HomeMy WebLinkAboutBLD2000-00524 BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451 (800) 831-2678
PERMIT #: BLD00-00524 Received Date 08/9/2000
SITE ADDRESS: 380 ADELMA BEACH RD Issue Date 09/15/2000
PORT TOWNSEND, 98368 Expiration Date 09/15/2001
APPLICANT: RONALD COHEN PHONE: (425)865-9787
PERLAS SAPIDA
16709 SE 31ST ST
BELLEVUE WA 98008-5720
SUBDIVISION: Block: Lot: T G1
PARCEL NUMBER: 001324046 Section: 32 Township: 30 N Range: 01 W
CONTRACTOR: DISCOVERY BAY CONST CO INC PHONE: 385-4372
PO BOX 1410
PORT TOWNSEND WA 98368
Contractor's License: DISCOBC090B9 Expires: 08/12/2001
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION STAIRS TO THE BEACH
REQUIRED INSPECTIONS:
[ ] Footings/Setbacks (Shoreline Setbacks):
[ ] Foundation:
[ ] Underground Plumbing/Underground Insulation:
[ ] Shear Wall:
/PI u m bin g: (Pz 72' cLo R72 7/C)A,7 i/;ee%r' 44(ri,
[ ] Propane Tank/Lines:
[ ] Insulation:
[ ] Sheetrock:
C
[t.] CrE�uta7LDecupancy Approval: /C / f/llC', e
HEALTH DEPARTMENT APPROVAL REQUIRED PRI' R TO FINAL INSPECTION.
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTION
Office Hours 9:00 a.m. -4:30 p.m.
Inspector's Phone Hours 8:00 a.m. - 9:00 a.m.
SPECIAL CONDITIONS MAY APPLY - SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
7.) Prior to construction, the proponent shall contact the Jefferson County Department of
Community Development at(360) 379-4466 with estimated project timelines for
monitoring and plan compliance.
8.) F-ior to the onset of construction, the applicant shall provide the Department of
C;}mmunity Development with the name and address of the contractor carrying out the
project.
9.) In order to limit the proliferation of similar stair structures in Discovery Bay, the applicant is
strongly encouraged to investigate utilizing this structure as a joint use/joint ownership
facility with neighboring property owners.
4
4
is\F_BLD_Permit_Buildng.rpt 10/29/99
SPECIAL CONDITIONS FOR CASE BLD00-00524
1.) Prior to issuance of the Jefferson County Building Permit and Jefferson County Sewage
Disposal Permit, the applicant will be required to sign a waiver, "Findings and Conditions
of Approval"which will require the following:
a. The applicant shall develop and submit to the Permit Center for approval a "Small
Parcel Erosion and Sediment Control Plan". Once the subject permit has been issued,
the applicant shall fully implement the provisions of the submitted "Small Parcel Erosion
and Sediment Control Plan."A final building inspection will not be performed until the
Permit Center verifies plan compliance.
b. Authorized clearing for the proposal shall be the minimum necessary to accomplish the
project.
c. A vegetative buffer of 30 feet shall be permanently maintained from the top or edge of
the landslide hazard area. All buffers shall be measured perpendicularly from the top of
the landslide hazard area.
d. All construction activities, including the storage and preparation of materials, shall not
encroach upon the designated geologically hazardous area, or its associated buffer.
e. A thirty-foot buffer area consisting of native vegetation shall be required along the top
of the shoreline bank. Prior to final building inspection, Development Review staff shall
inspect this thirty-foot buffer area to assure this condition has been met. Please phone
360-379-4450 to arrange the inspection.
f. Once established, the landslide hazard area buffer shall be retained in its natural
condition. Minor pruning of vegetation to enhance views may be permitted by the
Administrator on a case-by-case basis.
g. Landslide hazard areas and their associated buffers shall remain naturally vegetated.
Should buffer disturbance occur during construction, replanting with native vegetation
shall be required by the Critical Areas Administrator.
h. Surface drainage shall not be directed across the face of a marine bluff, landslide
hazard or ravine.
i. Residential structures shall not exceed thirty-five (35) feet in height.
j. The applicant shall carry out stair/path construction consistent with the mitigative
measures detailed in-the General Recommendations section of the geotechnical report
authored by Jane N. Myers, P.E. of Myers Biodynamics, Inc. and entitled "Slope
Evaluation, Cohen-Sapida Property-Adelma Beach Road, Jefferson County,
Washington."
2.) Proper disposal of construction debris must be on land in such a manner that debris
cannot enter the water body or cause water quality degradation of state waters.
3.) In order to minimize visual impact, the staircase shall be constructed to harmonize with
the local shoreline environment to the maximum extent practicable. The structure shall be
constructed of wooden material which will weather and blend with the existing shoreline
bank and can be painted, if necessary, to further minimize visual impact.
4.) Construction shall be in substantial compliance with the site plan submitted to Jefferson
County on January 10, 2000 and dated December 27, 1999 (Log Item#15) as it exists
now or is hereafter amended by Jefferson County and/or the Department of Ecology.
5.) No fill or other material may be placed in the waters or intertidal areas of Jefferson
County.
6.) Work within the jurisdiction of the Shoreline Program other than as described above shall
receive separate review from this office.
! ,
BUILDING PERMIT APPLICATION
Jefferson County Department of Community Development •
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00524 Received Date: 8/9/2000
SITE ADDRESS: ADEMLA BEACH RD
PORT TOWNSEND, 98368
APPLICANT: RONALD COHEN PHONE: (425)865-9787
PERLAS SAPIDA
16709 SE 31ST ST
BELLEVUE WA 98008-5720
SUBDIVISION: Block: Lot:
PARCEL NUMBER: 001324046 Section: 32 Township: 30 N Range: 01 W
CONTRACTOR: DISCOVERY BAY CONST CO INC PHONE: 385-4372
PO BOX 1410
PORT TOWNSEND WA 98368
Contractor's License DISCOBCO90B9 Expires 08/12/2000
ARCHITECT/ JIM REPLINGER
ENGINEER : 10456 BEACH CREST DR
BAINBRIDGE ISLAND WA 983110
PROJECT DESCRIPTION: STAIRS TO THE BEACH
TYPE OF WORK NON SQUARE FOOTAGE:
TYPE OF IMP DEK MAIN:
VALUATION 10,000.00 ADD'L: HEAT TYPE: UH
CODE EDITION: 1997 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: GARAGE: SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: PUD PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: Prop: Seismic Streams
Total: Total: Flood Way Flood Plane
F&W Landslide
Routing Date: Shoreline Aquifer
Forest: Commercial Rural
' )-'r xim.ity - Plat Co tlons
Type Amount Paid By: Date: Receipt: Ap rove ate
Permit $181.25 MAM 08/09/00 32298 AF R
Plan Check $54.38 MAM 08/09/00 32298 S __ Li
State Building Code $4.50 MAM 08/09/00 32298 SEP 1 S MOO
Total: $240.13
Jefferson County>✓"aurining
Sr Builtruk- L)mrtn:eni
is\F_BLD_App_Bld.rpt 10/29/99
Jefferson County Department of Comnuity DeYebpment
¢SIN `°� 621 Sheridan Street.Port Townsend WA 88368[360]378-4450
;41 '`fie ''a o
perm [ lz
S G` App[i - cul, , on
Project Description: Nay 4fAyaw y I N K, Aralhf J4 ?n4 nano s�Y/path', 12 L ?ih
Building Type: 7 Project Type: Frame Type:
Single Family jC New X Wood
Garage Attached/Detached = Addition = Steel
Modular 2 Alteration/Remodel = Concrete
Commercial = Repair = Masonry
Multi-family/.#of Units = Demolition = Other.
Industrial
Other. 41 !YS 112 le2/>h
Bedrooms: Bathrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: C2 Existing: d Sewer -Community System c Electricity = Oil
Proposed: O Proposed: a X Individual System Woodstove = Propane
Total: Total: 0
If not sewer,fill out the following: i Heat Pump
,Conventional = Alternative ) Other Ghhr-ateif•
Permit # SEP 98-ccr '
Water Supply: �/�
Private well ll ✓i)Two Party We Public:Name of water system: f .
Square Footage: I For Office Use Only
Main Floor UBC OCCUPANCY GROUP
` 2ND Floor Base fee _ (e1 1,Z5
3r Flcor Plan Check fee C54 ., 3%
Htd Basement State Surcharge fee 17
Unhtd Basement Subtotal 2•4o.13
Garage/Carport Pot Water Review fee - '�
Decks 911/Rd Approach fee 51 d J
Commercial TOTAL 2.9 ) • 13 .
Industrial Receipt # 3 ZZ`1 S
Other Cash/Check # totSG"1
T )tal Valuation: - Initials \ e" — --_
Or Date %•C'1 • C)t)
Estimated Cost: /Of LVIJ
_ I
If within 200' o the Shoreline,
Distance to Bank or Ordinary High Water Mark ft. Bank Height ft.
By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any
omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void.
I further..giee to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court cons,reasonable attomev's fees and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of the ganting of this permit.
I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections.
Access and right of en to the applicant's property or structure shall be requested and shall occur during regular business hours. � y�
Signa Date: 9 &v $1 ''��yW
Jefferson County Department of Community Development
.
z ON cOG 621 Sheridan Street,Port Townsend WA 98368 (360) 379-4450
Universal Plot Plan
`�ShrTNCs`t
Fill in the following blanks as completely as possible:
Project Description: 411401v4u GI raw driveway/new draft:field, aria 8 new 51-alr/Pat'hWay frill
Of I1 bank down tr a point- i- I2hd wa,-d of 1176 ar4may hi:h Water Ilia.
9 Digit Parcel Identification Number (from your tax statement): 001-324_of' k POl—31¢Ofb
Site Address
911#: 43 (W4deima $each P.09d) Road Name: Adam tezh RD24 Zip Code:
Legal Description
Subdivision Name: Block: Lot(s):
Section: 3// Township: 30 N Range: / W
Parcel Size (acres or square footage):
Property Owner: p.°R (Drell & (erIa 5;fida Phone: /4\ _ T7g7
Mailing Address: 167aA 31 Sr !>1-ree / l e,VVe f WA' /ej OS /
Applicant/Occupant: / Phone:
(if different from owner) Come, as g}vV,e)
Mailing Address:
Authorized Rep: AiRP-�Il nor Phone:C ') 6414
Mailing Address: 1a5-4 AGachaoft Drtvel Bainbri4o Island, Wk °f 'I/O
General Contractor:
Or Manufactured Home Installer: PI SCIA !Bay Constrvet i
on Gompfy1Inc• Phone: (3�)3.95--4- 2
Mailing Address: '1M b W;2IerSt: cv1t&A- / To Box 14-0 Port Thwlln_. /sen f /Wfr 15.s68
Contractor's State License Number: piSGOSG0,
60
$1
Expiration Date:
Septic Designer: mph
WI/son Phone:
Mailing Address:
Architect:/Engineer: orY1e 95 i(tt tnWw Ifle
8bo . Phone:
Mailing Address:
Loan Lender/General Phone:
Contractor's Bond Holder:
Mailing Address:
FOR OFFICE USE ONLY
Fire District: Planning Area: School District: Zone:
1/00 H:\home\pincntr\forams\universal plot plan
., . .
BUILDING PERMIT APPLICATION
� . Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD00-00524 Received Date: 8/9/2000
SITE ADDRESS: '..ADEMLA BEACH RD
PORT TOWNSEND, 98368
APPLICANT: RONALD COHEN PHONE: (425)865-9787
1 PERLAS SAPIDA
16709 SE 31ST ST
BELLEVUE WA 98008-5720
SUBDIVISION: Block: Lot:
PARCEL NUMBER: 001324046 Section: 32 Township: 30 N Range: 01 W
CONTRACTOR: DISCOVERY BAY CONST CO INC PHONE: 385-4372
PO BOX 1410
PORT TOWNSEND WA 98368
Contractor's License DISCOBC090B9 Expires 08/12/2000
ARCHITECT/ JIM REPLINGER
ENGINEER : 10456 BEACH CREST DR
BAINBRIDGE ISLAND WA 983110
PROJECT DESCRIPTION: STAIRS TO THE BEACH
TYPE OF WORK NON SQUARE FOOTAGE:
TYPE OF IMP DEK ,(
VALUATION 10,000.00
ADD'
/ \
'
CODE EDITION: 1997 L• HEAT TYPE: UH /i n
OCCUPANCY: HEAT BASE: HEAT TYPE: ,/
OCCUPANCY: UNHEATED: # OF STORIES:
OTHER: (l
CONST TYPE: SHORELINE: �(�
CONST TYPE: GARAGE:
DECK: SETBACK:
SEWAGE DISPOSAL: CON BANK HEIGHT:
WATER SYSTEM: PUD ~'
PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMW TER: YES NO AREA
Exist: Exist: Wetland Pr:, `(I L. ,Erosion
Prop: Prop: Seismic , r 5 Streams
Total: Total: Flood Way Flood Plane
Routing Date: F&W Landslide t
Shoreline i • _,..___ Aquifer
Forest: Commercial Rural ,
Type )-'r xlm,ityv Plat C...tons YP Amount Paid By: Date: teceipt: Appr e• , ,l
.
Permit $181.25 MAM 08/09/00 32298 '''p/ fir-(/
�
' ICA
Plan Check $54.38 MAM 08/09/00 32298 °'
State Building Code $4.50 MAM 08/09/00 32298C)' '.
k . ,
toTotal: $240.13
9ke -'' - i 0'
s ,04,
r„.-A>
i:1F_BLD_App_Bld.rpt 10/29/99
•
Jefferson County Department of Community Development August 17, 2000
621 Sheridan Street, Port Townsend, WA 98368
' (360) 379-4450
CRITICAL AREA STANDARD WAIVER
Applicant: RONALD COHEN
PERLAS SAPIDA
16709 SE 31ST ST
BELLEVUE WA 98008-5720
Critical Area Review Case Number: CAR00-00364
Project Description: stairs to the beach
Parcel Number. 001324046 S-T-R: 32-30N-01 W
Site Address: 380 ADELMA BEACH RD
PORT TOWNSEND WA, 98368
FINDING: The development, as proposed and portrayed on the Universal Plot Plan, does not encroach on
an identified critical area nor any associated buffers.
CONCLUSION: The proposed development meets the waiver requirements established in Jefferson County
Ordinance 05-0509-94.
CONDITION: The development shall be as proposed and portrayed on the Universal Plot Plan. Deviation,
additions or relocation of proposed development activities will require further review pursuant to
the Jefferson Cou Critical Areas Ordinance.
'fit' 1;
D partment of Community Development Staff
c: File
I:\F_CAR_Waiver_Standrd.rpt 12/13/99
s
.
Svr"rz"
•
JEFFERSON COUNTY
SUBSTANTIAL DEVELOPMENT PERMIT
WASHINGTON STATE SHORELINE MANAGEMENT ACT(RCW 90.58)
PROPONENT: RONALD COHEN
16709 SE 31ST STREET
BELLEVUE WA 98008-5720
DATE ISSUED: May 10, 2000
DATE EXPIRES: May 10, 2002
CASE NUMBER: SDP00-00002
PROJECT DESCRIPTION: The proposal involves the construction of a garage with dwelling unit above, a new
driveway and drainfield, and the installation of a path from the top of the bank down to a point just landward of the
ordinary high water mark. The pathway to the beach will be built at grade, with stairs built into the bank at the
steepest locations only. This project is exempt from review under the State Environmental Policy Act (SEPA)
pursuant to WAC 197-11-800(1)(i) and WAC 197-11-800(2)(d).
PROJECT LOCATION: Parcel numbers 001 324 040 & 001 324 046, Section 32, Township 30 North, Range 1
West, WM at Adelma Beach Road, Port Townsend,WA 98368.
WATERBODY AND/OR ASSOCIATED WETLANDS: DISCOVERY BAY
SHORELINE OF STATE-WIDE SIGNIFICANCE:
SHORELINE DESIGNATION:
Development pursuant to this permit shall be undertaken subject to the applicable policies and performance
standards of the Jefferson County Shoreline Management Master Program and the following conditions:
1.) Prior to issuance of the Jefferson County Building Permit and Jefferson County Sewage Disposal Permit, the
applicant will be required to sign a waiver, "Findings and Conditions of Approval" which will require the
following:
a. The applicant shall develop and submit to the Permit Center for approval a "Small Parcel Erosion and
Sediment Control Plan". Once the subject permit has been issued, the applicant shall fully implement the
provisions of the submitted "Small Parcel Erosion and Sediment Control Plan." A final building inspection will
not be performed until the Permit Center verifies plan compliance.
b. Authorized clearing for the proposal shall be the minimum necessary to accomplish the project.
c. A vegetative buffer of 30 feet shall be permanently maintained from the top or edge of the landslide hazard
area. All buffers shall be measured perpendicularly from the top of the landslide hazard area.
d. All construction activities, including the storage and preparation of materials, shall not encroach upon the
designated geologically hazardous area, or its associated buffer.
e. A thirty-foot buffer area consisting of native vegetation shall be required along the top of the shoreline bank.
Prior to final building inspection, Development Review staff shall inspect this thirty-foot buffer area to assure
this condition has been met. Please phone 360-379-4450 to arrange the inspection.
f. Once established, the landslide hazard area buffer shall be retained in its natural condition. Minor pruning of
vegetation to enhance views may be permitted by the Administrator on a case-by-case basis.
g. Landslide hazard areas and their associated buffers shall remain naturally vegetated. Should buffer
disturbance occur during construction, replanting with native vegetation shall be required by the Critical Areas
Administrator.
h. Surface drainage shall not be directed across the face of a marine bluff, landslide hazard or ravine.
i. Residential structures shall not exceed thirty-five (35)feet in height.
j. The applicant shall carry out stair/path construction consistent with the mitigative measures detailed in- the
General Recommendations section of the geotechnical report authored by Jane N. Myers, P.E. of Myers
Biodynamics, Inc. and entitled "Slope Evaluation, Cohen-Sapida Property - Adelma Beach Road, Jefferson
County, Washington."
2.) Proper disposal of construction debris must be on land in such a manner that debris cannot enter the water
body or cause water quality degradation of state waters.
3.) In order to minimize visual impact, the staircase shall be constructed to harmonize with the local shoreline
environment to the maximum extent practicable. The structure shall be constructed of wooden material which
will weather and blend with the existing shoreline bank and can be painted, if necessary, to further minimize
visual impact.
4.) Construction shall be in substantial compliance with the site plan submitted to Jefferson County on January 10,
2000 and dated December 27, 1999 (Log Item #15) as it exists now or is hereafter amended by Jefferson
County and/or the Department of Ecology.
5.) No fill or other material may be placed in the waters or intertidal areas of Jefferson County.
6.) Work within the jurisdiction of the Shoreline Program other than as described above shall receive separate
review from this office.
7.) Prior to construction, the proponent shall contact the Jefferson County Department of Community Development
at(360) 379-4464 with estimated project timelines for monitoring and plan compliance.
8.) Prior to the onset of construction, the applicant shall provide the Department of Community Development with
the name and address of the contractor carrying out the project.
9.) In order to limit the proliferation of similar stair structures in Discovery Bay, the applicant is strongly encouraged
to investigate utilizing this structure as a joint use/joint ownership facility with neighboring property owners.
NOTICE:
1. This permit may be rescinded by the Jefferson County Hearing Examiner or the Washington State Shorelines
Hearings Board upon finding that the permittee has not complied with the conditions herein, pursuant to RCW
90.58.140(8).
2. The permittee is liable for all damages to public and private property arising from violation of any provisions of
the permit hereby granted, including the cost of restoring the affected area to its condition prior to violation and
possible court costs that may ensue from violation, pursuant to RCW 90.58.230.
3. Construction pursuant to this permit will not begin nor is it authorized until twenty-one (21) days from the date
of filing as defined in RCW 90.58.140(5)(6) and WAC 173-14-090 or until all review proceedings initiated within
twenty-one days from the date of such filing have terminated, except as provided in RCW 90.58.140(5a-c).
Construction or substantial progress toward construction of the permitted development shall begin within two (2)
years from the date of this permit and completion of the permitted development shall be accomplished within five
(5) years from the date of this permit.
4. Nothing in this permit shall excuse the permittee from complying with any other federal, state, or local statutes,
ordinances, or regulations applicable to this project, but consistent with RCW 90.58.
Cr-
Department oft--Zommunity Development Staff
c: Jeffree Stewart, DOE, Shorelands Office
WA State Attorney General
is\F_SDP_Approval_Ltr.rpt 8/14/00
...
\ . .
i--
001 iiliige 4141-114-V
-..
kl.
x.---
• 16ey WO/
Z
IA ,14 1
- %
sts
_
1 - IllI 41 kX1
\ 'A
ci
2
_ ‘
A
3... \
(----). 1
> -
ciA .
- - - 1
.A .
-›.-
- .x.. .
---A,
il-,47
- 2
-6- ,....._.
V,Sib
Ii.I eci
\ ill
3 41 -•
1-41 Z A-
___ __-----
- _
,--
$
t),
-4.
_ , ..
--4-.
,-, -At 1--
1,... Ir.
1 tz i- ,-
1----.
•( —›.-- 1 t -. . &,t_'.
..... ,s,
. ti.
..i
cc,
K,..
Icc'
..____ _____ _ _ _I
..-I
ta
t"---
-4-k
--,1--.0*--
-
Z Qh Z
t---- 1---
tA
4--
zi.
4 v..,m ,......,
,k Q ,,. -9..
.- -_
(----
,r•
......t4
-e"
f----- \J\
,c ..
.r,i.
Ni-V141:1il Si a
< -) ,
>NW -4g Jai ."1110)11-41
4%,„..t_ • _
% •
— -,_.....---- • _
;-__ t...._
- - - -- '--- - -
of--
1,(?_
- _ _ _ _ _
- -- - ___
—_ t ta:4,4a
R cA
6,2
_ _ ____ _
t-- ---
_ _ ,.
-
--
_ —--- ---
Al ch/ -_. -- --
(----/'
Z.
---- 1 1