HomeMy WebLinkAboutWater Reclamation Plant for the Port Hadlock UGA Project Change Order No. 7 - 031725 JEFFERSON COUNTY
Shccl 1 of 2 DEPARTMENT OF PUBLIC WORKS Change
Dale: 3/10/2025 CHANGE ORDER Order No, 7
Ordered by County Engineer under terms of
Article 9 and 11 of the General and Supplemental Conditions 'Pr,/ I I i I)
Contract No.
Change proposed by Contractor To:
Interwest Construction
En red by: i A- voCC,( S-E 6,1,51-Cueke
4575 Fey Rd
Contractor Firm Nome Port Angeles,WA 98363
31IZI2S
g afore ate
0 \ (e veS ( f
Title
Consent given by Surety:(when required) Project Title Phase 2-Water
Reclamation Facility for
By: the PH Sewer
Attorney-in foct Dote
You are ordered to perform the following described work upon receipt of an approved copy of this change order:
The changes for this change order were 1) additional HMA,catch basins and redesign of sidewalk to meet ADA
drainage requirements per COP 27;2)addition of 208V panelboard to accommodate HVAC equipment made per
OCR 7; and 3)provide heaters of designed voltage as shown in electrical design per COP 29.2.
All work materials and measurement to be in accordance with the provisions of the standard specifications and
special provisions for the type of construction involved.
ORIGINAL CURRENT ESTIMATED ESTIMATED
CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL
AMOUNT(Incl.9.1%sales tax) AMOUNT(Incl.9.1%sales tax) THIS ORDER(incl.9.1%sales tax) AFTER CHANGE(Incl.9.1%sales tax)
$ 10,020,835.00 S 10,310,894.48 $166,116.54 $ 10,477,011.02
ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT
CONTRACT TIME CONTRACT TIME CHANGE(Add/Del) TIME
502 0 N/A N/A
rROCOMMENDEO APPRO MMENDED
PP S I°h6 _.. 7‘/z. >--
Project Manager Dote County cryweer Dote
APPROVAL RECOMMENDED APPR r\it
EILVPIC ..
Engineering Services Monger Dote Choir,Jefferson County Commissioners Dote
JEFFERSON COUNTY Contract No 405-2114-0
Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS
Change
Date: 3/10/2025 CHANGE ORDER ESTIMATE Order No. 7
ESTIMATED ESTIMATED
UNIT UNIT QUANTITY AMOUNT
MEASURE _ PRICE CHANGE CHANGE
COP No. DESCRIPTION
27R1 Paving and drainage revisions per COP 27 LS $126,467.02 1 $126,467.02
28 Electrical changes per OCR 7 LS $21,792.80 1 $21,792.80
29.2 Electrical unit heater changes per COP 29.2 LS $4,000.99 1 $4,000.99
CO 07 Subtotal $152,260.81
ESTIMATED NET CHANGE SUBTOTAL: $152,260.81
9.1%Sales Tax $13,855.73
ESTIMATED NET CHANGE TOTAL: $166,116.54
Department of Public Works
O Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Mark McCauley, County Administrator
From: Monte Reinders, P.E., Public Works Director/County Engineer
Agenda Date: March 17, 2025
Subject: Change Order No. 7, Phase 2 - Water Reclamation Plant for the
Port Hadlock UGA, Project No. 405-2114-0, Commerce Project No.
22-96515-026
Statement of Issue: Change Order No. 7 with Interwest Construction of Burlington,
Washington.
Analysis/Strategic Goals/Pro's a Con's: This change order modifies the original plan
in the following ways: 1) adding HMA, catch basins and redesign of sidewalk to meet
ADA drainage requirements; 2) adding a 208V panelboard to accommodate HVAC
equipment; and 3) providing heaters which match the voltage in the electrical design.
Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 7 is
$166,116.54 (includes 9.1% Washington State Sales Tax). The contract amount will
increase from $10,310,894.48 to $10,477,011.02. The project is funded at 100% by
the Department of Commerce.
Recommendation: Public Works recommends that the Board authorize Change Order
No. 7 with Interwest Construction, and return two originals to Public Works for further
processing.
Department Contact: Samantha Harper, P.E., Project Manager, 385-9175.
Reviewed B • //
Mark McCauley ' ounty Administrat Date/