Loading...
HomeMy WebLinkAbout BLD2003-00005 • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD03-00005 Received Date 01/3/2003 SITE ADDRESS: 62 BALDWIN LN Issue Date 02/4/2003 PORT LUDLOW, 98365 APPLICANT: LAWRENCE J MC MAHON PHONE: 951 E WILLOW ST SEQUIM WA 98382-3134 SUBDIVISION: PORT LUDLOW NO. 2 Block: Lot: 22 PARCEL NUMBER: 990600122 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: TERHUNE HOMES INC PHONE: 360-697-7000 PO BOX 97 POULSBO WA 98370 Contractor's License: TERHUHI133J7 Expires: 04/27/2003 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE REQUIRE CIEON.S. / [ l TBA %FootinaV �3(. 0-033, 1,6.p ft� t �< C� q [ ] Foundation: /ld( /7!3 / GJ " [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: OK W P.Ghdrf'rnns 5�8eo3 (tx* t Eee) [ ] Framing/Plumbing: /C .//b!u3 [ ] Propane Tank/Lines:iftrarkvp dASI,,uEc d,f!/ [ ] Insulation: ®R , 3[ ] Sheetrock: o I'll r// /4 [ ] Septic System Final Approval: [ ] Zoning Final Approval: (� [ ] Final/Occupancy Approval: /9 �,` --- '1 S---c HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 3794455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY-SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY • SPECIAL CONDITIONS FOR CASE BLD03-00005 1.) The application was reviewed by the Jefferson County Department of Community Development staff on 1/10/03 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Coastal Seawater Intrusion Protection Zone (SIPZ), and Stormwater. 2.) The property will be served by public water and therefore SIPZ conditions will not apply. If a well is utilized as potable water then all SIPZ conditions apply. 3.) The applicant is proposing to create or add 3,480-square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal adhere to Best Management Practices (BMPs) to control sedimentation and erosion on the subject property. 4.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 5.) A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 6.) The site plan as submitted with the building application on 1/03/03 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 2/03/03 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 7.) A stormwater site plan was submitted in conjunction with the application. The applicant shall adhere to the specifications of the drywall locations and replant all areas immediately following the final construction of the home. 8.) The building height is not to exceed 35 feet. 9.) Baldwin Lane is classified as a local access road and requires a minimum 20-foot setback. The other side and rear lot lines require a minimum 5-foot setback. All setbacks shall be measured perpendicularly from the lot line to the proposed development. 10.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined by the amount of impervious surface which includes roof tops, driveways, concrete, etc. 11.) The applicant has applied and was issued a road approach permit filed under RAP03-00002 is\F_BLD_Permit_Buildng.rpt 10/29/19 I Illk UILDING PERMIT APPLICA.N MLA03-00002 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD03-00005 Received Date: 1/3/2003 SITE ADDRESS: (Q61 BALDWIN LN PORT LUDLOW, 98365 OWNER: LAWRENCE J MC MAHON PHONE: 951 E WILLOW ST SEQUIM WA 98382-3134 SUBDIVISION: PORT LUDLOW NO. 2 Block: Lot: 22 PARCEL NUMBER: 990600122 Section: 9 Township: 28 N Range: 01 E CONTRACTOR: TERHUNE HOMES INC PHONE: 360-697-7000 PO BOX 97 POULSBO WA 98370 Contractor's License TERHUHI133J7 Expires 4/27/2003 REPRESENTATIVE: TERHUNE CUSTOM HOMES PHONE: (360)697-7000 PO BOX 97 POULSBO WA 98370 PROJECT DESCRIPTIOI SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW VALUATION 135,700.00 MAIN: 1,883 CODE EDITION: 1997 ADD'L: HEAT TYPE: PRO OCCUPANCY: R_3 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: #OF STORIES: CONST TYPE: 5N OTHER: GARAGE: 504 SHORELINE: CONST TYPE: SETBACK: DECK: 40 BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: Prop: Seismic Total: Total: Streams Flood Way Floodplain Routing Date: 63 F&W Landslide Shoreline Aquifer t Forest: Commercial Rural Type Amount Paid By: Date: Receipt: a �1%`.' :, '40 V E Permit $1,195.35 MAM 01/03/03 52804 "' Plan Check $776.98 MAM 01/03/03 52804 FEB 0 4 2003 State Building Code $4.50 MAM 01/03/03 52804 Potable Water Application $50.00 MAM 01/03/03 52804 Jefferson County Planning &Building Department Total: $2,026.83 //(11-Ifilpt / si/ i SON r, Jefferson COU +8rtjllent 01Conaminfty Development 'cw� G 621 Sh lan Street Port Townsend WA 88388[380]378-4450 Prmo Aicipu- s No,. O ovIl ,.,., Project Description: A l A COY V\ v-Le_ 'R.0f L ,It 2 ?A v t° Building Type: Project Type: Frame Type: Single Family YP 2 Newj Wood Garage Attached/Detached _ Addition ▪ Modular 2 Steel Alteration/Remodel C Concrete • Commercial = Repair - Multi-family/#of Units Masonry = Demolition 2 Other: Industrial - Other: Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing:: Existing: Proposed: X.Sewer C Community System C Electricity Oil P ? Proposed: 3 C Individual System Total: "2---- Total: Woodstove ,Propane If not sewer,fill out the following: C Heat Pump Conventional = Alternative ❑ Other Permit# SEP Water Supply: • Private well 2 Two Party Weller Public:Name of water system:�t t,..1 V1,n.41)l G Square Footage: Q For Office Use Only I ' Main Floor I 723 2-• S ,22,7 (i Q� l toa Consistency Review 0 4'7 2ND Floor Base fee I I 494 S'+ 3 5 3rd Floor Plan Check fee i,, 7E Htd Basement State Surcharge fee LI• So Unhtd Basement Subtotal Z. C) 2.3. 2.3 Garage/Carport 3 • 11 %61 . 6° Pot Water Review fee C?' I. 00 Decks ` I 0 0 Tite, 1/Rd Approach fee 1 , OD Commercial . q jC r• AL 2 Z y 5. g3 Industrial ‘ i _I t Receipt# 5 2.1&014 Other Cash/Check# 5 ! Y! . Total Valuation: (2,--*31 00 o Initials 1! Or Date l�/03 Estimated Cost: If within 200' of the•Shoreline, / Distance to Bank or Ordinary High Water Mark / A ft. Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours. Signature:C . Date: 12--2(o--O Z H:HOME\PLNCNTR\INFOBLDG\FORMS\BLDpertnitApplicadon 11-8-01 OVER