HomeMy WebLinkAboutBLD2000-00709 •
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
(360)379-4450 FAX(360)379-4451 (800) 831-2678
PERMIT #: BLD00-00709 Received Date 10/26/2000
SITE ADDRESS: 112 CLEAR VIEW PL Issue Date 11/1/2000
PORT LUDLOW, 98365 Expiration Date 11/1/2001
APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
SUBDIVISION: TEAL LAKE VILLAGE Block: Lot: 91
PARCEL NUMBER: 998700091 Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
Contractor's License: OLYMPRE010M8 Expires: 07/01/2001
LOAN LENDER/ PARKER SMITH & FEEK
BOND HOLDER:
PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
REQUIRED INSPECTIONS:
M ootings/S s (Shoreline Setbacks):Cit
[C]--t' indatiom' )rC > / i5e/c,c,
[ ] Underground Plumbing/Underground Insulation:
[ir /
[(,) ram ing/Plum ;r=r`� ��vcs�"��� 74-f-',C�.
[ ] Propane Tank/Lines:,C,t r L/wie
a ion: 450
;.
-etroc JP/ _ A tio ''
inal/Occupancy Approv-r 7/c 1/449/
HEALTH DEPARTMENT APPROVAL REQUIRED P IOR TO FINAL INSPECTION.
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
Inspector's Phone Hours 8:00 a.m. - 9:00 a.m.
SPECIAL CONDITIONS MAY APPLY - SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
BUILDING PERMIT APPLICATION
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00709 Received Date: 10/26/2000
SITE ADDRESS: 112 CLEAR VIEW PL
PORT LUDLOW, 98365
APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
SUBDIVISION: TEAL LAKE VILLAGE Block: Lot: 91
PARCEL NUMBER: 998700091 Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101
781 WALKER WAY
PORT LUDLOW WA 98365
Contractor's License OLYMPRE010M8 Expires 07/01/2001
ARCHITECT/
ENGINEER :
PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 2,204
VALUATION 130,311.00 ADD'L: HEAT TYPE: HTP
CODE EDITION: 1997 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: #OF STORIES: 1
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: 592 SHORELINE:
CONST TYPE: DECK: 240 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 2 Prop: 3 Seismic Streams
Total: 2 Total: 3 Flood Way Flood Plane
F&W Landslide
Routing Date: ? Shoreline Aquifer
Forest: Commercial Rural
Type Amount Paid By: Date: —PrReceipt:ty Apprro a drtlons
pp ��ate
Permit $1,167.35 MAM 10/26/00 34760 APPROVED
P R O`V/E D
State Building Code $4.50 MAM 10/26/00 34760 /`t
Potable Water Application $30.00 MAM 10/26/00 34760
Total: $1,201.85 4/"--ck
"V 1 2CIN
Jefferson County Planning
& Budding Department
is\F_BLD_App_Bld.rpt 10/29/99
• SENT°BY:F'0PC Rr:soL Rc-i;s DEVEL :1 0-23- u : r o: t SAM : • I 86a 44372522- 360 379 4451 :a 2/ 3
Affirm Cony knit Ca& * lepingst of Comity limeimmg
4. :. 41
,,,,\....._______,
perminf
Alwo
r i hguu q-L- c\\
ProjectDescription: NEWSINGLE FAMILY RESIDENCE/With Attached Garage STUCK FLAN #4
Euilding Trp ""�'
X Single F �7 Fze ypes
_ Wood
ii G !Detached C Minion a New
0 Steel
�' Modular a Steel
Commeral y Alteration/Remodel � Concrete
Muici-E f of Units -, Repair
C Masonry
DeaYo
C .Industrial 1~uevu C Other
Ocher
f
— Satlunocns: --"-"
13etfraartxs. �f Se age Dash T of Heat
Q 0 ant.
Proposed:
-- — Sewer =Cos u ySYste C Electricity C qd
Toc 2 Total
""` i- Indite System 0 VGdodsrovc C Propane-- trot sew r ut die • - g Heat Pump
C Conve i xl Aker, C Other
.. l
Water Supply: �`� Permit +Y S �.. .�-
h= piivatt III �, .vo P 17eB B Fsabli Nano of water s
`�"�` ,- Public it ter & Sesser
Square Footage: For Office Use Only -
Mairz Floor 2 204 t q 1 - �
OCCUPANCYOL1I'
?`D Floor
Ird Floor
Base fee
- 17 3
Had Basemen[ Not Applicable
State Surcharge fee - ,. _
Lanhcd Basement Subtotal ,�
Garage/Ca xt q 2 5 a
UBC
1 not Water Review Q .
ecics 240 00 i 911, Rd
Commercial APl� It
TOTAL
Industrial
p '
Other — Receipt
�"aral Vattcxti0 . (-------
3t� 3I 1 x kl�. Casf�/Cl: k �,- �f I
Or
Initials1 Dam
Estirnated Cost: . 1
Tt7ithin ' of the Shorel ne, l _
Distance to Bank or arl' Water 'dark
ft. Bank Height ft.
FiliMWS
Signatur� Darr.
Tt1
aAN 4
cO'd T 5pt bL E�92 131N30 l I Wd3d 03 ddaf 20:0T 000E-S T-1-30
(.-.Zr.,:� oN�o� Jefferson Cavity Purina Center * Deparflna t of Canninity Development
. ., 821311erldan Street Port Townsend WA 88388(360131&4450
nV
� � Uiri rtol Pi
STOCK PLAN #4
7cu ea de 0114.6 11(d m s 44 eemidde4 its MI 6:
Project Description:
NEW SINGLE FAMILY RESIDENCE WITH ATTACHED GARAGE
9 Digit Parcel Identification Number(from your tax statement):
Site Address
911#: , _ Cle,Fu �:
-VitvJ Pl. Road Name: ,.� ; �.+i- ' . , i ,;:,,.,_tip., Zip Code: 98365
Legal Description
Subdivision Name: TEAl Ltd .t.. 11/4j;‘‘4°1 `u Block: I Lot(s): I
Section: 7 _I Township: ZS N . Range: i
Parcel Size (acres or square footage):
Property Owner. Olympic Real Estate Development, LLC Phone:
(360) 437-2101
Mailing Address:
781 Walker Way, Port Ludlow, WA 98365
Applicant/Occupant: Phone:
(if different from owner) Same
Mailing Address:
i
Authorized Rep: I Phone:
Jeff Evanger I (360) 437-2101
Mailing Address:
781 Walker Way, Port Ludlow, WA 98365
General Contractor. (360) 437-2101
Or Manufactured Home Installer. Phone:
Mailing Address:
781 Walker Way, Port Ludlow, WA 98365
Contractor's State License Number. J Expiration Date:
4�`I MPft.�-010 W ) (011/01 .
Septic Designer: 1 Phone:
. Mailing Address:
Architect:/Engineer: Phone:
Mailing Address:
1
Loan Lender/General Phone:
Parker, Smith & Feek 800-457-0220
Contractor's Bond Holder: i
Mailing Address:
j
FOR OH-ICE USE ONLY
Fire District: Planning Area: School District Zone: I
4/`)8 H.\home\pincars\foams\uaivenal plot plan
10/24/00 18:21 FAX 206-780-2408 MacLearnsberry a 02
• .
4 ••••'"4.
'f• .: • .
te•ok. ,..,t'' . ...$* .) ''
CD
at
in CY
1:.T.. •• x...
' .....3F:t.. e••''...3.N.::......,•,;•..-:.• -..:••• ....:••<...
' ••,,.
.A........v.,.....::.:••.,:.••• `....:-/ ..
,...;:......;.?..,......,.......,„.,q.L..:....p4,..v.:..?!.::;,...,:,<,..i•,.,,,,,..--.... ;`A. ''',.
, •.,•-•'3.. •:-.,,...,.„, 1.:,:;.;A'Ai ••
.,,• ..!.....A,..„.4:
,..:.:::•:•,,,OW:v.sy.,,••,,,,,••::•4;•:44....,:,••:<•11.*.,....t..•
'''' ".g.V.:....=.;:•;:•;.•'.t'.'••;:...tt.'4:;',a141.11$3,Kiff••••••:<.X..•:;••••s'•••'';:•.'•:" .!....‘''...:. \:.'•:.
4...... ,..e
:•4:q.,
"4*•,,•:;,-, r•;••••:•,...,,:
.1,.•
.':'•'• :43.!::'77:•;:::11:',: :;.::'..IV:=.;•'::.:!...„ 't;::;':3,.:.,,-...:V•=:;: ::::•:::;T::;;;•••••:.
''..
3,.:•••:.,4•,;•
-, ....''''•' k :•••••••:,...n.....:1>::r.10C.244.4 .••••:$:....:•••:44:•,:.:4:.•• •:••.:.••.•:...,::.:•.,....S.::.
., •• • ed'N
-,;42t.,tr.=.;!:!,.;-.....;..5.--1::,,k,:4-7.!..:t,',.ti:,,..t.:!:•..;:!tr.::'::::::.:•.:,....::.:',!....±:
• ..: ••,,, • ..;•.. ,`., - `' ..??....;,,,,,,,•••.......*............:•••••••..., .....4................,...,:,,..n..,.•'
•oteoi,....2.,i
e'4,, k :e\? ;:. :..,:,: •4?••• . •,-;(,:....,.:.•:;...;:•;:::. •'..1 „:••' . ,..•:!..1.,:=::,.....-••••:::1•:;.':•-••:.":"T:!••; :.••........• '"'•
•.., ..41, .... 4
.i''''.-,... •• ›,...., .• ••••iZ....F.•:.;;;•.',1,••••7::•.!;.;t24.V.:'::::£.:. :::...::.....,-:;:'`*".r...:•''.:`..;...:::':;_,':';.',:::::;::.::::',::::'' ... S.36 as ..v.
......, '' :i" :..-41;;;;''''':`:•••v••••'.. ••••........N.,•••:::....-4 4::••,•;..... ....,...:••.:.., ........t.).
X.,
. .11 Y.4......t.t?.. :.•.:...% •::::>9......::17 ; '4...'''. ••••;TZ:.:::::. ••••:f.::'j......Ct 4,-, • 7, `....f
..,,,k4.
,nm• , '''''',:,,"`• - -,,,,,I=;:•.;:. ,fi;',',.•,!1 •'''.41'.'"-"'',..... ''''''!..,.,7;!'"„....f.::;`,1*::!:::::...:.- 4:‘,..:.• ...
•£ >•-• 4:
er“'%.
‘,........,.....'
4.-......,' ... r:
.....\..4.:... :'...*Vt. ;'••=1:‘.4..,e::.....,n.*•:;::=tat:K:V.:':.........e:'`.=."-!::'':-:..:: ":"':*7:*-'
''''''''''.:.ti . •:,:„.;:.,...:.,.. ,:.......i..,...-......,:...,. '... ":"... '•:,::":•'::•::":****'''
;,!:,:h,:.1;:£..::::..X,:::',:::;g:r.....:3;:r:::...=::‘.".::•, 4...:4:::'.;::":':::'::..":"::.:.:":.:::. .x, ,
A"...........,
v v .. •
,....,
..,
',,,'4'.'" .„.......x.x.,,....,,,..,.4:..,.......,.......,...... •4.1........... <, .4:•••:.,...:(....,:•,•••:..,.......,:. .
:.......r,,,.
' .
V....* ......:,:•,',..:*•.,:..:,......,,,v,.....:::....0 ........
..............., :•••:•44,1•••......Y4.,$'.....••• - : .
.....4-1.•:;...4‘,1,:•.:••••••.......,...........:••:, K")
. -244:••.....,..,:::,•••::.•:,{•••••••4,..:51.
..?.1.i..:•:.....t....!=....!;•„t;4':Z:ir•tr:li;r.": ,..>. ... • •
:;n:.•14444;'....:-. '111.:F.'''l. ,
-:•
5.59
. , .::'::i;r.i,...4..1.i.RA150r-t"7::;i:;,:' :..::.,. .::'.1::!:':;::?••••.il':•*:. r4,,^
0
.
••••••........::44:b.•;';.;;:.:;;;.%.,,....,.. . ''''': -;;.r....;:....... ...`.7...,.,....
'N•••••••••;...::;.:4.....=:;::::::::::!;;:::.:.::r•'•:4.• .
.01.445.'
....::::....f..........;:i.'.::....4::
b
• C.
a
r+
1, i'..,.4,.
P•"I 'P.. 4,PYt 1 •-,41.. '':i1/•`:,
',.....2"
L'•• .1 ..,„, •
: :i %••••••:`
,, \ .- P'••• ?••'''
.1 ..,0 ,0•,..; ;• r
'tr.
''10• '77 ,.,
.0,1,•,.. '',.!...:,E•';'''': "
•4::• ,,,•
%.,. ,z•.: :.','"
-.......
,
\Nilo.. ..
.. - .11111k‘
1"....
e•,•,,''... z. :''.§.,.. ..,.
,.. •••••4.; ,,s, ', .-.0-7,, •ar.4.7214 -
r.ex -417
?••
1"", •.47 .I.7 )1''Zi•
„...... %,.$ 7:
t IL
•‘, .MACLEARNSBEItRY5 Inc.
Olympic Resource Management
• -",..i.,.... : ..'"'
) 1,43,11C1 SIII'VeT070° CiVil Ellgi-310Cr5 0 PlarLnitT5
159 Wya.tt Way NE 13ainbridgc laland, WA 98110 Teal Lake Village
( Lot 91, Plan 4L
1%. or pitonc; (206) 642-5514 Eaclimilk: (2061780-2,406 DRAWN 3Y e Am DATE ,-...
ut,TOBER 24, 2000 4;18 P4C 97064
..1%,....sni,d# corEcKED BY ,.:•
Do AM scALE 1- - 20' INtf T 1 cr 1
NNW
. (A Ran' 0-01 -()
-
BUILDING PERMIT APPLICATION
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00709 Received Date: 10/26/2000
SITE ADDRESS: 112 CLEAR VIEW PL
PORT LUDLOW, 98365
APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC
781 WALKER WAY PHONE: (360)437-2101
PORT LUDLOW WA 98365
SUBDIVISION: TEAL LAKE VILLAGE
Block: Lot: 91
PARCEL NUMBER: 998700091
Section: 21 Township: 28 N Range: 01 E
CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC
781 WALKER WAY PHONE: (360)437-2101
PORT LUDLOW WA 98365
Contractor's License OLYMPRE010M8 Expires 07/01/2001
ARCHITECT/
ENGINEER :
PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION 130,311.00 MAIN: 2,204
CODE EDITION: 1997 ADD'L: HEAT TYPE: HTP
OCCUPANCY: R-3 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: # OF STORIES: 1
CONST TYPE: 5N OTHER:
CONST TYPE: GARAGE: 592 SHORELINE:
DECK: 240 SETBACK:
SEWAGE DISPOSAL: SEW BANK HEIGHT:
WATER SYSTEM: LUDLOW �p�` S-�
BEDROOMS: BATHROOMS: PARCEL TAGS: YES NO
STORMWATER: YES )< NO A EA Exist: Exist: Wetland rib Erosion
Prop: 2 Prop:
Seismic tiJ a Streams L
Total:
Total: 2Flood Way J Flood Plane
Routing Date: 'o/2. 7/00 F&W G fJaL/ Landslide
Shoreline � 0 Aquifer
Forest: Commercial NO Rural
Type Amount Paid By: Date: �rRecetlpt: �laoveoo aeons i
Permit pp� d� �,
;41*411034_,,,a 7ari?
$1,167.35 MAM 10/26/00 34760 � � V'
State Building Code $4.50 MAM 10/26/00 34760 `��
Potable Water Application
,
$30.00 MAM 10/26/00 34760cy --�.
Total: $1,201.85 k tr: &_ :ei
is\F_BLD_App_Bld.rpt `fe70
10/29/99
Jefferson County Department of Community Development October 31, 2000
621 Sheridan Street, Port Townsend, WA 98368
(360) 379-4450
CRITICAL AREA STANDARD WAIVER
Applicant: OLYMPIC REAL ESTATE DEVLOP LLC
781 WALKER WAY
PORT LUDLOW WA 98365
Critical Area Review Case Number: CAR00-00470
Project Description: SFR w/attached garage
Parcel Number: 998700091 S-T-R: 21-28N-01E
Site Address: 112 CLEAR VIEW PL
PORT LUDLOW WA, 98365
FINDING: The development, as proposed and portrayed on the Universal Plot Plan, does not encroach on
an identified critical area nor any associated buffers.
CONCLUSION: The proposed development meets the waiver requirements established in Jefferson County
Ordinance 05-0509-94.
CONDITION: The development shall be as pr,�..sed and portrayed on the Universal Plot Plan. Deviation,
additions or relocation of propos- •evelopment activities will require further review pursuant to
the Jefferson County Critica = ea. S rdinance.
ei/t/‘
11(.)AAC-'••-,
Department of Community Development Staff
c: File
I:\F_CAR_Waiver_Standrd.rpt 12/13/99
6
JEFFERSON COUNTY
STORMWATER MANAGEMENT ORDINANCE
SMALL PARCEL EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL WORKSHEET
Property Owner: Olympic Real Estate Dev. , LLC Telephone: (360) 437-2101
Address: 781 Walker Way, Port Ludlow, WA 98365
Assessor's Parcel Number: 99 -)OC o9 ,
Building Permit or Septic Permit Application Number(if applicable):
Brief Project Description:
New Single Family Residence with Attached Garage.
Site Location: C\e o.c Q AtSL
Person Responsible for BMP Installation and Maintenance: Jeff Evanger
Address: 781 Walker Way, Port Ludlow, WA 98365
Telephone: (360) 437-2101
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads.
Please check the measures you plan to implement and show their approximate location on the site
plan. You may also propose measures other than those listed. Attach additional sheets, if more
space is required.
( ) Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
[ 1 Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas, landslide or erosion hazard area, etc.).
•
EROSION AND SEDIMENT CONTROL WORKSHEET
[ ] Phase clearing so that only areas that are actively being worked are uncovered.
[ ] Start and complete land disturbing activities and stabilize the site between April 1 and
September 30. Stabilization means that disturbed areas will have well-established plant
cover or be landscaped to minimize erosion.
�] Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
[ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[ ] Place gravel base on roads, driveways, and parking areas after clearing and subgrade
preparation.
Pq Protect adjacent properties and water bodies from sediment deposition:
[ ] Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies. (See attached illustrations from Stormwater Management Manual.)
[ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration from
Stormwater Management Manual.)
[i Regularly inspect and maintain all BMPs especially after storms events.
[ ] Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
Site is very flat with sandy soils. So I believe the above measures
will be sufficient.
•
EROSION AND SEDIMENT CONTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabilized (seeded, landscaped, apply gravel base
to roadways, etc.)
Areas that are disturbed will be landscaped with natural type
veg. tation and lawn to property line.
3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate, dry well, infiltration trench, route runoff to existing drainage facilities, etc.).
All impervious surfaces will be run to roof drains and/or catch
basins as designed into the plat requirements.
4
a
EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices. Describe proposed maintenance of BMPs.
After excavation the soil piles will be covered and silt fence will
be installed. Silt fence will be left in place until we are ready to
landscape and all roof drains/catch basins are in. Landscaping will be
installed as early as possible on the exterior of the building when all
exterior concrete work is completed.
The Best Management Practices proposed above will be implemented to control erosion, sediment, and
stormwa . I wi notify the Permit Center for inspections as requi
_.______t
1 7 1 /7 , ,/
AIL-
,
Signature of Owner/Agent 7 ) Date
(Jeff Evanger)