Loading...
HomeMy WebLinkAboutAward of Contract for Upper Hoh Road MP 9.8-9.9 Emergency Repair - 040725 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: April 7, 2025 Subject: Award of Contract, Upper Hoh Road MP 9.8 - 9.9 Emergency Repair, Project No. 18021400, Statement of Issue: Award of Contract to Seton Construction, Inc., of Port Townsend, Washington for their bid of $414,432.00 for the above referenced project. Analysis/Strategic Goals/Pro's a Con's: Public Works has completed checking the bids for the above referenced project, and recommends award of the contract to Seton Construction, Inc. for their bid amount of $414,432.00. Fiscal Impact/Cost Benefit Analysis: The Bid amount is $414,432.00. This will be funded at 100% by $27,000 in private donations and $623,000 in Washington state Strategic Reserve Commerce funds. Recommendation: Public Works recommends that the Board authorize the Award of Contract to Seton Construction, Inc., and return the original to Public Works for further processing. Department Contact: Mark Thurston, P.E., Project Manager, 385-9210. Reviewed By: 7.(44/ Mark McCauley, ounty Administrator . Date Department of Public Works 623 Sheridan Street Port Townsend,WA 98368 Jefferson County, Washington 360-385-9160 DATE: March 27,2025 TO: Board of County Commissioners FROM: Monte Reinders,P.E.,Public Works Director/County Engineer SUBJECT: AWARD OF CONTRACT Upper Hoh Road MP 9.8—9.9 Emergency Repair County Project No. 18021400 In the matter of awarding a construction contract for the above referenced work: • The Call for Bids was issued by the Department of Public Works using the MRSC Small Works Roster on March 14,2025. • Due notice of the Call for Bids was given as required by law. • Bids were received and opened in public on March 26,2025 at the Department of Public Works office. • The Public Works Department has completed checking the bids and has investigated the qualifications of the lowest bidder. • Bid tabs are attached for reference. The Public Works Department recommends that the construction contract be awarded to the lowest responsive and responsible bidder: Seton Construction,Inc. of Port Townsend,Washington for their bid amount of S414,432.00 for the: Upper Hoh Road MP 9.8—9.9 Emergency Repair,County Project No. 18021400, and, authorize the County Engineer to execute change orders for the project, for up to 10% of the contract amount,or$41,443.20,for a total contract value,not to exceed$455,875.20. Ap roved Heidi Eisenhour Date Chair,Board of County Commissioners Attached: Bid Tabulations Bidder Verification Summary BID TABULATION SUMMARY UPPER HOH ROAD MP 9.8-9.9 EMERGENCY REPAIR FEDERAL AID NO. WA COUNTY PROJECT18021400 BID OPENING DATE: March 28,2025 Seton Construction,Inc. Bruch&Bruch Construction Inlerwest Construction Rognlin's,Inc. Brumfield Construction,Inc. Gig Harbor Excavation LLC ENGINEER'S ESTIMATE 4640 S Discovery Rd P.O.Box 250 609 North Hill Blvd 321 W.State Street P.O.Box 600 3402 Ross Ave BID OPENING TIME: 11:00 am. Port Townsend,WA 98368 Port Angeles,WA 98362 Burlington,WA 98233 Aberdeen,Wa 98520 Aberdeen,Wa 98520 Gig Harbor,WA 98332 See Note 1 ITEM QUANTITY UNIT ITEM DESCRIPTION UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. BID BID BID BID BID BID _ BID BID BID BID BID BID BID BID PREPARATION 1 1 L.S. MOBILIZATION $32,914.70 $32,914.70 $26,000.00 $26,000.00 $40,700.00 $40,700.00 $28,500.00 $28,500.00 $37,590.00 $37,590.00 $50,000.00 $50,000.00 $38,000.00 $38,000.00 GRADING 2 941 TON SELECT BORROW INCL. HAUL $26.00 $24,466.00 $33.00 $31,053.00 $30.25 $28,465.25 $34.50 $32,464.50 $45.00 $42,345.00 $42.00 $39,522.00 $78.93 $74,273.13 - DRAINAGE 3 1,470 TON HEAVY LOOSE RIPRAP $40.00 $58,800.00 $43.00 $63,210.00 $73.00 $107,310.00 $86.80, $127,596.00 00.00 $117,600.00 $137.00 $201,390.00 $97.00 $142,590.00 ROCK FOR EROSION AND SCOUR PROTECTION CI ASS D 4 2,086 TON (CONTRACTOR PROVIDED) $40.00 583,440.03 $50.00 $104,300.00 $77.00 5160,622.00 $100.00 $208,600.00 $90.00 $187,740.00 $138.00 $287,868.00 $113.70 $237,178.20 ROCK FOR EROSION AND SCOUR PROTECTION CLASS D $18.00 5 570 C.Y. (AGENCY PROVIDED) $9,120.00 $20.00 $11,400.00 $29.00 $16,530.00 $17.70 $10,089.00 $25.00 $14,250.00 $11.50 $6,555.00 $107.18 $61,092.60 ROCK FOR EROSION AND SCOUR PROTECTION CLASS D 6 200 C.Y. STOCKPILE $8,000.00 $50.00 $10,000.00 $77.00 $15,400.00 $94.00 $18,800.00 $85.00 $17,000.00 $120.00 $24,000.00 $137.00 $27,400.00 7 4.6 C.Y. QUARRY SPALLS $200.00 $920.00 $125.00 $575.00 $255.00_ $1,173.00 $125.00 $575.00 $100.00 $460.00 $165.00 $759.00 $172.00 $791.20 8 90 L.S. 24'DIA ALUMINIZED CMP $200.00 $18,000.00 $151.50 $13,635.03 $144.00 $12,980.00 $144.00 $12,960.00 $150.00 $13,500.00 5185.00 $16,650.00 $109.75 $9,877.50 SURFACING 9 135 TON CRUSHED SURFACING BASE COURSE $65.00 $8,775.00 $70.00 59,450.00 $60.50 $8,167.50 $4.00 $5,940.00 $100.00 $13,500.00 $40.00 $5,400.00 $73.42 $9,911.70 HOT MIX ASPHALT 10 41 TON COMMERCIAL HMA $250.00 $10,250.00 $580.00 $22,960.00 8563.50 $23,103.50 $550.00 $22,550.00 $600.00 524,600.00 $560.00 $22,960.00 $661.87 $27,128.47 EROSION CONTROL AND ROADSIDE PLANTING , 11 1 EST. EROSION CONTROL AND WATER POLLUTION CONTROL $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.03 $5,000.00 $5,000.00 12 274 C.V. TOP SOIL TYPE C $50.00 $13,700.00 $69.00 $18,906.00 $32.00 $8,768.00 $32.00 $8,768.00 $80.00 $21,920.00 $85.00 523,290.00 $107.00 $23,318.00 13 556 S.Y. BARK OR WOOD CHIP MULCH $10.00 $5,560.00 $14.00 $7,784.00 $9.00 $5,004.00 $13.00 57,228.00 $10.00 $5,560.00 $10.25 $5,699.03 $87.00 $48,372.00 14 20 EACH PACIFIC WILLOW LIVE STAKE $15.00 $300.00 $43.50 $870.00 $41.00 $820.00 $12.00 $240.00 $250.00 $5,000.00 $45.25 $905.00 $136.36 $2,727.20 15 20 EACH RED ALDER 2 YR BAREROOT OR CONTAINER $25.00 $500.00 $63.75 $1,275.00 $33.00 $660.00 $29.00 $580.00 $35.00 $700.00 $34.00 $680.00 $1313.36 $2,727.20 16 20 EACH BIG LEAF MAPLE 2 YR BAREROOT OR CONTAINER $25.00 $500.00 $63.75 $1,275.00 $33.00 $660.00 $29.00 $580.00 $35.00 $700.00 $34.00 $680.03 $136.36 $2,727.20 17 20 EACH WESTERN HEMLOCK 2 YR BAREROOT OR CONTAINER $25.00 $500.00 $63.75 $1,275.00 $33.00 $660.00 $29.00 $580.00 $40.00 $800.00 $64.00 $1,280.00 $136.36 $2,727.20 18 20 EACH SITKA SPRUCE 2 YR BAREROOT OR CONTAINER $25.00 $500.03 $63.75 $1,275.00 $37.00 $740.00 $35.00 $700.00 $40.00 $800.00 $40.00 $800.00 $136.36 $2,727.20 19 30 EACH SALMONBERRY 2 YR BAREROOT OR CONTAINER $25.00 $750.00 $63.75 $1,912.50 $33.00 $990.00 $27.00 $810.00 $35.00 $1,050.00 $34.00 $1,020.00 $136.36 $4,090.80 20 30 EACH THIMBLEBERRY 2 YR BAREROOT OR CONTAINER $25.00 $750.00 $63.75 $1,912.50 $33.00- $990.00 $27.00_ $810.00 $35.00 $1,050.00 $34.00 51,020.00 $136.36 54,090.80 21 30 EACH PACIFIC NINEBARK 2 YR BAREROOT OR CONTAINER $25.00 $750.00 $63.75 $1,912.50 $33.00 $990.00 $27.00 $810.00 $35.00 $1,050.00 $34.00 $1,020.00 $136.36 $4,090.80 22 30 EACH WESTERN SWORDFERN 2 YR BAREROOTOR CONTAINER $25.00 $750.00 $62.75 $1,882.50 $35.00 51,050.00 $27.00 $810.00 $35.00 51,050.00 $34.00 51,020.00 $136.36 $4,090.80 23 556 S.Y. TEMPORARY EROSION CONTROL BLANKET $6.00 $3,338.00 $7.00 $3,892.00 $8.00 $4,448.00 $5.00 $2,780.00 $10.00 $5,560.00 $10.00 $5,560.00 $45.63 $25,370.28 TRAFFIC 24 200 L.F. PAINT LINE $4.00 $800.00 $23.00 $4,600.00 $15.00 $3,000.00 $30.00 $6,000.00_ $30.00 $6,030.00 $12.00 $2,400.00 $140.00 $28,000.00 25 263 L.F. PRECAST CONCRETE BARRIER TYPR F UNACHORED $200.00 $52,600.00 $179.00 $47,077.00_ $219.00 $57,597.00 $165.00 $43,395.00 $225.00 $59,175.00 $163.00 $48,129.00 $170.81 $44,923.03 OTHER 26 1 L.S. SPCC PLAN $1,000 $1,000.00 $1,000.00 $1,000.00 $500.00 $500.00 $800.00 $800.00 $1,003.00 $1,000.00 $450.00 $450.00 $5,800.00 $5,800.00 27 1 EST. MISC.AGENCY DIRECTED WORK $20,000 $20,000.03 $20,000.00 $20,000.03 820,030.00 $20,000.00 $20,000.00 S20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 ,,,,/ PROJECT TO f,4'C $361,981.70 $414,432.00 $5'26,308.25 $567,965.50 $805,000.00 $774,057.00 $865,025.31 Prepared by Project Manager. .. arzern Reviewed by Erg.Serv.Manager:Eric Kuzma • • Date: '/2t/ 1S Note -Some total bid amounts Z' adjusted for math errors. Approved by County Engineer Monte Reinders P.E. Date: Za LOW TO IRON WO ORDER c.0 p ay m S m g 3o3z= Co A Ti n 2 y s N # c T < 9 m `o W i t sv S8 1 o m P. A WO AMOUNT(WO Raw TOM 8g i 4 g A m m x x APPARENT LOW BIDDER 0 T E n g m BIDS ENTERED IN BID TABULATION SHEET D io ti m m MATH VERIFIED Z m m P a ADOENDUMS ACKNOWLEDGED BY CONTRACTOR prtRACTOR i C 3 N m AL SIGNATURE PAGE SIGNED > y < "j FEDERAL I.D.XO, l • PA PROPOSAL HOBO INCLUDES q `p Censors.*owl on Ma bane NON-COLLUSION DECLARATION RETURNED WITS BID mLI PROPOSAL CERT.FEDERAL ND CONTRACTS(0724F0)RETURNED PAIN m BD PROPOSAL W N WAGE LAW COMPLIANCE CERTIFICATION SIGNED IEF]LWI i m SUBCONTRACTOR LIST SONS SEWAG0(1F1A1M Fn m BIDDER QUESTIONNAIRE(212L32) NDBE UTILIZATION CERTIFICATION COMPLETED IM X-WM w OBE BID ITEM BREAKDOWN MTSCIA Trn s, DBE MOTTO(CONFIRMATION DOCUMENT COMPLETED KW I D a W1) R i s DOE'Gond Path Mort IGFEI DoawweWen RI nooemsEI yB 3 i s DBE TRUCNX0 CREDIT WNW E DAYS OF AWARD(>ndRR) S I 0 Y PRIME CONTRACTOR OBE STATUS: IXIp IAxsed.wa.povlPannerS/OMWBEl00EOlxtoryl N SUBCONTRACTOR DBE FIRMS CERTIFIED BY DOWSE: www.on wee.w..PC.Iell.dwV.ow.mmea'A.ma Z SUBCONTRACTOR DBE FIRMISI CHECKED ON LIST Of E SUSPENDED FIRMS:_U i Inlp;Alwsed.wago0IPeIneNOMWBEIDBEOIndor0 g '(' WA STATE UNIFIED BUSINESS IDENTIFIER NO.(UM): m IIHPS:Ynecureld.vgyovNII:TW g Y STATE EXCISE TAX REGISTRATION NO.(MAY BE SAME AS M UM): Mlps;llsecurt.eo1.w..RovWRImm.NN IN) Link II bottom of LNI v.nW W:on p.92 4 yj )1 CONTRACTOR LICENSE NUMBER n tl3 W$ RA m CONTRACTORS LICENSE EXPIRATION DATE: DSpcllwcuTsnnl.wa.RoCNenryl CONTRACTOR LICENSE VERIFIED ON LM WEBSITE mni en In IpS:Ihxun.Inl.w9.000CIIMYI ii1 LL�NDUSTRIAL INSURANCE PREMIUM STATUS: Y3 won I oo.0ovhemN: 1 R 1 LONTRACTOI CHECKED ON LAI DEBARRED CONTRACTORS M BI B 9 LIST: G 8 1 . [ 4 �I eYDHEI004C0ITCSCI NeIMUIT.IRO revW.RNAw.WMngA9 0 0 . M t . eg$Q� S5 CONTRACTOR CHECKED ON FEDERAL SYSTEM FOR 0p a C Y ;S AWARD MANAGEMENT(SARI -1 O O g� WEBMTE: ninon,rnwrnam9ovlSAW 1 B W $3 S. Sy 2.1 �• EMPLOYMENT SECURTY DEPARTMENT NO.: a k Yp y v emall:publIIWCTLSQOS6wa.00v phone:TSD)BS0.SOR M R. aw g (VERIFICATION Of ACTIVE UNEMPLOYMENT ACCOUNT) @ u F. COMPLIANCE WRH APPRENTICESHIP UTILIZATION 3 D D REQUIREMENTS OF ROW 39.04?10 A49.0I (WA Ion poJ.CM I I million M LM CONTRACTOR TANNING VERIFICATION pa ROW i o M.OK.SMIINR In 101(01Rec I.XHISI I ovive on LNI V.UM.Ibn wan IdPSlyecure Inl.we 9DvlvenIYl BD i 5 MANDATORY PREMD WALK TNROUbI 3"g bO a SUPPLEMENTAL BIDDER CRITERIA SP 1.0214 2 Z.y2. (SUBCONTRACTOR RESPONSIBILITY.CLAIMS AGAINST 1S M RETNNAOE AND BONDS,PUBLIC BIDDING CRIME. F 2 A TERMINATION FOR CAUSE OR DEFAULT.LAWSUITS