Loading...
HomeMy WebLinkAbout030725 - Mailing from Emma Bolin - City of Port Townsend RECEIVED MAR 0 7 2025 JEFFERSON COUNTY CObM4ISSIONERS CITY OF PORT TOWNSEND SEPA RESPONSIBLE OFFICIAL'S DETERMINATION OF NON-SIGNIFICANCE Description: San Juan Discovery (SJD) is a phased mixed-use project designed for 179 dwelling units and as many as 29 Accessory Dwelling Units (ADU's). It includes new mixed-use buildings totaling 26,260 sf. 13,200 sf is planned for a combined child and elder care facility. It will have a 5,000 sf Community Art Center and a 5,000 sf Community Agricultural Center with 3/4-acre Community- oriented farm. Planned residential construction includes 12 Live-work units; 45 multi-family units devoted to senior-age residents built over the child/elder care center; 40 additional multi-family units built over the other planned retail spaces; 12 detached single-family homes with as many as 13 Accessory Dwelling Units (ADU); 16 zero lot line single-family homes with up to 16 ADU's; 8 Cottage-style homes and a 16-unit condominium area with duplexes, 4-plexes and Carriage House- style units. SJD includes a Common House for use by the PUD community with over 1-acre of publicly accessible outdoor open space that includes an improved Plaza spaced at the F St. and San Juan Avenue intersection. Access will be provided via a new internal road network built in accordance with the SJD Phasing plan. Phase 1 (i.e., southern, and western portions of the site) will connect to Discovery Rd. at two (2) locations via a looped road design. Phase 2 (i.e., northern, and eastern lands) will access San Juan Avenue via a new internal cul-de-sac road that begins roughly 1,000 ft. south of Discovery Rd. Provisions are made for both on-site and on-street parking along with a perimeter and internal non- motorized network. Public sewer and water will be extended into SJD from the adjoining public rights-of-way. Stormwater facilities, which include open water components (i.e., ponds and stream), have been designed along with on-site and street frontage landscaping. File Reference:ii: LUP22-028, Preliminary Plat/Plat Vacation and Planned Unit Development (PUD), with associated SEPA file LUP22-029 Applicant: PT Preservation Alliance L.L.C. Agent: Terrapin Architecture 3229 Highway 20 727 Taylor St. Pt. Townsend, WA 98368 Pt. Townsend, WA 98368 360-379-8090 Location/Legal Description: The 12-acre site lies southwest of the intersection of"F" Street and San Juan Avenue. It consists of five (5) existing tax parcels all lying within the NW'A of Section 3, Township 30 North, Range 1 West, W.M. Two (2) of the underlying tax parcels are unplatted tracts while other three (3) parcels were created through a prior land division in 1979 (e.g. the Ruth Short Short Plat). Jefferson County tax parcel numbers associated with the site are 001-034-001, 001- 034-002, 001-034-039, 001-034-040 and 001-034-041. A complete legal description for the site is in the project file available for review at the city's Planning and Community Development Department. Lead Agency: City of Port Townsend, Planning and Community Development Department (PCD) SEPA DNS San Juan Discovery PUD LUP22-029 The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after a review of the completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. This DNS is issued under 197-11-340; the lead agency will not act on this proposal for 15 days from the date below. Comments or a written statement appealing the threshold determination must be filed with the Planning and Community Development Department by 4:00 p.m., March 20th, 2025. Contact& Responsible Official: Emma Bolin,AICP Director, Planning and Community Development 250 Madison Street, Suite 3 Port Townsend, WA 98368 (360) 344-3041 Signature: Emma Bolin, Director City of Port Townsend PCD Date: March 5, 2025 Appeal Deadline: March 20, 2025 2 t. I ` I I i i i E �! I a , f t �� f Vi L- N Vie- -_� - i . f I �'� ��- ., �, 1 I �._ I I 1 i ......., ,,,,,..„.. , , __ _.1 1 ayd4 \ � ALDER ST L l ��el i .', NAINES S r SMOAAA I 14 A !! '���v \1 // !" H _r1 xi �• -- ❑ D % RAS1AA=MON f nil bar -- , -- _ Y�- \ _ ____---____ __- _ ____________ +-- .--tea® _ --.. - / 1 1 , Co -- it ~ 4iglib§gp511 E. � ' I I i z 99 z -- Z oi g 1 9 VI . 9GQ9g J1 r- , E FRAMED wl CE7.EE07R0I1 97113V07. TERRAPIN PT PRESERVATION ALLIANCE MASTER PLAN11h ARCHITECTURE K ;$ I J qyl 7011l9ERD W WW1 PORT:Is6o NO WA 9835E ENGIN' LNG PHONE:MEM 379-8090 I _.l ciry0f port l`�� TACOMA WA 983 r • f•' • i quadientLLI Jownsend 5 MAR 2Q25 PM 4 j r• M�ST-CLASS MAIL 250 Madison Street, Suite 3 :t3 ' ` •ita IT �� 03105/2025 ZIP 98368 N Port Townsend, WA 98368 'rM - • 043M30210114 M JEFFERSON COUNTY PO BOX 1220 PORT TOWNSEND WA 98368 9636e-OS2020 ► IIIIIIIIIIVIiI1nIIlirlillu1'1i►I1i1i'n1111,1,11111Nlli,11 l