Loading...
HomeMy WebLinkAboutBLD2000-00224 . t s BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX(360)379-4451 (800) 831-2678 PERMIT #: BLD00-00224 Received Date 04/7/2000 SITE ADDRESS: 821 SHINE RD Issue Date 05/30/2000 PORT LUDLOW, 98365 Expiration Date 05/30/2001 APPLICANT: MARIE GALLAGHER PHONE: (360)779-2112 BOB BIRD 22930 STOTTLEMEYER RD NE POULSBO WA 98370 SUBDIVISION: Block: Lot: PARCEL NUMBER: 821343008 Section: 34 Township: 28 N Range: 01 E CONTRACTOR: NORTHWOOD BUILDERS PHONE: (360)697-6324 PO BOX 1703 POULSBO WA 98370 Contractor's License: NORTHWB0920T Expires: 12/24/2000 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE REQUIRED INSPECTIONS: / [ ] o in`� s Setb cksa Shoreline Setbacks): V/e G/,.i4 p qTl� ['J. Foundation: C • t ' G [ ] Underground Plumbing/Underground Insulation: [hear ail: ' a Ai. < �� [ 7. gaming/Plumbin_g. /< r / — [ ] Propane Tank/Lines;€/T 4>IV 11-1/ G [ ] Insulation: ivotz y////, [v .,.-Sheetrock: [`r Final/Occupancy proval: fPl OK 7)6, /,jc w6&GQ !oN HEALTH DEPARTMENT PPROVAL REQUIRED PRIOR TO FINAL INSPECTION. THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. Inspector's Phone Hours 8:00 a.m. - 9:00 a.m. SPECIAL CONDITIONS MAY APPLY - SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY I 1 . , BUILDING PERMIT APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT#: BLD00-00224 Received Date: 4/7/2000 SITE ADDRESS: 701 SHINE RD PORT LUDLOW, 98365 APPLICANT: MARIE GALLAGHER PHONE: (360)779-2112 BOB BIRD 22930 STOTTLEMEYER RD NE POULSBO WA 98370 SUBDIVISION: Block: Lot: PARCEL NUMBER: 82134300b Section: 34 Township: 28 N Range: 01 E CONTRACTOR: NORTHWOOD BUILDERS PHONE: (360)697-6324 PO BOX 1703 POULSBO WA 98370 Contractor's License NORTHWB0920T Expires 12/24/2000 ARCHITECT/ PRISCILLA ZIMMERMAN ENGINEER : 3091 PT WHITE DR NE BAINBRIDGE ISLAND WA 98110 PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 3,774 VALUATION 215,031.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 814 SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: 40 SEWAGE DISPOSAL: OSS WATER SYSTEM: PUD STORMWATER: YES NO AREA BEDROOMS: BATHROOMS: Wetland Erosion Exist: Exist: Seismic Streams Prop: 3 Prop: 3 Flooding Landslide Total: 3 Total: ,3 F&W Plat Conditions Routing Date: Shoreline Aquifer t_I ^ l 0 — O Forest: Commercial Rural H. Proximity _ _ Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,643.35 MAM 04/07/00 27206 APPROVED Plan Check $493.01 MAM 04/07/00 27206 ! cj State Building Code $4.50 MAM 04/07/00 27206 Potable Water Application $30.00 MAM 04/07/00 27206 Total: $2,170.86 Jefferson County Planning Building Department I:\F_BLD_App_Bld.rpt 10/29/99 ��sON Jefferson County Department of Community Development °G 621 Sheridan Street,Port Town:,:Jul WA 88368[360]378-4450 Perme 0pii,, , ,,,c,,,T,�� O o0S ci, o�� Project Description: Building Type: Project Type: ' Frame Type: X Single Family Ng New R' Wood = Garage Attached/Detached = Addition = Steel • Modular = Alteration/Remodel = Concrete Commercial = Repair = Masonry Multi-family/#of Units = Demolition = Other: • Industrial • Other: Bedrooms: Bathrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: Existing: = Sewer =Community System Electricity ri Oil Proposed: 3 Proposed: — y Individual System = Woodstove Propane Total: 3 Total: ' N., 3 If not sewer,fill out the following: Heat Pump Conventional = Alternative = Other Permit # SEP Water Supply: = Private well = Two Party - = Public:Name of w. er 4: P U.P. #'/ OF Ff-pSpAf CD. Square Footage: WI$or Office Use Only Main Floor 3-771 4 F r \ CO UBC OCCUPANCY GROUP 2`D Floor Y \ Base fee o6 !/3• 3rd Floor Plan Check fee r9j, 0 Htd Basement State Surcharge fee Y, S C) Unhtd Basement i\ Subtotal c /470 Er G Garage/Carport 8/4- -.Q. FT \� Pot Water Review fee ` Yo ' o ° Decks 911/Rd Approach fee Commercial TOTAL / 00 .- o Industrial _.__` 7 0 0 'receipt # Other o irk\ ' ash/Check # at' Total Valuation: / 0 / Initials ,l Or ✓ Date 4' "7 - V Estimated Cost: A + \ If within 200' of the Shoreline, 1111 Ire vHW `eI ,� _ _ _ Distance to Bank or Ordinary Highater • ark C<• /2� ft. Bank Height ti 410 ft. By signing the application form,the applicant/owner art' that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner wi respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jeffers.. County against all liabilities,judgments,court costs,reasonable anomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of th granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of en • e ap icant's property or structure shall be requested and shall occur during regular business hours. 22 Signature: ' ,li L . Date: • Jo ' 00 C BUILDING PERMIT APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD00-00224 Received Date: 4/7/2000 SITE ADDRESS: 701 SHINE RD PORT LUDLOW, 98365 APPLICANT: MARIE GALLAGHER BOB BIRD PHONE: (360)779-2112 22930 STOTTLEMEYER RD NE POULSBO WA 98370 SUBDIVISION: Block: Lot: PARCEL NUMBER: 821343001 Section: 34 Township: 28 N Range: 01 E CONTRACTOR: NORTHWOOD BUILDERS PHONE: (360)697-6324 PO BOX 1703 POULSBO WA 98370 .' Contractor's License NORTHWB0920T Expires 12/24/2000 . i\,.0 ARCHITECT/ PRISCILLA ZIMMERMAN ( > " ENGINEER : 3091 PT WHITE DR NE `1 BAINBRIDGE ISLAND WA 98110 ) � ' PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE _ \ ,.,,-,R--**,, TYPE OF WORK RES SQUARE FOOTAGE: \j TYPE OF IMP NEW VALUATION 215,031.00 MAIN: 3,774 CODE EDITION: 1997 ADM.: HEAT TYPE: HTP OCCUPANCY: R-3 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: CONST TYPE: 5N OTHER: SHORELINE: CONST TYPE: GARAGE: 814 SETBACK: DECK: BANK HEIGHT: 40 SEWAGE DISPOSAL: OSS WATER SYSTEM: PUD STORMWATER: YES NO AREA BEDROOMS: BATHROOMS: Wetland Erosion Exist: Exist: Seismic Streams Prop: 3 Prop: 3 Flooding Landslide Total: 3 Total: . F&W Plat Conditions Routing Date: Shoreline Aquifer I` Forest: Commercial Rural —� Proximity Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,643.35 MAM 04/07/00 27206 n rx.98 Alba Plan Check $493.01 MAM 04/07/00 27206 State Building Code $4.50 MAM 04/07/00 27206 /_ ��i .� _ CCU Potable Water Application $30.00 MAM 04/07/00 27206 Total: $2,170.86 ( a r PMP's N1_ 1 \\V ;:1F,_BLD_App_Bid.rpt 10/29/99 'ounty Department of Community Development • May 17, 2000 In Street, Port Townsend, WA 98368 150 FINDINGS AND CONDITIONS OF APPROVAL AS REQUIRED UNDER THE JEFFERSON COUNTY INTERIM CRITICAL AREAS ORDINANCE Applicant: MARIE GALLAGHER / /�C)r�3 l2D 337 HIGH SCHOOL ROAD BAINBRIDGE ISLAND WA 98110 Critical Area Review Case Number: CAR99-00026 Project Description: Binding advance determination for single family residence. Parcel Number: 821343001 S-T-R: 34-28N-01 E Site Add ress: 781—SH-tt E-f I J (Ai e PORT LUDLOW WA, 98365 FIN DINGS: In accordance with the authority provided under subsection 4.101 and the requirements contained in Subsection 5.402 of the Jefferson County Interim Critical Areas Ordinance, the following are findings of fact relating to the referenced application: 1.) The application was reviewed by Jefferson County Permit Center staff on 2-24-99 for the potential presence of critical areas regulated under the provisions of the Ordinance, and the following critical areas were confirmed as potentially present on the subject property: shoreline, stream (type 5), wetlands, seismic, aquifer recharge area. 2.) Acting upon the above information, Jefferson County staff conducted a site inspection of the subject property on 2-24-99 and confirmed the existence of the following critical areas and/or their associated buffers on the property: shoreline, wetlands in the central and northern portion of the parcel, type 5 stream crossing the rear of the property from west to east, then flowing along the eastern property boundary. 3.) The wetlands located on the parcel have been classified as a category III wetlands according to the Washinton State Wetland Rating System, Second Edition. 4.) Subsequent to the initial findings and conditions dated 3-5-99 the applicant tightlined the type 5 stream which flowed along the eastern property boundary. This was done without county approval and without a hydraulics project approval from the Washington State Department of Fish and Wildlife. To mitigate for this action the applicant presented Jefferson County and WA State Department of Fish and Wildlife with a Mitigation/Enhancement Plan. This plan has been accepted by Jefferson County as mitigation for removing the vegetation along the type 5 stream along the eastern property boundary and tightlining the stream in that area. 5.) Aquifer recharge areas in Jefferson County are characterized by porous geologic formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 6.) A site inspection by Permit Center Staff was performed on February 24, 1999. 7.) The potential for an earthquake of a high magnitude occuring in western Washington in the near future is considered a high probability by regional experts. 8.) This waiver also includes findings and conditions for evaluation of shoreline areas as regulated under the provision of The Jefferson County Shoreline Management Master Program, adopted March 7, 1988, as amended. 9.) The standard setback for residential structures, including common appurtenant structures such as garages and workshops, shall be 30 feet, or 1 foot for each foot of bank height, whichever is greater. This setback shall be measured from the bank's edge when the bank height exceeds 10 feet. 10.) Proposed development is located on the north side of Shine Road. The shoreline is located on the south side of Shine Road. r ' This waiver from the provisions of the Jefferson County Interim Critical Areas Ordinance is granted subject to the following conditions. Any deviation from these cbnditions shall result in this waiver being revoked and the application becoming subject to further review. CONDITIONS OF APPROVAL: 1.) A minimum setback of 30 feet shall be permanently maintained as a fish and wildlife habitat area buffer associated with the shoreline. This buffer shall be measured perpendicularly from the ordinary high water mark along the shoreline. 2.) A setback (buffer) of 15 feet, measured perpendicularly from the ordinary high water mark along the bank of the "Type 5 water" (WAC 222-16-030)which crosses the north end of the parcel from west to east shall be permanently maintained as a fish and wildlife habitat area. 3.) Fish and wildlife habitat area buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, replanting with native vegetation shall be required by the Critical Area Administrator. No alteration shall be made to the fish and wildlife habitat area buffer without prior authorization by the Critical Area Administrator. 4.) All construction activities, including the storage and preparation of materials, shall not encroach upon the designated fish and wildlife habitat area, its associated buffer, or any critically important plants and trees identified on the subject property. 5.) Residential structures shall not exceed thirty-five (35)feet in height. 6.) A setback of 25 feet, measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, clearing or other alteration of the wetland or its buffer is allowed. 7.) No alteration shall be made to the wetland or its buffer without prior authorization by the Critical Area Administrator. Buffer enhancement is allowed as long as native species are selected for planting. 8.) Prior to and during approved construction activities, the perimeter of the wetland buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Wetland and Buffer- Do not Remove or Alter Existing Native Vegetation." 9.) The applicant shall permanently separate the upland boundary of the wetland buffer from the remainder of the subject property through installing and maintaining one of the following; logs, trees, a hedge row, or other prominent physical marking. The separation method identified by the applicant shall be approved by the Critical Area Administrator prior to planting or installation. 10.) All construction activities, including the storage and preparation of materials, shall not encroach upon the designated wetland, or its associated buffer. 11.) The applicant has proposed to install the plants incorporated in the mitigation plan during the summer months. Once the plan has been fully implemented a brief letter with photos will be submitted to the Jefferson County Department of Community Development, Development Review Division (CASE NO. CAR99-00026)to document installation of all the plants as specified on the enhancement design, as well as any subsitutions made to plant species and numbers. In addition, a letter will be submitted to Jefferson County to document the condition of the plants at the end of the growing season and whether or not any plants need to be replaced. The building department will not perform a final building inspection until plan compliance has been verified by the Development Review Division. (1 ct if/C).-"IL- 5/2 `doe) Warren Hart, AICP Date Critical Areas Administrator I understand that the granting of the above waiver from the provisions of the Jefferson County Interim Critical Areas Ordinance is made subject to my complying with the above listed conditions, and that any violation of said conditions shall result in revocation of the permit or approval and further review of the project under the Critical Areas Ordinance. Please sign and return to the Department of Community Development. /)7eLs , / /o--o Appff nt's Signattre d Date ev.,ei,,e- `' - 6,t.. HOOD CANAL TOP or elms r SHINE COUNTY ROAD a - , e 9I 'LI2 I 113.-6 yy 1 ---- r I Fit 4it • �„ In, ig O1/413 1111 CO I 101,' V/ WII o Fri 0 D c� I '� I 11(\ ---