Loading...
HomeMy WebLinkAboutStrider Construction Company Inc. Change Order No. 2 Phase 4 - Stage 1 - 051925 JEFFERSON COUNTY Shcet 1 of 2 DEPARTMENT OF PUBLIC WORKS Change 2 Date: 5/6/2025 CHANGE ORDER Order No. Ordered by County Engineer under terms of Section 1-04.4 of the Standard Specifications 405-Z114.0 Contract No. Change proposed by Contractor To: Strider Construction Endorsed by: Kyle J.Gebhardt,P.E.,President STZ inry2_ -,ets-1.per nisi lmt InJG. 4721 Northwest Drive Contractor Firm Name --------.---_. __ Bellingham,WA 98226 tZ MAY 2c0S afore Date f'21-5/DE.Arr Title Consent given by Surety:(when required) Project Title Phase 4-Stage 1 On-site Grinder Pump By: Installation for the Attorney-in-fact Dote You are ordered to perform the following described work upon receipt of an approved copy of this change order: The changes to the contract Include Increase in grinder pump tanks;changes from standard grinder pumps to explosion proof grinder pump; increase of electrical cost for the installation of the explosion proof pumps;change in grinder pump tank type;and added riser for the grease interceptors. All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the type of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT(incl.9.1%sales tax) AMOUNT(Incl.9.1%sales tax) THIS ORDER(Incl.9.1%sales tax) AFTER CHANGE(Incl.9.1%sales tax) $ 2,589,588.87 $ 2,602,680.87 $179,742.11 $ 2,782,422.98 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME(working days) CONTRACT TIME CHANGE(Add/Del) TIME 136 136 9 145 PP OVAL OMMENDED .....4,64,cigAPPROVALI '. MENDED ' I'17g �f / .. /L•Z' V Prole -Manager Dote County !neer Dote APPROVAL RECOMMENDED APPRO - iL El I / 4: , s . /20Y—a- ;(la P A ib Ecology Regional Project Manager Dote Choir,'efferson County Commissioners Date JEFFERSON COUNTY Contract Nc 40521270 Sheet 2 of 2 DEPARTMENT OF PUBLIC WORKS Change Date: 5/6/2025 CHANGE ORDER ESTIMATE Order No. 2 NEW BID ITEMS Bid DESCRIPTION Unit Unit Bid Qty Unit Bid Total Properties A-48 Bollard-COP 01 EA $ 1,200.00 5 $ 6,000.00 Type 2 Grinder Pump Assembly with Precast A-49 Concrete Manhole-COP 01 EA $ 45,000.00 1 $ 45,000.00 2 A-51 Tank Size Increase-COP 01 EA $ 2,600.00 7 $ 18,200.00 14a,19,28,35,83,110, A-52 Grease Interceptor Additional Risers-COP 03 EA $ 2,276.00 5 $ 11,380.00 CO 02 New Item Total $ 80,580.00 EXISTING BID ITEMS DELETED Bid DESCRIPTION Unit Unit Bid Qty Unit Bid Total A-21 Manhole 48 In.Diam.Type 1-COP 01 EA $ 9,500.00 -3 $ (28,500.00) 2,14b,91/93 A-29 Type 1 Grinder Pump Assembly-COP 01 EA $ 12,000.00 -4 $ (48,000.00) 14b,29,79,91/93 A-30 Type 2 Grinder Pump Assembly-COP 01 EA $ 17,000.00 -4 $ (68,000.00) 2,67,110,112 A-31 Type 4 Grinder Pump Assembly-COP 01 EA $ 32,000.00 -1 $ (32,000.00) 91/93 CO 02 Ex.Bid Item Deleted Total $ (176,500.00) EXISTING BID ITEMS ADDED Bid J DESCRIPTION _ Unit Unit Bid Qty Unit Bid Total A-29 Type 1 Grinder Pump Assembly-COP 01 EA $ 12,000.00 1 $ 12,000.00 110 A-30 Type 2 Grinder Pump Assembly-COP 01 EA $ 17,000.00 1 $ 17,000.00 29 A-31 Type 4 Grinder Pump Assembly-COP 01 EA $ 32,000.00 2 $ 64,000.00 67,112 Type 1 Grinder Pump Assembly,with precast A-32 concrete manhole-COP 01 EA $ 45,000.00 2 $ 90,000.00 14b,79 Type 4 Grinder Pump Assembly,with precast A-32 concrete manhole-COP 01 EA $ 45,000.00 1 $ 45,000.00 91/93 CO 02 Ex.Bid Item Added Total $ 228,000.00 ITEMS ADDED(Non Bid Items) N/A H-30 Hatch-COP 01 EA $ 3,795.00 1 $ 3,795.00 93/94 N/A Upgrade to an explosion proof pump-COP 01 EA $ 2,200.00 3 $ 6,600.00 77,83,111b N/A Existing Sewer Exploration-COP 01 LS $ 11,704.00 1 $ 11,704.00 N/A Control Panel Size Increase-COP 01 LS $ 2,224.00 1 $ 2,224.00 29,67,93,110 Electrical cost increase for explosion proof pumps- N/A COP 02 EA $ 2,732.00 3 $ 8,196.00 77,83,111b CO 02 Ex.Added Non Bid Items Total $ 32,519.00 ESTIMATED NET CHANGE SUBTOTAL: $ 164,599.00 9.2%Sales Tax $ 15,143.11 ESTIMATED NET CHANGE TOTAL: $ 179,742.11 Department of Public Works 0 Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: May 19, 2025 Subject: Change Order No. 2, Phase 4 - Stage 1 On-site Grinder Pump Installation for the PHUGA, Project No. 405-2127-0, Ecology Agreement No. WQC_2024_JCoPWE-00034 Statement of Issue: Change Order No. 2 with Strider Construction of Bellingham, Washington. Analysis/Strategic Goals/Pro's ft Con's: This change order changes the contract to include changes from standard grinder pumps to explosion proof grinder pumps; increase of electrical cost for the installation of the explosion proof pumps; change in grinder pump tank type; and added risers for the grease interceptors. Fiscal Impact/Cost Benefit Analysis: The amount for Change Order No. 2 is $179,742.11. The contract amount will increase from $2,602,680.87 to $2,782,422.98. NOTE, the cost includes 9.2% sales tax. The project is funded at 100% by the Department of Ecology combine funding package (Centennial grant, State Revolving Fund (SRF) loan and SRF forgivable loan). Recommendation: Public Works recommends that the Board authorize Change Order No. 2 with Strider Construction, and return one original to Public Works for further processing. Department Contact: Samantha Harper, P.E., Project Manager, 385-9175. Reviewe By: Mark McCaul , County Administrator ' Date