Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2003-00148
BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD03-00148 Received Date 03/10/2003 SITE ADDRESS: 81 MT CONSTANCE WAY Issue Date 04/22/2003 PORT LUDLOW, 98365 APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 2 PARCEL NUMBER: 978800002 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES PHONE: (360)437-2101 70 BREAKER LN PORT LUDLWO WA 98365 Contractor's License: PORTLAL994L8 Expires: 05/02/2004 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE (LOT 2) AEQUIRED I► • TI• ► TB A CKS ootings ai 47/994j IV [ ] Foundation: OK 4/28/d3 [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: N,,J/LL��� 6/24 [ ] Framing/Plumbing: C9K 7/¢/a3 it/ f 1 Propane Tank/Lines: [ ] Insulation: .0k Ga1,0460/15 7 7,03G f 1 Sheetrock: DX 7 43 f 1 Septic System Final Approval: [ ] Zoning Final Approval: f 1 Final/Occupancy Approval: ry -- CS c- ' HEALTH DEPARTMENT APPROVAL R QUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY -SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS FOCASE # BLD03-00148 1.) The application was reviewed by the Jefferson County Department of Community Development staff on March 19, 2003 for the potential presence of Critical Areas (CAs) under the provisions of the Jefferson County Interim Critical Areas Ordinance (JCICAO). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following CAs were confirmed to be present on the subject property: Osprey Nest. 2.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i). 3.) The Washington State Department of Fish and Wildlife reviewed potential impacts to Osprey Nests as part of the environmental/subdivision review process. WDFW in an e-mail dated January 1,2002 indicated that their Priority Habitat Species map identifies a Great Blue Heron rookery and an Osprey Nest within the Northeast corner of Section 21. The Northeast corner of Section 21 is approximately 1/2 mile northeast of the plat of Olympic Terrace, Division 1. 4.) The applicant is proposing to create or add 3939 square feet of impervious surface and 3560 square feet of land disturbing activities. Plat conditions require the applicant to submit a Small Parcel Erosion and Sediment Control Plan prior to commencement of any land disturbing activities and prior to issuance of a building permit for review and approval. The applicant submitted a Small Parcel Erosion and Sediment Control Plan. 5.) The parcel is a legal conforming lot that is designated as Single Family(MPR-SF 4-Dwellings Per Acre) under the Jefferson CountyComprehensive Plan Land Use Map effective 8/28/1998. 6.) This approval is for a Single Family Residence with Attached Garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 7.) The site plan as submitted with the building permit application on March 10, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated March 10, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 8.) The 41 lot residential lots within the plat of Olympic Terrace, Division 1 were established through the long subdivision process.The final plat for Olympic Terrace Division 1 was approved March 10, 2003 and recorded March 11, 2003 under AF#466745, in Volume 7, Pages 180 records of Jefferson County. 9.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 10.) Maximum impervious surface area for lot#2 shall not exceed 45 percent. 11.) Minimum setback from Mt. Constance Way right of way line shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 12.) The building height shall not exceed 35 feet. 13.) Based on Section 3.107 of the Port Ludlow Master Planned Resort Code, Accessory Dwelling Units are prohibited within the MPR-SF zone. 14.) Stormwater runoff from lot#2 shall be via a tightline(s)to existing catch basin. 15.) In order to avoid significant adverse impacts to soils and water, natural vegetation shall be maintained in open spaces; provided that removal of diseased and dangerous trees, selective thinning of vegetation and limbing of trees for views, shall be permitted provided the health of the tree is not jeopaardized and such activities are in accordance with recommendations provided by a qualified forester or similar professional. is\F_BLD_Permit_Buildng.rpt 10/29/1999 BUILDING PERMIT APPLICATION MRLA03 00114 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 t—b-t- L PERMIT #: DD03-00 CE v,006 Received Date: 3/10/2003 SITE ADDRESS: DCDI�lST9�`� PORT LUDLOW, 98365 OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 u SUBDIVISION: 9� g"' 0 2_ Block: IL—T-1� PARCEL NUMBER: 82 06 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES PHONE: (360)437-2101 70 BREAKER LN PORT LUDLWO WA 98365 Contractor's License PORTLAL994L8 Expires 5/2/2004 REPRESENTATIVE: PHONE: PROJECT DESCRIPTIOt SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 2,569 VALUATION 244,055.00 ADD'L: HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 540 SHORELINE: CONST TYPE: DECK: 340 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 3 Prop: 3 Seismic Streams Total: 3 Total: 3 Flood Way Floodplain Routing Date: F&W Landslide 3 l < �a2j4e, Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: A P E Permit $1,805.75 MAM 03/10/03 55086 �1 Plan Check $1,173.74 MAM 03/10/03 55086 APR 2 2 2003ent State Building Code $4.50 MAM 03/10/03 55086 z(z Potable Water Application $50.00 MAM 03/10/03 55086 Jefferson County Plannin r & B ilding Departm Total: $3,033.99 // • Jefferson Clip Department of Community Development �, �'"� �� 621 Sheridan Street,Port Townsend WA 08368(3601370-4450 0 (i a fir,_�4 -... -_,,,O TD) erm - ID A ps , c(irt , ,,n •_Lrii UT N .- toe=x- -P14 n e z Project Description: ' 41/ l. if Zi Cas r tc:` Building Type: Project Type: l r tr a Type: )(Single Family ,X'New \ood )(Garage Attached/Detached Addition MAR 0 2003 ' -�$t,eel Modular Alteration/Remodel _C ncrete Commercial Repair M sonry Multi-family/#of Units Demolition . 1- O her: Industrial P+I Other: Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: 0 Existing: 0 ASewer Community System Electricity Oil Proposed: 3 Proposed: 3 Individual System Woodstove Propane Total: 3 Total: 3 If not sewer,fill out the following: Meat Pump Conventional Alternative Other Permit# SEP Water Supply: Private well Two Party Well Public:Name of water system: ©W 1 e Square Footage: For Office Use Only r, Main Floor vt��f0 9 Consistency Review 14"Z • DO 2ND Floor Base fee, 1805. 15 3rd Floor Plan Check fee l I 73 • 7 Htd Basement State Surcharge fee 4-so Unhtd Basement Subtotal .3 030• )c) Garage/Carport 5 yo Pot Water Review fee 8t •d0 Decks 31710 911/Rd Approach fee (4 • 60 Commercial TOTAL 3 252 • 99 Industrial Receipt# 7 e45-66'6(.. Other Cash/Check# Eg e.S Total Valuation: Initials P/ Or Date .3/ 1O/e) A Estimated Cost: 1 17,OS , 00 ` If within 200' of the Shoreline, 1 Distance to Bank or Ordinary High Water Mark ft. Bank Height ft. liy;ignutg the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any matenal falsehood or am omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in:inc was .ucruc against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of a to Jefferson County and it's employees,representatives or agents for the purpose of application revie\•and any required later inspections. Access and right of entry to t al plic. t•p tperty r structure shall be requested and shall occur during regular business hours. Signature: Date: 0 OVER ► Ill I()III:.\I'I.N(:N'I'It\INI"OHI,IXG\FORMS\BI.DpermitApplication 11-8-01 K ��1, 4\° 'oa, �' l c� lrt l L-I r �f.I► � '' �U R ' n d At P.P' V l 30 b :C11: o 1) Mi� i .Vz O o N r rP i :3y , N o ,w Z �, # 2 W/- "� .� �- __ f -c - t ttG ■ , , - ,, ----- it , ad nil ........ , -3 o _ 1,,if 0 li ‘IN LD k.. - W. , r r1:4_r4_7liuf "1" I.t?[1,.f,k.„,,:,,,.,.1:',.' • © ,f 1 0 20071 3 ,f;14-1._1_-r____________-_—( 'Oil ¢" W r (v ' :, . ::, .',l._ern F is ski. pi 1-- 13,,) 1C. N11-. ‘0Lr- -F6.0,_1(. . \idd6v-r oLi 1Q--r 9.g e.I` .e-7ri'=, PLC k1 7 ,0 : M, ttud--' JEFFERSON COUNTY STORMWATER MANAGEMENT SMALL PARCEL EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL WORKSHEET Property Owner: Port Ludlow Associates Telephone: 437-2101 Address: 70 Breaker Lane, Port Ludlow, WA 98365 Assessor's Parcel Number: A yor+ton o-F S z l"ZI Y`� Es, (�®6 SOU Bui - c emut Application Number(if applicable): n'/ Brief Project Description: New Single Family Residence W/ attached garage, Site Location: /71+ L0A5-f4nce— 7i8 Person Responsible for BMP Installation and Maintenance: Jeff Evanger Address: Same as ahove Telephone:Same as ahnve 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan. You may also propose measures other than those listed. Attach additional sheets,if - more space is required. [J Stabilize construction access route. Limit construction vehicles to one route, if feasible. Provide a stabilized construction access by applying quarry spalls,ballast, or crushed rock to minimize tracking sediment onto roads. (See attached illustration from Stormwater Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. [J Minimize the extent of land disturbing activity and preserve existing vegetation. Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife habitat areas,landslide or erosion hazard area,etc.). APPROVED - SPESC Instructions—Shor.FornSTORMWATER PLAN Revised July 17,2002 3ki,- 1 O 2OO MAR 1 9 2003 10,o JEFFERSON COU Y ,1 ;- DFPT.M OD UNITY D .VH OPM- ' 1 EROSION AND SEDIMENT CONTROL WORKSHEET [] Phase clearing so that only areas that are actively being worked are uncovered. [J Start and complete land disturbing activities and stabilize the site between April 1 and September 30. Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion. [)� Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April 1 and September 30. [ J Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. [ J Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads, and property lines. [J Place gravel base on roads,driveways,and parking areas after clearing and subgrade preparation. [ Protect adjacent properties and water bodies from sediment deposition: [] Place straw or hay bales in ditches and drainage ways down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies.(See attached illustrations from Stormwater Management Manual.) [ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustration from Stormwater Management Manual.) [X Regularly inspect and maintain all BMPs especially after storms events. [] Describe other erosion and sediment control Best Management Practices. Be specific as to design and specifications. Site is very flat with sandy soils. So I believe the above measures will be sufficient, SPESC Instructions—Short Form Revised July 17,2002 MAR 1 0 2003 4 EROSION AND SEDIMENT CONTROL WORKSHEET 2. Describe how disturbed areas will be permanently stabilized(seeded, landscaped,apply gravel base to roadways,etc.) Areas that are distrubed will be landscaped with natural type vegetation and lawn to property line 3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,etc.). All impervious surfnres will he run to roof drains and catch basins as designed into the plat requirements. SPESC Instructions—Short Form Revised July 17,2002 'r' n 1 v 2003 5 EROSION AND SEDIMENT CONTROL WORKSHEET 4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices. Describe proposed maintenance of BMPs. after excavation the soil piles will be covered and silt fence will be installed. Silt fence will be left in place until we are ready to landscape and all roof drains/ catch basins are in. Landscaping will be installed as early as possible on the exterior of the building when all exterior concrete work is completed,( _ The Best Managem t Practices proposed above will be implemented to control erosion, sediment, and stormwat will notify the Jefferson County for inspections as re ' e 3 (9 03 Signature of wrier/Agent Date 1 0 )0 3 SPESC Instructions—Short Form Revised July 17,2002 6