Loading...
HomeMy WebLinkAboutBLD2002-00479 UILDING PERMIT APPLIC MLA02-00441 �N Review Type:I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD02-00479 Received Date: 8/21/2002 SITE ADDRESS: iti VISTA WOOD CT PORT LUDLOW, 98365 OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: TIMBERTON VILLAGE PHASE III Block: Lot: 76 PARCEL NUMBER: 998500076 Section: 17 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365 Contractor's License PORTLAL994L8 Expires 5/2/2004 REPRESENTATIVE: JEFF EVANGER PHONE: (3690)437-2101 PLA 70 BREAKER LN PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,818 VALUATION 197,886.00 ADD'L: 719 HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N SHORELINE: RACONST TYPE: pEGE' 497 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 3 Prop: 2 Seismic Streams Total: 3 Total: 2 Flood Way Floodplain Routing Date: cis..Z up a F&W Landslide Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,542.55 MAM 08/21/02 49511 APPROVED State Building Code $4.50 MAM 08/21/02 49511 Potable Water Application $50.00 MAM 08/21/02 49511 SEP 1 3 2002 Total: $1,597.05 Jetfers Planning & wildingonCounty Departure C/7/i/liaboriop) x �� s • • BUILDING PERMIT Jefferson County Depment of m 621 Sheridan Streetart, Port TownsendComunity, WA 98368Development (360)379-4450 FAX (360)379-4451 PERMIT#: BLD02-00479 Received Date 08/21/2002 SITE ADDRESS: 42 VISTA WOOD CT Issue Date 09/13/2002 PORT LUDLOW, 98365 APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: TIMBERTON VILLAGE PHASE III Block: Lot: 76 PARCEL NUMBER: 998500076 Section: 17 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365 Contractor's License: PORTLAL994L8 Expires: 05/02/2004 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE REQUIRED INSPECTIONS: �, /�Q �� [ ] SETBACKS / Footi / L''i'- earez /iU.�i14 E r�� lit [-.1.- Foundation: tls Z [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: �r ,ex L / -f3--c.�3 [ ] Framing/Plumbing: e) 716/61 W [ ] Propane Tank/Lines:r [ ] Insulation: O 217e03 4[ ] Sheetrock: 9R z//j4/a3 [ ] Septic System Final Approval: NSA `ce.u/e _ [ ] Zoning Final Approval: A//jQ [ ] Final/Occupancy Approval: eK Pe,r U dofr ',HEALTH DEPARTMENT PPR ( RED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY -SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY • • SPECIAL CONDITIONS FOR CASE BLD02-00479 1.) The application was reviewed by the Jefferson County Department of Community Development staff on August 29, 2002 for the potential presence of Critical Areas (CAs) under the provisions of the Jefferson County Interim Critical Areas Ordinance (JCICAO). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following CAs were confirmed to be present on the subject property: Great blue heron rookery. 2.) During SEPA environmental review for the Plat of Timberton Village, Washington State Department of Fish and Wildlife Area Habitat Biologist Tim Rymer conducted a field evaluation to determine the presence of a fish and wildlife habitat area on the subject property. Mr. Rymer and other Department of Fish and Wildlife personnel concluded that the suspected Great blue heron rookery was not located as mapped in the Jefferson County Critical Areas Ordinance, but, that it was in fact located in the NE Quarter of the NW Quarter of Section 20, Township 28 North, Range 1 East, which is approximately 1/2 mile south of the project site. 3.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 4.) The parcel is a legal conforming lot that is designated as Single Family -4 dwelling units per acre (MPR-SF 4:1) under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998. 5.) This approval is for a Single Family Residence with Attached Garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 6.) The site plan as submitted with the building permit application on August 21, 2001 has been reviewed for consistency under the MPR Code. It has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated September 4, 2002 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 7.) Lot 76 was created through the subdivision of Timberton Village Phase III on August 29, 2001and recorded under Auditor's File Number 447260 and filed in Volume 7 Page 144 of Plats, records of Jefferson County. 8.) The applicant is proposing to create or add 2925 square feet of impervious surface and 3000 square feet of land disturbing activities. Plat conditions and Section 4.1 of the Jefferson County Stormwater Management Ordinance that your proposal submit a Small Parcel Erosion and Sediment Control Plan. 9.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 10.) The southwest corner of lot 76 is adjacent to a wetland buffer located within Tract"J"of the Plat of Timberton Village Phase III. 11.) All construction activities shall not encroach upon the wetland buffer. This includes the storage or preparation of materials. 12.) Disturbance of vegetation within any area with a combination of slopes greater than 15 percent with impermeable or slowly impermeable soils, ground water seepage, or potentially unstable slopes, the following conditions shall apply: A) Whenever feasible, existing vegetation in these areas shall remain in an undisturbed condition; B) If the area is unvegetated due to a previous disturbance, immediate efforts shall be required to provide a persistent native vegetative cover to prevent erosion or hazard; C) In order to minimize impacts to environmentally sensitive areas and on site vegetation, authorized clearing shall be designed to minimize impacts to soil and under story vegetation by providing for sequencing and staging where appropriate. • 13.) In the event archaeological items are discovered during construction, builders and lot owners shall observe the following protocol: Stop Work, do not further disturb the area or remove any materials therefrom. Notify immediately the Director of Community Development(360) 379-4450. The Director of Community Development will immediately notify the Washington State Office of Archaeology and Historic Preservation ("OAHP"), (360)407-0752. Protect the area from vandals and collectors. Obtain services of a qualified archaeologist to evaluate the site and make recommendations for further work in the area. If further excavation or disturbance of the site is necessary, obtain the appropriate permit from OAHP. Proceed only in compliance with the terms and conditions of said permit. 14.) Based on Section 3.107 of the Port Ludlow Master Planned Resort Code, accessory dwelling units shall not be allowed in the MPR-SF zone. 15.) Based on Table MPR-SF of the Port Ludlow Master Planned Resort Code, the maximum impervious surface for lot 76 shall be 45 percent. 16.) Minimum setback from Vistawood Court-a private road (Tract G) property line shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 17.) The building height shall not exceed 35 feet. 18.) The applicant submitted a Summary Letter dated April 25, 2001 from GeoResources, who prepared the 1997 Geotechnical Report. The summary letter verified that the recommendations of the 1997 report have been met to the satisfaction of the professional engineer who prepared the report. is\F_BLD_Permit_Bu ildng.rpt 10/29/19 • • ill -- Jefferson County Department of Community Development r ,x 's 621 Sheridan Street,Port Townsend WA 88368 1360)379-4450 �� +r f: 1-1 t•}: '=5 t"'e '-+tom P4rrro4 APP. ocai-oon p. v ,,, 4... , ,,,,:,/, -, ,,,,,,,,,, . ,,,,i,,,:s4, Project Description: ' \ , _7_,4 ,7 , 5tz)cLp/cr S Building Type < Project Type: Frame ..e: Single Family `C,�` w Wood Garage Attached/Detached ' Addition Steel Modular Alteration/Remodel Concrete Commercial Repair Masonry Multi-family/#of Units Demolition Other: Industrial Other: Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: 0 Existing: a 10 Community System Electricity Oil Proposed: Z. Proposed: 3 Inaividual System Woodstove Propane Total: _Z__ Total: 3 If not sewer,fill out the following: Meat Pump Conventional Alternative Other Permit# SEP Water Supply: Private well Two Party Well Public:Name of water system: 01.)6, Square Footage: :For Office Use Only Main Floor / 8/S- Consistency Review 2ND Floor 7/ I Base fee 3rd Floor Plan Cheek-fee CO. Htd Basement State Surcharge fee Unhtd Basement Subtotal Garage/Carport 41 (7 7 Pot Water Review fee Decks Q 7 911/Rd Approach fee Commercial TOTAL • Industrial Receipt# Other Cash/Check# Total Valuation: / 9 7, $ 8Co Initials Or Date Estimated Cost: If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft.Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any was accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access ,rig .of- try to Jefferson County and it's employees,representatives or agents for the purpose of applic ion review and any required later inspections. Access and right of entry to - .,li s-ro.e or structure shall be requested and shall occur during regular business hours. Signature: �/�GC� Date: 6 /6/1L. OVER ► H:1 IOME\PLNCNTR\INFOBLDG\FORMS\BLDpertnitApplication 11-8-01 SE\T B'Y:PORT LUDLOW ASSOCIATES: 9- 4- 2 : 7:35AM : 1 360 4372522-, 3603794451 :# 3/ 7 # • • . JUTBRSON COUNTY STORMWATER MANAGEMENT ORDINANCE i1 . •; •A, . \II • I I,, .e ft• ►• . 0 . 1 litROJTON AND I 414 Ili! i • OL WOBICIDDICIT Property Owner:. Port tudip r _Zissc_gjaps„ipTelepboae: (360) 437-2101 A4dpnil: " 70 Brgaker. Lane, Ptujailow, WA _98355 AMMWS Parcel Number 9 9 s-s ao-0 7(.0 -r•.t•;- Permit at Septic Permit Application Na (f applicable): 3`D oz-oay 7 g PrOjont Description:_ —__ +: y`' �3 New Single Family 12Lidenes with Attsl�r; Gass.,, .., .., ► ,._ r :1 y; 'I 'j, SEP 4 2 ; s i I p .4/.2 _ .1/ i- 2✓C2o Gee -i- JFFFFRaLJ COUNTY DEPT. OF COMMMUNITY DEVELOPNIE T Responsible ix BMP Ia eanetioa and Maantenenek., Jell 17132Ssr Address:, Pgrt Ludlpy Associates .LLC - P Ludlow WA_ 91065_ T ' u : (360) 431-2101 1. Beseribalcbeck the Bat Mostaganem Practices (BMPa) that you will Qaptematt during lend disturbing activities or constructloa to centre) erotica and prevent sediment from entering water bodies(marine Waters,stsuns rivers, lakes,or weeleedt)or imPeodeR adilicalt property or roods- the measures you plea to impiaret and show their sppro do t. location on the site I You mny also propose measurer other than those food. Attach additional sheets, if encore ) space is r+egnirsd. j I $ Stabilise construction access route. Limit conawetion vehicles to one route, if Menge. Provide a stabilized constnutioa access by applying quarry spells, ballast,or crushed rock ► to minimize packing sediment onto roads. (Sec attached illustration from Stet { asagsgaigaLkiggiug.) If sediment is transported onto roads, they will be clamed dtor+oughtiy. ; ( l Minimize the shoat of laid disturbing activity and preserve existing vegetation. Preaarva bulltm of well-established vegetation between disturbed grass and property boundaries, reeds. water bodies, and desisruted critical areas . ' habitat areas, landalidt or erosion hazard ma,etc.). APPROVED PERMIT # BIB STORMWATER PLAN 0 2 - 0 479 SEP - 42t ; JEFFERSON COUNTY DCD ,t:,+t:,rR N�, � SKiAiATUR , SPENT BY=PORT LUDLOW ASSOCIATES; 9- 4- 2 ; 7:35AM ; 1 360 4372522 3603794451;# 4/ 7 4 • safauhusigunsiagraimaguanua 3. Dssalb.taw disturbed mug will be PentIsfleatlY stabilised(seeded, lowdneePod.*Ply Fuld base to roadways.see.) Areas that ILAIISSALUT rti1partY line_ • 3. Deraribs howl'loaf firm impervious meson will be controlled (duperse to Mood areal to thy well,infiltiodao tack mete nutov(Rhodos in*M lbodlides,etc.). All impervious surfaces mill be run to roof drains and/or catch basing as dsa j into the kilt` raga J rasanPi. PERMIT # BLD 0 2 - 0 4 7 9 JEFFERSON COUNTY BCD Si \T BY:PORT LUDLOW ASSOCIATES: 9- 4- 2 : 7:35AM : 1 360 4372522-, 3603794451 :# 5/ 7 • • • jPOSIOjfAND SEDIMENT CONTROL WORIL!MET 4. Specify your constructice sequence. Describe the timing of all had disturbing activities (clearing and Fes. coostruction, installation of drainage facilities, landscaping, etc.) and Best hfanagement Practices. Describe proposed ice of BMPs. Alter excavation the soil piles will be covered and silt fence will be installed. Silt fence will be left in place until we are ready to landscape and all roof drainalcatch basins are !E. Larldittalli112 will he installed as early is possible on the exterior orthe building when all exterior concrete work is completed. The Practices proposed above will be impleninted to control i roaicn, sadinnmt, and .. • 4: I will notify the Permit Caster for inspections as required, ( ; Ah5 r') $: .,•", ofOwxr/ :. x°3r+ 1a Date (Jeff Evanger) 444.644,r 4. -r- ...,..- , ,• ..---?\ -,.?I, ,..-= _.,; ..... .../-\ i IP ,-- .., -I jt.c--&--11.:2 L...i -`1,71 -..irT"2 4.`p-E-- ,:>-71'' ci-pY..1 --1 -7--. 1. 1-' a--.2F-'- 2 ...:_t.....-.).. ‘.7. •,.,7 y:. ....."*"' i.)1," - I 1Y--r-:NE, 4 \ 4- , ! , ' 1 ..}.C4 • -- -i;., 1 , „,.. i - , - !---,' , ' / : /17 ::',., p--7-' -") A 0 0' '- '---, r 0 I' N ,......-,,,„/,z2.,:l. , 2 --- ,,-, 11 __.,..„._____ ,„„...._ ...:.....:....„... , ,_ (_ ,, , , R-t-, ,........ tii t --- 1 .... ...., • , . , 1(1 ---7):-, 71i _ / r- i.,..irl \...'"?...... f",i\IL0 ....,•, -,-.. 7 Iv,J ill ili,201 N A.. 3 i C1.___ / . - .. m -72 -J__ „-:-.<-' . T - = . -% l L). • 41\'-tP : iii -„ - '5-1" / - ,41 100.-71 . --ck-ff G - - ----24C-1--_,` -. 2 - SITE PLAN PERMIT # BLO L1lo()00 4/7 i,o-ii SEP - 4 2002 0 2 - O. 4 7 9 ...... JEFFERSON CO JEFFERSON COUNTY DCD DEPT.OF CO UN SIGNATUR PMENT