Loading...
HomeMy WebLinkAboutBLD2002-00057 • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 (800) 831-2678 PERMIT #: BLD02-00057 Received Date 02/5/2002 SITE ADDRESS: 593 HIGHLAND DR Issue Date 03/19/2002 PORT LUDLOW, 98365 APPLICANT: KENNETH L GREENLEAF PHONE: (425)432-1972 LYNN D GREENLEAF PO BOX 191 MAPLE VALLEY WA 98038-0191 SUBDIVISION: SOUTH BAY#1 Block: Lot: 27 PARCEL NUMBER: 995500027 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: OWNER PHONE: LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE REQUIRED INSPECTIONS: [ ] SETBACKS / Footings: [ ] Foundation: [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: [ ] Framing/Plumbing: tki ( O"►;Q I - 13 -0 f [ ] Propane Tank/Lines: [ ] Insulation: [ ] Sheetrock: tlK 00/64: [ ] Septic System Final Approval: _ [ ] Zoning Final Approval: N/A �* [ ] Final/Occupancy Approval: ', C.,t_ "/'• `''(a / HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY - SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY • • SPECIAL CONDITIONS FOR CASE BLD02-00057 S 1.) The application was reviewed by the Jefferson County Department of Community Development staff on February 12, 2002 for the potential presence of Critical Areas(CAs) under the provisions of the Jefferson County Interim Critical Areas Ordinance (JCICAO). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following CAs were confirmed to be present on the subject property: Level 1 (slight) landslide hazard on western 1/3 of the property;and Osprey Nest. 2.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms. 3.) A geotechnical report was not required or submitted for the single family residence with attached garage. 4.) Based on earlier review by the Washington State Department of Fish and Wildlife related to osprey nest in the vicinity, the subject property is located within 1/4 mile from the nearest osprey nest. No observations of nesting osprey were documented. Because the proposed activity is greater than 660-feet from any documented osprey nest, it is unlikely that the activity will impact the osprey located in the vicinity of the subject property. WDFW recommended that the applicant consider the following information -"the removal of snags or live trees suitable for nesting may impact future nesting of osprey by eliminating potential nesting structures and should be avoided. Construction during the nesting period (April 1st through October 1st) should be avoided if a nesting pair is identifed within 660 feet of the proposed construction." 5.) The applicant is proposing to create or add 3,41 square feet of impervious surface and 4060 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Small Parcel Erosion and Sediment Control Plan. The applicant submitted a Small Parcel Erosion and Sediment Control Plan. 6.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 7.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 8.) The parcel is a legal conforming lot that is designated Single Family-4 dwelling units per acre (MPR-SF 4:1) under the Jefferson County Comprehensive Plan Land Use Map effective 8/28/98. 9.) This approval is for a single family residence with attached garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 10.) The revised site plan dated March 14, 2002 as submitted in conjunction with the building permit application on February 5, 2002 has been reviewed for consistency under the Port Ludlow Code and Development Agreement. It has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the approved revised site plan dated March 14, 2002 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 11.) Maximum Impervious Surface shall not exceed 45 percent. 12.) Minimum setback from the Highland Drive right-of-way line shall be 20 feet. Minimum side yard setbacks shall be 5 feet. Minimum rear yard setback shall be 20 feet, based on requirements of the approved South Bay No. 1 subdivision plat. 13.) The building height shall not exceed 35 feet. 14.) Based on Section 3.107 of the Port Ludlow Code, accessory dwelling units shall not be allowed in the MPR-SF zone. i:\F_BLD_Permit_Buildng.rpt 10/29/19 MLA02-00051 BUILDING PERMIT APPLIAIIIION Review Type: Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: IILD02-00057 Received Date: 2/5/2002 SITE ADDRESS: HIGHLAND DR PORT LUDLOW, 98365 OWNER: KENNETH L GREENLEAF PHONE: (425)432-1972 LYNN D GREENLEAF PO BOX 191 MAPLE VALLEY WA 98038-0191 SUBDIVISION: SOUTH BAY#1 Block: Lot: 27 PARCEL NUMBER: 995500027 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: ; co lk/E 7 PHONE: PHONE: REPRESENTATIVE(S): PROJECT DESCRIPTIO SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,964 VALUATION 122,699.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 552 SHORELINE: CONST TYPE: DECK: 311 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: PUBLIC PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 2 Prop: 3 Seismic Streams Total: 2 Total: 3 Flood Way Floodplain F&W Landslide Routing Date: /7 6, !i-7 . V* Shoreline Aquifer Forest: Commercial Rural Proximity Plat Conditions Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,122.55 MAM 02/05/02 44000 R ED Plan Check $336.77 MAM 02/05/02 44000 1 �/ State Building Code $4.50 MAM 02/05/02 44000 MAR 2 1 ?002 ff Potable Water Application $30.00 MAM 02/05/02 44000 Total: $1,493.82 J�C Buildin ®p ty Planning i 9Department 1 1 III Jefferson County Permit Center * Department of Community Development 4n so 621 Sheridan Street,Port Townsend WA 98368[360]370-4450 Iii .j E '', --' 9 \v1 E -r rmt 0 C Q�_ i r FEB - 5 2002 Project Description: 1. t�.. ri,,M,LY iz i.D �__ Building Type: Project Type: DEPT. P i�1y IUEVtLUNMtN X Single F. ' g New V Wood X Garags •ttache.& Detached ❑ Addition ❑ Steel ❑ Modular ❑ Alteration/Remodel ❑ Concrete O Commercial ❑ Repair 0 Masonry O Multi-family/# of Units ❑ Demolition ^u Other: ❑ Industrial ❑ Other: Bedrooms: Bathrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: Existing: ? )j )QSewer ❑CommunitySystem Electricity ❑ Oil Proposed: Proposed: —T 0 Individual System ❑ Woodstove ❑ Propane Total: 2 Total: �l If not sewer,fill out the following: 0 Heat Pump ❑ Conventional 0 Alternative 0 Other Permit # SEP Water Supply: ❑ Private well 0 Two Party Well A Public:Name of water system: Square Footage: For Office Use Only Z ter\< - Main Floor I T a ! ` cl - \ UBC OCCUPANCY GROUP C°1-1 3 9-U 0 2ND Floor Base fee l 1 2 Z 3rd Floor Plan Check fee ;'> " `,-, I -7 Htd Basement State Surcharge fee L,'.‘ ,C...) Unhtd Basement Subtotal k O 0 ° o �)C Garage/Carport '172. ``5 ) 9,0 Pot Water Review fee 3 0 O UH Decks 3 1 I ?--) \ \0 i 911/Rd Approach fee `J; 1 L. C_) Commercial 4/ TOTAL \ c '3 ;, ?j 4 , Industrial ( C)`ti Receipt # I44'(x� Other ` ))\ Cash hec # *-2.356. Total Valuation: v Initials Pe, Or1);_- __ Date Ste/ OZ.. kl Estimated Cost:4- ) 6 �a L If within 200' of the Shorel , Distance to Bank or Ordinary High'Water Mark �/ ft.Bank Height ft. Signature Date: 61— 0 Y -°'