HomeMy WebLinkAboutBLD2000-00264 a
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
(360)379-4450 FAX(360)379-4451 (800) 831-2678
PERMIT #: BLD00-00264 Received Date 05/1/2000
SITE ADDRESS: 135 OUTLOOK LN Issue Date 05/11/2000
PORT LUDLOW, 98365 Expiration Date 05/11/2001
APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
SUBDIVISION: TEAL LAKE VILLAGE Block: Lot: 99
PARCEL NUMBER: 998700099 Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
Contractor's License: OLYMPRE010M8 Expires: 06/01/2000
LOAN LENDER/ PARKER, SMITH & FEEK
BOND HOLDER:
PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
REQUIRED INSPECTIONS:
[ Footing LSD eline Setb cks): )r�C �- 6/
[ %' Foundation: + [< (/2_9 06,j
[ ] Underground Plumbing/Underground Insulation:
[ ] Shear Wall:, "A r�.j?/[)rZ NL.' 0/c- /'OA7t;''e) 1 .
[ ] Framin umbin : eE/,.--iA" &k ((z /2 c
[ ] Propane Tank/Lines:
[ "] Insulation: 0 r, ,4�L,a Lews. ‹.-- /-3o--
[0 heetrock_, / j( :7_A-1/cam/ �C ' .
[ ] Final/Occupancy Approval: rr' x -4=HEALTH DEPARTME4t APPROVAL REQUIRED PRIOR TO FINAL INSPECTION.
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
Inspector's Phone Hours 8:00 a.m. - 9:00 a.m.
SPECIAL CONDITIONS MAY APPLY - SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
f P
BUILDING PERMIT APPLICATION
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00264 Received Date: 5/1/2000
SITE ADDRESS: 135 OUTLOOK LN
PORT LUDLOW, 98365
APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
SUBDIVISION: TEAL LAKE VILLAGE Block: Lot: 99
PARCEL NUMBER: 998700099 Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
Contractor's License OLYMPRE010M8 Expires 06/01/2000
ARCHITECT/
ENGINEER :
PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 2,204
VALUATION 129,143.00 ADD'L: HEAT TYPE: HTP
CODE EDITION: 1997 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: 592 SHORELINE:
CONST TYPE: DECK: 240 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: LUDLOW STORMWATER: YES NO AREA
BEDROOMS: BATHROOMS: Wetland Erosion
Exist: Exist: Seismic Streams
Prop: 2 Prop: 3 Flooding Landslide
Total: 2 Total: 3 F&W Plat Conditions
Routing Date: Shoreline Aquifer
Forest: Commercial Rural
Proximity
Type Amount Paid By: Date: Receipt: pfxd/ t
Permit $1,161.75 MAM 05/01/00 30694 6 Y ' .a� " Lop
State Building Code $4.50 MAM 05/01/00 30694 � � ,..
Potable Water Application $30.00 MAM 05/01/00 30694 _—�MAY 1 1 2000
Total: $1,196.25
Jefferson County Planning
& Building Department
I:\F_BLD_App_Bld.rpt 10/29/99
♦ I
oN eo Jefferson County Permit Center * Department of Community Development
4 , ,, 621 Sheridan Street,Port Townsend WA 98368 13601 379-4450
141
''6 .).
11 s r m,113 A--)
o A o
*F1;''N� O Q `cC crV O TLV 80
�J STOCK PLAN #4
Project Description: New Single Family Residence/With Attached Garage
Building Type: Project Type: Frame Type:
XX Single Family X New X Wood
Garage Attached/Detached ❑ Addition ❑ Steel
❑ Modular ❑ Alteration/Remodel ❑ Concrete
❑ Commercial 0 Repair ❑ Masonry
❑ Multi-family/# of Units ❑ Demolition ❑ Other:
❑ Industrial
❑ Other:
Bedrooms: Bathrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: 0 Existing: ___0_ XX Sewer ❑Community System ❑ Electricity ❑ Oil
Proposed: ____2, — Proposed 3 ❑ Individual System ❑ Woodstove ❑ Propane
Total: 2 Total: 3 If not sewer,fill out the following: 2 Heat Pump
❑ Conventional ❑ Alternative ❑ Other
Permit # SEP
Water Supply:
❑ Private well ❑ Two Party Well a Public:Name of water system:Olympic Water & S ewer
Square Footage: For Office Use Only
Main Floor 2204 (120,823.3) UBC OCCUPANCY GROUP
2ND Floor Base fee 1161.75
3rd Floor Plan Check fee Not Applicable
Htd Basement State Surcharge fee 4.50
Unhtd Basement Subtotal 1166.25
Garage/Carport 592 (5920) Pot Water Review fee 30.00
Decks 240 (2400) 911 dApproachfeD 39.00
Commercial TOTAL 1235.25
Industrial ��_ - Receipt #
Other Q Cash/Check # ____ ___
Total Valuation. / iIF Initials
Or Date
Estimated Cost:
If within 200' of the Shoreline,
Distance to Bank r Ordin High Water Mark ft. Bank Height ft.
Signature: ,_ A411 Date: 4/7"C-7/96
04/28/00 02:45 FAX 206+780+2408 MacLearnsberry Z 0 4
r r
1 ..:.,
.,„10)
.•••••• ,,
:::•••• .:., :,. :, i
: :,..'''.i: ''.]:;..... ': ..... •,!,,.. ''•••::;:' ••:::.
?:•.'••••''' .`,...4 '''
•''' "' '•••
-.9 •
, rii'... ••:::
•-'
:.::,'',:gg:1;:!:1:.:::Mi:;ii•::•,
,r.,..;;;: ,:::•,:•ie...,:::.::k::.:,•,:".•kl:.:::
:•••••••..:.•:,i',7.i.:',.:?.c.7.F.n.K0::"::::.::;:•••.??. •":.$.25'
r
5.25' '''''' :-,:,:i.,4•••,- -nr:.:::':•:=•,'1•A.t=ba::::,'::,,''':•trZ,It:On::.?:::::::1:::::::'.•.•:
k,,..i:-...:i.,,::: -..,:::::::•,,,.i?,,,,... ..-.:Qw.i,,,?.:-.:,...x!,,,3:::,•:•:4:.•-,•,,,A.:::i.:::::::.,-4:8:.?.:.,=:::: :::::::,,E::::,;:•;:.
.. -3: :.§:•liMA•:;-,t•.'4!7:•••:.•:;•.'t,..tr:•,•‘;:mi,,:!•,i•=•::',.M:,:i!.:!:.::,.:-miu!i=•::im:
'"-....itin::si...4:,':',:::41:.•••:ig:••:4•:•%:::.A•gig:•:-::n:::•-miii!,•:.:r.?.:4•!...iii;J:•.'H': :]:.::::•R-:i .:`..,._:,:i•:'-:::.
. •-% i•.:'.,i!...i:g:•,, ]:,x:i_:i:i':i,:•::•::m:niq?..,.•-c:.;:?:::,;.:•;-.,:••, ,,,. i.,AN.•!..;ft::.::;.:..::::•:,: i, ....„
5:7":::::•,*:::,'g:V.•;;:-.:;.:,•:.,;:::,;:;•;:;k:::::::•::::s••65:::,•;-.. ..-:•,:•••:;•;•::::,:?;:?:•4:::::: ::,,,,,•-i•i•:;•:-.:f::•-::i.:i:, ....,
:::•::•:i•::::::::,:ig:ri,,,,i:K••::i:::i:•-••.::-,...."••••,••::•=:•:.: ;::::,..,...,.,-...:••-,:,•1:.::::::.:.::::,.:::.::::::::•::::.:. ,.
• ,::......„:,::i• i'' ...,::::::,'....n::.:,n:n:::::::Aq•••:.:.,....::::•....-::•••:3:w.g••••::•,,,:. •"•:....,,,,•••::•••,,,,,,s,-, ,,,,,,•,:r. ..
- :: ••. :"- :Zi::':i'imi`':'a; .::'::,..:g.:1:::••M:i:2•-iii :i•::if.:-:•.'g••••.::irin:•-i-M-1.i.•-i :::::;•1.1; :‘,:•i?::0 ..
•• •••• ••• •-.....:.:.:.....,..::::..:••....,.:::•,:•:;:::0:::::: s:::•:::;:::.,.:::::.:•..ii•:::,:i:::,i;i: 1
. '•:,..,:•-•-e; '........-:i.j: :•iig":3.::•7•:i•A'i•...Wi.=.•..-•.::: '.:L-r.a::. •ii..:ii: i:i:•: ::: •: ::.-::::::'.:::iJm., •-•;.::::"..:
'••
,j,.....7...... . ............. . ..... . ......... .. ............
"---•-•••••,. .'.:•;f::.::::,,,mi?:: ::::::,i*:,i•-,:i:i•:_:..,.....,:•::]•::.::::::-•....:::.:::0::::::::::,........;.•,..:::.-....-..,:„.....„.,.;„ u,
....
...
-'
\--g 0
,,,,,,, •—•b• ,..,,,,=:..:,.,,.;: .-• •...::::,;••.:,,,,.,.4::::•,,,••:::,..:::.::::s:::•:-...:
..• -,k.,.....-k::::.,&•,.,:. . •-.-•-*:•:•:.•• .•:::„..,..*:„,. ..•....,:,„:,.,.....,,....,......:,,: •• •••
, ..
. .........
..,.i.
,i.::k::-,::,-,:,:.::-.,:::<,3-8:,••••,: :,....::::•:;:,,,,,,.:•;•*•:4.•,,,,,,,,•i,..... ..:,•::...,•••:,..4, .:.••••• ••
••--'F,,.,•;,aaii?.ikr.i,.:0Ai•: :::::•fc:::i:5ic•:*,"t::;:?•",: i:kx,:,..23.:",:::;;;-•rk,:ri::r.rr:is.,:r;'.i.:.•:.•:.:r-4,:l..,,,Z, g
r::, ;,.. i:.::.•••,,,
vi Riga::li.VgiMU'X''.0
.....,.. t.)::-:"'''' ..1.....i.":M.::::040:Vic:!..0,!;. 'tr-,,r.;:!tati- po:::_:,::::,;,c•-',i,•i!:', ,,•5; It
.,...:,.. .,„„.,,,,,,_:::::,:::::,::::::on:-:;:,::::•=4;mm:
..;',: ..,..::..::::'::i..,:.:v::,:.::::!,,,,,,,,:f.:.,,*:-.:m1 . . .:..M,:;•,,....?;')•::!:•!•:Z.k::,i,•,,.•!::
•,..,•,..:::•':••,. .i•k".:,:.:V i
.........,..
, ....,
Z:5;:i:::i•••••E•'.',..ti:.::Mi ::',':::i''::•:*.iM: ' •
: ,..
. . .. .... ...............
• .
••••••..........................,.........-.......,.....„....... . :
'--
i:•inr:gili??,:.:Miii:::•i:*•,..1,..W4..V3,i ' • 5 '21? .
•b:',7::•,.:S•e••:: ::,A,4A.•,:.:• •,..,,,.......,4,„•,x,......,i.
'-''..`",XX".::X: ',...*i•r:,i,i,,,M,,:,,i,$'',.• '
• . .,i
. . . v•:, Fr ' ,s 2.7,_;,,,.1.,----
. . . . • ....s . .. ..
.... , ..
• • .... - . - .,„ :
i:.' ''''. \., .•-•.- 'r.,.::::i. ''
. , . ... •
010"..'
tt
° ‘ 1-431k1CLAI°1-JEL9 SBERRY Inc.
'i I Land Surveyors 0 Civil Engineers 0 Planners Teal
) 159 Wyatt Way NE Bainbridge Island,WA 98110
phone (206) 842.5514 facsimile: (206) 780-2408
Lot 99, Plan 4L
DRAWN ST BAM DATE APRIL 28, 2000 JOB NO
„,......
.1Watft, Olympic Management La ukrcee vilgfAiaanaegement
0 .
97064
‘ ' 0 :()
CHEcrECI Br BAM seAu 1" = 20' sHEE T 1 or 1 1
SON °� Jefferson County Permit Center * Department of Community Development
4� 621 Sheridan Street, Port Townsend WA 08368 (360]370-4450
ti 4, 04 R A o
,k97' .1i1N;'0''''. °''' URVErScl Oh? lco
STOCK PLAN #4 TLV LOT 99
iu LK lice joa.dua 9 azgied. Q4 eon egete4 Qd fr,o (,e:
IProject Description:
NEW SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE
9 Digit Parcel Identification Number(from your tax statement):
998-700-099
Site Address
911#: 135 Outlook Lane Road Name: Outlook Lane Zip Code: 98365
Legal Description
Subdivision Name: Teal Lake Village Block: Lot(s): 99
Section: 21 & 16 Township: 28N Range: lE
Parcel Size (acres or square footage):
Property Owner: Phone:
Olympic Real Estate Development, LLC (360) 437-2101
Mailing Address:
781 Walker Way, Port Ludlow, WA 98365
Applicant/Occupant: Phone:
(if different from owner)
Mailing Address:
Authorized Rep: Jeff Evanger Phone:
g (360) 437-2101
Mailing Address:
781 Walker Way, Port Ludlow, WA 98365
General Contractor: Olympic Real Estate Development, LLC (360) 437-2101
Or Manufactured Home Installer: Phone: 1
Mailing Address:
781 Walker Way, Port Ludlow, WA 98365
Contractor's State License Number: OLYMPREOlOM8 Expiration Date:
6-1-2000
Septic Designer: Phone:
Mailing Address:
Architect:/Engineer: Phone:
Mailing Address:
Loan Lender/General Phone:
Contractor's Bond Holder: Parker, Smith & Feek 800-457-0220
Mailing Address:
FOR OPPICE USE ONLY'
Fire District Planning Area: School District Zone:
4/98 H:\home\pincntr\forms\universal plot plan
CM,00 - CO 1 7
0/� BUILDING PERMIT APPLICATION
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00264 Received Date: 5/1/2000
SITE ADDRESS: 135 OUTLOOK LN
PORT LUDLOW, 98365
APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
SUBDIVISION: TEAL LAKE VILLAGE Block: Lot: 99
PARCEL NUMBER: 998700099 Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
Contractor's License OLYMPRE010M8 Expires 06/01/2000
ARCH ITECT/
ENGINEER :
PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 2,204
VALUATION 129,143.00 ADD'L: HEAT TYPE: HTP
CODE EDITION: 1997 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: 552 SHORELINE:
CONST TYPE: 240 SETBACK:
DECK:
\ _S�BANK HEIGHT:
SEWAGE DISPOSAL: SEW '�l f
WATER SYSTEM: LUDLOW =� 1� STORMWATEI(� YES V�`�i0°'ENO AREA
BEDROOMS: BATHROOMS: \ S Wetland AJ Erosion . •
Exist: Exist: N Seismic /\) 0 Streams 1II
Prop: 2 Prop: 3 - Flooding _ 0 Q �d e I
Total: 2 Total: 3 F&W 05Q
Shoreline 1 1J U Aquifer �( ,/,
Routing Date: 5.-- , / Forest: Commercial ►�(j Rural N;C1�
7 Proximity
Type Amount Paid By: Date: Receipt: Approved/Datg,
Permit $1,161.75 MAM 05/01/00 30694 bb�� ,.,tU
State Building Code $4.50 MAM 05/01/00 30694 Re ""d- LR, `/
Potable Water Application $30.00 MAM 05/01/00 30694
Total: $1,196.25 Crtca l Area
,:.
RvewP-$1D .,
I:1F_BLD App_Bld.rpt 10/29/99
Jtt-- U hhi-111 ER 2E0 379 4451 P.03
APPROVED BY
JEFFERSON COUNTY
9 ;a`
MAY
JEFFERSON COUNTY
STORMWATER MANAGEMENT ORDINANCE .►��
AUTH. ��, �
SMALL PARCEL EROSION AND SEDIMENT CONTROL P AN
EROSION AND SEDIMENT CONTROL WORKSHEET
Property Owner: Olympic Real Estate Development Telephone: (360) 437-2101
Address: 781 Walker Way, Port Ludlow, WA 98365
Assessor's Parcel Number. 998-700-099
Building Permit or Septic Permit Application Number (if applicable):
Brief Project Description: New Single Family Residence With Attached Garage.
Site Location: 135 Outlook Lane
Person Responsible for BMP Installation and Maintenance: Jeff Evang e r
Address: 781 Walker Way, Port Ludlow, WA 98365
Telephone: (360) 4.37-2101
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads.
Please check the measures you plan to implement and show their approximate location on the site
plan. You may also propose measures other than those listed. Attach additional sheets, if more
space is required.
{xj Stabilize construction access route_ Limit construction vehicles to one route, if feasible.
Provide a stabilizal construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from itormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
(Xi Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas, larvlslide or erosion hazard area, etc.).
:30 EF= :0 PERMIT BEN-ER‘ 3EE 379 4451 P.24
EROSION AND SEDIMENT CONTROL WORKSHEET
( ] Phase clearing so that only areas that are actively being worked are uncovered.
[ ] Start and complete land disturbing activities and stabilize the site between April 1 and
September 30_ Stabilization means that disturbed areas will have well-established plant
cover or be landscaped to minimize erosion_
(x) Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30,
[ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away fruiu water bodies, roads,
and property lines.
[ ] Place gravel base on roads, driveways, and parking areas after clearing and subgrade
preparation_
] Protect adjacent properties and water bodies from sediment deposition:
rf Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies_ (See attached illustrations from Stormwater Management Manual_)
[d Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration from
Stormwater Management Manual.)
Regularly inspect and maintain all BMPs especially after storms events.
[) Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
Ci tP is TrPry flat with candy coils CO T bel i evp the al7Ove MPasyT-Pg t.T;11
be sufficient.
:31 JEFF CO PERMIT CENTER. 360 379 4451 P.05
EROSION AND SEPIMEJ4T cQINTTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabilized(seeded, landscaped, apply gravel base
to roadways,etc.)
Areas that are distrubed will be landscaped with natural type vegetation
and lawn to property line.
3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate, dry well,infiltration trench, route runoff to existing drainage facilities, etc.).
All impervious surfaces will be run to roof drains andLor catch basins
as designed into the plat requirements.
:31 JEFF CO PERMIT CENTER 360 379 4451 P.05
EROSION AND SEDIMITNT['ONTROL WORKSHEET
4. Specify your construction sequence, Describe the timing of all land disturbing activities (clearing
and grading construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices. Describe proposed maintenance of BMPs.
After excavation the soil piles will be covered and silt fence will be
installed. Silt fence will be left in place until we are ready to land-
scape and all roof drains/catch basins are in. Landscaping will be installed
as early as possible on the exterior of the building and all exterior concrete
work is completed.
The Best Mai gmenh,Practices proposed above will be implemented to control erosion, sediment, and
st'rmwater I vill rotify the Permit Center for inspections as requ"
/70
Signature /Ag nt Da
TOTAL P,06
•
Jefferson County Department of Community Development May 10, 2000
*621 Sheridan Street, Port Townsend, WA 98368
(360) 379-4450
CRITICAL AREA STANDARD WAIVER
Applicant: OLYMPIC REAL ESTATE DEVLOP LLC
781 WALKER WAY
PORT LUDLOW WA 98365
Critical Area Review Case Number: CAR00-00176
Project Description:
Parcel Number: 998700099 S-T-R: 21-28N-01E
Site Address: 135 OUTLOOK LN
PORT LUDLOW WA, 98365
FINDING: The development, as proposed and portrayed on the Universal Plot Plan, does not encroach on
an identified critical area nor any associated buffers.
CONCLUSION: The proposed development meets the waiver requirements established in Jefferson County
Ordinance 05-0509-94.
CONDITION: The development shall be as proposed and portrayed on the Universal Plot Plan. Deviation,
additions or relocation of proposed development activities will require further review pursuant to
the Jefferson County Critical Areas Ordinance.
Depar of Community Development Staff
c: File
I:\F_CAR_Waiver_Standrd.rpt 12/13/99