HomeMy WebLinkAboutBLD2001-00302 •
kUILDING PERMIT APPLICATION MLA01-00283
Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD01-00302 Received Date: 5/29/2001
SITE ADDRESS: 255 MOONDANCE DR
PORT LUDLOW, 98365
APPLICANT: STEPHEN SEYL JR PHONE: (360)437-8146
PO BOX 364
QUILCENE WA 98376
SUBDIVISION: Block: Lot: T 92
PARCEL NUMBER: 821334004 Section: 33 Township: 28 N Range: 01 E
CONTRACTOR: OWNER PHONE:
ARCHITECT/ WEST SOUND ARCHITECT & DESIGN
ENGINEER : PO BOX 1452
KINGSTON WA 98346
PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION 69,442.00 MAIN: 1,020
CODE EDITION: 1997 ADD'L: HEAT TYPE: EEE
OCCUPANCY: R_3 HEAT BASE: HEAT TYPE: WOD
OCCUPANCY: UNHEATED: #OF STORIES:
CONST TYPE: 5N OTHER:
GARAGE: 1,020 SHORELINE:
CONST TYPE: SETBACK:
DECK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: PWELL
PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 1 Prop: 1 Seismic Streams
Total: 1 ' Total: 1 Flood Way Floodplain
Routing Date: F&W Landslide
5 h,k, s,,,,L..."
Shoreline Aquifer
Forest: Commercial Rural _
Type Amount Paid By: Date: �rKece gyp: Approveaivate Conditions
Permit $783.75 MAM 05/29/01 28353
Plan Check $235.13 MAM 05/29/01 28353
State Building Code $4.50 MAM 05/29/01 28353
Potable Water Application $30.00 MAM 05/29/01 28353
Total: $1,053.38
• •
JEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
UNIFIED DEVELOPMENT CODE
TYPE I LAND USE PERMIT
APPLICANT: STEPHEN SEYL JR
PO BOX 364
QUILCENE WA 98376
DATE ISSUED: June 06, 2001
DATE EXPIRES: June 06, 2002
MLA NUMBER: MLA01-00283
PROJECT PLANNER: M FARFAN
PROJECT DESCRIPTION:
SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
PROJECT LOCATION:
Parcel number 821 334 004 in Section 33, Township 28, Range 01 East, WM located at 255 Moondance Dr, Port
Ludlow, WA 98365
FINDINGS:
1.) The Administrator finds that this application complies with applicable provisions of the Unified Developmen
Code, all other applicable ordinances and regulations, and is consistent with the Jefferson County
Comprehensive Plan and Land Use map.
2.) The application was reviewed by the Jefferson County Department of Community Development staff on June 5,
2001 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified
Development Code (UDC). After an initial Geographic Information Systems mapping review and an
investigative site inspection, the following ESAs were confirmed to be present on the subject property:
Landslide hazard area 1 (northern half of parcel) and SUSC & SAPA aquifer recharge.
3.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow
percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic
formations that contain sufficient saturated permeable material to yield significant quantities of water to wells
and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson
County.
4.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid
infiltration of recharge waters to groundwater aquifers.
5.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge
Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1)All
Industrial Land-Uses (2)All Commercial Uses (3)All Rural Residential Land Uses requiring a Discretionary Use
or Conditional Use Permit(4)All Rural Residential Land Uses with nonconforming uses that would otherwise
require a Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential Developments
(6) Unsewered residential development with gross densities greater than one unit per acre. All of the above
listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified
Development Code.
6.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and
groundwater that may combine to create problems with slope stability, erosion, and water quality during and
after construction or during natural events such as earthquakes or severe rainstorms.
7.) Jefferson County has determined that the use of real property for agriculture and forestry operations is a high
priority and favored use in the county. The county will not consider to be a nuisance those inconveniences or
discomforts arising from such operations, if such operations are consistent with commonly accepted best
management practices in compliance with local, state, and federal laws. If your real property includes or is
within five hundred (500) feet of real property designated as Rural Residential 1:10 or 1:20, Rural Industrial,
Rural Commercial, Agriculture, or Forestry, you may be subject to inconveniences or discomforts arising from
such farming and forestry operations, including but not limited to noise, tree removal, odors, flies, fumes, dust,
smoke, the operation of farm and forestry machinery during any 24-hour period, the storage and disposal or
manure, and the application of permitted fertilizers and permitted pesticides. One or more of these
inconveniences may occur as a result of agricultural and forestry operations which are in conformance with
• .
existing laws and regulations.
8.) Jefferson County determined that this proposal is categorically exempt from review under the State
Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
9.) The site plan as submitted with the single family residence with attached garage building application on May 29
2001 has been reviewed for consistency under the UDC, and has been approved by Jefferson County
Department of Community Development. Any modifications, changes, and/or additions to the stamped,
approved site plan dated June 5, 2001 shall be resubmitted for review and approval by Jefferson County
Department of Community Development.
10.) This approval is for a single family residence with attached garage only. Any future permits on this site are
subject to review for consistency with applicable codes and ordinances and does not preclude review and
conditions which may be placed on future permits.
11.) Potable water(individual well) was approved on June 4, 2001 for the single family residence.
12.) A septic permit (SEP94-00012)was finaled on November 6, 1997 by the Jefferson County Environmenal Healt
Department for a three bedroom septic system.
13.) A geotechnical report was not required for this application.
14.) The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive Land Use Map effectiv
August 28, 1998.
CONDITIONS:
1.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the Landslide Hazard
Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area.
2.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer
disturbance occur during construction, the Unified Development Code (UDC) Administrator shall require
replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated
buffer without prior authorization by the UDC Administrator.
3.) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be
marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from
the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer- Do
not Remove or Alter Existing Vegetation."
4.) The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder
of the subject property through installing logs, trees, a hedge row, or any other prominent physical marking
approved by the UDC Administrator.
5.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation.
The submitted proposal does not require additional aquifer protection measures. However, during construction
the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and
defined in the Stormwater Management Manual for the Puget Sound Basin (see attached).
6.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and
sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during
construction, and in the design and operation of stormwater and drainage control systems.
7.) The building height shall not exceed 35 feet.
8.) Minimum setback from Teal Lake Road (a county local access road, C505309) and Moondance Lane (private
road P458) is 20 feet. Minimum setback from south property line is 5 feet and minimum setback from north
property line is 250 feet due to the designated commercial forest lands.
9.) Maximum lot coverage shall not exceed 25%.
10.) A minimum of two (2) on-site parking spaces is required for the single family residence.
NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal
ordinances, regulations, or statutes applicable to the proposed development.
Development pursuant to this permit shall be undertaken subject to the applicable development and performance
standards of the Jefferson County Unified Development Code.
If during excavation or development of the site an area of potential archaeological significance is uncovered, all
activity in the immediate area shall be halted, and the Administrator shall be notified at once.
• •
The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon
became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA,
any person may bring lawsuit against any individual or agency that"takes" listed species (defined as causing
harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service
can levy penalties. All areas in Jefferson County are included as"critical habitat"for a listed species.
Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if
protective measures are not taken. To minimize the potential to damage habitat, all property owners developing
adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following:
- Set back buildings, utilities and roads as far as possible from surface waters (streams, rivers, lakes, marine
waters), or at least 150 feet from the edge of the water
-All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters
- Remove minimal vegetation for site development, especially large trees
-Allow trees that have fallen into surface waters to remain there
- Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into
surface waters or roadside ditches
Any individual, group, or agency can bring suit for a listed species "taking", even if you are in compliance with
Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a
professional fisheries habitat biologist, and following the recommendations for site development provided by the
biologist. For more information, contact the National Marine Fisheries Service in Seattle at (206)526-6613, or the
U.S. Fish and Wildlife Service at(503) 231-6121.
Pursuant to RCW 36.70C, the applicant or any aggrieved party may appeal this final decision to Jefferson County
Superior Court within twenty-one (21) calendar days of the date of issuance of this land use decision. For more
information elated tojudical appeals see UDC Section 8.5.2.
UDC Administrator
• S p.
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451 (800) 831-2678
PERMIT#: BLD01-00302
SITE ADDRESS: 255 MOONDANCE DR Received Date 05/29/2001
PORT LUDLOW, 98365 Issue Date 06/6/2001
APPLICANT: STEPHEN SEYL JR Expiration Date 06/6/2002
PO BOX 364 PHONE: (360)437-8146
QUILCENE WA 98376
SUBDIVISION:
PARCEL NUMBER: 821334004 Block: Lot: T 92
Section: 33 Township: 28 N Range: 01 E
CONTRACTOR: OWNER
PHONE:
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
REQUIRED INSPECTIONS:
[ tba ks (5horeiine Setbacks): / /
[2l� ootings� /! a
[ ou .a ••:
[ inder.round Plumbin., nderground Insulation:(fG eviv
[ ] Shear Wall: (2/c c i • o
[ ] Framing/Plumbing: b 5u
vita, auL`� 'Sc C/U
[ ] Propane Tank/Lines: z O .
'��"� I 49-7 d L
[ ] Insulation:
[ ] Sheetrock: O,k /D Zf'
Lei
[ ] Final/Occupancy Approval: r
6i L` L18 =!l,
HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION.
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIO
Office Hours 9:00 a.m. -4:30 p.m. NS.
SPECIAL CONDITIONS APPLY-SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS FOR CASE BLD01-00302
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on June 5, 2001 for the potential presence of Environmentally Sensitive
Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an
initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
Landslide hazard area 1 (northern half of parcel) and SUSC &SAPA aquifer recharge.
2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological
formations that allow percolation of the surface water into the soils and the underlying
zone of saturation. Aquifers are geologic formations that contain sufficient saturated
permeable material to yield significant quantities of water to wells and springs. Aquifers
serve as the source of drinking water within most of the rural portions of Jefferson County.
3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions
that promote rapid infiltration of recharge waters to groundwater aquifers.
4.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special
Aquifer Recharge Protection Areas and the following land uses located within Susceptible
Aquifer Recharge Areas (1)All Industrial Land Uses (2)All Commercial Uses (3)All Rural
Residential Land Uses requiring a Discretionary Use or Conditional Use Permit(4)All
Rural Residential Land Uses with nonconforming uses that would otherwise require a
Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential
Developments (6) Unsewered residential development with gross densities greater than
one unit per acre. All of the above listed uses shall be subject to the applicable
requirements and standards of the Jefferson County Unified Development Code.
5.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type,
geologic material, and groundwater that may combine to create problems with slope
stability, erosion, and water quality during and after construction or during natural events
such as earthquakes or severe rainstorms.
6.) Jefferson County has determined that the use of real property for agriculture and forestry
operations is a high priority and favored use in the county. The county will not consider to
be a nuisance those inconveniences or discomforts arising from such operations, if such
operations are consistent with commonly accepted best management practices in
compliance with local, state, and federal laws. If your real property includes or is within
five hundred (500) feet of real property designated as Rural Residential 1:10 or 1:20,
Rural Industrial, Rural Commercial, Agriculture, or Forestry, you may be subject to
inconveniences or discomforts arising from such farming and forestry operations,
including but not limited to noise, tree removal, odors, flies, fumes, dust, smoke, the
operation of farm and forestry machinery during any 24-hour period, the storage and
disposal or manure, and the application of permitted fertilizers and permitted pesticides.
One or more of these inconveniences may occur as a result of agricultural and forestry
operations which are in conformance with existing laws and regulations.
7.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the
Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the
Landslide Hazard Area.
8.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated.
Should buffer disturbance occur during construction, the Unified Development Code
(UDC)Administrator shall require replanting with native vegetation. No alterations shall be
made to the Landslide Hazard Area or its associated buffer without prior authorization by
the UDC Administrator.
9.) Prior to and during approved construction activities, the perimeter of the landslide hazard
area buffer shall be marked with a temporary sign. The sign shall be placed in such a
manner that it can be directly observed from the construction area. The sign shall contain
the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter
Existing Vegetation."
10.) The applicant shall permanently separate the boundary of the Landslide Hazard Area
Buffer from the remainder of the subject property through installing logs, trees, a hedge
row, or any.other prominent physical marking approved by the UDC Administrator.
11.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs)and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin (see attached).
12.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
13.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i).
14.) The site plan as submitted with the single family residence with attached garage building
application on May 29, 2001 has been reviewed for consistency under the UDC, and has
been approved by Jefferson County Department of Community Development. Any
modifications, changes, and/or additions to the stamped, approved site plan dated June 5,
2001 shall be resubmitted for review and approval by Jefferson County Department of
Community Development.
15.) This approval is for a single family residence with attached garage only. Any future
permits on this site are subject to review for consistency with applicable codes and
ordinances and does not preclude review and conditions which may be placed on future
permits.
16.) Potable water(individual well)was approved on June 4, 2001 for the single family
residence.
17.) A septic permit(SEP94-00012)was finaled on November 6, 1997 by the Jefferson County
Environmenal Health Department for a three bedroom septic system.
18.) A geotechnical report was not required for this application.
19.) The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive
Land Use Map effective August 28, 1998.
20.) The building height shall not exceed 35 feet.
21.) Minimum setback from Teal Lake Road (a county local access road, C505309)and
Moondance Lane (private road P458) is 20 feet. Minimum setback from south property
line is 5 feet and minimum setback from north property line is 250 feet due to the
designated commercial forest lands.
22.) Maximum lot coverage shall not exceed 25%.
23.) A minimum of two (2) on-site parking spaces is required for the single family residence.
i:1F_BLD_Permit_Buildng.rpt 10/29/19
r 111/ , ,
.
44 BUILDING PERMIT APPLICATION Review
OOe83
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD01-00302 Received Date: 5/29/2001
SITE ADDRESS: 255 MOONDANCE DR
PORT LUDLOW, 98365
APPLICANT: STEPHEN SEYL JR PHONE: (360)437-8146
PO BOX 364
QUILCENE WA 98376
SUBDIVISION: Block: Lot: T 92
PARCEL NUMBER: 821334004 Section: 33 Township: 28 N Range: 01 E
CONTRACTOR: OWNER PHONE:
ARCHITECT/ WEST SOUND ARCHITECT & DESIGN
ENGINEER : PO BOX 1452
KINGSTON WA 98346
PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 1,020
VALUATION 69,442.00 ADD'L: HEAT TYPE: EEE
CODE EDITION: 1997 HEAT BASE: HEAT TYPE: WOD
OCCUPANCY: R 3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: 1,020 SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: PWELL PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 1 Prop: 1 Seismic Streams
Total: 1 Total: 1 Flood Way Floodplain I
Routing Date: F&W Landslide
`� � j 1D, Shoreline Aquifer
DU Forest: Commerc' I `'
y —Proximity - r v*., • 7 v,,, I i —
Type Amount Paid By: Date: Receipt: Asap -• _
Permit $783.75 MAM 05/29/01 28353
Plan Check $235.13 MAM 05/29/01 28353 J U N 0 5 2001
State Building Code $4.50 MAM 05/29/01 28353
JEFFERSON COUNTY
Potable Water Application $30.00 MAM 05/29/01 28353 DEPT. OF COMMUNITY DEVELOPMENT
Total: $1,053.38 SIGNATURE: 1,z.4-, � L 4-1---1,_
0 IP .
Jefferson County Department of Community Development
4S�N 0.°trZ Part
621 Sheridan Street, Townsend WA 88368(3601378-4450
perml}?, A 0 0 c o n
;-, , {,,,,. ii ,
Project Description: 1' -,,
Building Type: I_ j MAY 2 9 2001 P ect Type: Frame Type:
X Single Family ew Wood
Garage Attached/Deta' ed ; ❑ ddition I Steel
ModularDEPT. JEFFERSON COUNTY ❑ teration/Remodel I Concrete
Commercial OFCOMMUNITY DEVELOPM ENT eau- ❑ Masonry
❑ Multi-family/#of Units I Demolition I Other.
• Industrial A /
• Other: V. D i ' ,
Bedrooms: Bathrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: Existing: 0 ❑ Sewer :Community System XElectricity ❑ Oil
Proposed: / / Proposed: / Individual System Woodstove Propane
Total: ! Total: / If not sewer,fill out the following: ❑ Heat Pump
Conventional ❑ Alternative ❑ Other
Permit# SEP " CO i Z
Water Supply:
Private well I Two Party Well I Public:Name of water system:
Square Footage: _ For Office Use Only
Main Floor /D c`J "�o( 1 f v �O C UBC OCCUPANCY GROUP _
2�Floor Base fee _ l' 'J .�' 7 3
3rd Floor Plan Check fee _5 /
Htd Basement State Surcharge fee 4 '
Unhtd Basement /Q !0 .�,C)C). C Subtotal /C`Q 3, , 'J
Garage/Carport Pot-VT er Review fee ) L), Ot
Th
Decks j..- b 91J, Rd Approach fee c-./ r C
Commercial C I r T OTL ,
Industrial Receipt # _)
Other Cash/Check# . `7 j c i
Total Valuation: Initials ,2''''//
Or Date 5/2 9/0/
Estimated Cost: 6 0 O � «<
If within 200' of the Shoreline,
Distance to Bank or Ordinary High Water Mark ft.Bank Height ft.
By signing the application form,the applicant/owner attests that the information provided herein is true and con eu.to the best of their knowledge. Any material falsehood or any
omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access an right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections.
A:; t
and righ of entry to the prop or structure shall be requested and shall occur during regular business hours.
ature• /3*
/ Date: Z--// (/
r.-.----
!& 1 L-1 ..M... ..1 .111W IMIIMINIMIllir IMIN111111111•17IMMI1
,....i)
I ___ CDEril
o c •„ ') >
L—.0
\r‘ —
a
[1119 c. 1 g'-'
a
CD ow
v.\ 0
'''.- :.1z-t- trij t' I's a.)*•
cl
,...,, \ o a;
0: 0 '‹ ' (..) on 0 0
4 4
4 (A.
CL4 r\ ,....... n .,0 er) CI 1'4 V.. •N
71'..) -----, ......4
(I) r.'
-....
0
V •S) 4J .F.: ...i
• 0
4 z8
.
0 P....4
Q .-
Ci)
-2 \,
0 C \) N1
z.....
1—' •1. 1
.A4 .
o...5
...,
-X.
9 ti 8 O f)' • ,...._ <3 C\ %. , ' ,Q)
0 ci) bl ,-,_t, rz4 H L., •J
0,.0 •
(..) -0
-1--
)
2 .6 I 'z..._. ••
g,-;•) --" . 4 ..
b --- •1 1
$-, ,_. 0 _.,•/
v
,.... ,..)
L4-.1 1'4 \\1/4 -X •C' ._:8 1*.•:: -P---4' il
t
...5, -4
sz) 0 Q\J 0
4•4 kti (1)
•
(1) • t.4 -4 .--,
'4,so.. .0'
Q(1) • '' .-5
0 ,
i.: .-
(\ riY ;9 C`\ t' 0 .4 0.) , 0 -r., r.t4 0
'-',A ."." 41 ° (1)" '8' CL. 0 4-i •,::, •E Q.— ' ° c.,) ----
() / .,i ; `in r." ---1 '-' .2.2, ''' a",' ij a e.•• 4 6u . ••
Z '''• ' ',, Z g .LI ".. --c5 sa.,
,„,5
,,, ,,_, ‘,) 44 v, - ,,,
o ----- 4 , cu -,1 . 0 cl . .. ,,, . --, 0-, .-1:1 1..1 ''..) c..) -9'
,--,
V •-t „cu 1 (..) "15 .-t t' c:i 1 .i...j 1 09 to 1
\ ____, CI . , P.• •-t a.i C9 .Nu
,.., ..-, -,zi -'-a' (u -c) -1:3 Lt4L1-4 .Pn °)
4ar 1-1 4-bu 4..i Mt 64 .() Ci) < 5t a.) < < '.. < cl < ,..9 .< /.4 CI .' 0 • -•
.--.
r-i cu
• f: a)
'ri 0 : ) 4 1lAu' ll) .° -I PA c:,., • . • . . • 0 . .
rti 4
Cr, cn oN .-1 cr) cn P-4 041.4 ., ,7'-.- <!C 0 0 U (nu 1-4 U LI, 4-1 ••
‘dnit
1
A
...
to
/
v
----...„.„......._
f)
cr)
S
z..,
NOVEU3S
(---- --------„,......_>
p, ,
.,,
r.z u..
o 4 i,:j1 1
PlQ Z
CCD > 0
CC
W 0L)
J
0_
0
". A.
< *".
•
.
I .- N :1
f:=1
a
0
Li
Z
w EJ
.-, W
W ‘-'
r_.- it.F. i--- , PI
0 i_.i V' al 7i
1*
-J 0 -2 1=1 cn OLL
.? a.
•<6.
1-9
ct- 0
•Ni
'"o \
I `414,
4,
i. • ' .-7 .0
Z .1 11
< s
--.
-I .0
a. a. ...
4 1— g
4.;
2 0
.....1
Z 0.. RIC
O 1.1.1 03V) .C_
P ....1 0 .73
C cu
4 (3.
(...) 2 ..... ,..
0 4 'cl° Em
—, • v)
APPROVED jEcE [IwE ...
. .
SITE PLAN stonnwater
...
Req ' )11.04.4
...
..... ' . •
•
I Minn ftt MAY 2 9 2001
.
.
• 1 ill 1 -$-. ._ .
, . , . . 1, JUN -1- 2001- - i - , - - , . f 1 4 - I !-T- 1 r I 71 -' 1-.
, 1
ii, -E--:LpiT .
'JEFFERSON
, 1 1
1 : tit ii _ :, I I _,..... 0 ___,OF 9,OM_MUNITY DEVELOPMENT
-1 i _ i _ 1,,_,._ : _.
I
, 1 • ; , 1
, , • JEFFER.S024-6 I - , -- . , -,, , , ---t
, ; , . t- ; t--I
c
DPT.OF CO M k i••• :! Z I.s 1 I ' I ' i II I '
I I :1 • i i_
,
— , ,.._. .., ......... i • t -1 ' • ; ; -1
1 • ,SIONATUNI: 6A,1 1.; - - ,
i • I I I ! • 1 1
' 1 1 i
, V
• i I ,I I -- 'I' - S - I
'
I i - - 1 - t I - t-rr-t- - ...It-.; . , . ,
, , , . I1 .,1 „•
I
'.--
,
1 1
I .: : ..'-t -... t-.. •i I
.1 1 , ' '• I '
1 1 ..
I' r t f ' ' ... . I -1- I l''• ' -'; '• ! •-•-• 1 ''`I• - I-- - l ''' /- ; '
•
! • : I . I , f : 1 I ; , , ,,
; !- I• -• r• ! - ; i 1 I i ' ' i
; • ; ; I • ! I .! ; ; • I' 1 I ,
; : •-•i : _. ;,,,•_. ;.._ '. L I ; ; I
; 4,.:- . I . ; l! I . - l- ; --t •-/ -----I -- I-- -- I 1 1 I ! --- 1, ;
i. _! . ., _ , , ; ' ! ; 1, ! •1 1 !,I , • ; 1 I ! ;
i - 1 -4-,-- • •
, NI I,, I • I
'I I I
•1 41 I I t I t ' 1.. i ! . ii. , , .- ,i___. ,,_7. .. -.. i 4._ , i,I ,
. : , I : . 1
' I
I I ! ' • , i :
1 i - I
1 'I --1 ---1--1------ I - • -, ' .--
• ! . -
• i I I ,
, , I
' 1 I '
: 1 1 1
, t ,
t I t/
' , : I
• ,- :. :
1 1- -• ' i , :1 ' - - t :
.
i
,
•
1 ; ..
. ,
- '--- -.!-- t * — I / --f . -:--4- • .
.
,
. ' 1 1 , I
.•
: L i ....._,
4._ .
. . ...
11• t- r ' I , i ---- . .t 1- -1- ., — •
; . , I i 1
. , 1 I i , , ;
/
; 1 ., . - - - -
, 1 . _. . .. ._ , ._ .. .
- , , 1
, ,
1 ,
.1.. III 1. . ,. 1 iv i ,_....32 .,?..% . : I. f... , It _ __ ._.; I_ 1 , _ . ; , / .
! ,
. I i / , , I . ; ,
. I .
I
: I •
. ; , • i ' ;' ; . I I
I • -.- -I I-I' ' ; '
. , I
1 I ' I 1 I ,' ‘ it I
' , 1
'). ! - 1. . • ' • ' ; ' 1.-- IT ' ' : . ; ' ': ' [ 1---- ' ' ; ; 1 t
', 1 • C.) ;
1 1 1 ; . i : i ;;
.•-•- ,,-, ; .
, - ..• - ' : 1 , 1 , 1, , : , •• ; ;
1 ;
; . : ;
.1 ,
. ;
IA
. 1 , 1 ; . •
tit
1 , ; : ;
; , ''•,_ ... _L _/
, . ; ,
I: . ; , -, -- , ,
. ; ,...„ : ; ; 1 , /• c-,1
' 7
,
:
;
• 1 ;r ,
, / 1 ; 1
• ...J . -; I• - -4, 1 ; .--t- ',‘ i- t t'• t '
. ' -
, t ,
: ! .
_...I1 _
1 : ; 1 ;t
, I 1
,4 ..,,
., . . / ; : I • ' i --1 ----I- --ft- -1 --. . ,
1Zr ' . :
/ ., , 1 C64- 1 • ) I, I I
t
' 4 ,
•
• i, ... . .. I
1 • ,
, , , • . ,
t ,
.
.
I
1
. ,
. .
I I • ;
. ,
/ I I' 1: : .1: /7
1
I I ,
. .
. ,
. i
1 ,
i
l ' ' t ,, / '- • ,I
. It I ,
,
, / , I ' I.• , ,,
, I 1
. . ,
i/
I , .
. ,
,
/
i ' I
/
. / ' ; ',,* ' '- ' - - FROPO S'E 1). .
1, . .
/ / i ! ! i ,
' 1
, ?.<
/
,
/
/ I , { F141/.0)&16-
I . 1 1 I .11- I I. -
,
.
I: , I ' 11 ' 1
1 I ., 1
i 111 1
• •I • • .
.
• i 1
.t. \--= •
7 , ' : - ,1 1, -- ----- r .- , . --,,, . - I i
, , . ,, .
, ,,
. ,
, , , 1 . .
/ . , ,c)/ -- ----1 i t
/ •, i
.( 1 C2._......._ N,
, ,
, .
/ ,
,
, ,,/
,
, c,,,sc3-----, . . s
DkAikl F./CI-4 ( t'
: ' : : I - >
/ • _ . , ,--141/ , .
I . '
, <CY5 I 71NC-)
/ . ,• ,
/ i/ • ••,
*' • :• •''
y.
-'1,7• IiI
-t KC-6, tALJ‘ /NAAFI/
2
• ' 1 ' • '.3 I
Sort'e , 1 , ,
: / 1 .. ,
, ! f' si
. . / V/ I- -- ! - ; 4 i . , -
'
-'1
. .
''..2
t,
, . . ,
, Z . .
f : . .
i . .
. . . . .... rN( , i- . -,„zr- ! •,'
, . , . • .
• ,:::,,,
1 , t ; 4/ ! 1 I
i
,
,, . .
• 1 I .
1 , •. . • 1.----64-1-- 1- --; ' gs i '; i ; ,v , • •
I , ,,
1, , i , , -,,,,b.
1 • ••••- ,
I
<Of
• 1 ,
Sills' n „' 6)•
, , T, . ,.
. 1
. , . .
. .,
I ,,
1• ' .. , : i .. '
i • , - ,
I I 1 . - '. . ; .• '
I VO
i I { I
. ._I
I I ' '- I 1 I ' ' ' ' CIANA'71()14
I 1 , ,
, I "••-•' '
<--- 5c)0 (#-. -->