Loading...
HomeMy WebLinkAboutBLD2003-00122 BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD03-00122 Received Date 02/28/2003 SITE ADDRESS: j 1-3 VISTA WOOD CT Issue Date 03/19/2003 PORT LUDLOW, 98365 APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: TIMBERTON VILLAGE PHASE III Block: Lot: 78 PARCEL NUMBER: 998500078 Section: 17 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES PHONE: (360)437-2101 70 BREAKER LN PORT LUDLWO WA 98365 Contractor's License: PORTLAL994L8 Expires: 05/02/2004 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE REQUIRED INSPECTIONS: / [ ] SETBACKS /Footings: 4e 03 Id lOItOabbi ,- o� [ ] Foundation: ®K /ec ,d/2 /tizvs q' 63 10/ [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: U/1 43 1 // / . [ ] Framing/Plumbing: rjp-i,, ) A5Tir 4 V>=}TS 04 CGylgl�/Oili Il�(2/ 3 o ` Fi2.4m1Ia4 4K. tgle3 At Pki� ok12/45Ail /, ( 1 Propane Tank/Lines: / 1� e 1 a33 ��tEe� u>� �9/ [ 1 Insulation: Ok /2/4 3 glt 1 Sheetrock: R, 0!/`A T`el—' [ 1 Septic System Final Approval: [ ] Zoning Final Approval: f 1 Final/Occupancy Approval: ee-ar-Ce D('1/Oti " / HEALTH DEPARTMENTAPPR ALRQRE IOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY -SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY • • SPECIAL CONDITIONS FOR CASE A BLD03-00122 S 1.) The application was reviewed by the Jefferson County Department of Community Development staff on March 5, 2003 for the potential presence of Critical Areas (CAs) under the provisions of the Jefferson County Interim Critical Areas Ordinance (JCICAO). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following CAs were confirmed to be present on the subject property: Great blue heron colony and wetland area. 2.) During SEPA environmental review for the plat of Timberton Village, Washington State Department of Fish and Wildlife Area Habitat Biologist Tim Rymer conducted a field evaluation to determine the presence of a fish and wildlife habitat area on the subject property. Mr. Rymer and other Department of Fish and Wildlife personnel concluded that the suspected Great Blue Heron rookery was not located as mapped in the Jefferson County Interim Critical Areas Ordinance, but, that it was in fact located in the NE Quarter of the NW Quarter of Section 20, Township 28 North, Range 1 East, which is approximately 1/2 mile south of the project site. 3.) As part of critical area review for environmental review during the preliminary plat review, a Wetland Delineation was prepared and submitted. The delineation identified 2 wetlands in proximity to lot 78. The wetland west of lot 78 has a 25-foot buffer and it has been identified in the field with signs. A portion of the wetland buffer is found within the west property line of the lot. The proposed residence is located outside the wetland buffer. 4.) The applicant is proposing to create or add 3022 square feet of impervious surface and 3022 square feet of land disturbing activities. Section 4.1 of the Jefferson County Stormwater Management Ordinance and Notice to Purshasers#2 of the Plat of Timberton Village Phase III requires that your proposal submit a Small Parcel Erosion and Sediment Control Plan. The applicant submitted a SPESCP. 5.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 6.) A Geotechnical Report was submitted in conjunction with the plat of Timberton Village Phase III. The report addressed the stability of the geologic hazard area. A followup letter fromGeoResources dated April 25, 2001 confirms that the recommended tasks have been implemented by the applicant and developer. 7.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i). 8.) This approval is for a Single-Family Residence with Attached Garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 9.) The site plan as submitted with the building permit application on February 28, 2003 has been reviewed for consistency under the MPR Code, and has been approved by the Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated February 28, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 10.) The parcel is a legal non-conforming lot that is designated as Single Family MPR under the Jefferson County Comprehensive Plan Land Use Map effective 8/2//1998. 11.) Maximum lot impervious surface area shall not exceed 45 percent for lot 78. 12.) Minimum setback from Vista Wood Court right of way line shall be 20 feet. Minimum side and rear setbacks shall be 5 feet. 13.) The building height shall not exceed 35 feet. 14.) Based on Section 3.107 of the Port Ludlow Master Planned Resort Code, accessory dwelling units shall not be allowed in the MPR-SF zone. • 15.) Lot 78 is a corner lot fronting'Timberton Drive (a public street)and VistaWood Court(a private road). The recorded plat of Timberton Village Phase III establishes setbacks as follows: Side = 5 feet; Front=20 feet; Rear= 10 feet. Access to the proposed residence is from the private road. The proposed setback is 20 feet. Per MPR Code Section 1.30 Rules of Interpretation, "all words used in the ordinance shall use normal and customary meanings, unless specifically defined otherwise in this ordinance". The MPR Code does not define front yard. Applying the normal and customary meaning of front yard as- on a corner lot, or lot bounded by more than one public or private street, or dedicated vehicular access easement, the front lot line would be the lot line providing principle access for the adjacent street. is\F_BLD_Permit_Buildng.rpt 10/29/1999 - - - 7," .1 35C1372522 PORT LUDLOW ASSOCIATES 4 JC PERMIT CENTER Z002 '.-,---1-,-:---: 7 ,..-', -:':---'", • ",,,-) L.filLrr-f L.0 -1- I oN ..,./. ...47s..11J E-...0501...1 K(211.11.6 (i-----------;) .,.,._ u., Pr FFf2e,At t-1-0..) 1,-lef 'w A. .17 I >::_,,7_,, w \ ....%\• . - cr.7.--,: ........., . --A ,..,.(.. k e' 6l -S" .. ier ,dtt,st. .1.....,....„ , . ..., i LT D' 'l2 e. , . ..._ , Jli / c..- .... . i. .- . • i ii 40( i• . to : - • A=. 10, te2 • , _ • : \ ., / •,,s .- ..t4 .:',,,r / -, 1/d Wirq I $. \ „.. ""s........14 • 0 - .2 .. . - ,.. .el . • ,14 / --- "_---"'"Iej •i : % -- i ri- : • •. ...,. , . . ''''''...,,,,,„_144 ,,..,....,:,‘ "' — 8 - N '.- • •. o . --..."--,_,,,-- 7 ' • orA ...mill _ .- • 4.,S2.,a / / *IPA .-- .VI p ' ' iir---/----__ 1-• I. 4 / 1 vr\„..,"%i,k...1 :••;-, 1.:--- ---,---V- 1 I I .- Z—F...AiOlriard i'r1ll0-0-F-1V.1.1'•:!.P r--Itl----'—C.4...— )_, . ..4„..,.., 2...-- ,..,,,, / . ,----- .2-": ','`. ,-,-,•• . ---,•/ • . — '-----------(-1-::::- , / *- 4,2.1p4112&I r2..w 1 . /1 / / ' ,—* sP,bp ,.. ...,.. ., ..„. ,.. . . ----7-.....a. . .. , . rf„4 171, 71.1. . . ..„.,..:.,.. / , /.,,. , 7 e _ _-/\ . . • . ........„,/ • rt .... _.,.. o #.......,e •A I I Z.k.\4 il . : .4 ., . _......._. .. . _ - 4 , IL.:11 11.11 ,......... „.... - ,P,71 ' _711.tgi's, -k . , . _.....____ .... .0. . • 06,\i,41D Cr. . ., 1. CAd1,1,A4 Et,. 117:- ,, R.!—, ' t . ‘,,i 1.4 •••0 ( .- _,.. , .,,-.,f•./. .,- „....,,,,-, i(--, iii-150-1" k1- \ EL- 61E... ...............______ • BUILDING PERMIT APPLIION MLLA03 000 94 Review Ty : I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD03-00122 Received Date: 2/28/2003 SITE ADDRESS: I VISTA WOOD CT PORT l u o -6w wc► q 3(05 OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: TIMBERTON VILLAGE PHASE III Block: Lot: 78 PARCEL NUMBER: 998500078 Section: 17 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES PHONE: (360)437-2101 70 BREAKER LN PORT LUDLWO WA 98365 Contractor's License PORTLAL994L8 Expires 5/2/2004 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOI SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,815 VALUATION 202,000.00 ADD'L: 743 HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 475 SHORELINE: CONST TYPE: DECK: 249 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: PUBLIC PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 3 Prop: 3 Seismic Streams Total: 3 Total: 3 Flood Way Floodplain Routing Date: �l F&W Landslide ✓' / Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: 't'�_: a_ oED Permit $1,564.95 MAM 02/28/03 55067 State Building Code $4.50 MAM 02/28/03 55067 MAR 1 9 2003 Potable Water Application $50.00 MAM 02/28/03 55067 Jefferson County Planning Total: $1,619.45 & Building Department SENT '48Y.:,PORT 1.11, LOIV ASSOC J.4111: 2-19- 3 :10:00AM ; 1 360 102522-1 3603794451:# 3/ 3 , . . '',roi.1,'"•••,‘ ' • . ' , •.,,,,., , Jefferson County Floportiont of Coninsity Dovolmunt ,,-,;...,,..,..,., .-• .1 1 •._,.,‘. - ,....., • 4."?. '' "'" . 121 Okorldm Stroet,Part'rewound VIA 811181(3101 3714460 '.i '.r.‘ cu., o 11. . • ,, r 0 Pr[rfg' '' Amptliotocic:Ilko°on 7- 7 Project Deectiption: , • - .5-toc-x- PI 't 6 3Z ,.. . Building Type: — PrOfter Type: I Frame Type: • . 1 - .c.,."1.,;I:',.''.I.• se Single Family 1 )C New Wood ,111.•,. Garage.Attached/i3etached Addition Steel III: :,... 'Modular ,, ' Alteration/Remodel Concrete ., . Commercial ik•ePit Matortt7 N.12:ti-farilily,/±4 0(Units Demolition Other. .. Industrial Other: ,... .:.',e•:. •;•:',.$3,,., . Beettoomst Type of Sewage Disposal: Type of Heat; ,. __,.. Exi.iting; Choose one: . s2 ENisting: ,......_....Q.-- *wet Community System Electricity Oil • ,, I PrDp0F.ecl: _3 Proposed; 3 Individual System woocistove Propane . Tots:: ;,3,.._. , Tood 0 Uncut sewer,fill Oilt the fallowing; "(Seat Pump i'',.:'!'',:i• ., Conventional Alternative Other ' 1,' Pemait# SEP ........,-, — • i ,.1.?..., •,, Water Supply° P..ivate vfe...,........... ..........T.:..% Ivo ZW........gell, X.Public Name of watts s/ateila: 0 e4d 6 i ,,,'•..• 15E, ,••,,,,,, . :,' "Twiw---1 -!(,,,,,••• - ••- .....:,:;,, . r,r17.1)are ootagei• ,*.p*Oliffat . . y. ,....1.;,:.•r.: , .,, • :; • .'1:•ii::1, 1! • r„, .8• . . ti'it IN S ,2:(:) •--t ' 00 :.00:r • i4, i.,S"' P.cItSis,t0M441Pico.4:".. ' ' ' . ....4, -t•• 2:1'•11 Floor f q 1 44a.sc)5-041 , Biii;fee _ i g Iv Lt, q 5 • .4,,,I• :,,,,!:. i 3n1 Floor 4.- Plan Check fee Ai/ti ..,,,...i";•.' . d Baserzent , ;State Shreharge foe L. r 5 9 ' 1 __,Liiie,/4: , q --5' tinhtd.Bastrnent .'. 7 . - Salt.00.• I •. Garage/Carport lr 74"" t I 95. -75 '1:06i:WItteitIAleVie*fee . ''. ,•..• ?,/'' a° •',,: • 1!,i•:,.:.:.-::•,.',,,.H1;.'':::..'''. - DCoercrkarsen at. c ia•l '-•-,• -•0-4 9 „g.,-t---i--t8---.:*- 3t)-- g' i'i4.:.r'. .• ' , /4".. /* ,.,Cc. I - r.. . . „4 - 6AL: / 3s, qS Jntutxm. i , Other i ... .. :.• ..':,43,1 ..,„.i.!1.....:,, .i,,,..1:::!c:,.,i:* ''•:!i,1' ,i.:,,i,A.,',,.,,'.. .;!,,,,,•,: : ::A ti", :..,,,1 .,], . Total Valua o .,,i; ., hliI,'I rti I ..,:. r...,:ii'il ',.H ,', ;1'.:•!•: :'.' '. :. ".'•:•..:1!1''''. . - t) :. . .. „. ::',,. •,. . . : ' Er4rnAte4 CD • . • • ,.6.y.r If within 2 'of the S dine, • L.!i;ii•.; Distance to Ba o4Seiine, r ' ary High Water Mark - ft.Bank Height ft. .i. By,..ruN,..,:m auplico.ti.on r.,Airi,'the appSontlownef art a that the information provided herein is woe and correct to the beg or their knowledge. Any rokteri,ai istithoed or any axon of a nacuCtaa,facc met by the applicintjoWnei with ecupect to this application packet may teaselt its this permit being noll and void- '...'1.•-'li,': .,, 1.uttntr are*T.,0 save,indsOnify and hold harmless)Jefferson tiounu against all liahihies,iudgmenta,court costs,reasonable attorney's fees and expert/tea which may in any way-acorns: j.:j'Ijrjji•jr against Jefferon County 1st result of oz in COrluegUanCO of the granting ve;1,...peruna. 1 fur/bcr Agroc to pcnvidt giiiirAott and right of anCey tO JtefectIOO County and it's Ls Inployees,reprtsenogiuras or agents for the purpose 0 FSLp?lication reVI.C..4,,II tte any required IMAr in$pectiOun i! ' i I,' ACCCns4 anti dsh,.OF entry tailche ApplictoE's property or cincture then be requested aud clutil Decor chains regular business hOUOL ,,. , :°%, '' - Signature: Date:•:•,.•," . I‘i'tII....kil:,•I: .. OVER OP. ,. . — — a ,x.....,,. l0:14E\PINCNTTAtNTINFOBLDGNFORMS\BLOpermitApplicatIon i l-8-01 / 0 0 I ° 7 .:1• 1'.,. , 3-0? -to - ;,...,.,- .,. • I E3 39Vd COG 00 ...J3C iGt,t262.6396 TZ :Li 603Z/3EIZEI 7 F E B 2 8 2003 - ` JEFFERSON COUNTY STORMWATER MANAGEMENT ` ' 'SMALL-PARCEL EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL WORKSHEET Property Owner: Port Ludlow Associates Telephone: 437-2101 Address: 70 Breaker Lane, Port Ludlow, WA 98365 Assessor's Parcel Number: Building Permit or Septic Permit Application Number(if applicable): Brief Project Description: New Single Family Residence W/ attached garage. • Site Location: Person Responsible for BMP Installation and Maintenance: Jeff Eva ti g e r Address: Same as ahnve Telephone:Sallie aS shove 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan.You may also propose measures other than those listed. Attach additional sheets,if- more space is required. [1 Stabilize construction access route. Limit construction vehicles to one route, if feasible. Provide a stabilized construction access by applying quarry spalls,ballast, or crushed rock to minimize tracking sediment onto roads. (See attached illustration from Stormwater • Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. [1 Minimize the extent of land disturbing activity and preserve existing vegetation. Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and Wildlife habitat areas,landslide or erosion hazard area,etc.). APPROVED SPESC Instructions—Short Form STORMWATER PLAN Revised July 17,2002 • 3 MAR 18 2003 • 1EFFER O O TY DEPT.OF CO I' .vI:LOPM!>NT SIGNATU ;'/ i F E B 2 8 2003 EROSION AND SEDIMENT CONTROL WORKSHEET '"` [] Phase clearing so that only areas that are actively being worked are uncovered. [J Start and complete land disturbing activities and stabilize the site between April 1 and September 30. Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion. [4 Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April 1 and September 30. [ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. [ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads, and property lines. [] Place gravel base on roads,driveways,and parking areas after clearing and subgrade preparation. 01 Protect adjacent properties and water bodies from sediment deposition: [] Place straw or hay bales in ditches and drainage ways down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies.(See attached illustrations from Stormwater Management Manual.) [ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustration from Stormwater Management Manual.) [X Regularly inspect and maintain all BMPs especially after storms events. [J Describe other erosion and sediment control Best Management Practices. Be specific as to design and specifications. Site is very flat with sandy soils. So I believe the above measures will be sufficient. SPESC Instructions--Short Form Revised July 17,2002 4 FEB 2 8 2003 EROSION AND SEDIMENT CONTROL WORKSHEET 3. } Vesenbe how distu bed areas will be permanently stabilized(seeded, landscaped,apply gravel base to roadways,etc.) Areas that are distrubed will be landscaped with natural type vegetation and lawn to property line 3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.). All impervious surfaces wi l l he run to roof drains and catch basins as designed into the plat requirements. SPESC Instructions—Short Form Revised July 17,2002 5 FEB 2 8 2003 EROSION AND SEDIMENT CONTROL WORKSHEET m .-- G . 5pecifk,your construction sequence. Describe the timing of all land disturbing activities (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices.Describe proposed maintenance of BMPs. After excavation the soil piles will be covered and silt fence will be installed. Silt fence will be left in place until we are ready to landscape and all roof drains/ • catch basins are in. Landscaping will be installed as early as bl possie on the exterior of the building when all exterior concrete work is completed.( _ The Best Manageme4 Practices proposed above will be implemented to control erosion, sediment, and stormwater o notify the Jefferson County for inspections as required. 1 e� idt ��/(3 Signature of er/Agent Date SPESC Instructions—Short Form Revised July 17,2002 ` 6