Loading...
HomeMy WebLinkAbout070610_ca08 TO: FROM: DATE: RE: JEFFERSON COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST Board of County Commissioners Sheriff Anthony Hernandez (by Larry Southwiek, Project Manager) July 6, 2010 JEFFCOM 9-1-1 Improvements Change Order Requests No. 10, 11, U and 13 STATEMENT OF ISSUE: Approval and execution of Change Order Request (COR) No. 10 in the amount of $6,167.00, COR No. 11 in the amount of$10,469.00, COR No. 12 in the amount of$11,165.00 and COR No. 13 in the amount of$23,132.00, all for BnchAuan Gen~ Contracting Company (Conttactor). ANALYSIS: On Janumy 25, 2010, the Board of County CommillSioners approved and executed a contract with Buchanan General Contracting Company, P.O. Box 40069, Bellevue, W A 98015 for the construction of the Je~om 9-1-1 Radio System Improvement Project. Construction started at the South (Coyle) and Maynard Peak sites on February 8. Work began at the Green Mountain site the fust week ofMa.rch. The following CORs are essential for the completion of construction at the Maynard Peak, Green Mountain and Port Townsend sites. Change Order Request No. 10, 11, 12 and 13 are attached for your approval and execution. COR No. 10 is for an additional 'ice bridge' (a s1ructUre to support and protect the microwave guides and cabling from the tower to the equipment s1ructUre) to be constructed at the Maynard Peak site. The original design and bid included one 'ice bridge' and a second one is required. COR No. 11 is for an additional 'ice bridge' to be constructed at the Green Mountain site. The original design and bid included one 'ice bridge' to the tower but it needs to be extended to the vertica1'cable ladder' which carries the cabling up the tower. COR No. 12 is for the revised propane fuel tank f01mdl!tiou slab and protective bollards at the Green Mountain site. COR No.3 deleted the original designed fuel tank enclosure included in the bid but didn't include these costs for the revised design and construction. COR No. 13 is for construction of the access road and preparation for the Port Townsend water reservoir site for access by the geotechnical engineers for soil testing which is required for the design and permitting. These CORs were approved by the Je~m Administrative Board on June 24, 2010. FISCAL IMPACT: Funds will be provided by the JeffCom Enhancement Fund 121 which was funded by a 2007 bond issue. The total amount of the original contract with sales tax is $364,728.08. Change Order Requests No.1 through 9 increased the current approved cost to $399,798.08. The total ofCORs 10, 11, 12 and 13 is $50,933.00 bringing the new total to $450,731.08. The total ofCORs 1 through 13 is $86,003.00 or 23.58% of the original contract. Sufficient funds are available. RECOMMENDATION: Move to approve and execute Change Order Request No. 10, II, 12 and 13 to the JefK:om 911 Radio System Improvement Contraet with B1IChanan General Con1Iacting Company. ~ A 'sttmQr ~ bh;;o Date JEFFCOM 9-1-1 Radio System Improvements CHANGE ORDER REQUEST No. 10, 11, 12 and 13 : CONTRACTOR Buchanan General Contracting Company : CONTACT PERSON Terry Buchanan : ADDRESS P.O. Box 40069, Bellevue, WA 98015 : TELEPHONE NUMBER (425) 462-1326 : E-MAIL terry@buchanangc.com : DEPARTMENT JEFFCOM 9-1-1 : JEFFCOM 9-1-1 CONTACT Sheriff Anthony Hernandez (by Larry Southwick) : TELEPHONE NUMBER (360) 385-3831 (Southwick 360-379-2878) : PROJECT JEFFCOM 9-1-1 Radio System Improvement Project : AMOUNT $50,933.00 : FUND SOURCE Encumbered JEFFCOM 9-1-1 Enhancement Funds : CONTRACT DURATION 90 working days from February 8, 2010 June 1, 2010 Little Construction 2009 4th Street Port Townsend, WA 98368 Attention: Alex Little Reference: JEFFCOMM 911 CE10 – Additional Ice Bridge – Maynard Peak Dear Alex, We are pleased to submit a lump sum quotation of $6,167.00 to provide all of the labor, material, equipment and supervision to install additional ice bridg at the Maynard Peak site per the provided design. A copy of our breakdown is attached. Please issue an authorization to proceed with this additional work. Thank you. Very Truly Yours, Buchanan General Contracting Company Terry Buchanan Project Manager Cc: Larry Southwick PO Box 40069 Bellevue, WA 98015 phone 425 462-1326fax 425 462-9468 www.buchanangc.com BUCHAGC 159CF Buchanan General Contracting Co.Estimator:Rod Jeffcom 911 - Maynard PeakPrint date:6/1/10 CE10 - Additional Ice Bridge - Maynard Peak BGC LaborMaterialSubcontractorTotalNotes CodeDescriptionQuantityUnitTotalUnitTotalUnitTotalCost GENERAL CONDITIONS Superintendent12hr49.635960.0000.000596 As built drawings1ls0.0000.00035.003535 Telephone0.10mo0.000225.00230.00023 Subsistance Superintendent2da0.00010.00200.00020tolls Subsistance Craft3da0.00025.00750.00075fuel & tolls Travel trucks1.0ea0.00075.00750.00075 Construction equipment0.10mo0.000480.00480.00048 Pick up truck0.10mo0.000615.00620.00062 Small tools0.10mo0.000480.00480.00048 Fuel and maintenance0.10mo0.0001275.001280.000128 Fuel adjustment0.10mo0.0000.0000.0000none SUBTOTAL GENERAL CONDITIONS596478351108 Furnish & Install Additional Ice Bridge pick-up & deliver components3hr15.00450.0000.00045 auger bridge posts 36"x12"1ea30.003080.00800.000110 buy & set 3 1/2" post & cap1ea15.0015143.001430.000158B237 buy, tie & set rebar @ 20# ea20#0.75150.0311.202440 hand mix sack concrete @ post4sk7.50306.50260.00056 buy & set 3 1/2" footed post & cap1ea15.0015148.001480.000163B279 parabolts @ footed post4ea3.00123.50140.00026 buy & set 24" grip strut20lf3.006028.005600.000620 arm over brackets2ea15.003055.001100.000140B1211 coax support assembly @ 3' oc 7ea15.0010550.003500.000455B1890 Grounding @ New Ice Bridge hand excavate to ground ring1hr15.00150.0000.00015 ground added posts2ea15.003040.00800.000110 added ground buss bar1ea30.0030125.001250.000155 tie new buss bar into ground ring1ea30.003030.00300.00060 1,0582,144593,261 Labor Adjustment208.93%96500965 Labor Taxes31.65%64000640 Total Labor, Material, & Sub2,6632,144594,866 Overhead & Fee13.50%657 Sub Total5,523 B&O, & Insurance3.01%166 Sub Total5,689 WSST8.40%478 Total Bid$6,167 Copy of CE10 - Additional Ice Bridge Maynard PeakPage 1 June 1, 2010 Little Construction 2009 4th Street Port Townsend, WA 98368 Attention: Alex Little Reference: JEFFCOMM 911 CE11 – Additional Ice Bridge – Green Mountain Dear Alex, We are pleased to submit a lump sum quotation of $10,469.00 to provide all of the labor, material, equipment and supervision to install additional ice bridg at the Green Mountain site per the provided design. A copy of our breakdown is attached. Please issue an authorization to proceed with this additional work. Thank you. Very Truly Yours, Buchanan General Contracting Company Terry Buchanan Project Manager Cc: Larry Southwick PO Box 40069 Bellevue, WA 98015 phone 425 462-1326fax 425 462-9468 www.buchanangc.com BUCHAGC 159CF Buchanan General Contracting Co.Estimator:Rod Jeffcom 911 - Green MountainPrint date:6/1/10 CE11 - Additional Ice Bridge, Green Moutain BGC LaborMaterialSubcontractorTotalNotes CodeDescriptionQuantityUnitTotalUnitTotalUnitTotalCost GENERAL CONDITIONS Superintendent16hr49.637940.0000.000794 As built drawings1ls0.0000.00035.003535 Telephone0.10mo0.000225.00230.00023 Subsistance Superintendent2da0.00010.00200.00020tolls Subsistance Craft6da0.00025.001500.000150fuel & tolls Travel trucks1.0ea0.00075.00750.00075 Construction equipment0.10mo0.000480.00480.00048 Pick up truck0.10mo0.000615.00620.00062 Small tools0.10mo0.000480.00480.00048 Fuel and maintenance0.10mo0.0001275.001280.000128 Fuel adjustment0.10mo0.0000.0000.0000none SUBTOTAL GENERAL CONDITIONS794553351382 Furnish & Install Additional Ice Bridge pick-up & deliver components3hr15.00450.0000.00045 hand excavate post pads 3'x2'x2'4ea30.001200.0000.000120 2x4 forms @ top40lf1.50601.65660126 buy, tie & set rebar @ 20# ea80#0.75600.0321.2096158 buy & place concrete post piers1.5cy30.0045143.00215150.00225485short load buy & set 3 1/2" footed post & cap4ea15.0060148.005920.000652B279 parabolts @ footed post16ea3.00483.50560.000104 buy & set 24" grip strut30lf3.009028.008400.000930 arm over brackets4ea15.006055.002200.000280B1211 coax support assembly @ 3' oc 9ea15.0013550.004500.000585B1890 Grounding @ New Ice Bridge hand excavate to ground ring2hr15.00300.0000.00030 ground added posts4ea15.006040.001600.000220 added ground buss bar1ea30.0030125.001250.000155 tie new buss bar into ground ring1ea30.003030.00300.00060 1,6673,3083565,331 Labor Adjustment208.93%1,824001,824 Labor Taxes31.65%1,105001,105 Total Labor, Material, & Sub4,5963,3083568,260 Overhead & Fee13.50%1,115 Sub Total9,376 B&O, & Insurance3.01%282 Sub Total9,658 WSST8.40%811 Total Bid$10,469 Copy of CE11 - Additional Ice Bridge Green MountainP, a0g6e-0 11-10 June 1, 2010 Little Construction 2009 4th Street Port Townsend, WA 98368 Attention: Alex Little Reference: JEFFCOMM 911 CE12 – Fuel Tanks Slab and Bollards – Green Mountain Dear Alex, We are pleased to submit a lump sum quotation of $11,165.00 to provide all of the labor, material, equipment and supervision to install the revised fuel tank slab at the Green Mountain site after we credited back the original slab in Change Estimate Three. A copy of our breakdown is attached. Please issue an authorization to proceed with this additional work. Thank you. Very Truly Yours, Buchanan General Contracting Company Terry Buchanan Project Manager Cc: Larry Southwick PO Box 40069 Bellevue, WA 98015 phone 425 462-1326fax 425 462-9468 www.buchanangc.com BUCHAGC 159CF Buchanan General Contracting Co.Estimator:Rod Jeffcom 911 - Green MountainPrint date:6/1/10 CE12 - Fuel Tank Slab and Bollards, Green Moutain BGC LaborMaterialSubcontractorTotalNotes CodeDescriptionQuantityUnitTotalUnitTotalUnitTotalCost GENERAL CONDITIONS Superintendent24hr49.631,1910.0000.0001,191 As built drawings1ls0.0000.00035.003535 Telephone0.15mo0.000225.00340.00034 Subsistance Superintendent3da0.00010.00300.00030tolls Subsistance Craft7da0.00025.001750.000175fuel & tolls Travel trucks2.0ea0.00075.001500.000150 Construction equipment0.15mo0.000480.00720.00072 Pick up truck0.15mo0.000615.00920.00092 Small tools0.15mo0.000480.00720.00072 Fuel and maintenance0.15mo0.0001275.001910.000191 Fuel adjustment0.15mo0.0000.0000.0000none SUBTOTAL GENERAL CONDITIONS1191816352042 ADD PROPANE TANK SLAB - 6'x18' 1/0hand excavate thickened edge 3cy22.50680.0000.00068 1/2load, haul & dispose of debris4cy3.75156.50260.00041 fine grade & compact 108sf0.66710.0000.00071 24'' edge forms - 48'48sf1.80861.75840.000170 buy & place rebar160#0.28450.0350.65104154 3/4" champher strip53lf0.45240.35190.00042 screeds108sf0.12130.12130.00026 buy & place concrete 6"6cy15.009087.005220.000612 finish concrete108sf0.45490.0000.00049 cure & protect108sf0.10110.0890.00019 BUY & PLACE 6" PIPE BOLLARDS pick-up & deliver bollards3hr15.00450.0000.00045 hand excavate for bollards5ea30.001500.0000.000150 1/2load, haul & dispose of debris2cy3.7586.50130.00021 buy & place 6" galvanized bollards5ea30.00150195.009750.0001,125 buy & place concrete @ bollards2.5cy30.007587.002180.000293 Grounding @ Bollards hand excavate to ground ring4hr15.00600.0000.00060 ground pipe bollards5ea15.007540.002000.000275 2,2252,8991395,263 Labor Adjustment208.93%2,160002,160 Labor Taxes31.65%1,388001,388 Total Labor, Material, & Sub5,7722,8991398,810 Overhead & Fee13.50%1,189 Sub Total9,999 B&O, & Insurance3.01%301 Sub Total10,300 Copy of CE12 - Fuel Tank Slab Green Mountain, 06-0P1a-g1e0 1 Buchanan General Contracting Co.Estimator:Dennis Jeffcom 911 - Green MountainRevsion 1Print date:6/17/10 CE13 - Geotech Access, Opt #2, Pt Townsend BGC LaborMaterialSubcontractorTotalNotes CodeDescriptionQuantityUnitTotalUnitTotalUnitTotalCost General Conditions SUPERINTENDENT Superintendent24hr49.631,1910.0000.0001,191 Meetings & Reporting4hr49.631990.0000.000199 Site Walks2hr49.63990.0000.00099 Telephone0.37mo0.000225.00830.00083 Subsistance Superintendent8da0.00010.00800.00080toles Subsistance Craft8da0.00025.002000.000200fuel & toles Travel trucks2ea0.00075.001500.000150 Job office1ls0.00090.00900.00090 Sanitary convenience1ls0.000130.001300.000130 Local yard (composite rate)2hr40.038032.50650.000145 Disposal1ea80.068097.5098115.00115293 Mobilize & Demobilize2hr40.038032.50650.000145 Safety2hr49.639925.00500.000149 Construction equipment0.37mo0.000295.001090.000109 Pick up truck0.37mo0.000650.002410.000241 Tool sharpening1ls0.0000.0000.0000 Job photos1ls0.00050.00500.00050 Small tools0.37mo0.000295.001090.000109 Fuel and maintenance0.37mo0.0001000.003700.000370 Fuel adjustment0.37mo0.0000.0000.0000none Locates4hr0.0000.000125.00500500 Foreman (carpenter)4hr48.631950.0000.000195 Survey and Engineer Site1ls0.00080.00800.00080 SUBTOTAL GENERAL CONDITIONS202319706154607 EQUIPMENT1s/c0.0000.0000.0000 Mob/demob equipment1ls0.0000.000430.00430430 SITEWORK1s/c0.0000.0000.0000 Access Road - 15'x30' w/flares1s/c0.0000.0000.0000 580 Backhoe 7hr0.0000.000125.00875875 10cy Dump2hr0.0000.00090.00180180 2/0clear & grub 50sy0.60300.0000.00030 1/2load, haul & dispose10cy1.50158.00800.00095 2/0rough grade & compact50sy0.60300.0000.00030 compactor0.5da30.0015115.00580.00073 filter fabric675sf0.09570.151010.000159 2/0import & place gravel @ 6"10cy3.003023.452350.000265 finish grade45sy0.67300.0000.00030 plate compactor - clean-up0.5da30.0015115.00580.00073 Compound - 50'x12' + 30'x30'1s/c0.0000.0000.0000 580 Backhoe 18hr0.0000.000125.0022502,250 10cy Dump6hr0.0000.00090.00540540 cut down trees & heavy brush8hr15.001200.0000.000120 Copy of CE13 - Geotech Access Opt #2 Pt TownsendP, a0g6e- 117-10 Buchanan General Contracting Co.Estimator:Dennis Jeffcom 911 - Green MountainRevsion 1Print date:6/17/10 CE13 - Geotech Access, Opt #2, Pt Townsend BGC LaborMaterialSubcontractorTotalNotes CodeDescriptionQuantityUnitTotalUnitTotalUnitTotalCost CHAIN LINK FENCE - 6'CLF1s/c0.0000.0001158.0011581,158viking 580 Backhoe 1hr0.0000.000125.00125125john 10cy Dump0hr0.0000.0000.0000 open existing fence15lf2.00300.0000.00030 1/0pull fence posts2ea0.0000.0000.0000 load, haul & dispose of debris2cy7.501510.002030.006095 install to permanent gate posts2ea0.0000.0000.0000 12' double gate1ea0.0000.0000.0000 3,3144,1046,35013,769 Labor Adjustment198.67%2,566002,566 Labor Taxes32.61%1,918001,918 Total Labor, Material, & Sub7,7984,1046,35018,252 Overhead & Fee13.50%2,464 Sub Total20,716 B&O, & Insurance3.01%624 Sub Total21,339 WSST8.40%1,793 Total Bid$23,132 Copy of CE13 - Geotech Access Opt #2 Pt TownsendP, a0g6e- 127-10