HomeMy WebLinkAboutBLD2002-00494 • e
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT#: BLD02-00494 Received Date 08/27/2002
SITE ADDRESS: 73 ROCKY BROOK RD Issue Date 09/25/2002
BRINNON, 98320
APPLICANT: JAY C MONTGOMERY PHONE: (360)876-7895
LISA B MONTGOMERY
7450 JASON LN SE
PORT ORCHARD WA 98367-8570
SUBDIVISION: Block: Lot:
PARCEL NUMBER: 602341043 Section: 34 Township: 26 N Range: 02 W
CONTRACTOR: OWNER/BUILDER PHONE:
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE
RtyJAKtU INSNt(:I IUNS: :GG�
[ir SETBACKS / Footings:
['j/Foundation: it 7-;•0 Z
[ ] Underground Plumbing/Underground Insulation:
[ ] Shear Wall:
[di Framing/Plumbing: a /Ge,v R:.5--03
[ ] Propane Tank/Lines:
[ ] Insulation:
[ ] Sheetrock: D/� 4°,3,7/
[ ] Septic System Final Approval:
[ ] Zoning Final Approval:
[ ] Final/Occupancy Approval. 9 7 o-
HEA H DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. - 4:30 p.m.
SPECIAL CONDITIONS APPLY-SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
• S
SPECIAL CONDITIONS FOR CASE BLD02-00494
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on August 30, 2002 for the potential presence of Environmentally
Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC).
After an initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on or near the subject
property: Susceptible Aquifer Recharge Area and Special Aquifer Protection Area, Type I
Landslide Hazard Area.
2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological
formations that allow percolation of the surface water into the soils and the underlying
zone of saturation. Aquifers are geologic formations that contain sufficient saturated
permeable material to yield significant quantities of water to wells and springs. Aquifers
serve as the source of drinking water within most of the rural portions of Jefferson County.
3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions
that promote rapid infiltration of recharge waters to groundwater aquifers.
4.) Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type,
geologic material, and groundwater that may combine to create problems with slope
stability, erosion, and water quality during and after construction or during natural events
such as earthquakes or severe rainstorms.
5.) Buffers are areas that shall be maintained in their natural condition, however, minor
pruning or alteration of vegetation may be permitted as long as the function and character
of the buffer are not diminished.
6.) A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the
Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the
Landslide Hazard Area.
7.) Landslide Hazard Areas and their associated buffers shall remain naturally vegetated.
Should buffer disturbance occur during construction, the Unified Development Code
(UDC)Administrator shall require replanting with native vegetation. No alterations shall b
made to the Landslide Hazard Area or its associated buffer without prior authorization by
the UDC Administrator.
8.) Prior to and during approved construction activities, the perimeter of the landslide hazard
area buffer shall be marked with a temporary sign. The sign shall be placed in such a
manner that it can be directly observed from the construction area. The sign shall contain
the following statement: "Landslide Hazard Area and Buffer- Do not Remove or Alter
Existing Vegetation."
9.) All construction activities shall not encroach upon the buffer. This includes the storage or
preparation of materials.
10.) The applicant shall permanently separate the boundary of the Landslide Hazard Area
Buffer from the remainder of the subject property through installing logs, trees, a hedge
row, or any other prominent physical marking approved by the UDC Administrator.
11.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
12.) A site visit was conducted by Jefferson County Development Review staff on September
11, 2002. Staff confirmed the location of the proposed single family residence to be out of
the 30-foot landslide hazard buffer.
13.) The applicant is proposing to create or add 1,184 square feet of impervious surface and
6,250 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson
County Unified Development Code requires that your proposal adhere to Best
Management Practices (BMPs).
14.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
15.) Jefferson County determineat this proposal is categorically exempt fro�eview under
the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i).
16.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of
impervious surface which includes rooftops, driveways, concrete, etc.
17.) The building height is not to exceed 35 feet.
18.) Minimum setback from Rocky Brook Rd is 20 feet. Minimum setback from Dosewallips R
is 20 feet. Minimum side and rear setbacks are 5 feet. Landslide Hazard Areas further
impact setbacks.
19.) A minimum of two (2) on-site parking spaces are required for the single family residence.
20.) This parcel has been designated as Rural Residential 1:5 under the Jefferson County
Comprehensive Plan Land Use Map effective August 28, 1998.
21.) Rocky Brook Rd (C251509) is a county local access road. The road approach is existing,
and an address of 73 Rocky Brook Rd has been assigned to the parcel.
22.) A septic permit(SEP02-00122)was issued on June 26, 2002 for a system with capacity of
240 gallons per day.
23.) This site is served by a two-party well located at the northwest corner of parcel 602 341
004. A Declaration of Easement was recorded under AFN 460250.
24.) The site plan as submitted with the building application on August 27, 2002 has been
reviewed for consistency under the UDC, and has been approved by Jefferson County
Department of Community Development. Any modifications, changes, and/or additions to
the stamped, approved site plan dated September 23, 2002 shall be resubmitted for
review and approval by Jefferson County Department of Community Development.
25.) This approval is for a single family residence only. Any future permits on this site are
subject to review for consistency with applicable codes and ordinances and does not
preclude review and conditions which may be placed on future permits.
is\F_BLD_Permit_Buildng.rpt 10/29/19
ItILDING PERMIT APPLICA1N MRLeview 02 Type455
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD02-00494 Received Date: 8/27/2002
SITE ADDRESS: 73 ROCKY BROOK RD
BRINNON, 98320
OWNER: JAY C MONTGOMERY PHONE: (360)876-7895
LISA B MONTGOMERY
7450 JASON LN SE
PORT ORCHARD WA 98367-8570
SUBDIVISION: Block: Lot:
PARCEL NUMBER: 602341043 Section: 34 Township: 26 N Range: 02 W
CONTRACTOR: OWNER PHONE:
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 730
VALUATION 89,447.00 ADD'L: 490 HEAT TYPE: EEE
CODE EDITION: 1997 HEAT BASE: HEAT TYPE: WOD
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: SHORELINE:
CONST TYPE: DECK: 416 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: CON
WATER SYSTEM: 2WELL PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 2 Prop: 2 Seismic Streams
Total: 2 Total: 2 Flood Way Floodplain
Routing Date: V-46.2....._ F&W Landslide
ri ,2)
Shoreline Aquifer
Forest: Commercial Rural
Type Amount Paid By: Date: Receipt: AP E
D
Permit $923.75 MAM 08/27/02 49602 r �� lJ
Plan Check $600.44 MAM 08/27/02 49602 SEP 2 5 2002
State Building Code $4.50 MAM 08/27/02 49602
Potable Water Application $50.00 MAM 08/27/02 49602 Jefferson County Planning
& Building Department
Total: $1,578.69
SC
„...1.,, ill e f ai
)
� • •�.5ox c Moran Comity Uo1artll et at C mm iiIty Development
�� 821 Silerklan Street,Port Town1�1 WA 18388 t380)370-4450
4..... --'-'1"-.461-74PN' 0_,.
Prmt �-°�� ppo.eacation
,,,,,,,,..,s_
MX tot
Project Aeecri lion: 2 7
13°l am fi Project Type:
Pro 4
i �'P Framelypti:
Single Family 11 New X Wood
Li Garage Attached/betstched 1J Addition
5 Modular 0 Steel
0 Alteration/Remodel 0 Concrete
❑ Commercial
Multi-family/0 of Units0 Repair 0 Masonry
0 Demolition Cl Other:
[J Industrial
0 Other:
Bathrooms: Bedrooms: Type of Sewage Disposal: 'ape of TIeat:
Choose one:
Existing: Existing: ❑ Sewer 0 Cointnuni S m Proposed:oposed: _ Proposed: ty y ste 1 Electricity 0 Oil
Total Individual System Woodsrova ❑ propane
T oral If not sewer,fill out the following: 0 Heat Pump
XConventional 0 Alternative 0 Other
s , Permit# SEP O -dC)k ll
Water Supply;
LI Private well x1 Two Patty Well 0 Public:Name of Ovate stem:_
Square Footage: — t► For Office Use Only J
Main Floor 30 . 1./654 t 1
, ��• Consistency Review 47.00
2ND Floor q 3 0 Base fee t 3,7
3'd Floor
Plan Check fee--65% C 60. 144
Htd Basement State Surcharge fee C f t S C)
Unhtd Basement I Subtotal I 575. kit
Garage/Carport _ Pot Water Review fee IS*I -_00
p
Decks '4 1 to , L o5. t2 911/Rd Approach fee _ `•• _
Commercial 41114 72_ TOTAL ry
industrial _ I Receipt# ."irtwAr
Other Cash/Check#
q lOz1 Z
Total Valuation:_ Initials e
Or Date ��
Estimated Cost:_ IL,.�0 O a
t-
Ifwithin 200' aF the Shoreline,
Distance to Bank or Ordinary High Water Mark _ ft.Bank Height ft.
By signing the application form,the applicant/owner snail]that the information poovidec7 ere..is true end correct r know
to tlw boat of theiledge. Any material falsehood or any .
orniadon of a material fact made by the applicant/owner with respect to this application parker may result in this permit being null and void,
1 further agree to save,indemmlfy and hold harmteea Jeffctaon County against all liabilities,judgments,court costa,reasonable attorneys foes and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of fie granting of this permit.
I further agree to provide as and tight of entry to Jeffs eon County and les en. to era,representatives or egonre for the purpose of application review
Acres and right of entry p y Pip app and any required laterincpections-
8 �y"• to applicant's property or structure shall be requested and shall occur during roguing-business hours,
Signature ( _ . Date: 4-1-x-C3' -
1-1:HOMI\FLNCNTR\INFOELDG\FORMS\BLDpermitApplicadon 11-$-01 OVER. 01-"
ZOO
'17sa Aare+,.I.. f
TO/TO LEIttd (IOU 00 ❑d❑C TStIELE09E EE :80 Z,007:/LT/L0