Loading...
HomeMy WebLinkAboutBLD2001-00511 • MANUFACTURED/MOBILE HOME INSTALLATION PERMIT Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360) 379-4450 FAX (360) 379-4451 (800) 831-2678 PERMIT #: BLD01-00511 Received Date: 9/10/2001 SITE ADDRESS: 1123 DABOB RD Issue Date: 10/9/2001 QUILCENE, 98376 Expiration Date 10/9/2002 APPLICANT: FRANK NEAL GLORIA NEAL 1030 DABOB RD QUILCENE WA 98376 SUBDIVISION: Block: Lot: T 8 PARCEL#: 801212006 Section: 21 Township: 28 N Range: 01 W CONTRACTOR/ PRESTIGE PROPERTIES PHONE: (360)385-9033 DEALER 11524 RHODY DRIVE PORT HADLOCK WA 98339 Lowci/ , 1' tw Contractor's License PRESTP1066CM Expires 11/13/2001 PROJECT DESCRIPTION MANUFACTURED HOME INSTALLATION MAKE: GOLDEN WEST YEAR: 2002 SIZE: 27 X 66 THIS PERMIT IS VALID FOR ONE YEAR AND IS NOT RENEWABLE. THE FINAL INSPECTION MUST BE SCHEDULED AND PASSED WITHIN THAT YEAR. THE EXPIRATION DATE IS 10/9/2002. REQUIRED INSPECTIONS: �D [ k etbacks: ( In -/ -t ] i2r:k. [ .] Footing(If continous footings are used): d/C Co ( — [ ] BIockin Plumbing:: s 4 5 o� fo(3cto( f' [ ILakirting Vents/Porches/Ste , /� J� - 13- �-,/ HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. Inspector's Phone Hours 8:00 a.m. - 9:00 a.m. SPECIAL CONDITIONS APPLY -SEE REVERSE HOT-LINE AVAILABLE 24 HOURS A DAY MLA01-00477 �. .,r Review Type: I MANUFACTURED/ MOBILE HOME INSTALLATION APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD01-00511 Received Date: 9/10/2001 SITE ADDRESS: DABOB RD QUILCENE, 98376 APPLICANT: FRANK NEAL PHONE: (360)732-4642 GLORIA NEAL 1030 DABOB RD QUILCENE WA 98376 SUBDIVISION: Block: Lot: T 8 PARCEL NUMBER: 801212006 Section: 21 Township: 28 N Range: 01 W CONTRACTOR/ PRESTIGE PROPERTIES PHONE: (360)385-9033 DEALER: 11524 RHODY DRIVE PORT HADLOCK WA 98339 Contractor's License PRESTP1066CM Expires 11/13/2001 REPRESENTATIVE: PRESTIGE PROPERTIES 11524 RHODY DR PORT HADLOCK WA 98339 PROJECT DESCRIPTION MANUFACTURED HOME INSTALLATION TYPE OF WORK MOB MANUFACTURED HOME: SHORELINE: TYPE OF IMP NEW MAKE: GOLDEN WEST SETBACK: VALUATION 76,900.00 YEAR: 2002 LABOR & INDUSTRIES APPROVAL? SIZE: 27 X 66 BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PWELL BEDROOMS: BATHROOMS: PARCEL TAGS: YES NO STORMWATER: YES NO Exist: Exist: AREA Plat Conditions Prop: 3 Prop: 2 Wetland Erosion Total: 3 Total: 2 Seismic Streams Flood Way Floodplain ( F&W Landslide Routing Date: '�� Shoreline Aquifer Forest: Commercial Rural Proximity __ AIPfff108VED Type Amount Paid By: Date: Receipt: Manufactured Homes $141.00 MAM 09/10/01 30342 Potable Water Application $30.00 MAM 09/10/01 30342 OL ( U92001 Total: $171.00 J sir DEPT.OF M17 ENT I — SIGNA �. �. 7 Jy , JEFFERSON COUNTY PERMIT CENTER, 621 SHERIDAN ST, PORT TOWNSEND WA 98368 MANUFACTURED x HOME INSTALLATION PERMIT APPLICATION 7 NEW BUILDING ❑ REPLACEMENT 27 SIZE YEAR c MAKE Golden West � COST 762002 900 .6600 BEDROOMS: BATHROOMS: EXISTING 0 EXISTING 0 PROPOSED 3 PROPOSED 2 ����1` TOTAL 3 TYPE OF SEWAGE DISPOSAL: WATER SUPPLY: 0 SEWER 0 COMMUNITY SYSTEM ® PRIVATE WELL ❑ TWO PARY WELL INDIVIDUAL SYSTEM 0 Conventional ❑ PUBLIC PERMIT # SEP Pending 0 Alternative Name of water system: IF WATERFRONT PROPERTY, DISTANCE TO BANK OR HIGH WATER LINE ft BANK HEIGHT ft SIGNATURE DATE �j/O NAME (PLEASE PRINT) Harold Frank Neal FOR OF ICE USE ONLY ` • BASE FEE RECEIPT !: . ADDITIONAL SECTIONS CASH/CK.# a STATE SURCHARGE;. It SUBTOTAL � + POTABLE WATER ' . 1 T /ROAD APPROACH _ � TOTAL "' �° `?` � H:\HOME\PLNCNTR\FORMS\M09(LEAP.5/97 tldU !� 4 Q v �0.5-# LILY-r IS�G T -O .may 4.47 Z (A)641. . 15-4 t E ► Q `y JEFFE RSON C2L'47- c".e le a.4 CC DEPT. OF CON MUNi-v CE`,,E_.2.4 �, - fIJ . gig E..4 uj oa -4N ))r Q 1 !665>/:'4- / ( C'f'o,v r- -240 � -�� r ��SE EX/5 // Fp o,vF /65'' }��7 R J( SPECIAL CONDITIONS CASE # BLD01-00511 1.) The application was reviewed by the Jefferson County Department of Community Development staff on 9/27/01 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Lanslide Hazard Area I (low), adjacent Commercial Forestland, and Susceptible Aquifer Recharge Area. 2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 4.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin (see attached). 5.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms. The proposed dwelling does not directly encroach upon a landslide hazard, however, a 30-foot setback is required from the top or toe of a landslide hazard. 6.) A vegetative buffer/building setback of 30-feet shall be permanently maintained from the top or edge of the Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area. 7.) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter Existing Vegetation." 8.) All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials. 9.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC) Administrator shall require replanting with native vegetation. No alterations shall b made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator. 10.) The applicant is proposing to create or add 1,928 square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal adhere to Best Management Practices to control sediment and erosion. 11.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 12.) The site plan as submitted with the building application on 9/10/01 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated October 8, 2001 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 13.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined by impervious surface which includes driveways, rooftops, decks. 14.) Dabob Road is classified as a Minor Collector and thus requires a 20-foot front yard setback. The sides shall maintain a minimum 5-foot setback. The eastern lot line abuts designated Commercial Forestland. The applicant has requested a reduction from the standard 250-foot setback, down to 85-feet. The lot size cannot accomodate the entire 250-foot setback, therefore the 85-foot setback proposal is approved. 15.) The building height is not to exceed 35 feet. „,„,,i,....„... ,,.., ,,,,.. ,..:„z:, ,,,, .47 \ �o JEFFERSONCOLIN� I { @ill (,7i m•�ox C7 0 .9-,EL , .9',fl p O l 'i d 0 M �Od a 1 aUll I L 0 $ (3 C 0 .§ f IIw�w d CU t? iI ¢ o 4 a w J m N a m E _____ rh d T E �E-' I( ) O 1 0Tc r`/-- 0. zo 01I __,--",,' M„ o = -,--- � :M z Q (` CD o xa,w»i po 0 o q (n m a 1\ fIn L. ` J ° w A 'NW VI <o CL. �o��' ' gill • y. a o --"t : Q o _� r p Jo f 2 Bil Ah.oulm.y. tA 8 ° a Z a. J Re 4M5 3 :cisM .0 C \-- e iY a ` L^ N t w 3 o • .0 1:11 AM MI III■ c I c' .y O 0 1 4 .0'......-6-- I'_11 III '�,g II °' ” -1-- I T ` iri 1,``!j WO :i ibmulE: m i Ili a w4,161 n,ao ro I E i&.. fr A .J... , (::11.) a ol c c ►v o ,11V O U - O d a JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT UNIFIED DEVELOPMENT CODE TYPE I LAND USE PERMIT APPLICANT: FRANK NEAL GLORIA NEAL 1030 DABOB RD QUILCENE WA 98376 DATE ISSUED: October 09, 2001 DATE EXPIRES: October 09, 2002 MLA NUMBER: MLA01-00477 PROJECT PLANNER: K RUSSELL PROJECT DESCRIPTION: ROAD APPROACH & 911 - DABOB RD MANUFACTURED HOME INSTALLATION PROJECT LOCATION: Parcel number 801 212 006 in Section 21, Township 28, Range 01 West WM located at Dabob Rd, Quilcene. WA 98376 FINDINGS: 1.) The Administrator finds that this application complies with applicable provisions of the Unified Developmen Code, all other applicable ordinances and regulations, and is consistent with the Jefferson County Comprehensive Plan and Land Use map. 2.) The application was reviewed by the Jefferson County Department of Community Development staff on 9/27/0 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Lanslice Hazard Area I (low), adjacent Commercial Forestland, and Susceptible Aquifer Recharge Area. 3.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 4.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 5.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, arc groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms. The proposed dwelling does not directly encroach upon a landslide hazard, however, a 30-foot setback is required from the top or toe of a landslide hazard. 6.) The applicant is proposing to create or add 1,928 square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal adhere to Best Management Practices to control sediment and erosion. 7.) The site plan as submitted with the building application on 9/10/01 has been reviewed for consistency under UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated October 8, 2001 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 1NDITIONS: Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and fined in the Stormwater Management Manual for the Puget Sound Basin (see attached). 'egetative buffer/building setback of 30-feet shall be permanently maintained from the top or edge of the } LL 1Y Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area. 3.) Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter Existing Vegetation." 4.) All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials. 5.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC)Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator. 6.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 7.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined by impervious surface which includes driveways, rooftops, decks. 8.) Dabob Road is classified as a Minor Collector and thus requires a 20-foot front yard setback. The sides shall maintain a minimum 5-foot setback. The eastern lot line abuts designated Commercial Forestland. The applicant has requested a reduction from the standard 250-foot setback, down to 85-feet. The lot size cannot accomodate the entire 250-foot setback, therefore the 85-foot setback proposal is approved. 9.) The building height is not to exceed 35 feet. NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development. Development pursuant to this permit shall be undertaken subject to the applicable development and performance standards of the Jefferson County Unified Development Code. If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once. The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that"takes"listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. All areas in Jefferson County are included as"critical habitat"for a listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following: -Set back buildings, utilities and roads as far as possible from surface waters (streams, rivers, lakes, marine waters), or at least 150 feet from the edge of the water -All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters - Remove minimal vegetation for site development, especially large trees -Allow trees that have fallen into surface waters to remain there - Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches Any individual, group, or agency can bring suit for a listed species "taking," even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle at (206)526-6613, or the U.S. Fish and Wildlife Service at(503) 231-6121. APPEALS: Pursuant to RCW 36.70C, the applicant or any aggrieved party may appeal this final decision to Jefferson County Superior Court within twenty-one(21) calendar days of the date of issuance of this land use decision. For more information related tojudical appeals see UDC Section 8.5.2. The Threshold Determination for this Type I Permit may not be appealed to the Hearing Examiner. For more information related to SEPA appeals see UDC Section 8.10.12. The SEPA Official has issued a Determination of Significance for this project. This Threshold Determination may not be appealed to the Hearing Examiner. For more information related to SEPA appeals see UDC Section 8.10.12. UDC Administr6tbr