HomeMy WebLinkAboutBLD2000-00714 BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
(360)379-4450 FAX(360)379-4451 (800) 831-2678
PERMIT #: BLD00-00714 Received Date 10/30/2000
SITE ADDRESS: 2828 HASTINGS AVE W Issue Date 11/8/2000
PORT TOWNSEND, 98368 Expiration Date 11/8/2001
APPLICANT: BRYAN HAYES PHONE: (360)379-8755
PO BOX 1014
PORT TOWNSEND WA 98368
SUBDIVISION: HASTINGS MILL SHORT PLAT Block: Lot: 4
PARCEL NUMBER: 001053033 Section: 5 Township: 30 N Range: 01 W
CONTRACTOR: OWNER PHONE:
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION GARAGE/ BARN
REQUIRED INSPECTIONS:
� /
[ 9�'. Footings/Setbacks (Shoreline Setbacks) f th
Foundation: orC &l -c&2' �
[s, nderground Plumbing/Underground Insula :PAO,AIYT Mfrw< 9it 127/2/6/1
[ [ Shear Wall: f /z/6,/ . ��c P,.�T
pe!,erc4,„0,,,,,--„, P���.
[ ] Propane Tank/Lines: /
[ ] Sheetrock:
] Final/Occupancy Approval
HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION.
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
Inspector's Phone Hours 8:00 a.m. - 9:00 a.m.
SPECIAL CONDITIONS MAY APPLY - SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
•
410
BUILDING PERMIT APPLICA!ON
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00714 Received Date: 10/30/2000
SITE ADDRESS: 2828 HASTINGS AVE W
PORT TOWNSEND, 98368
APPLICANT: BRYAN HAYES PHONE: (360)379-8755
PO BOX 1014
PORT TOWNSEND WA 98368
SUBDIVISION: HASTINGS MILL SHORT PLAT Block: Lot: 4
PARCEL NUMBER: 001053033 Section: 5 Township: 30 N Range: 01 W
CONTRACTOR: OWNER PHONE:
ARCH ITECT/
ENGINEER :
PROJECT DESCRIPTION: GARAGE / BARN 11/5Fif w r6','// z1 tD 3e3p
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 840
VALUATION 22,400.00 ADD'L: 560 HEAT TYPE: UH
CODE EDITION: 1997 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: GARAGE: 840 SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL:
WATER SYSTEM:
PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: Prop: Seismic Streams
Total: Total: Flood Way Flood Plane
R
F&W Landslide
Routing Date:
(U 3/2.000 P Shoreline Aquifer
Forest: Commercial Rural
Type Amount Paid By: Date: —PrReceipt:lti'Iat C;�i6dltlons
rove ate
Permit $363.25 MAM 10/30/00 34622 A P R O V E
Plan Check $108.97 MAM 10/30/00 34622 r
State Building Code $4.50 MAM 10/30/00 34622 NOV 8 ZI,i!I
Total: $476.72
Jefferson County Planning
& Building Department
is\F_BLD_App_Bld.rpt 10/29/99
(...--,?..SON--6>o��
JEFFERSON COUNTY
'.4 DEPARTMENT OF COMMUNITY DEVELOPMENT
ti .. �C
.., , 621 Sheridan Street • Por, Townsend • Washington 98368
�`S'�NCs`S' 360 - 450 • :.0 831<`2 78 • 0/37 -4d .1 Fa.
ifteitaismaioritialli
U ! P T ICATION
Pro'ect Descri tion:
1 Building Type: Project Type: Frame T .e: 71 .
Single Family New 'ood
. "IP
, - Garage Attache Detached Addition Steel
Modular teranon/Remod - Concrete
Commercial Repair Masonry
Multi-family/#of Units Demolition Other:
Industrial
il Other:
Bedrooms: Bathrooms: Type of Sewage Disposal: r/ Type of Heat:
Choose one: IV
Existing: Existing: Sewer _ Community System - 7 ElectricityOil
Proposed: Proposed: Individual System oodstove 1...-1;r6pane
Total: Total: If not sewer,fill out the following:V _ Heat Pump
Conventional .: Alternative '7 A ' Other
Permit# SEP
Water Supply:
-_ Private well Two Party Well _ Public:Name of water system:
SquareI.
• _ For Office Use Only
Main •• Si++ 11( 7K-7y UBC OCCUPANCY GR UP > VIE Floor .Th
• . Base fee �j(,3Z ��?�7S^ �4:,e)• -0
Floor Plan Check fee 1 Ugh •�t 3 I.e 8 U+ 1
' State Surcharge fee , V
Unhtd Basement Subtotal I,2-0 7 • 1p{o
Garage/Carport ♦ C- , • 'J r Pot Water Review fee
Decks911/Rd Approach fee •� G
Comtnercial TOTAL G 2- • (v
IndustrialReceipt# $55 C
Other
co h/Check# q So
Total • Otials Pl
z-F3
Or Date C:,l t StO 1
Estimated Cost:
If within 200' of the Shoreline,
Distance to Bank or Ordinary High Water Mark ft. Bank Height ft.
J
13c signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. .Any matenal falsehood or any
omission of a matenal fact made by the applicant/owner with respect to this application packet may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue
agiunst Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of• try to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections.
Access and right of en >the applicant's p operty or structure shall be requested and shall occur during regular business hours.
e �r
Signature: Date: o l 5—�1,/
1 l:l-IOME\PLN :N'l'R NFOBI,) ;\F R'AIS\BLDpermitApplicationl/2000
„.--,,,---4. • Car- &° — 0<-31- -- -"2,,
{
BUILDING
PERMIT APPLICATION
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT#: BLD00-00714 Received Date: 10/30/2000
SITE ADDRESS: 2828 HASTINGS AVE W
PORT TOWNSEND, 98368
APPLICANT: BRYAN HAYES PHONE:
PO BOX 1014 (360 379-8755
PORT TOWNSEND WA 98368
SUBDIVISION: HASTINGS MILL SHORT PLAT Block:
PARCEL NUMBER: 001053033 Section: 5 Township: 30 N Range: 01 W t: 4
CONTRACTOR: OWNER
PHONE:
ARCHITECT/
ENGINEER :
PROJECT DESCRIPTION: GARAGE / BARN
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION 22,400.00 MAIN: 840
CODE EDITION: 1997 ADD'L: 560 HEAT TYPE: UH
OCCUPANCY: HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
CONST TYPE: OTHER:
CONST TYPE: GARAGE: 840 SHORELINE:
DECK: SETBACK:
elp.i.2
SEWAGE DISPOSAL: BANK H
WATER SYSTEM:
BEDROOMS: BATHROOMS: PARCEL TAG E NO
STORMW : YES NO AREA
Exist:
Exist: Wetland rosion
Prop: Prop: y� f
Total: k
Seismic Streams �f Y
Total: Flood Way Flood Plane
it(
Routing Date: F&W Landslide
U 3//2c7 � Shoreline �4quifer
Forest: Commercial U Rural 1)
Type
Permit
Plan Check
'r4xlml V
Amountoo 1
Paid By: Date: Receipt: Apploved�a eons
$363.25 MAM 10/30/00 34622
$108.97 MAM 10/30/00 34622 1JC ',�
State Building Code $4.50 MAM 10/30/00 34622 '
Total: $476.72 -
It 2
. r ti i "971,S,...'
ReW 4 I . .--';.-w- . ' ' I
t
�BLDA ��
_ PP_Bld.rpt 7/4.
i:
10/29/99
pi
•
CA P-00
JE1r ERSON COUNTY
STORMWATER MANAGEMENT ORDINANCE
SMALL PARCEL EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL WORKSHEET
Property Owner: %Li.("r
Telephone., -
Address: "(--
Assessor's
"r 3
Parcel Number:_
Building Permit or Septic Permit Application Number(if applicable):
Brief Project Description: I
Site Location:
yr .
Person Responsible for BMP Installation and Maintenance:
Address:
Telephone: ` -
I. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or rows.
Please check the measures you plan to implement and show their approximate location on the site
plan. You may also propose measures other than those listed. Attach additional sheets, if more
space is required.
-] Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Liana ement Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas, landslide or erosion hazard area, etc.).
9
Pir •
EROSION AND SEDIMENT CONTROL WORKSHEET
[ ) Phase clearing so that only areas that are actively being worked are uncovered.
[ ] Start and complete land disturbing activities and stabilize the site between April 1 and
September 30. Stabilization means that disturbed areas will have well-established plant
cover or be landscaped to minimize erosion.
•
[) Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April 1 and September 30.
] Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and Iocate away from water bodies, rods,
and property lines.
[-Place gravel base on roads, driveways, and parking areas after clearing and subgrade
preparation.
[) Protect adjacent properties and water bodies from sediment deposition:
[.] Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it Ieaves the project site or enters
water bodies. (See attached illustrations from Stormwater Management Manual.)
] Install a filter fence down slope from areas of land disturbing activity to filter runoff
before it leaves the project site or enters water bodies. (See attached illustration foam
Stormwater Management Manual.)
[v) Regularly inspect and maintain all BMPs especially after storms events.
[) Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
10
• 110
EROSION AND SEDIMENT CONTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabilized (seeded, landscaped, apply gravel base
to roadways, etc.)
h 1b `t
r.y
3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate, dry well, infiltration trench, route runoff to existing drainage facilities, etc.).
11
• S
EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices. Describe proposed maintenance of BMPs.
"f- , - . .,
,, , ,,'? -,1-[ (
�: %'X (✓_ - ' ' ' �_f �.,/ ' " �• .,c
( ' ...
J
j
f ^'a7 { '
t r 1�` ' �,`` .y
The Best Management Practices proposed above will be implemented to control erosion, sediment, and
stormwater runoff. I will notify the Permit Center for inspections as required.
Signature of Owner/Agent Daf#e
12
•
ts'
00E'
'11
41)
2) t
, .
\,) \ _
(
C57)
rsk
/ fr
•
yvvo
1' J
ID ,
tO
ti
"CIr-
I
4k Q o
stay , o N
di q p., 00 0 0
0 a.; 0 0 k 0 _0 -0 -0
aU - U on -0 • .. 0.., W 0, a
illt M M-1 Fq
O
v _
o ro .
Y
N
>1
1- 0 0 Y a; ..
r
cu
U b b IP i I.
cu
o
, N x
o ` a.)'
° can
(c-rtY � o a �; o O. C
o v a, -) bn
4rr � {J -a� u c� W
3-4 g \• H
yy,,c,,
`y C714`� � a �V •v i +-+�, „ ^d r 11111
� p
a. a a) 0.) da y ov b -1 et d
� to on�A p O, ot , z ,.o Li
A
to i
•
Li) �, r ----- SNJVH13S
W 9 < f
s 1 D
Q R1
n W
Z q O
n to `4 z
O O OH -I
o
4.3
F CC J
W
n_
0 A Ce J
3 L.)
W J
> o..
H \ Q
O c�
W Z
W
I. � o W 7 W
N Z Q - '-+ liCJ A Q O
0
y��d a VO�L I-
`e,s
/PbOc1 N
0o
J
"O
.......`..' ...; z
Z w
...re
Q too
J .0
0.. d
a to
4 O 'o d
a (o 4-
Z to c
c d
H CL o
0 co
0O Q C E
N
J
T
3/v 4/0 x 3/0 f
L7771,1"
N it
4 I / FEN i0 E �JW
O L w,-\
Kip
it
,i,
..
31
REVISED da
*—.-9-1(
/o x ' z) / x
tea„ M1;
l u I
—T—
u p
-14
I
ij OS
A
1, fj [- lot, 1, #" p"
It-
0