Township: 28 N Range: 01 E
CONTRACTOR: JEFF SMITH ENT PHONE: (360)582-1348
PO BOX 161
JOYCE WA 98343-0161
Contractor's License JEFFSE*027ML Expires 12/03/2000
ARCHITECT/ `Q//
ENGINEER : � I V� �� 9 �1 UT
cA,8 -0,-ca --9/5 -
PROJECT DESCRIPTION: GARAGE
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION 7,680.00 MAIN:
CODE EDITION: 1997 ADD'L: HEAT TYPE: UH
OCCUPANCY: U_1 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: # OF STORIES:
CONST TYPE: 5N OTHER:
GARAGE: 768 SHORELINE:
CONST TYPE: SETBACK:
DECK:
BANK HEIGH
SEWAGE DISPOSAL:
WATER SYSTEM:
STORMWATER: YES NO AREA
BEDROOMS: BATHROOMS: Wetland rosion It
Exist: Exist: Seismic Streams
Prop: Prop: Flooding Landslide 1 -4--3,
Total: Total: F&W kr0 Plat Conditions A)U
Routing Date: Shoreline 5►? rb6,4 Aquifer yPS
CI -00 Forest: Commercial 00 Rural ,Jo
Proximity
Type Amount Paid By: Date: Receipt: try�Il�te .�a
Permit $153.25 MAM 03/06/00 25337 ` x ¢�
Plan Check $45.98 MAM 03/06/00 25337 ���G �, 1, , C'�
State Building Code $4.50 MAM 03/06/00 25337 r �
Total: $203.73 �.
Stain* a
. : ,,a, ,
.4.. • :. 1
. . ..
. . _.. _
Jefferson County Department of Community Development March 14, 2000
• 621 Sheridan Street, Port Townsend, WA 98368
(360) 379-4450
CRITICAL AREA STANDARD WAIVER
Applicant: GEORGE EDWARDS
KAREN EDWARDS
26055 SE 156TH ST
ISSAQUAH WA 98027
Critical Area Review Case Number: CAR00-00097
Project Description:
Parcel Number: 998200110 S-T-R: 22-28N-01 E
Site Address: 3051 PARADISE BAY RD
PORT LUDLOW WA, 98365
FINDING: The development, as proposed and portrayed on the Universal Plot Plan, does not encroach on
an identified critical area nor any associated buffers.
CONCLUSION: The proposed development meets the waiver requirements established in Jefferson County
Ordinance 05-0509-94.
CONDITION: The development shall be as proposed and portrayed on the Universal Plot Plan. Deviation,
additions or relocation of proposed development activities will require further review pursuant to
the Jefferson County Critical Areas Ordinance.
De a ent f Community Development Staff
c: File
I:\F_CAR_Waiver_Standrd.rpt 12/13/99
JE)hFERSON COUNTY
STOR.'�IWATER MANAGEMENT ORDINANCE
SMALL PARCEL EROSION AND SEDI ANT CONTROL PLAN
EROSION AND SEDIMENT CONTROL WORKSHEET
Property Owner: C-kooe, ,�a - S Telephone:
Address: .2p d SS S+ �SS4�(
Assessor's Parcel Number:
Building Permit or Septic Permit Application Number(if applicable):
Brief Project Description: 'Piccemee+ p-P kl)eu.9 kla A, i4Owt'e 1/4.U/A+ktCAtfLe
Site Location: 3.0 ( Paj—c Jae 16Xi R-Q. Pt 1-1.4. I o�,
Person Responsible for BMP Installation and Maintenance: �G- ,ry L. Sr„4.1`1-4,-‘
Address: P o 6 )e- /6 ( (la?ece t-00, RR 34/3
Telephone: (360 9.l -0/'f q
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or
roads. Please check the measures you plan to implement and show their approximate location on
the site plan. You may also propose measures other than those listed. Attach additional sheets, if
more pace is required.
[ Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
[4 Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas, landslide or erosion hazard area, etc.).
SPESC Instructions—Short Form
Revised June 3, 1999
3
/
/
//
•
EROSION AND SEDIMENT CONTROL WORKSHEET
/
,' [] Phase clearing so that only areas that are actively being worked are uncovered.
[] Start and complete land disturbing activities and stabilize the site between April 1 and
September 30. Stabilization means that disturbed areas will have well-established plant
cover or be landscaped to minimize erosion.
Stabilize exposed soil Exposed and
P unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
[ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[] Place gravel base on roads, driveways,and parking areas after clearing and subgrade
preparation.
[] Protect adjacent properties and water bodies from sediment deposition:
[] Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies. (See attached illustrations from Stormwater Management Manual.)
[ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration from
[`( Stormwater Management Manual.)
Regularly inspect
p ct and maintain all BMPs especially after storms events.
[] Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
SPESC Instructions—Short Form
Revised June 3, 1999
4
•
f� EROSION AND SEDIMENT CONTROL WORKSHEET
Describe how disturbed areas will be permanently stabilized (seeded, landscaped, apply gravel base
to roadways, etc.) (�
S G ravel .
3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate, dry well, infiltration wench,route runoff to existing drainage facilities,etc.).
14 -e_ waxy O.J tO c i 1,1 k &i v ey-Fe tQ tf7 (t3-4 u e V esti'4a4A.)
0.t'e_atS . `P Sfor nA uao r w l) b t c.Q r u of f`e �-o(/
SPESC Instructions—Short Form
Revised June 3, 1999
5
EROSION AND SEDIMENT CONTROL WORKSHEET
Specify your construct/'' ion sequence. Describe the timing of all land disturbing activities (clearing
/ and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices. Describe proposed maintenance of BMPs.
•
gel✓ . +o exciLva77 la14 CI'eCit.r -)r' fro v sa atA.6�
d-y of W % :(`E cvetuv.� Rock *At driv
t r c _c`ca..'I-ei - ck�-'It a Sce�
y t.L.9 ri-k},A. aLi-De eks
Pot� 6u�► c v AcA-P a:c+cr- :. ex.ro..00...4-40,A. ,2).-P
us.t. cm-r;vcs.
The Best Management Practices proposed above will be implemented to control erosion, sediment, and
stormwater runoff. I will notify the Permit Center for inspections as required.
/1-c...c43 , 477R s `99
Si caner/Agent Date
SPESC Instructions—Short Form
Revised June 3, 1999
6
.....,
> ,1
ir 76.ie'
i
i
I C
1
RE,serve
1 r=c4 uu/R,b.S ''
cc) <
7 9-sT3c/o? ,()
fl (
1 c7 i
6Z . .
1 - 15141e ,
I (--
- '0 •rp 9..3
0 rcl ,a3 (JR
/
...
24) i ci,
<D, ,
1 0,
1 , .
0\ k6
1
. —
Ci!41 -
4 ' d
---c_::____--•
r 0
xx----- ---
Ma vt [1104\C_ i
7
--t i
dz.::
a
/
eft, .\ /
di"Vi 2:3 .
ri
l41 ----Pc j •
1 V .
cpi<
V .
/7.•
1 7• .. /
ft
(/ '(
9.
tis
--1 _.----
,L)
/-7/?'