Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2000-00728
f BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 (800) 831-2678 PERMIT #: BLD00-00728 Received Date 11/9/2000 SITE ADDRESS: 94 TIMBER RIDGE DR Issue Date 11/29/2000 PORT LUDLOW, 98365 Expiration Date 11/29/2001 APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 SUBDIVISION: TIMBERTON VILLAGE PHASE II Block: Lot: 51 PARCEL NUMBER: 998500051 Section: 17 Township: 28 N Range: 01 E CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101 70 BREAKER LANE PORT LUDLOW WA 98365 Contractor's License: OLYMPRE010M8 Expires: ( )1gaer1522 LOAN LENDER/ PARKER, SMITH & FEEK BOND HOLDER: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE REQUIRED INSPECTIONS: f,.. - -igs/Seth —1Zs.(Shoreline Setbacks): 0 t=F-jZ '/C /�/')24) [ ] Foundation: (0)<.( ` / ..7-- �/ r [ ] Underground Plumbing/Underground Insulation: �" [ ] e S FX r SHt=�/7 O,C 3/kg/o/ (ter. [ ] Framing Pce%"!15 ©,L 'S/.e2C/o/ (- [ ] Propane Tank/Lines: [ ] v��- •'•GviPet.s /Avc 7 ef- ,9.S ©!( �1' /7 r 9i [I,]--, heetroc1) 7,e ytl2=plo1 (çI/OcjiiiApprovaT:�e 4 -c.r---(._ io-ici-eN HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION. THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. Inspector's Phone Hours 8:00 a.m. - 9:00 a.m. SPECIAL CONDITIONS MAY APPLY - SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY BUILDING PERMIT APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD00-00728 Received Date: 11/9/2000 SITE ADDRESS: 94 TIMBER RIDGE DR PORT LUDLOW, 98365 APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 SUBDIVISION: TIMBERTON VILLAGE PHASE II Block: Lot: 51 PARCEL NUMBER: 998500051 Section: 17 Township: 28 N Range: 01 E CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 Contractor's License OLYMPRE010M8 Expires 07/01/2001 ARCHITECT/ ENGINEER : PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,815 VALUATION 148,825.00 ADD'L: 743 HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 475 SHORELINE: CONST TYPE: DECK: 249 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 3 Prop: 3 Seismic Streams Total: 3 Total: 3 Flood Way Flood Plane F&W Landslide Routing Date: I h 2/ODShoreline Aquifer `.J Forest: Commercial Rural '-'roximit - Plat d dons Type Amount Paid By: Date: Receipt: C; Permit $1,268.15 MAM 11/09/00 35423 A015 State Building Code $4.50 MAM 11/09/00 35423 ;r2. (c/...4.( Potable Water Application $30.00 MAM 11/09/00 35423 N O V ' q MO Total: $1,302.65 Jefferson County Planning &Building Department is\F_BLD_App_Bld.rpt 10/29/99 ,, vl.ui f,i-N 1 Y:POK-. Kt-:Sou c-s r.. ,Di-NE_ :10-23- U :1 ll;164M ; 1 3E;O 4372522- 3t 0 3711 446: :ti 3/ 3 - �I(illl'1� NKr * IPf tlf y Isimlipmeel I21 Swift IIrMt Pitt Tow and Ili ION ) Perfilit• : No Appiication Project Description: Unlace FamilyResidence withAtta~ R STOCK PLAN 532 Building Types Project Type: • •P111111C Types -- 1 Single Family XX New 2 Wood 3r Garage At ed/Desached 0 Addition C Steel Alteration/Remodel _ Concrete 2 Commercial C Repair 2 hdasonsy M /r of Units C. Demolition C 2 Industrial _ Other. Bedrooms: :.�. TTy�pe • one: Sewage � Type . Heat . ._.xist:* Eziseinv E Sewer CCommairy S9soem Electricity C O;Apo _3_ • -- .3--- .3--- L Individual C Woodcraft 0. Prop eneTotal , I Total: —3— k sewer,8Q out the followItic X Near Pump C Conventional : Alternative 0 Other Permit 4 SEP Water Supply: Private well = TWO Patty Well sir Public Name of water s r _imnessie Writ a7- I glow.r Square Footage For OeIce Use Only Main Floor 1815 ___ ._*,100.y to°,Z5 UBC OCCUPANCY GROUP ?tiv Floor 743 1, f 2-S OS Base fee 1 Z 1'% • l S 3rd Floor , L..C6eelefee NI A— cird Basemen: Stare Surcharge fee Lk • Sv Unhad Basement Subtotal l 'Z 1 a , (a S Garage/Capon 47 s LI J �5° Pot Water Review fee 31) , D O Decks 249 Z, 4190 911/Rd Approach fee Sc) , d O Commercial ` TOTAL i 3 Li 1 , in S Industrial '. Receipt N S -3 . Other Cash/Check N S I Total Valuation: L L4ri 82S-3.o Inivals Or Dace l I Estimated Cost: If within 200' of a Shoreline, Distance co Bank or 1-ftes Water Mark Et. Bank Height —ft. Si gnaturc / . 4// -` . Cam- Data // 0 Jeff Evan=er U. LO' d :Sb? ALL 09'_ d31r13 i:L,d3d OD 3f Z.0:0I 0OUT,-51:-1D'7 • Jefferson County Permit Canter * Department of Community Development g5oN co 6 Claxton Street.Port Townsend WA 88368(3601378-4450 3 • Vela 1`9FIINO`� �►. pi P:©t STOCK PLAN 532 Project Description: New Single Family Residence with attached Garage 9 Digit Parcel Identification Number(from your tax statement): 9/2 _ SQO_ 5I Site Address 911#: _94 1 i rel':2f Midge? 1)(. m Road Naee Tim be.[ D{. Zip Code: 3 (vS Legal Description Subdivision Name: T,Mbe t; o N 1\/-s, t. uN SE =Z Block: Lot(s): .5" I Section: 1-7 Township: 2 gg N Range: I Parcel Size (acres or square footage): Property Owner: Phone: Olympic Real Estate Development (360) 437-2101 Mailing Address: 781 Walker Wav, Port Ludlow WA 98365 Applicant/Occupant: Phone: (if different from owner) Same Mailing Address: Authorized Rep: Phone: Jeff Evanger (360) 437-2101 Mailing Address: 781 Walker Way. Port Ludlow. WA 98365 General Contractor: Or Manufactured Home Installer: Olympic Real Estate Development Phone: (360) 437-2101 Mailing Address: 781 Walker Way, Port Ludlow, WA 98365 Contractor's State License Number: OLYMPREOlOM8 Expiration Date: 6/1/00 Septic Designer: Phone: Mailing Address: Architect:/Engineer: Phone: Mailing Address: Loan Lender/General Phone: Contractor's Bond Holder: Parker, Smith & Feek 1-800-457-0220 Mailing Address: FOR 01-PICE USE ONLY Fire District: Planning Area: School District: Zone: 4/98 H:\home\pincntr\focms\universal plot plan 4 , 10/30/00 19:02 FAX 206+780+2408 MecLearnsberry Z 04 • I • • i ' i i O''6. ... • , • l• • k..} Y •••,, A ik; ..• • 1 1 • •„ „ii, in i ,....f,.._ .....____ II ac --- _- •i ./.J-1. :; -,I - ,, !„..,,•,7 , I ..44.,....:•4: :,4,4•...,,,,,:•,, -.--_-.. / 1 I • -,n,...c.....c.,4,,,,:,,,•,,,I..,,., ,-_ ..,,. ...,":._:,,,7,!=r,•gli!.' i i I 5.r::',%;,'::•:::::',i',"„%::,.';''"•:::,?,'„1:: ,;!'::::'.::::::::::;:: :!%!::!•.;:•!::!;;;;:„............,.. ra,... kv.:;••., 1I I I . I 1 NI .• . .., ,...,Z.:,...00 Alp 1,• I 00 :i:::!:::%;'::=7•=4=::::!.4:Z!::•.7,Z;r:7,..:i.::::.:::.;:;:,:.:;;;:,.;.'.;'' I 1 ./ C.14 1 i 4...;:r•r;44 - ,•,...,... ..-.4.;;4 •••X•A,,,..,-:-:-:',."•,w-'4 ,•:::V. "..,f.,..r..,....:7...r.r.... '4',...?7.Z::.":::::::::::::.:'.:=,. i ,....e. I i ::!;.:"...5ranii0i•Vkz.4t-' •••:::.=:'; .:':: ''''''''"'" '''' ''''''`" I I 1 •*':.".4^+• i I 1 1 •.:,........................T.:%:.4'...........,!..,,•:,•<k.....x,,,,c...i..,••• 1... , ;,•.`•.••:.. '.,,,f.:••?:!.. ''!'''.:;.`r.:';''''' ,.. FC7 '... / i eb 1 / 1 // %. ...... .........,..,..-cw.....z...J..,e .'.'. .... .4.4 .,.c..e.ne• ...,..... ... <. th.r.N.;:::41........",t::::X!;:..;:,'••:••t.1•0:12t,n,:ln:;:.:;r:•=..;;.:':•:,••••;•:=....-..,:"}::.::7.:n:•='Z.:•••••••:•:••••••=:i.•:.:=.0.......P.,. r ,-.i r t ..-.--..%.,....4-.:::::::: :::,::;.:;:::::;::=t-.:,•::it.•;h::.i.i.:!-:.;=:.....xL::::::::::::::-.::-.::.::::.:.,r.::-...m..4..--.;:.-.::::..::::=...:"!...i......:.:;::'''' I . ,:-••••.,,,, / 1! .t...-.;.::".::::',;:-i:',::::::',==::::::::"::',.::::Vg,•::4=:;•'::::::::::•:::-''''''''.---`'er r':-:".":'..€'''". ; r.1 ....1 e ; t t e •. • tlx:::;:::•.;::i.::',:z:::-::=::::!::::::V::::: 1 II i I d .3,1 n 4.....,... I o .4;1;,..... i -76'i 1 t i -I .-""•,--.L.C1 e q•, ..." ' `77-'' '..ts- ••• ' •....,•,• ,•• ••••;‘, ,•-• -- '-i'l "'J " •:"....:1 I. 7- -CV_-ii v t• . _ • 4 0 ••:1 / / i / 1 1 £1 ,., 4., ;,... i ii. ,i, .4.!;.i. '1,,,I•....v.' / r ,...., , ..„ „ . ..... ... , ...., '...{. If •'''':'Il• 61 '... , .... c:.....,: ikill %,.....k••ro 1.4 1..... .. '4. '.4.',..• di..."• : ):'') (/_:1 i....,.. '''' .`". ....4.:.- ....,, -:. 111111 1„..... • ,• ..k4; t .;,...4 .. „Lt a s.... .:E md w.l. ...q.. •rk ..„,,.. ...„ .,.:'.''. , MA CLE;t-ilt,t1r. SBERIZY, Inc. (kJ ,„4 C) . Civil Engin Lot 51, Plan 532R eer.0 Plaxinee 159 Wyatt Way NE Bnbriage Liana,WA 98110 Timberton Village phone! (206)842.5514 faceimile: (206)780-2408 Olympic Resource Mgmt. on.- vo BAM °^74 OCTOBER 30, 2000 ChEOCED SY B SCALE " ' s4teT 198077 Am 1 20 cf 1 41111•1111=11111111=1111.11111k.. • _____ . • STORMWATER CALCULATIONS Owner/Applicant: Olympic Real Estate Dev. LLC ❑ PROPOSED LAND DISTURBING ACTIVITY Site Address: 94' Tv,.n.aru Kit_ Dr. Drainfield area cleared sq.ft. Driveway Length 20 ft. (�QQ X Width 16 ft. 9 Digit Parcel Identification No.: ! ! 0 -5OO 05/ = Total Driveway 320 sq.ft. Permit Number: Clearing and Grading for Site Development PLOT PLAN (Well/Structures/Utilities/etc.) sq.ft. 2500 sq.ft. INDICATE the following information. Total Land Disturbance 2820 sq.ft. Draw entire parcel to scale. Indicate scale of plot plan: One inch equals IMPERVIOUS SURFACE Proposed Structures (all roof area) 2402 sq.ft. = 1. North arrow Existing Structures (all roof area) 0 sq.ft. 2. All property boundaries and dimensions Sidewalks 80 sq.ft. 3. Names of adjacent streets Concrete Patios 0 sq.ft. = 4. Driveway/s & parking spaces Proposed: 5. Major features such as ravines, Driveway Length 20 ft. seasonal creeks, bodies of water, etc. X Width 16 ft. = 6. Septic tank, drainfield and reserve area location, = Total Driveway 320 sq.ft. existing or proposed, and distance to Total Impervious Surface 2820 sq.ft. closest structure • 7. Sewer lines The Stormwater Manual sets forth the following Small Parcel Minimum Requirements: • 8. Wells and/or water lines • Construction Access Route Stabilization: 2 9. Neighboring wells within 150 feet Construction vehicle access shall be, whenever feasible, limited to one route. Access points shall be stabilized with = 10. Paved surfaces (patios) quarry spalls or crushed rock to minimize the tracking of • 1 1. Structures, existing and/or proposed sediment onto public roads. If sediment is inadvertently transported onto public roads, roads shall be cleaned = 12. Setbacks (distances to property thoroughly at the end of the day by shoveling or sweeping. Street washing should only be done after the bulk of the boundaries, structures, banks, sediment has been removed by sweeping. and shorelines) • Stabilization of Exposed Soil: All exposed and unworried soil shall be stabilized by sodding, 2 1 3. Easements for access or utilities seeding, mulching, plastic covering, application of gravel base 14. Arrows showing direction of slope-- on roads and driveways, or other appropriate means within seven days during the period from May 1 to September 30 assume an elevation of 100 feet at one and within two days during the period from October 1 to April lot corner and indicate the other lot 30. Mulch shall be applied to a minimum depth of two inches. • Protection of Adjacent Properties: corner elevations in relation to it Adjacent properties shall be protected from sediment deposition by appropriate use of vegetative buffer strips, sediment barriers or filters, dikes, mulching, or by a FOR APPLICATIONS ADJOINING SHORELINES, combination of these measures and other appropriate Best Management Practices (BMPs). INDICATE: • Maintenance: 1 5. Ordinary high water mark All erosion and sediment control BMPs shall be regularly inspected and maintained to ensure continued performance of 16. Top of bank, if over 10 feet high their intended function. 17. Slope of bank in degrees • Other Appropriate BMPs as required by Jefferson County to mitigate the effects of increased runoff shall be applied. H:'.HOME\PLNCN TR\FOAMS\PLOTPLN.FRM9/97 • . . (f-A/0-- _)(:) — Oeyrai. BUILDING PERMIT APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD00-00728 Received Date: 11/9/2000 SITE ADDRESS: 94 TIMBER RIDGE DR PORT LUDLOW, 98365 APPLICANT: OLYMPIC REAL ESTATE DEVLOP LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 SUBDIVISION: TIMBERTON VILLAGE PHASE II Block: Lot: 51 PARCEL NUMBER: 998500051 Section: 17 Township: 28 N Range: 01 E CONTRACTOR: OLYMPIC REAL ESTATE DEV LLC PHONE: (360)437-2101 781 WALKER WAY PORT LUDLOW WA 98365 Contractor's License OLYMPRE010M8 Expires 07/01/2001 ARCHITECT/ ENGINEER : PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,815 VALUATION 148,825.00 ADD'L: 743 HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: . 5N SHORELINE: GARAGE: 475 CONST TYPE: SETBACK: DECK: 249 BANK HEIGHT: SEWAGE DISPOSAL: SEW , .&?L 5.P WATER SYSTEM: LUDLOW PARCEL TAGS: - NO K BEDROOMS: BATHROOMS: STORMWATE,ar' NO AREA Exist: Exist: Wetland ),.b Erosion if;Q Prop: 3 Prop: 3 Seismic ND Streams Total: 3 Total: 3 Flood , ay N6 Flood PIa e n/12 F&W HC1- Landslides �'- Routing Date: I I3 f l Shoreline!Jo Aquifer tip/ Forest: Commercial WO Ruralp ,{A/O Type Amount Paid By: Date: r�Receipt:y - Appro ed/Da{eons Permit $1,268.15 MAM 11/09/00 35423 101 State Building Code $4.50 MAM 11/09/00 35423 -� Potable Water Application $30.00 MAM 11/09/00 35423 �11'• Total: $1,302.65 �' 7 � 1 r � �t t� W-f. ' A, i:1F_BLD_App_Bld.rpt 10/29/99 Fir JEFFERSON COUNTY STORMWATER MANAGEMENT ORDINANCE SMALL PARCEL EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL WORKSHEET Property Owner: Olympic Real Estate Dev. , LLC Telephone: (360) 437-2101 Address: 781 Walker Way, Port Ludlow, WA 98365 Assessor's Parcel Number: 99% 5C0 O5 Building Permit or Septic Permit Application Number(if applicable): Brief Project Description: New Single Family Residence with Attached Garage. Site Location: '\ o V'J€ Person Responsible for BMP Installation and Maintenance: Jeff Evanger Address: 781 Walker Way, Port Ludlow, WA 98365 Telephone: (360) 437-2101 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan. You may also propose measures other than those listed. Attach additional sheets, if more space is required. [ ] Stabilize construction access route. Limit construction vehicles to one route, if feasible. Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock to minimize tracking sediment onto roads. (See attached illustration from Stormwater Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. Minimize the extent of land disturbing activity and preserve existing vegetation. [ I Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife habitat areas, landslide or erosion hazard area, etc.). EROSION AND SEDIMENT CONTROL WORKSHEET ( J Phase clearing so that only areas that are actively being worked are uncovered. [ J Start and complete land disturbing activities and stabilize the site between April 1 and September 30. Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion. Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April 1 and September 30. [ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. [ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads, and property lines. [ ] Place gravel base on roads, driveways, and parking areas after clearing and subgrade preparation. (� Protect adjacent properties and water bodies from sediment deposition: [ ] Place straw or hay bales in ditches and drainage ways down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustrations from Stormwater Management Manual.) [ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustration from Stormwater Management Manual.) [/3 Regularly inspect and maintain all BMPs especially after storms events. [ J Describe other erosion and sediment control Best Management Practices. Be specific as to design and specifications. S', ,,a 47., Se a Ctisy•t:444—, ,k_a..tgt--. 1st- sZ . .17: lope¢.. • prir EROSION AND SEDIMENT CONTROL WORKSHEET 2. Describe how disturbed areas will be permanently stabilized (seeded, landscaped, apply gravel base to roadways, etc.) Areas that are disturbed will be landscaped with natural type vegetation_ and_ lawn to property line. 3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to infiltrate, dry well, infiltration trench, route runoff to existing drainage facilities, etc.). All impervious surfaces will be run to roof drains and/or catch basins as designed into the plat requirements. EROSION AND SEDIMENT CONTROL WORKSHEET 4. Specify your construction sequence. Describe the tuning of all land disturbing activities (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices. Describe proposed maintenance of BMPs. After excavation the soil piles will be covered and silt fence will be installed. Silt fence will be left in place until we are ready to landscape and all roof drains/catch basins are in. Landscaping will be installed as early as possible on the exterior of the building when all exterior concrete work is completed. The Best Management Practices proposed above will be implemented to control erosion, sediment, and stormwa / . 11 notify the Permit Center for inspections as requi / . - // ///7/14/ t4( / Signature o Owner/Agent / Dat (Jeff Evanger) k._' • Jefferson County Department of Community Development November 15, 2000 621 Sheridan Street, Port Townsend, WA 98368 (360) 379-4450 CRITICAL AREA STANDARD WAIVER Applicant: OLYMPIC REAL ESTATE DEVLOP LLC 781 WALKER WAY PORT LUDLOW WA 98365 Critical Area Review Case Number: CAR00-00487 Project Description: SFR with attached garage Parcel Number: 998500051 S-T-R: 17-28N-01 E Site Address: 94 TIMBER RIDGE DR PORT LUDLOW WA, 98365 FINDING: The development, as proposed and portrayed on the Universal Plot Plan, does not encroach on an identified critical area nor any associated buffers. CONCLUSION: The proposed development meets the waiver requirements established in Jefferson County Ordinance 05-0509-94. CONDITION: The development shall be as proposed and portrayed on the Universal Plot Plan. Deviation, additions or relocation of proposed development activities will require further review pursuant to the Jefferson County Critical Areas Ordinance. Departrben of Community Development Staff c: File I:\F_CAR_Waiver_Standrd.rpt 12/13/99