Loading...
HomeMy WebLinkAboutBLD2002-00374 i BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 (800) 831-2678 PERMIT #: BLD02-00374 Received Date 06/28/2002 SITE ADDRESS: 73 SYCAMORE ST Issue Date 07/31/2002 PORT HADLOCK, 98339 APPLICANT: BISHOP BROTHERS CONSTRUCTION PHONE: (360)385-2441 PO BOX 417 PORT HADLOCK WA 98339 SUBDIVISION: BISHOP ACRES Block: Lot: 25 PARCEL NUMBER: 932300025 Section: 2 Township: 29 N Range: 01 W CONTRACTOR: BISHOP BROTHERS CONSTRUCTION PHONE: (360)385-2441 PO BOX 417 PORT HADLOCK WA 98339 Contractor's License: BISHOBCO93D6 Expires: 12/14/2002 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE R UIRED INSPECTIONS: [P,I SETBACKS / Footings: a/ /0 d'Z ilk.'� Q /Q [:I- Foundation: dK /0/d2- [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: [ l Framing/ urrrr.►b. .� _ (7 -23 _c-z` L.-4-// - �A //9(, - [ ] Propane Tank/Linnees,:.j,Vr e Jive- tope t/?1�3 „[ l Insuj ,. (O / Z/ /cO2 7'1:—f2 j ' I [ ] Sheetroc-�',' 'A?/0Cc" G:7 , rcr t i.trf/ Nic 0Kelr 2-3-23 [ ] Septic System Final Approval: [ ] Zoning Final Approval: [ ] Final/Occupancy Approval/e, /1 %,`:- =- e �//14.9-c- _ ; / .-4 '; HEALTH DEPARTMENT APPR AL REQUIRED P OR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY -SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY • • SPECIAL CONDITIONS FOR CASE BLD02-00374 1.) The application was reviewed by the Jefferson County Department of Community Development staff on July 10, 2002 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Susceptible Aquifer Recharge Area, Special Aquifer Protection Area. 2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 4.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1)All Industrial Land Uses (2)All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit(4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code. 5.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 6.) The applicant is proposing to create or add 2,160 square feet of impervious surface and 4,100 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal adhere to Best Management Practices (BMPs). 7.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 8.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 9.) A minimum of two on-site parking spaces are required for the single family residence with attached garage. 10.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as area of impervious surface which includes rooftops, driveways, concrete, etc. 11.) The building height is not to exceed 35 feet. 12.) Minimum setback from Sycamore St is 20 feet. Minimum setback from Mason St is 20 feet. Minimum side and rear setbacks are 5 feet. All setbacks are to be measured from the property line. 13.) This parcel has been designated as Rural Residential 1:5 under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998. 14.) Sycamore St(C642809) is a local access road. A road approach was reviewed under RAP02-00157. An address of 73 Sycamore St has been assigned to the parcel. 15.) A septic permit(SEP02-00145)was issued July 11, 2002 for a system with capacity of 36 gallons per day. The cancelled septic applications (SEP94-00500 and SEP99-00066) have been filed with SEP02-00145. 16.) This parcel was created through the Bishop Acres subdivision on March 19, 1990 and recorded under AFN 329172, Long Plats, Vol 16, pp 126-127. 17.) Per the Bishop Acres long pia. recorded under AFN 329172, "An easement is hereby reserved for and granted to Puget Sound Power and Light Company, US West, Port Townsend Cable T.V. Company, and their respective successors and assigns, under and upon the exterior 10 feet parallel with and adjoining the street frontage of all lots and tracts in which to install, lay, construct, renew, operate and maintain underground conduits, cable pipeline, and wires with the necessary facilities and other equipment for the purpose of service to this subdivision and other property with electric, telephone and cable T.V. service respectively, together with the right to enter upon the lots at all time for the purpose stated." 18.) The site plan as submitted with the building application on June 28, 2002 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated July 19, 2002 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 19.) This approval is for a single family residence with attached garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. i:\F_BLD_Permit_Buildng.rpt 10/29/19 ' ILDING PERMIT APPLICAN MRLA02 0eview 0p356 e:I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD02-00374 Received Date: 6/28/2002 SITE ADDRESS: rA'?j SYCAMORE ST PORT HADLOCK, 98339 OWNER: BISHOP BROTHERS CONSTRUCTION PHONE: (360)385-2441 PO BOX 417 PORT HADLOCK WA 98339 SUBDIVISION: BISHOP ACRES Block: Lot: 25 PARCEL NUMBER: 932300025 Section: 2 Township: 29 N Range: 01 W CONTRACTOR: BISHOP BROTHERS CONSTRUCTION PHONE: (360)385-2441 PO BOX 417 PORT HADLOCK WA 98339 Contractor's License BISHOBCO93D6 Expires 12/14/2002 REPRESENTATIVE(S): JOHN SWALLOW PO BOX 417 PORT HADLOCK WA 98339 PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,216 VALUATION 90,788.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N SHORELINE: GARAGE: 484 CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: OSS WATER SYSTEM: PUBLIC PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES __ NO AREA _ Exist: Exist: Wetland Erosion Prop: 3 Prop: 2 Seismic _ Streams Total: 3 Total: 2 Flood Way_ Floodplain _ Routing Date: F&W Landslide 7 I /O� Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: A PP' '' •I' NrE D Permit $930.75 MAM 06/28/02 49155 1 \/ Plan Check $604.99 MAM 06/28/02 49155 JUL 3 1 2002 State Building Code $4.50 MAM 06/28/02 49155 Potable Water Application $50.00 MAM 06/28/02 49155 Jefferson& Building County DepPlaartment & Department Total: $1,590.24iti/ D cf_.) (M ccrfil(16 • kftwlion can of Community Development 4J �soN, °& -- 621 Sheridan Street,Port Townsend WA 883i8[3801371-4410 Y3 0 `4r 0 App (NIPC / M _ OcQ '00n C NJ Project Description: `V .,, Buildi ype: ., Project Type: Frame Type: Li%'E e: w ood Single Family 1 — 0 G age Attaced/Detached ` Addition 1 Steel Modular , ,.. _�✓ :=_J a _alteration/Remodel Concrete I Commercial i wCI I Repair 1 Masonry 0 Multi-family/#of Units I Demolition I Other: I Industrial I Other. Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: Existing: 7 Sewer I Community System rlecmcity I Oil Proposed: 02 Proposed: 3 n 'vidual System Woodstove II Propane Total: 02 Total: 2 J If not sewer,fill out the following: li Heat Pump I Conventional I Alternative LI Other Permit# SEP Water Supply: I Private well I Two Party Well Public:Name of water system: Square Footage: / / For Office Use Only Main Floor /R/ (p ? ^��/y e'if k Consistency Review 47.00 2ND Floor Base fee 3c• '7.} 3rd Floor (.Plan Check fee—65% 01, �/ 9 Htd Basement State Surcharge fee 7 50 Unhtd Basement e..142 Subtotal / C `,q-' .rj V '! /Carport Cp LI 3r t Water Review fee `'J I'll, CC? Decks n�l' 91`1/Rd Approach fee Commercial q 0 tr TOTAL at 9 " 14/ ✓ ( Industrial Receipt# < ts Other Cash/Check# /t.—3 Total Valuation: Initials fle./1/7 CVOr Date olkf 61✓Z Estimated Cost: 7.5" fO sf) If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft. Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours. Signature: iZ,....4/- -... Date: -Zk---O H:HOME\PLNCNTR\INFOBLDG\FORMS\BLDperrnitApplication 11-8-01