HomeMy WebLinkAboutBLD2003-00258 •JILDING PERMIT APPLICAT`N MLA03-00215
Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD03-00258 Received Date: 4/23/2003
SITE ADDRESS: q'2., CAMBER DR
PORT LUDLOW, 98365
OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365-9766
SUBDIVISION: LUDLOW POINT VILLAGE DIV 4 Block: Lot: 2
PARCEL NUMBER: 969800002 Section: 17 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License PORTLAL994L8 Expires 5/2/2004
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTIOP SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
TYPE OF WORK RES SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 2,170
VALUATION 234,858.00 ADD'L: 841 HEAT TYPE: HTP
CODE EDITION: 1997 HEAT BASE: HEAT TYPE:
OCCUPANCY: R-3 UNHEATED: #OF STORIES:
OCCUPANCY: OTHER:
CONST TYPE: 5N GARAGE: 592 SHORELINE:
CONST TYPE: DECK: 280 SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: SEW
WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA
Exist: Exist: Wetland Erosion
Prop: 3 Prop: 4 Seismic Streams
Total: 3 Total: 4 Flood Way Floodplain
Routing Date: F&W Landslide
%-ii;;c 6. L-�)✓ Shoreline Aquifer
Forest: Commercial Rural , /�
Type Amount Paid By: Date: Receipt: A° Atlpr eV
Permit $1,749.75 MAM 04/23/03 56115 MAY 1 4 2003
State Building Code $4.50 MAM 04/23/03 56115
Potable Water Application $51.00 MAM 04/23/03 56115 Jefferson County Planning
Total: $1,805.25 & Building Department
effi -... i 14a9
3 17/2 O3 14:21 FAX 3604372522 PORT LUDLOW ASSOCIATES -> JC PERMIT CENTER Z 003
�, • Vf I' ' ' UI + o I It
• f ' ,� p -la' to v lZ 210
, ,Mi tr - II �� a t
-;.-- ..--:- :: ---- .-5,-/..71(W,41.1.,.. ' / g .--
1 �-, - . i'
-1
. . '- -,,.,e'..,,,-i-•-.-,-D-1)-'E''t :1f-'„ri',,t.,.,7!r.
u.-...!..,N?.,...t._rf-.t,.-;1..,3---7.-!.1,_—. _27-:i3O.,/-_,_0---.3-.-i!.L,.,.-.,,.-J\;\,=,[-:_',.7:.,)0,1#
))
•
. ,_s_ ....._/___1_,F,AA'
to0...o.6Rl„2,.IA.7c'1.h ...i.C.;.
wr
F �.
JEFFFr:�C " CCUfhr � F Lam'pp71,77Tft I^(nw,,(-.\'} Lop;„P[uY
7 d L
. 0E-„,..„.m._..7___.
', ,O,
Pal Q
, 2 s
I.`�N° - .
�' Q dIP
96aoidQ
3333f A• 1 -
/ � Zlddv uaa �H illifiall l 74
4
Z
ash j -
10.141 /'
, I o
law
-- 4
• Ilik .
...._- --- — tf'
• BUILDING PERMIT •
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT #: BLD03-00258 Received Date 04/23/2003
SITE ADDRESS: 92 CAMBER DR Issue Date 05/14/2003
PORT LUDLOW, 98365
APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365-9766
SUBDIVISION: LUDLOW POINT VILLAGE DIV 4 Block: Lot: 2
PARCEL NUMBER: 969800002 Section: 17 Township: 28 N Range: 01 E
CONTRACTOR: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101
70 BREAKER LN
PORT LUDLOW WA 98365
Contractor's License: PORTLAL994L8 Expires: 05/02/2004
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE
REQUIRED INSPECTIONS: -/ ,/ // $74, '
[ ] SETBACKS /Footings: �� �0// 0,3�/�CO/fdi�lok lus'TALLD
[ ] Foundation: ,a, `,Z.�j17
[ ] Underground Plumbing/U derground Insulation:
[ ] Shear Wall:
[ ] Framing/Plumbing: ZaMsaNL bk /e/zi/63
11 Propane Tank/Lines: c d O Z,/ o3
[ ] Insulation: L(/Accs Ak4.TE'D L°�,u1.14 OkiO3.1.6 fa.?ter
f 1 Sheetrock:J� 0643f 1 Septic System Final Aprova:
[ ] Zoning Final Approval:
F 1 Final/Occupancy Approval: ��' -�.r !' 4/7,,44
HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
SPECIAL CONDITIONS APPLY -SEE REVERSE
HOT LINE AVAILABLE 24 HOURS A DAY
•
SPECIAL CONDITIONS FOR CASE # BLD03-00258
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on May 1, 2003 for the potential presence of Environmentally Sensitive
Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an
initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
Seawater Intrusion Protection Area (SPIZ).
2.) Marine shorelines and islands are susceptible to a condition that is known as seawater
intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in
an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater
suitable for public consumption without significant additional treatment and cost.
Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of
the rate of aquifer recharge (primarily through rainfall)and the rate of groundwater
withdrawals (primarily through wells). The Washington Department of Ecology is the
agency with statutory authority to regulate groundwater withdrawal for individual wells in
Jefferson County. New development, redevelopment, and land use activities on islands
and in close proximity to marine shorelines in particular should be developed in such a
manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to
the maximum extent possible by infiltrating stormwater runoff so that it recharges the
aquifer.
3.) The parcel is located within a coastal SIPZ (seawater intrusion protection zone)according
to the County GIS map. There are voluntary and mandatory measures identified in the
Jefferson County Seawater Intrusion Policy(Resolution 44-22, effective September 23,
2002)that apply to well drilling proposals and building permit applications on existing lots
of record.
A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine
shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources
within 1000 feet.
4.) MANDATORY MEASURES FOR COASTAL SIPZ:
1. For proof of potable water on a building permit application, applicant must utilize
DOH-approved public water system if available.
2. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water or an individual well may be used as proof of potable water subject to the
following requirement:
a. Chloride concentration of a laboratory-certified well water sample submitted with
building permit application.
3. If public water is unavailable, a qualifying alternative system may be used as proof of
potable water.
5.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act(SEPA) pursuant to WAC 197-11-800(1)(b)(i).
6.) The applicant is proposing to create or add 3356 square feet of impervious surface and
3284 square feet of land disturbing activities. Conditions of plat approval and Section 4.1
of the Jefferson County Stormwater Management Ordinance requires that your proposal
submit a Small Parcel Erosion and Sediment Control Plan. The applicant submitted a
SPESCP.
7.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by
the Department of Community Development. Once the subject permit has been issued
the applicant shall fully implement the provisions of the submitted plan and contact the
Jefferson County Department of Community Development to arrange a schedule to
inspect the property for plan compliance. A Certificate of Occupancy will not be issued
until the Department verifies plan compliance. No clearing for roadways or utilities shall
occur on the project site until clearing necessary for the installation of temporary
sedimentation and erosion control measures have been completed.
8.) This approval is for a Single Family Residence with Attached Garage only. Any future
permits on this site are subject to review for consistency with applicable codes and
ordinances and does not preclude review and conditions which may be placed on future
permits.
9.) The site plan as submitted wilt building permit application on April 23,103 has been
reviewed for consistency under the MPR Code, and has been approved by Jefferson
County Department of Community Development. Any modifications, changes, and/or
additions to the stamped, approved site plan dated April 23, 2003 shall be resubmitted for
review and approval by Jefferson County Department of Community Development.
10.) The parcel is a legal conforming lot that is designated as Single Family(MPR-SF 4:1)
under the Jefferson County Comprehensive Plan Land Use Map effective August 28,
1998.
11.) All utilities shall be installed underground. All residences shall be required to connect to
the sewer system. No on-site sewage disposal systems shall be permitted.
12.) Maximum impervious surface area for lot 2 shall not exceed 45 percent.
13.) Minimum setback from Camber Lane right of way line shall be 20 feet. Minimum side yard
setbacks shall be 5 feet. Minimum rear yard setback shall be 20 feet.
14.) The building height shall not exceed 35 feet.
15.) Based on Section 3.107 of the Port Ludlow MPR Code, Accessory Dwelling Units are not
allowed in the MPR-SF zone.
16.) The applicant and/or contractor shall be responsible to ensure that the submitted and
5/1/2003 approved Small Parcel Erosion and Sediment Control Plan is implemented and
that the water runoff system is constructed in accordance with prior approved stormwater
management plans.
is\F_BLD_Permit_Buildng.rpt 10/29/1999
2Q• :52 FAX 3604372522 PORT LUDLOW ASSOCIAT_E_S -> JC PERMIT CENTER Z 002
' ; : p F..0,1- v,:_..„ ..,,t)
•
Jefferson County Department of Community Development
`'. ` �•J 821 Sheridan Street,Port Townsend WA 88388[350]378-4450
a APR 2 3 2uua o
1 0 0
t.:0, '� PERSON 0�� cac•rorn.- �E a
'' '. L!v �l Lit Z
Project Description: .. r=K. ' cam pc i SYZ r
Building Type: Project Type: Frame Type:
if x Si^..gle Family X New ood
l x_ C^^age Attached/Detached Addition Steel
tixodu at Alteration/Remodel Concrete
Co:natrterciai Repair Masonry
:V '7-f mils/f#of Units Demolition Other:
Ind:astra'
Other
Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat:
i: Choose one:
E.xistu-1 0 Existing O x Sewer Community System Electricity Oil
Propucec: 4 Proposed '-' Individual System Woodstove Propane
j rota::: r! Total: 3 If not sewer,fill out the following: )Heat Pump
1 Conventional Alternative Other
Permit# SEP
Water Supply: -- tl
Prix ate well Two Party Well x Public:Name of water system: 0 a/S
Y
-rS car Footage: '? "
: . f lt 3t
ad -t �.
Lt,
Main Floor ZI7o 7
s&0 l u t t:' �� i ' '
'i� � � ; st t {tt i .r: 1•.:2; t
T ti r ` 6�ri I t o !
sy 54�0®A 1 . Iy 1 '2ND Floor
} — s Pt1 ' t { 5 , i'i'}` { � < 6u a ,� qi 45 r aIi3 cl5.V . r a tt"11-., n: i.1�3rd Floor t� r �
cr " ° 'Htc Basement j% t +h i
� 1 C'zi `cl 2_e ne-'t E12p t •
i
1 Garage 5 QZ tat53 T�
a
r
r• Decks t e �Zgo 6 `5ci®CoC a ; - : ' �is : : .
1 Commercial AEI ' ww�;; tf"i;,ya; y's�-F.:r.--;zt�^!::�;css"r.';$:i;,at;' jr.,. :
-, :qn�.f'v.:(Ii,E:+:G ksiiRlt 1't: -i: _
Industrial .�•.x.,.,.:,,: :'.
a
+;, .�.:s :;�;,?I?�ti;':'=..ss,�•w"•' "- `'.rt?.(�'tR •:i/r,'iti✓:��;
Other x,l".t ; 13r&'-.'.•li+ t [; `:: _ .�`'7. C/'�
Tota'Valuatio : — VA I i 1\' °. s
i Or `t r�tEc !KPH r i ti ra �K�e t a�,, r
il
r X"` t`t si'I�t'�a. tt x�c. !t l�.?;F l t ct 3'ttli Estimated Cos.C::?..:y, 858 .. t,t:,, turd :. tk Efl i ,i , : ,:!,r
— ._ l ' a.,r. :e5..''?„i1 ;:0r yt11t l,,.r , .,, !_ ,f. t,'_li, _�s .�.,rw., ,}
'... If within 200' of the Shoreline,
I
Distance to Bank or Ordinary High Water Mark ft.Bank Height ft•
By s gn ng the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any
omisson oft a ma:e--ial fact made by the applicant/owner with respect co this application packet may result in this permit being null and void.
I'Luther agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of the granting of this permit.
I fur er agree to provide access and tight of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections.
Access rt d right of entry to he applicant's property or structure shall be requested and shall occur doting regular business hours.
Signature: • Date:
OVER ►
H:H.0ME\PLNCNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01
- L-1
.
141.0
APR 2 3 Au.)
COUNTY
STORMWATERNMANAGEMENT JEFFERSON COUNTY DCD
SMALL PARCEL EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL WORKSHEET
Property Owner: Port Ludlow Associates Telephone: 437-2101
Address: 70 Breaker Lane, Port Ludlow, WA 98365
Assessor's Parcel Number: 967-8'00-Oo
Building Permit or Septic Permit Application Number(if applicable):
Brief Project Description: New Single Family Residence W/ attached garage.
Site Location:
Person Responsible for BMP Installation and Maintenance: Jeff Evange r
f,, Address: Same aS above
Telephone:Same aS above
1. Describe/check the Best Management Practices (BMPs) that you will implement during land
disturbing activities or construction to control erosion and prevent sediment from entering water
bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or
roads. Please check the measures you plan to implement and show their approximate location on
the site plan. You may also propose measures other than those listed. Attach additional sheets,if
more space is required.
[J Stabilize construction access route. Limit construction vehicles to one route, if feasible.
Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock
to minimize tracking sediment onto roads. (See attached illustration from Stormwater
Management Manual.) If sediment is transported onto roads, they will be cleaned
thoroughly.
[] Minimize the extent of land disturbing activity and preserve existing vegetation.
Preserve buffers of well-established vegetation between disturbed areas and property
boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife
habitat areas,landslide or erosion hazard area,etc.).
APPROVED
STORMWATER PLAN
SPESC Instructions—Short Form
Revised July 17,2002
3 MAY - 1 2003
JEFFE SON CO NTY
DEPT.OF(' MON F ENT
SIGNATi 1
EROSION AND SEDIMENT CONTROL WORKSHEET
[] Phase clearing so that only areas that are actively being worked are uncovered.
[] Start and complete land disturbing activities and stabilize the site between April 1
and September 30. Stabilization means that disturbed areas will have well-established
plant cover or be landscaped to minimize erosion.
[)Q Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between
October 1 and March 31 and within 7 days between April I and September 30.
[ 1 Cover exposed soil with a minimum of 2 inches of straw or hay or other material
approved for this purpose.
[ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads,
and property lines.
[] Place gravel base on roads,driveways,and parking areas after clearing and subgrade
preparation.
[)i Protect adjacent properties and water bodies from sediment deposition:
[1 Place straw or hay bales in ditches and drainage ways down slope from areas
of land disturbing activity to filter runoff before it leaves the project site or enters
water bodies.(See attached illustrations from Stormwater Management Manual.)
[] Install a filter fence down slope from areas of land disturbing activity to filter runoff
4
before it leaves the project site or enters water bodies. (See attached illustration from
_ ? Stormwater Management Manual.)
[X Regularly inspect and maintain all BMPs especially after storms events.
[] Describe other erosion and sediment control Best Management Practices. Be specific
as to design and specifications.
Site is very flat with sandy snits. So I believe the above
measures will be sufficient,
SPESC Instructions—Short Form 5 140,40
Revised July 17,2002
4
APR 2 3 Alin
JEFFERSON COUNTY DOD
EROSION AND SEDIMENT CONTROL WORKSHEET
2. Describe how disturbed areas will be permanently stabilized(seeded,landscaped,apply gravel base
to roadways,etc.)
Areas that are distrubed will be landscaped with natural
type vegetation and lawn to property line
.3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to
infiltrate,dry well,infiltration trench,route runoff to existing drainage facilities,.etc.).
ALL tmperv_i nlls surfaces will he run to roof drains and
catch basins as designed into the plat requirements.
SPESC Instructions—Short Form
Revised July 17,2002
JEFFERSON DpU IY
DCD
EROSION AND SEDIMENT CONTROL WORKSHEET
4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing
and grading, construction, installation of drainage facilities, landscaping, etc.) and Best
Management Practices.Describe proposed maintenance of BMPs.
After excavation the soil piles will be covered and silt
fence will be installed. Silt fence will be left in
place until we are ready to landscape and all roof drains/
catch basins are in. Landscaping will be installed as •
early as possible on the exterior of the building when
all exterior concrete work is completed:,t .
The Best a e Practices proposed above will be implemented to control erosion, sediment, and
stormwater 'I n v ify.the Jefferson County for inspections as requited. ,
4,_ G 7
Signature o Owner/Agent Date
4 �®
4)
SPESC Instructions—Short Form
Revised July 17,2002
6 APR 2 3 Zuu
JEFFERSON COUNTY DCD