Loading...
HomeMy WebLinkAbout031025 - Correspondence re Invoice for Road Maintenance RECEIVED MAR 1 0 2025 JEFFERSON II COUNTYNERS 3/5/25 Jefferson County Commissioners, This is an invoice for$250 for services rendered on 2/27/25, County road maintenance performed at the intersection of Lords Lake Loop Road and Highway 101, which comprised of filling numerous large water filled pot holes on the triangular piece of land necessary to perform a right-hand turn on to Lords Lake Loop Road when heading south on Highway 101. This sum covers just my costs, which includes dump truck service, five tons of gravel from Penny Creek quarry, conversion of dump truck for manual off-load of gravel, travel to and from site, helper labor, hand shoveling gravel into potholes, clean up, plus fuel. Please remit $250 within thirty days of receipt. Background: Lords Lake Loop road intersects Highway 101 at an acute angle of about sixty degrees heading south. It is just about impossible to make a right-hand turn onto Lords Lake Loop Road from Highway 101 when heading south without transiting over this triangular piece of land which is not paved. I have been performing this maintenance circa 2017 and, at my own expense, paid for the gravel, fuel, truck service, and labor since Public Works seems to be negligent with road maintenance at this intersection. I contacted the Public Works department a number of times about maintenance at this intersection and opened dialogue about realigning Lords Lake Loop road so that LLL road intersects Highway 101 at a right angle thus establishing a traditional turn configuration and eliminating the pothole situation. Public Works stated that this job was a very easy task to do but not on the schedule to be performed. requested that this task be placed on the schedule. Nothing. When I now write to the director of Public Works, I do not receive any further response, I suppose I'm just a Public Works pain in the ass. My goal is to relieve myself(not that way Greg) of the necessity of filling potholes for the county at this intersection.This is a task I already pay for via property taxes, fuel taxes, and a host of other taxes and fees imposed without a vote. It has been years now trying to remedy this constipated situation, without movement. It would be greatly appreciated if the County Commissioners would add some fiber to the process and place LLL road realignment on the schedule and let me know when this task will be performed, sooner rather than later. Second complaint: Lords Lake Loop road sustained damage at about the 1.5 mile mark, with about one lane being lost down the side of the slope, maybe close to ten years ago, during a winter with heavy rains, due to inadequate culvert maintenance. Many years ago, I've asked the director of Public Works when repairs will take place, who actually responded back then, that repairs were expected to be accomplished the summer of 2021. It is now years past and still nothing from Public Works, but mother nature continues her endeavors with more weather damage because the slide is not protected. It would be greatly appreciated if the County Commissioners would ensure that LLL road repairs are completed this summer since it is shamefully past due. Richard Kelby���G�y,/' 273 River Ridge Road Quilcene, WA 98376 PORTLA.ND OR RPDC 972 Mr.Richard Kelbon 273 River Ridge Rd ce�g ._- Quilcene,WA 98376 7.MAR202`�, S .F, I • • 0 0 C C�mih1spivv7�yS ��. Rok 1220 A ?o 6 8 RECEIVED MAR 10 2025 ,E COM IISSIONERRSTY Seizi e—c92020 �ililll'I���'NI�fI'l�l�in�lll�lllillluulnl�Ll�flyfi�in111