HomeMy WebLinkAboutBLD2003-00113 °BUILDING PERMIT APPLICA ION ReAOW 0 Type:009i1
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD03-00113 Received Date: 2/27/2003
SITE ADDRESS: 41 FLAMINGO RD 31
PORT TOWNSEND, 98368
OWNER: SANDRA I SETON TRUSTEE PHONE:
SANDRA SETON LIVING TRUST
21411 32ND PL W
BRIER WA 98036-8094
SUBDIVISION: ONE HAWKEYE PARK Block: Lot: 1-43
PARCEL NUMBER: 958700001 Section: 16 Township: 30 N Range: 01 W
CONTRACTOR: JAIME KOZELISKY PHONE: (360)385-3215
1112 S JACOB MILLER RD
PORT TOWNSEND WA 98368
REPRESENTATIVE: @ 0 . L.; G►oatn,a ri PHONE:
3L t1 3 mob
PROJECT DESCRIPT NUFACTURED HOME INSTALLATION
TYPE OF WORK MOB SQUARE FOOTAGE:
TYPE OF IMP NEW
VALUATION MAIN:
CODE EDITION: 1997 ADD'L: HEAT TYPE:
OCCUPANCY: HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES:
OTHER:
CONST TYPE: GARAGE: SHORELINE:
CONST TYPE: SETBACK:
DECK: BANK HEIGHT:
SEWAGE DISPOSAL:
WATER SYSTEM: PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: 0 Wetland Erosion
Prop: 3 Prop: 2 Seismic Streams
Total: 3 Total: 2 Flood Way Floodplain
Routing Date: F&W Landslide
Shoreline Aquifer
Forest: Commercial Rural
Proximity _ Plat Conditions
Type Amount Paid By: Date: Receipt: Approved/Date
APPROVED
Total:
FEB 2 8 2003
Jefferson County Planning
& Building Department
CCr MCA ,
r • 110
JEFFERSON COUNTY COMMUNITY DEVELOPMENT 621 SHERIDAN ST W vRT TONSEND WA 98368
MANUFACTURED HOME INSTALLATION PERMIT APPLICATION
❑ NEW BUILDING ® REPLACEMENT
SIZE "! i 2%
YEAR
MAKE F LEPt V op 6COST lb,DOS
BEDROOMS: BATHROOMS:
EXISTING EXISTING Z
PROPOSED - PROPOSED 'e
TOTAL -) TOTAL
TYPE OF SEWAGE DISPOSAL: WATER SUPPLY:
❑ SEWER 0 COMMUNITY SYSTEM ❑ PRIVATE WELL 0 TWO PARY WELL
,JNDIVIDUAL SYSTEM KConventional PUBLIC
PERMIT#SEI91-3-7 ❑ Alternative Name of water system: U C)•T- .f •
IF WATERFRONT PROPERTY,
DI ANCE TO BANK OR HIGH WATER LINE ft BANK HEIGHT ft
By signing application form, the applicant/owner attests that the information provided herein is true and correct to the best of their
knowledge. A material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet
may result in this per - eing null and void.
I further agree to save, indemnify and hold ferson Count a ainst all liabilities, judgments, court costs, reasonable attorney's fees
and expenses which may in any way accrue against Jefferson County as a res us ence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and it's employees, representatives or age for the purpose of
application review and any required later inspections. Access and right of entry to the applicant's property or structure shallbrequested and
shall occur during regular business hours.
r
SIGNATURE 744
DATE
NAME(PLEASE PRINT)
FOR OFFICE USE ONLY
CONSISTENCY REVIEW FEE _4 I .00 RECEIPT# 3 /
BASE FEE /s•/ ‘
ADDITIONAL SECTIONS "C.l CASH/CK# / r
SUBTOTAL / (p -CO DATE _a
POTABLE WATER i •O
911/ROAD APPROACH
TOTAL _b
H:\HOMBPLNCNTRUNFOBLDU=ORMS\MOBI LEAP.11/26/01
•.
MANUFACTURED/MOBILE HOME INSTALLATION PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT#: BLD03-00113 Received Date: 2/27/2003
SITE ADDRESS: 41 FLAMINGO RD 31 Issue Date: 2/28/2003
PORT TOWNSEND, 98368
APPLICANT: SANDRA I SETON TRUSTEE
SANDRA SETON LIVING TRUST
21411 32ND PL W
BRIER WA 98036-8094
SUBDIVISION: ONE HAWKEYE PARK Block: Lot: 1-43
PARCEL#: 958700001 Section: 16 Township: 30 N Range: 01 W
CONTRACTOR/ JAIME KOZELISKY PHONE: (360)385-3215
DEALER 1112 S JACOB MILLER RD
PORT TOWNSEND WA 98368
�v,
PROJECT DESCRIPTIOP��ANUFACTURED HOME INSTALLATION
MAKE: FtQ 'WOU \C-SlIZre L4 313
YEAR: tetSL{
SIZE: 1-W7C. Z(r
THIS PERMIT IS VALID FOR ONE YEAR AND IS NOT RENEWABLE.
THE FINAL INSPECTION MUST BE SCHEDULED AND PASSED WITHIN THAT YEAR.
THE EXPIRATION DATE IS 2/28/2004.
REQUIRED INSPECTIONS:[ ] 6etba�c}s oo �ytin CONTINUOUS FOOTING, SLAB or PADS USED): vr` ,.��03,
[ ] Blocknyn i lumbing:� 03
[ ] Zoning Approval:
[ ] Septic System Approval:[ ] Final/Skirting/Vents/Porches/Steps: CV&-(...47 LA)f
HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
SPECIAL CONDITIONS APPLY -SEE REVERSE
HOT-LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS CASE # BLD03-00113
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on February 27, 2003 for the potential presence of Environmentally
Sensitive Areas(ESAs) under the provisions of the Unified Development Code (UDC).
After an initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
SUSC& SAPA aquifer recharge area.
2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological
formations that allow percolation of the surface water into the soils and the underlying
zone of saturation. Aquifers are geologic formations that contain sufficient saturated
permeable material to yield significant quantities of water to wells and springs. Aquifers
serve as the source of drinking water within most of the rural portions of Jefferson County.
3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions
that promote rapid infiltration of recharge waters to groundwater aquifers.
4.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special
Aquifer Recharge Protection Areas and the following land uses located within Susceptible
Aquifer Recharge Areas(1)All Industrial Land Uses(2)All Commercial Uses(3)All Rural
Residential Land Uses requiring a Discretionary Use or Conditional Use Permit(4)All
Rural Residential Land Uses with nonconforming uses that would otherwise require a
Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential
Developments(6) Unsewered residential development with gross densities greater than
one unit per acre. All of the above listed uses shall be subject to the applicable
requirements and standards of the Jefferson County Unified Development Code.
5.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
6.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater,
erosion and sediment during construction. BMPs shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater
and drainage control systems.
7.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i).
8.) This approval is for a manufactured home installation only. Any future permits on this site
are subject to review for consistency with applicable codes and ordinances and does not
preclude review and conditions which may be placed on future permits.
9.) The site plan as submitted with the building permit application on February 28, 2003 has
been reviewed for consistency under the UDC, and has been approved by Jefferson
County Department of Community Development. Any modifications, changes, and/or
additions to the stamped, approved site plan dated February 28, 2003 shall be
resubmitted for review and approval by Jefferson County Department of Community '
Development.
10.) The building height shall not exceed 35 feet.
11.) Minimum setback from Flamingo Road right-of-way shall be 20 feet. Minimum side and
rear setbacks shall be 5 feet.
12.) A minimum of two(2) on-site parking spaces shall be provided for the manufactured
home.
13.) Flamingo Road is a county local access road (C624319). An address of 20 Flamingo
Road has been assigned to the parcel.
14.) The parcel was created through the One Hawkeye Park binding site plan on December
26, 1990 under AFN 337105.
II
I
s
------ -'-:7.
ram,
... / ' ;''-'79,2,
ii ,o ,
ITO03
ab o
r �"q �r
\�tl /7 `fih "'/ �T �
047
ct: 44 SA / 1 i
GN)..) 4„.0
d
s5 �- s ,�'
, ,_
,,,
raft ''',. M
CD tss—
,ZZt ...4, kJ 46*
�'f�,rF
n
CCU ,pti
8 , 1 J.