Loading...
HomeMy WebLinkAboutBLD2000-00264 a BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX(360)379-4451 (800) 831-2678 PERMIT #: BLD00-00264 Received Date 05/1/2000 SITE ADDRESS: 135 OUTLOOK LN Issue Date 05/11/2000 PORT LUDLOW, 98365 Expiration Date 05/11/2001 APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 SUBDIVISION: TEAL LAKE VILLAGE Block: Lot: 99 PARCEL NUMBER: 998700099 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 Contractor's License: OLYMPRE010M8 Expires: 06/01/2000 LOAN LENDER/ PARKER, SMITH & FEEK BOND HOLDER: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE REQUIRED INSPECTIONS: [ Footing LSD eline Setb cks): )r�C �- 6/ [ %' Foundation: + [< (/2_9 06,j [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall:, "A r�.j?/[)rZ NL.' 0/c- /'OA7t;''e) 1 . [ ] Framin umbin : eE/,.--iA" &k ((z /2 c [ ] Propane Tank/Lines: [ "] Insulation: 0 r, ,4�L,a Lews. ‹.-- /-3o-- [0 heetrock_, / j( :7_A-1/cam/ �C ' . [ ] Final/Occupancy Approval: rr' x -4=HEALTH DEPARTME4t APPROVAL REQUIRED PRIOR TO FINAL INSPECTION. THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. Inspector's Phone Hours 8:00 a.m. - 9:00 a.m. SPECIAL CONDITIONS MAY APPLY - SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY f P BUILDING PERMIT APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD00-00264 Received Date: 5/1/2000 SITE ADDRESS: 135 OUTLOOK LN PORT LUDLOW, 98365 APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 SUBDIVISION: TEAL LAKE VILLAGE Block: Lot: 99 PARCEL NUMBER: 998700099 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 Contractor's License OLYMPRE010M8 Expires 06/01/2000 ARCHITECT/ ENGINEER : PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 2,204 VALUATION 129,143.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 592 SHORELINE: CONST TYPE: DECK: 240 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW STORMWATER: YES NO AREA BEDROOMS: BATHROOMS: Wetland Erosion Exist: Exist: Seismic Streams Prop: 2 Prop: 3 Flooding Landslide Total: 2 Total: 3 F&W Plat Conditions Routing Date: Shoreline Aquifer Forest: Commercial Rural Proximity Type Amount Paid By: Date: Receipt: pfxd/ t Permit $1,161.75 MAM 05/01/00 30694 6 Y ' .a� " Lop State Building Code $4.50 MAM 05/01/00 30694 � � ,.. Potable Water Application $30.00 MAM 05/01/00 30694 _—�MAY 1 1 2000 Total: $1,196.25 Jefferson County Planning & Building Department I:\F_BLD_App_Bld.rpt 10/29/99 ♦ I oN eo Jefferson County Permit Center * Department of Community Development 4 , ,, 621 Sheridan Street,Port Townsend WA 98368 13601 379-4450 141 ''6 .). 11 s r m,113 A--) o A o *F1;''N� O Q `cC crV O TLV 80 �J STOCK PLAN #4 Project Description: New Single Family Residence/With Attached Garage Building Type: Project Type: Frame Type: XX Single Family X New X Wood Garage Attached/Detached ❑ Addition ❑ Steel ❑ Modular ❑ Alteration/Remodel ❑ Concrete ❑ Commercial 0 Repair ❑ Masonry ❑ Multi-family/# of Units ❑ Demolition ❑ Other: ❑ Industrial ❑ Other: Bedrooms: Bathrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: 0 Existing: ___0_ XX Sewer ❑Community System ❑ Electricity ❑ Oil Proposed: ____2, — Proposed 3 ❑ Individual System ❑ Woodstove ❑ Propane Total: 2 Total: 3 If not sewer,fill out the following: 2 Heat Pump ❑ Conventional ❑ Alternative ❑ Other Permit # SEP Water Supply: ❑ Private well ❑ Two Party Well a Public:Name of water system:Olympic Water & S ewer Square Footage: For Office Use Only Main Floor 2204 (120,823.3) UBC OCCUPANCY GROUP 2ND Floor Base fee 1161.75 3rd Floor Plan Check fee Not Applicable Htd Basement State Surcharge fee 4.50 Unhtd Basement Subtotal 1166.25 Garage/Carport 592 (5920) Pot Water Review fee 30.00 Decks 240 (2400) 911 dApproachfeD 39.00 Commercial TOTAL 1235.25 Industrial ��_ - Receipt # Other Q Cash/Check # ____ ___ Total Valuation. / iIF Initials Or Date Estimated Cost: If within 200' of the Shoreline, Distance to Bank r Ordin High Water Mark ft. Bank Height ft. Signature: ,_ A411 Date: 4/7"C-7/96 04/28/00 02:45 FAX 206+780+2408 MacLearnsberry Z 0 4 r r 1 ..:., .,„10) .•••••• ,, :::•••• .:., :,. :, i : :,..'''.i: ''.]:;..... ': ..... •,!,,.. ''•••::;:' ••:::. ?:•.'••••''' .`,...4 ''' •''' "' '••• -.9 • , rii'... ••::: •-' :.::,'',:gg:1;:!:1:.:::Mi:;ii•::•, ,r.,..;;;: ,:::•,:•ie...,:::.::k::.:,•,:".•kl:.::: :•••••••..:.•:,i',7.i.:',.:?.c.7.F.n.K0::"::::.::;:•••.??. •":.$.25' r 5.25' '''''' :-,:,:i.,4•••,- -nr:.:::':•:=•,'1•A.t=ba::::,'::,,''':•trZ,It:On::.?:::::::1:::::::'.•.•: k,,..i:-...:i.,,::: -..,:::::::•,,,.i?,,,,... ..-.:Qw.i,,,?.:-.:,...x!,,,3:::,•:•:4:.•-,•,,,A.:::i.:::::::.,-4:8:.?.:.,=:::: :::::::,,E::::,;:•;:. .. -3: :.§:•liMA•:;-,t•.'4!7:•••:.•:;•.'t,..tr:•,•‘;:mi,,:!•,i•=•::',.M:,:i!.:!:.::,.:-miu!i=•::im: '"-....itin::si...4:,':',:::41:.•••:ig:••:4•:•%:::.A•gig:•:-::n:::•-miii!,•:.:r.?.:4•!...iii;J:•.'H': :]:.::::•R-:i .:`..,._:,:i•:'-:::. . •-% i•.:'.,i!...i:g:•,, ]:,x:i_:i:i':i,:•::•::m:niq?..,.•-c:.;:?:::,;.:•;-.,:••, ,,,. i.,AN.•!..;ft::.::;.:..::::•:,: i, ....„ 5:7":::::•,*:::,'g:V.•;;:-.:;.:,•:.,;:::,;:;•;:;k:::::::•::::s••65:::,•;-.. ..-:•,:•••:;•;•::::,:?;:?:•4:::::: ::,,,,,•-i•i•:;•:-.:f::•-::i.:i:, ...., :::•::•:i•::::::::,:ig:ri,,,,i:K••::i:::i:•-••.::-,...."••••,••::•=:•:.: ;::::,..,...,.,-...:••-,:,•1:.::::::.:.::::,.:::.::::::::•::::.:. ,. • ,::......„:,::i• i'' ...,::::::,'....n::.:,n:n:::::::Aq•••:.:.,....::::•....-::•••:3:w.g••••::•,,,:. •"•:....,,,,•••::•••,,,,,,s,-, ,,,,,,•,:r. .. - :: ••. :"- :Zi::':i'imi`':'a; .::'::,..:g.:1:::••M:i:2•-iii :i•::if.:-:•.'g••••.::irin:•-i-M-1.i.•-i :::::;•1.1; :‘,:•i?::0 .. •• •••• ••• •-.....:.:.:.....,..::::..:••....,.:::•,:•:;:::0:::::: s:::•:::;:::.,.:::::.:•..ii•:::,:i:::,i;i: 1 . '•:,..,:•-•-e; '........-:i.j: :•iig":3.::•7•:i•A'i•...Wi.=.•..-•.::: '.:L-r.a::. •ii..:ii: i:i:•: ::: •: ::.-::::::'.:::iJm., •-•;.::::"..: '•• ,j,.....7...... . ............. . ..... . ......... .. ............ "---•-•••••,. .'.:•;f::.::::,,,mi?:: ::::::,i*:,i•-,:i:i•:_:..,.....,:•::]•::.::::::-•....:::.:::0::::::::::,........;.•,..:::.-....-..,:„.....„.,.;„ u, .... ... -' \--g 0 ,,,,,,, •—•b• ,..,,,,=:..:,.,,.;: .-• •...::::,;••.:,,,,.,.4::::•,,,••:::,..:::.::::s:::•:-...: ..• -,k.,.....-k::::.,&•,.,:. . •-.-•-*:•:•:.•• .•:::„..,..*:„,. ..•....,:,„:,.,.....,,....,......:,,: •• ••• , .. . ......... ..,.i. ,i.::k::-,::,-,:,:.::-.,:::<,3-8:,••••,: :,....::::•:;:,,,,,,.:•;•*•:4.•,,,,,,,,•i,..... ..:,•::...,•••:,..4, .:.••••• •• ••--'F,,.,•;,aaii?.ikr.i,.:0Ai•: :::::•fc:::i:5ic•:*,"t::;:?•",: i:kx,:,..23.:",:::;;;-•rk,:ri::r.rr:is.,:r;'.i.:.•:.•:.:r-4,:l..,,,Z, g r::, ;,.. i:.::.•••,,, vi Riga::li.VgiMU'X''.0 .....,.. t.)::-:"'''' ..1.....i.":M.::::040:Vic:!..0,!;. 'tr-,,r.;:!tati- po:::_:,::::,;,c•-',i,•i!:', ,,•5; It .,...:,.. .,„„.,,,,,,_:::::,:::::,::::::on:-:;:,::::•=4;mm: ..;',: ..,..::..::::'::i..,:.:v::,:.::::!,,,,,,,,:f.:.,,*:-.:m1 . . .:..M,:;•,,....?;')•::!:•!•:Z.k::,i,•,,.•!:: •,..,•,..:::•':••,. .i•k".:,:.:V i .........,.. , ...., Z:5;:i:::i•••••E•'.',..ti:.::Mi ::',':::i''::•:*.iM: ' • : ,.. . . .. .... ............... • . ••••••..........................,.........-.......,.....„....... . : '-- i:•inr:gili??,:.:Miii:::•i:*•,..1,..W4..V3,i ' • 5 '21? . •b:',7::•,.:S•e••:: ::,A,4A.•,:.:• •,..,,,.......,4,„•,x,......,i. '-''..`",XX".::X: ',...*i•r:,i,i,,,M,,:,,i,$'',.• ' • . .,i . . . v•:, Fr ' ,s 2.7,_;,,,.1.,---- . . . . • ....s . .. .. .... , .. • • .... - . - .,„ : i:.' ''''. \., .•-•.- 'r.,.::::i. '' . , . ... • 010"..' tt ° ‘ 1-431k1CLAI°1-JEL9 SBERRY Inc. 'i I Land Surveyors 0 Civil Engineers 0 Planners Teal ) 159 Wyatt Way NE Bainbridge Island,WA 98110 phone (206) 842.5514 facsimile: (206) 780-2408 Lot 99, Plan 4L DRAWN ST BAM DATE APRIL 28, 2000 JOB NO „,...... .1Watft, Olympic Management La ukrcee vilgfAiaanaegement 0 . 97064 ‘ ' 0 :() CHEcrECI Br BAM seAu 1" = 20' sHEE T 1 or 1 1 SON °� Jefferson County Permit Center * Department of Community Development 4� 621 Sheridan Street, Port Townsend WA 08368 (360]370-4450 ti 4, 04 R A o ,k97' .1i1N;'0''''. °''' URVErScl Oh? lco STOCK PLAN #4 TLV LOT 99 iu LK lice joa.dua 9 azgied. Q4 eon egete4 Qd fr,o (,e: IProject Description: NEW SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE 9 Digit Parcel Identification Number(from your tax statement): 998-700-099 Site Address 911#: 135 Outlook Lane Road Name: Outlook Lane Zip Code: 98365 Legal Description Subdivision Name: Teal Lake Village Block: Lot(s): 99 Section: 21 & 16 Township: 28N Range: lE Parcel Size (acres or square footage): Property Owner: Phone: Olympic Real Estate Development, LLC (360) 437-2101 Mailing Address: 781 Walker Way, Port Ludlow, WA 98365 Applicant/Occupant: Phone: (if different from owner) Mailing Address: Authorized Rep: Jeff Evanger Phone: g (360) 437-2101 Mailing Address: 781 Walker Way, Port Ludlow, WA 98365 General Contractor: Olympic Real Estate Development, LLC (360) 437-2101 Or Manufactured Home Installer: Phone: 1 Mailing Address: 781 Walker Way, Port Ludlow, WA 98365 Contractor's State License Number: OLYMPREOlOM8 Expiration Date: 6-1-2000 Septic Designer: Phone: Mailing Address: Architect:/Engineer: Phone: Mailing Address: Loan Lender/General Phone: Contractor's Bond Holder: Parker, Smith & Feek 800-457-0220 Mailing Address: FOR OPPICE USE ONLY' Fire District Planning Area: School District Zone: 4/98 H:\home\pincntr\forms\universal plot plan CM,00 - CO 1 7 0/� BUILDING PERMIT APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD00-00264 Received Date: 5/1/2000 SITE ADDRESS: 135 OUTLOOK LN PORT LUDLOW, 98365 APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 SUBDIVISION: TEAL LAKE VILLAGE Block: Lot: 99 PARCEL NUMBER: 998700099 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 Contractor's License OLYMPRE010M8 Expires 06/01/2000 ARCH ITECT/ ENGINEER : PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 2,204 VALUATION 129,143.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 552 SHORELINE: CONST TYPE: 240 SETBACK: DECK: \ _S�BANK HEIGHT: SEWAGE DISPOSAL: SEW '�l f WATER SYSTEM: LUDLOW =� 1� STORMWATEI(� YES V�`�i0°'ENO AREA BEDROOMS: BATHROOMS: \ S Wetland AJ Erosion . • Exist: Exist: N Seismic /\) 0 Streams 1II Prop: 2 Prop: 3 - Flooding _ 0 Q �d e I Total: 2 Total: 3 F&W 05Q Shoreline 1 1J U Aquifer �( ,/, Routing Date: 5.-- , / Forest: Commercial ►�(j Rural N;C1� 7 Proximity Type Amount Paid By: Date: Receipt: Approved/Datg, Permit $1,161.75 MAM 05/01/00 30694 bb�� ,.,tU State Building Code $4.50 MAM 05/01/00 30694 Re ""d- LR, `/ Potable Water Application $30.00 MAM 05/01/00 30694 Total: $1,196.25 Crtca l Area ,:. RvewP-$1D ., I:1F_BLD App_Bld.rpt 10/29/99 Jtt-- U hhi-111 ER 2E0 379 4451 P.03 APPROVED BY JEFFERSON COUNTY 9 ;a` MAY JEFFERSON COUNTY STORMWATER MANAGEMENT ORDINANCE .►�� AUTH. ��, � SMALL PARCEL EROSION AND SEDIMENT CONTROL P AN EROSION AND SEDIMENT CONTROL WORKSHEET Property Owner: Olympic Real Estate Development Telephone: (360) 437-2101 Address: 781 Walker Way, Port Ludlow, WA 98365 Assessor's Parcel Number. 998-700-099 Building Permit or Septic Permit Application Number (if applicable): Brief Project Description: New Single Family Residence With Attached Garage. Site Location: 135 Outlook Lane Person Responsible for BMP Installation and Maintenance: Jeff Evang e r Address: 781 Walker Way, Port Ludlow, WA 98365 Telephone: (360) 4.37-2101 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan. You may also propose measures other than those listed. Attach additional sheets, if more space is required. {xj Stabilize construction access route_ Limit construction vehicles to one route, if feasible. Provide a stabilizal construction access by applying quarry spalls, ballast, or crushed rock to minimize tracking sediment onto roads. (See attached illustration from itormwater Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. (Xi Minimize the extent of land disturbing activity and preserve existing vegetation. Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife habitat areas, larvlslide or erosion hazard area, etc.). :30 EF= :0 PERMIT BEN-ER‘ 3EE 379 4451 P.24 EROSION AND SEDIMENT CONTROL WORKSHEET ( ] Phase clearing so that only areas that are actively being worked are uncovered. [ ] Start and complete land disturbing activities and stabilize the site between April 1 and September 30_ Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion_ (x) Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April 1 and September 30, [ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. [ ] Cover soil stockpiles with plastic sheeting and locate away fruiu water bodies, roads, and property lines. [ ] Place gravel base on roads, driveways, and parking areas after clearing and subgrade preparation_ ] Protect adjacent properties and water bodies from sediment deposition: rf Place straw or hay bales in ditches and drainage ways down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies_ (See attached illustrations from Stormwater Management Manual_) [d Install a filter fence down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustration from Stormwater Management Manual.) Regularly inspect and maintain all BMPs especially after storms events. [) Describe other erosion and sediment control Best Management Practices. Be specific as to design and specifications. Ci tP is TrPry flat with candy coils CO T bel i evp the al7Ove MPasyT-Pg t.T;11 be sufficient. :31 JEFF CO PERMIT CENTER. 360 379 4451 P.05 EROSION AND SEPIMEJ4T cQINTTROL WORKSHEET 2. Describe how disturbed areas will be permanently stabilized(seeded, landscaped, apply gravel base to roadways,etc.) Areas that are distrubed will be landscaped with natural type vegetation and lawn to property line. 3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to infiltrate, dry well,infiltration trench, route runoff to existing drainage facilities, etc.). All impervious surfaces will be run to roof drains andLor catch basins as designed into the plat requirements. :31 JEFF CO PERMIT CENTER 360 379 4451 P.05 EROSION AND SEDIMITNT['ONTROL WORKSHEET 4. Specify your construction sequence, Describe the timing of all land disturbing activities (clearing and grading construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices. Describe proposed maintenance of BMPs. After excavation the soil piles will be covered and silt fence will be installed. Silt fence will be left in place until we are ready to land- scape and all roof drains/catch basins are in. Landscaping will be installed as early as possible on the exterior of the building and all exterior concrete work is completed. The Best Mai gmenh,Practices proposed above will be implemented to control erosion, sediment, and st'rmwater I vill rotify the Permit Center for inspections as requ" /70 Signature /Ag nt Da TOTAL P,06 • Jefferson County Department of Community Development May 10, 2000 *621 Sheridan Street, Port Townsend, WA 98368 (360) 379-4450 CRITICAL AREA STANDARD WAIVER Applicant: OLYMPIC REAL ESTATE DEVLOP LLC 781 WALKER WAY PORT LUDLOW WA 98365 Critical Area Review Case Number: CAR00-00176 Project Description: Parcel Number: 998700099 S-T-R: 21-28N-01E Site Address: 135 OUTLOOK LN PORT LUDLOW WA, 98365 FINDING: The development, as proposed and portrayed on the Universal Plot Plan, does not encroach on an identified critical area nor any associated buffers. CONCLUSION: The proposed development meets the waiver requirements established in Jefferson County Ordinance 05-0509-94. CONDITION: The development shall be as proposed and portrayed on the Universal Plot Plan. Deviation, additions or relocation of proposed development activities will require further review pursuant to the Jefferson County Critical Areas Ordinance. Depar of Community Development Staff c: File I:\F_CAR_Waiver_Standrd.rpt 12/13/99