Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2001-00056
i BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 (800) 831-2678 PERMIT #: BLD01-00056 Received Date 01/26/2001 SITE ADDRESS: 134 MCCURDY LN Issue Date 02/22/2001 PORT LUDLOW, 98365 Expiration Date 02/22/2002 APPLICANT: ROBERT STEWART PHONE: (503)774-3656 9701 SE JOHNSON CREEK BLVD APT#C208 PORTLAND OR 97266 SUBDIVISION: PORT LUDLOW NO. 2 Block: Lot: 132 PARCEL NUMBER: 990603132 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: M V P CONSTRUCTION CO PHONE: (360)598-3178 PO BOX 159 ROLLINGBAY WA 98061 Contractor's License: MVPCOC*101RK Expires: 11/30/2001 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE i -/'4 7 ' .47i2/g REQUIRED INSPECTIONS: [ ] etbac ,�SIIh}oreline Setbacks): e r• ele. ,�74)/e . /r--- 60 -.5/t- ��,�,., [ ooti I.-:P/'e. .14/2 l( [ n ati t 6/ or A_e l©, ' C� [ ] Underground Plumbing/Underground Insulation: [irl----- ear Wa : c/e �/'A [ ramin-.►4 'I e. ti? F17.*M6 > 40/ 0r i [ Propane Tank/Lines: 0 .5/21C/ [ ] Insulation: PAL., o !" ,2- a) [[,4—Z etroc e2/__<.___ ZactZe2/62cr:2__ [ ] Final/Occupancy Approval: HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION. THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIO Office Hours 9:00 a.m. -4:30 p.m. Inspector's Phone Hours 8:00 a.m. - 9:00 a.m. SPECIAL CONDITIONS APPLY-SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS FOR CASE BLD01-00056 1.) Maximum lot coverage is not to exceed 45%. 2.) The building height is not to exceed 35 feet. 3.) Front yard setback shall be 20', side and rear yard setbacks shall be 5' 4.) The site plan as submitted has been reviewed and approved by DCD staff on 2-13-01 which found that the site plan is consistent with the UDC. Any changes or modifications to the approved site plan shall be reviewed and approved by the UDC administrator. i:W_B!D_Permit Buildng.rpt 10/29/19 t BUILDING PERMIT APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD01-00056 Received Date: 1/26/2001 SITE ADDRESS: MCCURDY LN \V" PORT LUDLOW, 98365 APPLICANT: FRANCISCO OJEDA JR PHONE: 6516 N 23RD ST TACOMA WA 984062214 SUBDIVISION: PORT LUDLOW NO. 2 Block: Lot: 132 PARCEL NUMBER: 990603132 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: M V P CONSTRUCTION CO PHONE: (360)598-3178 PO BOX 159 .ROLLINGBAY WA 98061 Contractor's License MVPCOC*101 RK Expires 11/30/2001 ARCHITECT/ ENGINEER : PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE eA-VA �9i?.9 TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,530 VALUATION 93,226.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 704 SHORELINE: CONST TYPE: DECK: 150 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: 0 Wetland Erosion Prop: 3 Prop: 2 Seismic Streams Total: 3 Total: 2 Flood Way Floodplain Routing Date: F&W Landslide � , / Shoreline Aquifer ( D 1/c. Forest: Comm-r•'= _ Type Amount Paid By: Date: —Proximity ., t . , � - Permit $951.75 MAM 01/26/01 37322 Plan Check $285.53 MAM 01/26/01 37322 F F R 1 5 2001 State Building Code $4.50 MAM 01/26/01 37322 JEFFERSON COUNTY Potable Water Application $30.00 MAM 01/26/01 37322 DEPT. OF COMMUNI DEVEL•PMENT SIGNATURE: Total: $1,271.78 ILIT-1.-- Jefferson County Department of Community Development „esol,y 2 6 2001 ° 621 Sheridan Street,Port Townsend WA 88368[3601378-4450 ti � n `�`'� ;2 ill _ i' ° M�A a I ' IFS . , FCoMM NIIYD •EL� T O Q ,� o D O cs � � C���[it Project Description: Building Type: Project Type: Frame Type: • Single Family I New Wood - Garage Attached/Detached I Addition Steel • Modular i Alteration/Remodel _- Concrete Commercial C Repair Masonry Multi-family/#of Units i Demolition Other: ▪ Industrial Other. Bedrooms: •Bathrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: Existing: Sewer ❑Community System ❑ Electricity ❑ Oil Proposed: Proposed: ❑ Individual System ❑ Woodstove E Propane Total: Total: If not sewer,fill out the following: ❑ Heat Pump 01 Conventional ❑ Alternative ❑ Other Permit# SEP Water Supply: ▪ Private well ❑ Two Party Well'❑ Public:Name of water system: Square Footage: For Office Use Only a Main Floor AS---7G9 S'q (,PS 6o UBC OCCUPANCY GROUP 2ND Floor Base fee _______2T_/ . 75 3rd Floor Plan Check fee Z '"S- S. .3 Htd Basement State Surcharge fee 4 r- so Unhtd Basement ++�� 7090 , Subtotal / 24 I r —IF Garage/Carport > D Pot Water Review fee 30 , Co Decks 911/Rd Approach fee Si , 0 Commercial TOTAL 1 3 Z 2 . -/g Industrial Receipt # C 7 3 c?\49, Other /s'Ps `ra• -/�� eel Cash/Check# 1 d Total Valuation: �j�,�--- � In �s Or 9 3 22S` D e kJ l(ate/0 , Estimated Cost: If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft.Bank Height ft. By signing the application orm,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours. Signature: Date: 1 Jefferson County Department of Community Developme E C L5 U(1 c, 1 ,,2:- Co G 621 Sheridan Street,Port Townsend WA 98368 (360) 379-4 _ i -, y - JAN262001 o. Universal Plot Plan '1%1‘16 JEFFERSON COUNT`,' DEPT. OF COMMUNITY DEVEL Fill in the following blanks as completely as possible : Project Description: -Si 12 9 Digit Parcel Identification Number (from your tax statement): Site Address 911#: Road Name: Zip Code: Legal Description Subdivision Name: j Block: Lot(s): Section: Township: Range: Parcel Size (acres or square footage): Property Owner: A ,/2 p G S`L=; c_,..) A. (Z Phone:5—,) ' >> 7 -3 Mailing Address: c_�> O / S er T a l-4,z.)S a-v C?v --'- r.2 L V N° p r2 t.;6 ,0 7 2 e Applicant/Occupant: Phone: (if different from owner) Mailing Address: Authorized Rep: Phone: Mailing Address: General Contractor: Or Manufactured Home Installer: . U p, CJ 1JS?' Phone jC a --.5` 7 F—3 ' > F-- Mailing. ess: Contractor's State License Number: 1\ / Expiration Date. ' /0e) c) i , Septic Designer: Cs_. 6_ , Phone: i f Mliiing Address: Architect:/Engineer: G-- Phone: Niiiling Address: Loan Lender/General Phone: Contractor's Bond Holder: c) i\—)6 Mailing Address: FOR OFFICE USE ONLY Fire District: Planning Area: I School District: Zone: i%00 H:\home\pincntr\forms\universal plot plan 1 h BUILDING PERMIT APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD01-00056 Received Date: 1/26/2001 SITE ADDRESS: MCCURDY LN PORT LUDLOW, 98365 APPLICANT: FRANCISCO OJEDA JR 62-6) -7--S '�n/ J PHONE: 6516 N 23RD ST I"Ei\-' au -rt_._ TACOMA WA 984062214 SUBDIVISION: PORT LUDLOW NO. 2 Block: Lot: 132 PARCEL NUMBER: 990603132 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: M V P CONSTRUCTION CO PHONE: (360)598-3178 PO BOX 159 ROLLINGBAY WA 98061 Contractor's License MVPCOC*101RK Expires 11/30/2001 ARCHITECT/ ENGINEER : PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,530 VALUATION 93,226.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 704 SHORELINE: CONST TYPE: DECK: 150 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: 0 Wetland Erosion Prop: 3 Prop: 2 Seismic Streams Total: 3 Total: 2 Flood Way Floodplain Routing Date: �� o/ F&W Landslide Shoreline Aquifer ?_. Forest: Commercial Rural PrQ4ximity Nlat t; ditions Type Amount Paid By: Date: Receipt: Approved/Date Permit $951.75 MAM 01/26/01 37322 APPROVED Plan Check $285.53 MAM 01/26/01 37322 State Building Code $4.50 MAM 01/26/01 37322 Potable Water Application $30.00 MAM 01/26/01 37322 F F R 1 4 2001 Total: $1,271.78 `JEFFERSON COUNTY DEPT.OF COV 1_TY DEVELOPMENT SIGNATURE: A - i II sz- --- ---- ------- - -- -- i E.- : E g "__:r I - - - - ---- - - — -�-- -- - - - -` -3AN 2 6 2001 r • - -- AT . r'' a ''1' J gl • L - — - -- - ----f• -- -- ----- --• _\ � ' �F-R 1_�1�Q1• ,-• I . t r - -- '_R-- -- - Y - - ---r- • OMMI,It�iTY DEVELOPMENT - i '� • RE' �'1 T - - !-- _0 . . Gi-'- .,..?r - .t __ .. ._.1.z..1.24i.k._,.,,.-:_________L___. _ 3. .. . 7• V1, CA - ---- IP , �� - - 1r x - - — -o_- — 1 11 j 1 _w_. - • Vil 0- in I ..§ II i ---7 ) '-"----:-T-'' . __,_ .... .-. .. I , i. 1 i i • .__._ ____J. .. --,.. ..--,1- - -i. 1 , . , , . ,. i . _________.___.___ _____ : , . , , , • ,. . .. , ; : •• .__,. , , , _, .., 1• -- - - �S>� ;- i -•- - ,szo�_ - - : - - 1. +.J_. 7 -— - • —'_l ;_ ; 4.. •1 _-�-�; -- n- _ -y :4'Z' k e, 4 2 Z7 ) V ., .. : ,,, 1 1 ____..,__, ..._______ . \\, . - . -`- --- --- - - - - _ -._ . `v -- - _"'� - '►- - - -i I i k/{D1= DPI V 1/4O� Jl 0-49 .) • . Al ,..___ . . . ,,,,, , , , , , , . , , t`.. { --;-- .-_ --------_ . _.. . ..l.. .... _E: .r -.------- I. 4 1.7.7._\ ...... JEFFERSON COUNTY FEB 1 3 2001 STORMWATER MANAGEMENT ORDINANCE I SMALL PARCEL EROSION AND SEDIMENT CONTROL LAN _ , EROSION AND SEDIMENT CONTROL WORKSHEET - .. "` 41- Property Owner: Mr. and Mrs . Robert Stewart Telephone:503-774-3656 Address: 9701 SE Johnson Creek Blvd. , Apt. #C 208, Portland, Oregon 97266 Assessor's Parcel Number: 990 b03 132 Building Permit or Septic Permit Application Number (if applicable): Applied for Brief Project Description: Tn nonstrct a new Single Family Residence on Lot. 132 in Port Ludlow Site Location: At the end of the Cul—de—Sac an McCurdy Lane, Port Ludlow Person Responsible for BMP Installation and Maintenance:MVP Cons trot ion (Glenn Hagen) POBOX RollingBa ATa 80 Address: 159, y, 9 61 Telephone: 1-888-30:3-2854 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan. You may also propose measures other than those listed. Attach additional sheets, if more space is required. [ 1 Stabilize construction access route. Limit construction vehicles to one route, if feasible. Provide a stabilized construction access by applying quarry spans, ballast, or crushed rock to minimize tracking sediment onto roads. (See attached illustration from Stormwater Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. [] Minimize the extent of land disturbing activity and preserve existing vegetation. Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife habitat areas, landslide or erosion hazard area, etc.). APPROVED 9 FFR 1 4 2001 JEF E' • •U DEPT. OF COMMU TY DEVELOPMENT SIGNATURE: rI4.Y EROSION AND SEDIMENT CONTROL WORKSHEET 2. Describe how disturbed areas will be permanently stabilized (seeded, landscaped, apply gravel base to roadways, etc.) 4re2 around the immediate home will be seeded with grass frivPway wi ! L nave a base of crusnea concrete, and then a finin layer of 3/4 Baalt Undisturbed areas will not be touched • 3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to infiltrate, dry well, infiltration trench, route runoff to existing drainage facilities, etc.). The 4" tightline around the footer of the nome will be tied in with the 4" perforTiid downspout line, and brought to the storm water drain area in the cul-de-sac of McCurdy Lane. • 11 J. EROSION AND SEDIMENT CONTROL WORKSHEET 4. Specify your construction sequence. Describe the timing of all Iand disturbing activities (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices. Describe proposed maintenance of BMPs. 1 . Clearing and Grading- sometime uuring the middle of March 2. Construct on- From mid-March until first of August 3. Installation of facilities- during the month of June/July 11 . Landscaping-after home construction-duing July/August . A Filter fence . will be onsite duing excavation and foundation pour ilag/ will be removed after home is backf111en , 6_ Soil piles will ba covered with Visquene. ana the drive way will be covered with crushed concrete during_ construction, and then envPreri with a j/4. Rasa1 t after the home is finished. The Best Management Practices proposed above will be implemented to control erosion, sediment, and storm r "of. I will no 'fy the Permit Center for inspections as required. �. C � 2/12/01 Signature of Owner/Agent 0 Date (, -e-Ft'-2 )2 - 2iY • 12 d *. EROSION AND SEDIMENT CONTROL WORKSHEET Phase clearing so that only areas that are actively being worked are uncovered. Start and complete land disturbing activities and stabilize the site between April 1 and September 30. Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion. [X] Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April I and September 30. [ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. 6,,k Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads, and property lines. Place gravel base on roads, driveways, and parking areas after clearing and subgrade p.eparation. [x] Protect adjacent properties and water bodies from sediment deposition: [] Place straw or hay bales in ditches and drainage ways down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustrations from Stormwater Management Manual.) [x] Install a filter fence down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustration f,om Stormwater Management Manuai.) [i Regularly inspect and maintain all BMPs especially after storms events. [ ] Describe other erosion and sediment control Best Management Practices. Be specific as to design and specifications. Lot is quite level, and we expext that the Filter Fench, and covcrcd Soil pilcs and cnverPd driveway snout -be enough to handle construction activities . B1VIF' s installed will aahere to Stormwater Management Manuel • 10