HomeMy WebLinkAboutAward of Contract for Olympic Discovery Trail Department of Public Works
O Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Mark McCauley, County Administrator
From: Monte Reinders, P.E., Public Works Director/County Engineer
Agenda Date: March 10, 2025
Subject: Award of Contract for Olympic Discovery Trail- Anderson Lake
Connection, County Project No. 18019893, County Road No.
850200, Federal Aid Project No. STBGR-2016(030), RCO Project
No. 20-1745
Statement of Issue: Award of Contract to Seton Construction Inc. of Port Townsend,
Washington for their bid of $3,782,268.93 for the above referenced project.
Analysis/Strategic Goals/Pro's Et Con's: The Public Works Department has completed
checking the bids and has investigated the qualifications of the lowest bidder
including Bidder responsibility criteria of RCW 39.04.350(1) and project Special
Provision 1-02.14 or WSDOT Standard Specification 1-02.14. Bid tabulations and
Bidder verification documentation is attached.
Fiscal Impact/Cost Benefit Analysis: The Bid amount is $3,782,268.93. The
construction portion of the project is funded with a Federal Highway Administration
Surface Transportation Block Grant, and a WA State Recreation and Conservation
Office WA Wildlife and Recreation Program- Trails grant.
Recommendation: Public Works recommends that the Board authorize the Award of
Contract to Seton Construction Inc., and authorize the County Engineer to execute
necessary change orders for the project for up to 5% of the contract amount
($189,113.45, or an aggregate total of $3,971,382.38), by signing the attached
document and returning it to Public Works for further processing.
Department Contact: John Fleming, Project Manager, Ext. 217
Reviewed By:
3/V,Z.
Mark McCauley unty Administrator ..1-v Date
ON
rat' r 0r
Department of Public Works 623 Sheridan Street
Port Townsend,WA 98368
Jefferson County, Washington 360-385-9160
4'S'finsioc
DATE: February 28,2025
TO: Board of County Commissioners
FROM: Monte Reinders,P.E.,Public Works Director/County Engineer
SUBJECT: AWARD OF CONTRACT
Olympic Discovery Trail-Anderson Lake Connection Project
County Project No. 18019893
In the matter of awarding a construction contract for the above referenced work:
• The Call for Bids was issued by the Board of County Commissioners on December 23,2024.
• Due notice of the Call for Bids was given as required by law.
• Sealed bids were received and opened in public on February 7,2025 in the Commissioner's Chambers.
• The Public Works Department has completed checking the bids and has investigated the qualifications
of the lowest bidder including Bidder responsibility criteria of RCW 39.04.350(1)and project Special
Provision 1-02.14 or WSDOT Standard Specification 1-02.14.
• Bid tabs are attached for reference.
The Public Works Department recommends that the construction contract be awarded to the lowest responsive
and responsible bidder:
Seton Construction,Inc.of Port Townsend,Washington for their bid amount of$3,782,268.93 for the:
Olympic Discovery Trail-Anderson Lake Connection Project,County Project No. 18019893,
and, authorize the County Engineer to execute change orders for the project, due to unforeseen conditions
only, for up to 5% of the contract amount, or $189,113.45, for a total contract value, not to exceed
$3,971,382.38.
App . -
r �. J
Heidi ise . Date
Chair,Board of County Commissioners
Attached: Bid Tabulation
Bidder Verification Summary
COUNTY PROJECT NO 18019893
COUNTY ROAD NO.850200 BID TABULATION for OLYMPIC DISCOVERY TRAIL-ANDERSON LAKE CONNECTION PROJECT
FEDERAL AID PROJECT NO.STBGR-2016(030)
RCO PROJECT NO.20-1745
BIDDERS
BID OPENING DATE: FEBRUARY 7, 2025 Seton Construction Earthworks Solutions OMA Construction CR Construction Brumfield Consln/Dtion Intenwest Construction Nordlan0 Construction
ENGINEER'S ESTIMATE 4840 S.Discovery Rd. 8629156M St NE P.O.Box 429 45127 SE 140t St. P.O.Box 600 809 North Hill 85.6 123 Ponderosa Ptaee
BID OPENING TIME: 2:00 o.m. Pet Townsend,WA 98388 Arlington,WA 98229 Maple teary,WA 98038 North Bend,WA 88045 Aberdeen.WA 88520 Burlington.WA 9e233 NONbrhd.WA 98358
ITEM I TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL -
LW IT UNIT TOTAL UNIT TOTAL UNIT TOTAL
NO. QUANTITY UNIT ITEM DESCRIPTION BID BID BID BID _ BID BID BID BID BID BID BID BID BID BID BID BID
GROUP 1 LTRAIL) - - -
GENERAL REQUIREMENTS
1 96% LS Mobilization $287,193.00 $275,705.28 $231,000.00 $221,76000 1274,432.50 $263,455 20 $385,000.00 S389,600.00 $200,000.00 $192,000.00 5338,000.00 $322,560.00 $281,000.00 8269.76000 5350.000.00 $338,00000
2 98% LS Roadway Surveying $45,000.00 $43200.00 $72,000.00 S69,120.00 $45,440.40 T43,622.78 $50,000.00 $48,000.00 $40,000.00 $38,400.00 $57,600.00 S55,2913.00 $44,900.00 543,10400 $100,000.00 $98,000.00
'
3 96% LS ADA Features Surveying $2,500.00 $2 400.00 54,500.00 $4,320.00 $2,388.30 $2,292.77 $1,500.00 51,440.00 $2,000.00 $1,920.00 $5,760.00 $5,529.80 $2,360.00 $2,285.60 $5000.00 24,800.00
4 1 LS Spill Prevention,Control CountermeasuresISPCC)Plan $5,000.00 $5900.00_ $2,500.00 $2,500.00 51,710.00 51.710.00 $5,000.00 $5,000.00 $250.00 $250.00 $5,000.00 $5,000.00 $90000 $900.00 $1,000.00 $1,000.00
5 400 HR Training $70.00 $28,000.00 $5.00 $2,000.00 557.00 $22,809.00 $5.00 52.000.00 $110.00 $44,000.00 5162.50 505.000.00 $5.00 92000.00 $15.00 $8,000.00
6 79% LS Project Temporary Traffic Control S48000.130 $37,920.00 $135,000.00 $106,850.00 511.400.00 39,006.00 575,000.00 $59,250.00 $106,000.00 $83,740.00 1244,90000 $193,471.00 S168,000.00 $132,720.00 $60,000.00 $47,400.00
7 1 EST Work Zone Safety Contingency $5,000.00 $5000.00 $5,000.00 $5,000.00 $5.00000 $5,000.00 55,000.00 $5,000.00 $5,000.00- -
f5,000.00 $5.000.00 $5,000.00 $5 000.00 55,000.00 $5,000.00 $5,000.00
EARTHWORK _
8 98% LS Clearing and Grubbing $273,000.00 $267,540.00 1325,00000 $318,500.00 $129,846.00 S127,249.08 $200,000.00 $196,000.00 $85,000.00 S83,300.00 $165,130.00 5181,827.40 5610000.00 $597,800.00 $285,000.00 $259700.00
9 1 LS Removal of Structure and Obstruction $12,000.00 $12,000.00 $12,000.00 512,000.00 $5,700.00 $5,700.00 $5,000.00 $5,000.00 $59.000.00 $19,000.00 $62,000.00 $62,000.00_ $12,000.00 512,00000 $20,000.00 $20,000.00
10 24,975 C.V. Roadway Excavation Ind.Haul $23.00 $574,425.00 $8.00 $149,850.00 $6.70 $167,332.50 $22.00 $549,450.00 514.00 $349,650.00 56.00 $149,850.00 $9.00 5224,775.00 $16.00 $399,600.00
11 2.498 C.Y. Unsuitable Foundation Excavation Intl.Haul $34.06 $84,932.00 $17.00 $42,468.00 $9.55 523,855.90 $15.00 $37,470.00 $35.00 $87,430.00 $38.50 $96,173.00 $14.40 $35,97120 $20.00 $49.98000
12 16,920 TN Gravel Borrowlncl.Haul $33.00- $558,360.00 $20.00 $338,400.00 $29.55 $499,986.00 $15.00 $253,800.00 538.00 $642,960.00 $16.00 $270,720.00 $25.00 $423,000.00 526.00 $439,920.00
13 23,770 C.V. Embankment Compaction $8.00 $190,160.00 $9.50 5225,815.00 52.15 551,105.50 $2.00 $47,540.00 $6.00 $142,620.00 $6.00 $142,620.00 $7.40 $175,898.00 $4.00 $95,080.00
14 14,522 S.F. 9wMg_or Extra Excavation Class El $2.00 $29,044.00 $0.50_ $7,281.00 $1.71 $24,832.62 $2.00 $29,044.00 $0.25 $3,630.50 $10.00 $145,220.00 $1.00 $14,522.00 $2.50 $36,305.00
BASES
15 11,660 TN Crushed Surhtlng Top Courts $45.00 f524,700.00 $32.00 5373,720.00 536.51 3426956.40 $44.00 $513,040.00 $41.00 $478,080.00 $45.00 $524,700.00 $54.20 $631,972.00 $44.00 5513,040.00
SURFACE TREATMENTS AND PAVEMENTS
18 3,695 TN Commercial HMA _ 5142.00 $524,690.00 $155.00 $572,725.00 $146.25 1540,393.75_ $189.00 $624,455.00 $164.00 $605,980.00 3189.00 $898,355.00 $169.00 5624,455.00 $185.00 1683,575.00
17 32,050 S.Y. Soil Residual I6bi,.Je $0.25 $8,012.50 $0.75 $24,037.50 $0.95 $30,447.50 $0.40 $12.820.00 $0.10 53,2135.00 $1.00 $32,050.00 $0.80 S25,640.00 $0.90 $28,845.00
DRAINAGE STRUCTURES,STORM SEWERS,SANITARY
SEWERS,WATER MAINS,AND CONDUITS
18 760 LF O.V Reinf.Conc.Culvert Pipe 12-In.Dr81n. $100.00 $76,000.00 $85.00 $64,600.00 $92.70 170,452.00 $85.00 564,600.00_ $128.00 597,280.00 $105.00 $79,800.00 $87.00 988,120.00 $175.00 $133.000.00
19 235 IF O.III Reinf.Conc.Culvert Pipe 18-In.Diana. 5130.00 $30.550.00 $105.00 524,675.00 $131.55 $30,914.25 5185.00 $43,475.00 $144.00 $33,840 00 $122.00 528,670.00 $110.00 $25,850.00 $225.00 $52,875.00
20 305 LF Cl.III Reinf.Conc.Culvert Pipe 24-In.Diem. $150.00 $45.750.00 $135.00 $41 175 00 5158.95 $48,479.75 5300.00 $91,500.00 $167.00 550,935.00 $150.00 $45,750.00 $15000 $45,750.00 $310.00 594,55000
21 130 LF O.Ill Reinf.Conc.Culvert Pipe 30-In.Diem. $200.00 $26,000.00 $190.00 $24,700.00 $214.20 $27,846.00 $400.00 $52,000.00 S268.00 $34,840.00 $191.00 S24,830.00 5270.00 535,100.00 $400.00 $52,00000
22 75 IF Ducal Iron Cub.Pipe/2-In.Diem. $150.00 $11,250.00 $95.00_ $7,125.00 5138.70 $10252.50 $250.00 $18,750.00 595.00 $7,125.00 $120.00 $9,000.00 $115.00 $8,625.00 $200.00 $15,000.00
23 385 LF Comgated Pdyethykene Storm Seaver Pipe 6-In.Dam. $80.00 _ $30,800.00_ $25.00 $9,825.00 $31.85 $12,262.25 $65.00 $25,025.00 $73.00 $28,105.00 $33.00 $12,705.00 $20.00 $7,700.00 $40.00 $15 400-D0
24 3 EA Concrete mint $1,100.00 , $3,300.00 51,800.00 55,400.00 52,694.00 $8,082.00 $1,500.00 $4,500.00 $2,800.00 18,400.00 53,300.00 $9,900.00 51,200.00 $3,600.00 53.000.00 $9.000.00
25 13 EA Catch Basin Type 1 $3,000.00 $39,000.00 52.200.00_ $28,600.00 $3,825.00( 549,725.00 58,500.00 $84,500.00 $1,635.00 521,255.00 $4,000.00 $52,000.00 $1,900.00 $24,700.00 $3,000.00 539,000.00
26 1 LS U85ty Adjustment _ $1821.55 $1,821.55 5100.00 $100.00 $5,960.00 $5,960.00 $5,000.00 55,000.00 57,500.00 $7,500.00 $6,500.00 $6,500.00 $5,70000 $5,700.00 $5.000.00 $5.000.00
27 1.700 LF Infiltration Trench $15.00 $25,500.00 $45.00 576500.00 $44.00 $74,800.00 $30.00 $51,000.00 $12.00 $20,400.00 $110.00 $187,000.00 $86.00 $112 200.00 $75.00 $127,500.00
28 600 LF Bloretention Swale _ $25.00 $15,000.00 $70.00 $42,000.00 $72.65 $43,590.00 $80.00 $48,000.00 $16.75 S10,050.00 $195.00 $117,000.06 576.00 $45,600.00 $110.00 $66,000.00
MISCELLANEOUS CONSTRUCTION
29 98% LS Erosion Control and Water Pollution Prevention $40,000.00 338.400.00- $91,000.00 $87,360.00 S24,874.80 $23,879.81 $75,000.00 $72,000.03 $35,000.00 133,600.00 $107,520.00 $103,21920 $173,000.00 $168.080.00 $115,000.00 $110,400.00
30 96% LS Stonnwater Pollution Prevention Plan(SWPPP)a lmpkmenalion $5,000.00 $4,800.00 510,600.00 $10,176.00 537,620.03 536.115.20 $1,000.00 $960.00 318,00000 $17,260.00 $125,000.00 $120,000.00 $21,500.00 $20.640.00 $1,000.00 $980.00
31 186 EA Plant Selection Abies grandks/Grand Fir.I Gal. $15.00 $2,790.03 $14.00 52.804.00 $14.30 $2959.80 $15.00 $2,790.00 528.75 $5,347.50 $16.00 $2,976.00 $15.00 52.790.00 $20.00 $3,720.00
32 186 EA PawlSelection Paeudawga menneek/Douglas Fir,1 Gal. $15.00 $2,790.00 $14.00 52.604.00 $14.30 $2,659.80 $15.00 $2,790.00 $28.75 55,347.50 $18.00' $2,976.00 $15.00 $2,790.00 $14.00 $2,604.00
33 188 EA Plant Selection Acer macrophylklnn/Big Leaf Maple,1 Gal. $15.00 $2.790.00 $14.00 $2,804.00 $14.30 $2,659.80 $15.00 $2,790.00 $28.75 55,347.50 $16.00 52,976.06 $15.00 $2.790.00 $14.00 52.604.00
34 1830 EA Rini awwAw,CorAn m,,.n,no mum.e I a.w.a wanes.t o.r $15.00 $24,450.00 $13.00 $21,190.00 $13.20 $21,518.00 $12.00 $19,560.00 $22.50 $36,675.00 $15.00 $24,450.00 $13.50 $22,005.00 $20.00 $32,600.00
35 2280 EA Pram Selection Manonia aoultolium/Tact Oregon Grape.1 Gal. $15.00 $34,200.00 $14.00_ $31.920.00 $14.74 $33,607.20 $15.00 $34,200.00 $22.75 $51,870.00 $17.00 1,38,760.00 $15.00 534,200.00 $14.00 $31,920.00
Selection 1830 EA Plant Seetion Ribes sengurneum/Rebllawarirg Con 9L 1 Gal. $15.00 $24,450.00 $14.00 $22,820.00 $14.74_ $24,026.20 $15.00 $24,450.00 $22.50 $36,875.00 $17.00' $27,710.00 $15.00 $24,450.00 $14.00 $22,820.00
37 1630 EA Plant Selection Rosa nutkana/Nop&a Rose.1 Gal. $15.00 S24,450.00 $13.00_ $21,190.00 $1320 $21,516.00 $15.00 $24,450.00 $22.50 $36,675.00 $15.00 $24,450.00 $13.50 522,005,00 $14.00 $22,820.00
38 1830 EA Pant Selection Rubus parvillorus/Thimbleberry,1 Gal. $15.00 S24,450.00 113.00 $21,190.00 $13.20 $21,516.00 $15.03 $24,450.00 $22.50 $36,875.00 $15.00 $24,450.00 $13.50 $22,005.00 $14.00 S22,820.00
39 2280 FA Plant Selection Symphoncarpos albus/Snowberry,1 Gel. _
FA $15 $34,200.00 $14.00 $31,920.00 314.83 $33,356.40 515.00 134.200.00 122.75 S51,870.00 516.00 $36,480.00 115.00 $34 20000 $14.00 $31,920.00
40 1590 Pint Selection Lancers invduaeta/Twaawly,5'Llve Stake $2 $3,180.00 $10.00 $15,900.00 $10.58 $16,790.40 $10.00 115.900.00 $7.50 511,925.00 $12.00_ $19,080.00 $11.00 $17,490.00 $9.00 $14,310.00
41 1590 EA Montew.C.n,nvwerpaep..w.,.1*.1was s L.w.4. S2 $3,180.00 $10.00 $35,900.00 $10.56 518,790.40 $10.00 S15,900.00 $7.50 $11,925.00 $12.00 $19,080.00 $11.00 $17,490.00 $9.00 $14,310.00
42 80 EA Plant Sea o a1w coon Salsa I Peofc Wilke 5'Use
ve Stake $2 _ $180.00 $17.00 $1,380.00 517.18 $1,372.80 $16.00 $1,2110.00 $11.75 5940.00 519.00 51,520.00 $17.50 $1,400.00 $8.00 $640.00
43 1590 EA _Plant Selection Sails eRM Cnsa l Silks Yallow,5'Live Stake $2 $3,180.00 $17.00 $27,030.00 $17.16 $27,284.40 $18.00 $,5,44000 $7.50 $11,925.03 $19.00 $30,210.00 $17.50 527,825.00 $8.00 $12,720.00
44 3 AC Seeding,Fertilizing,and Mulching-Stommvater $4,000.00 $12,000.00 $5,100.00 $15,300.00 $5,115.00_ $15,345.00 $5,000,00 115,0130.00• $11,015.00 $33,045.00 55,1300.00 $16,800.00 $5 230.00 $15,690.00 $9,200.00 $27,600.00
45 8.7 AC Seeding,Fertilizing,and Mulching-Upland Restoration $4,000.00 $34,80000_ $8,700.00 S58,290.00- 56,710.00 $58.377.00 $6,100.00 $53,070.00 $9,552.00 $83,102.40 $7,500,00' $85,250.00 $7,000.00 560,900.00 $9,000.00 $78,300.00
46 0.3 AC Seeding.Fertilizing,and Mulching-Roadside Restoration $4,000.00 $1,200.00 $5,100.00 $1,530.00 $4,950.00 $1,485.00 $4,603.00 51,3130.00 $24,506.00 $7,351.80 $5,500.00 $1,650.00 $5,060.00 $1,518.00 $15,000.00 S4,500.00
47 5140 CY Topso9,Type B $6.00 $30,840.00 $10.00 $51,400.00 $41.25 $212,025.00 $10.00 $51,400.00 $65.00 $334,100.00 S1300 $66.820.00 $1220 162,708.00 535.00 5179,90000
48 17100 SY Fine Compost $3.00 _ 551,300.00 $3.00 $51,300.00 $3.00 551,300.00 $3.00 $51,300.00 $4.00 $68,400.00 $5.00 $85,500.00 $3.00� $51,300.00 $3.10 $53910.00
49 20850 SY Bark or Wood Chip Mulch $4.00 $83,400.00 53.00 $62.550.00 $4.85 $101,122.50 $5.00 $104,250.00 $12.25 3255,412.50 $3.30 $613,805.00 $3.00 $82,550.00 $8.00 $166.800.00
50 94% EST Fine Grading $6,150.00 $8,150.00_ $6,150.00 $6,150.00 $6,150.00 56,150.00 56,150.00 $8,150.00 $6,150.00 56,150.00 $6,150.00 $6,150.00 $6,150.00 $6,150.00 $6,150.00 56.15000
51 1550 LF Root Bonier $10.00 $15,500.00 $14.00 $21,700.00 $13.75_ 521,312.50 $13.00 $20,150.00 $20.25 $31,387.50 $17.00 $26,350.00 $14.00 $21,700.00 $17.00 526.350.00
52 2 EA Bollard,Type 2 11,500.00 $3,000.00 $2,500.00 55,000.00 51,768.50_ $3,537.00 $500.00 $1,000.00 $2,500.00 55000.00 $1,800.00 $3,600.00 $2,300.00 $4,800.00 52,000.00 84,000.00
53 160 LF Chain Una Fence,Type 3 542.00 _ $6,720.00 $35.00 $5,600.00 $37.10 $5,936,001 $65.00 $10,400.00 $35.00 $5,60000 $50.00 38,000.00 $80.00 $9,600.00 $80.00 $9,600.00
54 88 LF Detectable Wanting Surface $75.00 56,600.00 $83.00 57,304.00 $85.00 57.480.00 $20.00 $1,780.00 $45.00 $3,960.00 586.00 57,568.00 $74.00 $6,512.00 $75.00 58,800.00
55 60% LS Permanent Signing and Pavement Marking 511,500.00 56,900.00 $44,000.00 $26,400.00 $45,748.20 527,448.92 535,000.0E 521,000.00 56,000.00 $3,600.00 $32,500 00 519.500.00 $42,200.00 $25,320.00 546,000.00 527.800.00
56 350 SF Gravity Block Wall $80.00 $28,000.00 55800 520,300.00 564.25_ 522,487.50 585.00 529.750.00 $65.00 $22,750.00 $150.00 S52,500.00 556.0E $19,800.00 $100.00 $35,000.00
57 2015 LF Glare Screen,Type 2 $50.00 5100,750.00 $44.00 S88,88000 $47.35 $95,41025 $45.00 690,675.00 $40.25 $81,103.75 $42.00 584,630.00 $43.50 $87,65250 $45.00 $90,675.00
MATERIALS
58 230 TN Quarry Spells $50.00 511,500.00 $75.00 $17250.00 590.0E 520,700.00 $85.00 519,550.00 $85.00 519,550.00 S190.00 143,700.00 $150.00, 534.500.00 $100.00 $23,000.00
Group 1(Trail)Total _ S4,102,1110.33 $3,664,526.60 $3,563,076.63 $4,025,254.00 $4,416,465.96 $4,543,667.20 $4,491,188.30 54,657,803.00
GROUP 2(SR 20) ,
GENERAL REQUIREMENTS
1 4% LS Mobilization $287,193.00 511,487.72 5237,0000E $9,240.00 5274,432.50 $10,977.30 $400,000.00 516,000.00 $200,000.00 $8,000.00 514,000.00 $560.00 5281,000.00 511,240.00 5350,000.00 514,000.00
2 4% LS Roadway Surveying $50,000.00 52.000.00 572,00000 $2,880.00 545,440.40- 51,817.62 525000.00 $1,000.00 540.000.0E 51000.00 52,400.0E $96.00 $44,900.00 51,796.00 $100,000.00 $4,000.00
3 4% LS ADA Features Surveying 52,500.00 $100.00 545500.00 5130.00 $2,388.30 $95.53 575,000.00 53,00E 00 $2,000.00 $80.00 5240.00 59.6E 52.360.00 $94.40 $5,000.00 $200.00
4 21% LS Project Temporary Traffic Control $48,000.00 $10,080.00 $135.003.00 528.350.0E $11,400.00 $2,394.00 $35,000.00 $7,350.00 $106,000.00 $22,280.00 S85,100.00 513,671.00 $168,000.00 $35,280.00 $80,000.00 512,600.00
EARTHWORK
5 2% LS Clearing and Grubbing 5273,000.00 55,460.00 5325,000.00 56,500.00 5129.846.00 $2,596.92 $50,000.00 51,000 00 585,000.0E 11,70000 $3,370.00 5871E 5610,000.00 512,200.00 $265,000.00 55,300.00
6 25 C.V. Roadway Excavation Ind.Haul $23.00 _ $575.00 $8.00 $15003, 56.70 5187.50 $100.00 52,500.0E 550.0E 51250.00 $13.00 5325.00 $26.00 $850.00 $75.00 51,875.00
7 2 C.V. Unsuitable Foundation Excavation Intl.Haul 534.0E $86./1U 5500E 5700.0E $9.58 $19.12 5500.0E 51,000.0E 5700.0E 5200.0E 540.0E_ 580.0E 5280.0E 5520.0E 575.0E 5150.00
8 20 TN Gravel Borrow Ind.Haul $33.00 5680.00 $4500 5900.00 $29.55 $591.00 585.00 51.300.00 5,65.00 51,300.00 544-75 5895.00 $55.00 $1,100.00 $75.00 51,500.00
9 20 C.V. Embankment Compaction $8.00 5150.00 57.00 $140.00 $2.15 $43.0E $5.00 5100.00 $10.00 5200.00 $11.25 S225.00, $37.00 $740.00 55.00 $10000
10 210 S.F. Shoring or E tra Excavation Class El $2.00 $420.00 $0.50 $10500 $1.71 5359.10 f $10.00 $2,100.00 $5.00 $1,050.00 $8.50 $1,785.00 $1.50 5315.00 53.00 $630.00
BASES _
11 10 TN Crushed Surfacing Top Course $45.00 $450.00 $32.00 5320.00 $36.55, 5385.50 $65.00 $850.00 $55.00 5550.00 $49.00 $490.00 $120.00 51,200.00 575.0E $750.00
SURFACE TREATMENTS AND PAVEMENTS
12 5 TN Commercial HMA 5142.00 5710.90 5600.00 53,000.0E 5598.50 52,992.5E 5500.00 52,500.00 5164.00 5820.00 $700.00 53,500.00 S50000 53,000.0E 585000 153,250.00
13 250 S.V. Soil Residual Herbicide $025 $62.50 $0.75 $187.50, $0.95 $237.50 $2.00 5500.0E $0.10 $25.00 $6.00 51,500.00 50.80 5200.00 $2.00 5500.00
DRAINAGE STRUCTURES,STORM SEWERS,SANITARY
SEWERS,WATER MAINS,AND CONDUITS
14 35 LF_Cl.V Reid.Conc.Culvert Pipe 12-In.Dram. 5100.0E 53,500.00 f08.00 $3,010.00 $92.70_ $3244.50 5120.00 54,200.0E 510000 53.500.05 $85.05 52,975.0E $110.00 53,850.00 5200.00 57,000.00
15 12 LF Infiltration Trench $15.00 $180.00 544.00_ 5528.00 $44.00 5528.00 $30.00 2360.00 $25.00 5300.0E 5280.0E 53,120.0E $93.00 51,118.00 $150.00 51,800.00
MISCELLANEOUS CONSTRUCTION
16 4% L5 Erosion Control and WaterPollution Prevention S40,000.00- 51.800.00 $91,000.00 $3,840.00 537,520.00 $1,504.80T $15,000.00 5600.00 535,000.0E 51,400.0E 54,480.0E 5179.20 $173,000.00 56,920.00 5115,000.00 54,600.00
17 4% LS Sran,waoer P011ulion Prevention wan(SWPPP)6 Implementation $5,000.00 5200.0E $10,600.00 5424.0E $17,100.00 5684.00 $5,000.00 $200.00 518,000.00 $720.00_ 515,5000E $620.00 527,500.0E 5860.0E 51,000.0E 540.0E
18 6% EST Fine Grading 5400.00 $400.00 $400.00_ $400.00 5400.00 5400.00 5400.00 5400.00 5400.00 5400.00 5400.00 5400.00 $400.00 5400.00 5400.00 5400.00
19 14 L.F Detectable Warning Surface $75.00 51.050.00 $78.00 51,092.00 $85.00 $1,190.00 520.00 5280.0E_ $25.00 5350.0E $86.00 51,204.00 $80.00 51,120.00 575.00 $1,050.00
20 1 LS Illumination System 580,000.00 560.000.00 $50,000.00 550,000.00 $66,550.00 $60,550.00 $75,000.00 $75,000 00 $79,925.00 $79,925.00 $63,000.00 $63,000.00 5115,000.00f 5115,000.00 586,000.00 $88000.00
21 1 LS Rectangular Rapid Fleshing Beacon System 5160,000.00 5160,000.00 580,000.00 180,000.00 5110,605.00 5110,805 00 580,000.00 $80,000.00 $82,575.00 582,575.0E $97,000.00 S97,000.05 560,000.00 560,000.00 585,000.00 585,000.00
22 40% LS Permanent Signing and Pavement Marking 511,500.00 54,800.00 544.000.00 517,800.00 545,748.20 518 299.28 $10,000.00, $4,000.00 56.000.00 52.400.00 555,000.00 $22,000.00 545200.00 518,080.00 548000.00 $18,400.00
GROUP 2(SR-20)SubtoW: 5263,763.22 $201,746.60 $226,662.17 _ 5204,040.0E $210,605.00 $213,702.20 $275,681.40 $246,146,00
GROUP 2(SR-20)Salsa Tat(9.140:_ 524,002.45 518.995.93 $20.535.28 518,567.84 _ $19.165.06 519,448.90 $25,087.01 522.672.20
GROUP 2(SR-20)Total: $267,766.97 5227,742A3 $246,197.45 $222,607.64 1229,770.06 $233,149.10 $300,766.41 $271,817.20
. 1lJJ PROJECT TOTAL: $4,3N056.00 _ $3,762,265.93 13,809,274.06 44,247,861.64 $4,646,236.01 $4,776,836.30 $4,791,956.71 $4,SM,620,20
Prepared,Project Manager John Fleming'nz J . Data: 2/122025 _
I I vVV �`-I NOTE: YELLOW HIGHLIGHTED NUMBERS WERE CORRECTIONS MADE BY JEFFERSON COUNTY PUBLIC WORKS AS PER 2024 WSDOT STANDARD SPECIFICATIONS SECTION 103.1: "After
Reviewed-Eng.Svc.Manager Erie Kuzma O9ba: `II_7J1 opening and reading Proposals,the Contracting Agency will check them for correctness of extensions of the prices per unit and the total price. If a discrepancy exists between the price per unit
I I and the extended amount of any Bid item,the price per unit will controL"
Appro County Engineer Enpine Monte RaiMra,PEI Dale: � L/� 1 1 1 I I I . _. I I I
w M to LOW TO HIGH BID ORDER G G m CO
d z i m m O
. a 0
m 3 F D m z s. m
0F
Q m
D jig ()n Pa
m g' '� m
c m
n
y u g 0 m
y C m
m o 0
Y k k r k Y ; C m ° O x•
tp $ BID AMOUNT(W/O Salmi Tax) m 9 w Z
co 5
83 - 8 0 a a e uO c
S APPARENT LOW BIDDER 00 3
m H H Co g y m BIDS ENTERED IN BID TABULATION SHEET m D
2
A rg ZZ g g g MATH VERIFIED J -<
m0, m m.20 m ADOENDUMS ACKNOWLEDGED BY CONTRACTOR F
�� >
On In PROPOSAL SIGNATURE PAGE SIGNED ZO
m
t.
o m TO
Z
m yy LL FEDERAL I.D.NO. Z
Z G A 5
Q ESSS m x
$9 q 9T g 0, y y 6%PROPOSAL BOND INCLUDED rrl
Z
m
m Z m Z m Corporate seal on bid bond y
w 0 w 0 rp
O
m m m m m m NON-COLLUSION DECLARATION RETURNED WITH BID Z
w w Cl w cow m „PROPOSAL
m m m m m m m CERT.FEDERAL AID CONTRACTS(272-040)RETURNED WITH BID
Co CO Co Co CO w w PROPOSAL
tw�r N 0, 0 WAGE LAW COMPLIANCE CERTIFICATION SIGNED(272.009)
p(3 OOw;
Co On !m E'-uml F;i w w CO mw SUBCONTRACTOR LIST RCW 39.30.060(171-016)
$ 6` 00
$a a m$ w m y m a a BIDDER QUESTIONNAIRE(272-022)
In 3 3 N m DBE UTILIZATION CERTIFICATION COMPLETED(]7]-086)
i 4 4 N Co re DBE BID ITEM BREAKDOWN(272-064)
g g y CO g OBE WRITTEN CONFIRMATION DOCUMENT COMPLETED)t22-061)i
9
D > i a D DBE'Good Filth Effort'(GFE)Docunwntatlon(I necessary) e
y 01 H g pioO�nr DBE TRUCKING CREDIT WITHIN 6 DAYS OF AWARD(272056)
TRACTOR DBE
TUS:
El- m• m. in m1 m m_ Attp:llva PRIME do wa.9ov//PaMartlOAMWBE/DBEOirectoryl
A m a m m m SUBCONTRACTOR DBE FIRM(S)CERTIFIED BY OME:
w w w Co Co Co WB
www.omwba.wa.900IIIreCtnryol<artMad-firm.
4 4 a 9,V 4 4 4 4 SUBCONTRACTOR DBE FIRM(S)CHECKED ON MT OF
g g f w g g g SUSPENDED FIRMS:
8 4 ; fy QPy 5 http:IMsdotwa.9ovlpartn.rs/OMWBE/OBEDlnctoryl
O g T ii I WA STATE UNIFIED BUSINESS IDENTIFIER NO.(UBI):
rL3 bttps:Ilaecure.Ini.wa.9ovNeriryl
S V. . s J Q
A $ t5 STATE EXCISE TAX REGISTRATION NO.(MAY BE SAME AS UBN:
http.:INacure.dor.wa.povlgleunauoU_I#T
a pi �nl Link at bottom of LNI verification page
O "' 00 JrA QQQy
O4 CONTRACTOR LICENSE NUMBER
80 yy8dy4t,^�� g i CONTRACTOR'S LICENSE EXPIRATION DATE:
grRP1 alRS hlipe:/Ieecure.Inl.we sonlver(yl
A m m m m m A CONTRACTOR LICENSE VERIFIED ON LSI WEBSITE
Cl w w w w rn w httpe:llsecure.lni wa.govN6rlly/
ffi -n @@@@ ppp�p g$ LQI INDUSTRIAL INSURANCE ACCOUNT NO.:
yyy X r K I I O 1g 2 https:llsecure.lni wa.govlverify/
1.tl FC�j. Fay �y Cg K IBg•H htme:/DUNunNIniINSURANCEpIPREMIUM STATUS:
1.
S dx3 o d3 la 3+z 5' e' d3 p0. i3 LRir
4 4 4 4 4 4 4 CONTRACTOR CHECKED ON LAI DEBARRED CONTRACTORS T. n
g g 0
LIST:
bttp:/Fwww.lni.wa.pov/TradesLkanoinglPrevWapsIAwardin9Apencl V C C
f [ $ H F E f e9/OaberradContractoraldefault.a.p g. C
o' C 0
ile i 4x�° sX y;o ilf 4I roy o MAN CEMENT(SA I WEB6ITEEDERSYSw.aORM/ 3 1 m
S a a aC 4 g a B a g Si'' EMPLOYMENT SECURTIY DEPARTMENT NO.: 8N
°�1 16 ,3L ¢5 emell:publicworksgesd.wC.0ov phone:(260)690�99 r, �3
E7M r6$Y (VERIFICATION OF ACTIVE UNEMPLOYMENT ACCOUNT) ; N
U
ay i mat y y a ii n y y F COMPLIANCE WITH APPRENTICESHIP UTILIZATION
s D$ `$q D rl D �. D � s3i .' REQUIREMENTS OF RCW 29.01.3206/9.04(WA
igl zg Xg 6)a f1s igal igml ig 1I i39g 11 for projects<l million
In �9n in m m UM CONTRACTOR TRAINING VERIFICATION per RCW
3 3 3 3 2904.360(1Nf)(*tractive July 1,2016)Included on IN!Verification
a TL 1a It TL P•g•:http.Ilsecure.Ini.wa,gOVherlN/
Tt 'M.
A. A. A. D rld a VOLUNTARY PRE-BID WALK THROUGHr iRX SUPPLEMENTAL BIDDER CRITERIA SP 1-02.14
(SUBCONTRACTOR RESPONSIBILITY,CLAIMS AGAINST
D D D D D D A. (SUBCONTRACTOR
AND BONDS,PUBLIC BIDDING CRIME,TERMINATION
FOR CAUSE OR DEFAULT,LAWSUITS