Loading...
HomeMy WebLinkAboutBLD2003-00279 BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD03-00279 Received Date 05/1/2003 SITE ADDRESS: 52 MT LENA LN Issue Date 05/13/2003 PORT LUDLOW, 98365 APPLICANT: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 39 PARCEL NUMBER: 978800039 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES PHONE: (360)437-2101 70 BREAKER LN PORT LUDLWO WA 98365 Contractor's License: PORTLAL994L8 Expires: 05/02/2004 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION: SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE RQUIRED INSPECTIONS: �� / � / [ SETBACKS /Footings: J-'fress,\ (// /05 D r-FC-fz- f�/Z./o^ [ ] Foundation: �4�G3� ' 4'f [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: �!i,..)- '6-a?-4)2 / [ ] Framing/Plumbing: vie /�1/e eireoNS 7�1/03 [ 1 Propane Tank/Lines: lure i hm gas , al04 7E-0,1 / 1 q/7/03a-3 [ ] Insulation: p,03 [ 1 Sheetrock: 601C o,,Np V),,,-193 [ 1 Septic System Final Approval: [ ] Zoning Final Approval: [ Final/Occupancy Approva c_ t 1—A3-OS HEAL DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY -SEE REVERSE HOT LINE AVAILABLE 24 HOURS A DAY • SPECIAL CONDITIONS FOR CASE # BLD03-00279 1.) The application was reviewed by the Jefferson County Department of Community Development staff on (date)for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Osprey Nest. 2.) The Washington State Department of Fish and Wildlife reviewed potential impacts to Osprey Nests as part of the environmental/subdivision review process. WDFW in an email dated January 2002 indicated the their Priority Habitat Species Map identifies a Great blue heron rookery and an Osprey Nest within the Northeast corner of Section 21. The Northeast corner of Section 21 is approximately 1/2 mile northeast of the Plat of Olympic Terrace, Division 1. 3.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA)pursuant to WAC 197-11-800(1)(b)(i). 4.) The applicant is proposing to create or add 3983 square feet of impervious surface and 3555 square feet of land disturbing activities. Conditions of Plat approval requires that your proposal submit a Small Parcel Erosion and Sediment Control Plan. The applicant submitted a SPESCP. 5.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 6.) The parcel is a legal conforming lot that is designated as Single Family(MPR-SF-4:1 ) under the Jefferson County Comprehensive Plan Land Use Map efffective August 28, 1998. 7.) This approval is for a Single Family Residence with Attached Garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 8.) The site plan as submitted with the building permit application on May 1, 2003 has been reviewed for consistency under the MPR, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated May 1, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 9.) The 41 residential lots within the Plat of Olympic Terrace, Division 1 were established through the long subdivision process. The final plat of Olympic Terrace Divsion 1 was approved March 10, 2003 and recorded Marchh 11, 2003 under Auditor's File Number 466745, in Volume 7, Pages 176-180 of Plats. 10.) Maximum impervious surface area for lot#39 shall not exceed 45 percent. 11.) Minimum setback from Mt. Lena Lane right of way line shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 12.) The building height, including enlargements or structural modifications, shall not exceed 35 feet. 13.) Based on Section 3.107 of the Port Ludlow Master Planned Resort Code, Accessory Dwelling Units are prohibited within the MPR-SF zone. 14.) Stormwater runoff(yard drainage)from lot#39 shall be directed into the approved stormwater retention pond. 15.) Prior to commencement of any land disturbing activities and prior to issuance of a building permit, a Small Parcel Erosion and Sediment Control Plan shall be developed to the standards of the Jefferson County Stormwater Management Ordinance and be submitted to the Department of Community Development for review and approval. Temporary erosion control best management practices shall be approved by the Department of Community Development and implemented at all times during land disturbing activities. is\F_BLD_Permit_Buildng.rpt 10/29/1999 l M t I APPROVED SITE PLAN MAY oit 2003 MAY - 9 2003 JEFFE'SON Crc "• /"'r ._- F.r r DEPT.OF CO/ '� y:r ir,7.2,*: NT r. (� t SIGNATURE,/ y/i�J I \ -1,10-ri ---D Ptr, ' I Y , llre,*r , I I ., 44‘41.444:1,,, \ N I --.J.H 4. i 51 . I \ 6C.,\/-)4Te-P -t, 4 *>t I 4 q �e I2„7„.,. 1„ • . - tw ‘,0 Li, , t . . , „tii . ----. ryr . k Zo i I tlifzi-/-/ N'S-'''N4 ,-. , A .. . 44 ,, -6tp6--x--, 4,., N4 �' I ' . rne.... - - jitata0[I f"VI PA/k1 04PLor6 "TO Al7_r ,F^;) ,f). -- --5-1-wl _ to ,ovie.,-F- -ro47) # _ ---- A-Ai EJ,6,,, ,, .gip:: �...... _ - _ .., . n MAY - 1 2003 JEFFERSON COUNTY STORMWATER MANAGEMENT SMALL PARCEL EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL WORKSHEET Property Owner: Port Ludlow Associates Telephone: 437-2101 Address: 70 Breaker Lane, Port Ludlow, WA 98365 Assessor's Parcel Number: 978-8a0-03`)' Building Permit or Septic Permit Application Number(if applicable): Brief Project Description: New Single Family Residence W/ attached garage, Site Location: in-f /en&. LQ/?e (©l y i c Th/fa e_ 3 g) Person Responsible for BMP Installation and Maintenance: Jeff Ev a n ci e r r' Address: Same as above Telephone:Same as ahnve 1. Describe/check the Best Management Practices (BMPs) that you will implement during land disturbing activities or construction to control erosion and prevent sediment from entering water bodies (marine waters, streams, rivers, lakes, or wetlands) or impacting adjacent property or roads. Please check the measures you plan to implement and show their approximate location on the site plan. You may also propose measures other than those listed. Attach additional sheets,if more space is required. [] Stabilize construction access route. Limit construction vehicles to one route, if feasible. Provide a stabilized construction access by applying quarry spalls, ballast, or crushed rock to minimize tracking sediment onto roads. (See attached illustration from Stormwater Management Manual.) If sediment is transported onto roads, they will be cleaned thoroughly. [] Minimize the extent of land disturbing activity and preserve existing vegetation. Preserve buffers of well-established vegetation between disturbed areas and property boundaries, roads, water bodies, and designated critical areas (wetlands, fish and wildlife habitat areas,landslide or erosion hazard area,etc.). APPROVED SPESC Instructions—Short Form STORM WATER PLAN Revised July 17,2002 3 MAY - 9 2003 JEFFER ON C T n1iPT.f)F('O INi MIiNT SIGNATil L;%, • �_l MAY - 1 2003 EROSION AND SEDIMENT CONTROL WORKSHEET _ ar : [] Phase clearing so that only areas that are actively being worked are uncovered. [] Start and complete land disturbing activities and stabilize the site between April 1 and September 30. Stabilization means that disturbed areas will have well-established plant cover or be landscaped to minimize erosion. [)� Stabilize exposed soil Exposed and unworked soil will be covered within 2 days between October 1 and March 31 and within 7 days between April 1 and September 30. [ ] Cover exposed soil with a minimum of 2 inches of straw or hay or other material approved for this purpose. [ ] Cover soil stockpiles with plastic sheeting and locate away from water bodies, roads, and property lines. [] Place gravel base on roads,driveways,and parking areas after clearing and subgrade preparation. [ Protect adjacent properties and water bodies from sediment deposition: [] Place straw or hay bales in ditches and drainage ways down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies.(See attached illustrations from Stormwater Management Manual.) [ ] Install a filter fence down slope from areas of land disturbing activity to filter runoff before it leaves the project site or enters water bodies. (See attached illustration from Stormwater Management Manual.) [l Regularly inspect and maintain all BMPs especially after storms events. [] Describe other erosion and sediment control Best Management Practices. Be specific as to design and specifications. Site is very flat soils. So I believe the above measures will be sufficient. SPESC Instructions—Short Form Revised July 17,2002 4 . t EROSION AND SEDIMENT CONTROL WORKSHEET 2. Describe how disturbed areas will be permanently stabilized(seeded, landscaped,apply gravel base to roadways,etc.) Areas that are distrubed will be landscaped with natural type vegetation and lawn to property line 3. Describe how runoff from impervious surfaces will be controlled (disperse to vegetated areas to. infiltrate,thy well,infiltration trench,route runoff to existing drainage facilities,etc.). All impervious surfaces will he run to roof drains and catch basins as designed into the plat requirements, SPESC Instructions—Short Form Revised July 17,2002 5 • t EROSION AND SEDIMENT CONTROL WORKSHEET 4. Specify your construction sequence. Describe the timing of all land disturbing activities (clearing and grading, construction, installation of drainage facilities, landscaping, etc.) and Best Management Practices.Describe proposed maintenance of BMPs. After excavation the soil piles will be covered and silt fence will be installed. Silt fence will be left in place until we are ready to landscape and all roof drains/ • catch basins are in. Landscaping will be installed as early as possible on the exterior of the building when all exterior concrete work is completed:,( , The Best a m t Practices proposed above will be implemented to control erosion, sediment, and stormw er . will tify the Jefferson County for inspections as required. /i, ./L/t:f/44:_, (//43° 613 Sighatire o wner/Agent Date if,'',."'ff:',.':.,'' MAY - 1 2003 '� �"� 1/'1 ' f SPESC Instructions—Short Form Revised July 17,2002 6 0 BUILDING PERMIT APPLPA TION MLA03-00236 Review Type: I Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD03-00279 Received Date: 5/1/2003 SITE ADDRESS: 52 MT LENA LN PORT LUDLOW, 98365 OWNER: PORT LUDLOW ASSOCIATES LLC PHONE: (360)437-2101 70 BREAKER LN PORT LUDLOW WA 98365-9766 SUBDIVISION: OLYMPIC TERRACE DIVISION 1 Block: Lot: 39 PARCEL NUMBER: 978800039 Section: 21 Township: 28 N Range: 01 E CONTRACTOR: PORT LUDLOW ASSOCIATES PHONE: (360)437-2101 70 BREAKER LN PORT LUDLWO WA 98365 Contractor's License PORTLAL994L8 Expires 5/2/2004 REPRESENTATIVE: PHONE: PROJECT DESCRIPTION SINGLE FAMILY RESIDENCE W/ATTACHED GARAGE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,818 VALUATION 188,903.00 ADD'L: 719 HEAT TYPE: HTP CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R 3 UNHEATED: #OF STORIES: OCCUPANCY: OTHER: CONST TYPE: 5N GARAGE: 713 SHORELINE: CONST TYPE: DECK: 275 SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: SEW WATER SYSTEM: LUDLOW PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 3 Prop: 2 Seismic Streams Total: 3 Total: 2 Flood Way Floodplain Routing Date: S�` (� F&W Landslide (p Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: A plane Permit $1,492.15 MAM 05/01/03 56204 �'1 01/03State Building Code $4.50 MAM 05/01/03 56204 MAY 1, 3 20 Potable Water Application $51.00 MAM 05/01/03 56204 Total: $1,547.65 Jefferson County Planning & Buildi g Department //,agnp Fj • Jeffersonty Department of Community Development 150N 621 Sheridan Street,Port Townsend WA 08368(360)370-4450 (11 r o ,,,,,.,,,,,,,,,.. TM Pcfi© n 0_1_,...3 9 Project Description: ���k (�Ic1✓1 S wc � 3 ar' Building Type: f Project Type: Frame Type: x Single Family x New A S.. Wood x Garage Attached/Detached .Q Addition Steel Modular Alteration/Remodel Concrete Commercial Repair Masonry Multi-family/#of Units Demolition Other: Industrial - _ Other: Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: Existing: O Existing: O x Sewer Community System Electricity Oil Proposed: Z Proposed: 3 Individual System Woodstove Propane Total: Z Total: 3 If not sewer,fill out the following: x Heat Pump Conventional Alternative Other Permit# SEP Water Supply: Private well Two Party Well x Public:Name of water system: Ole!.•!5 t -Square Footage: �#6033i- Main Floor / l$ I (Q r Dti 4.. (� Consistency Resew C 2No Floor 7 I �p 1 �3W 2 Base fee 3rd Floor Plan Check fee Htd Basement State Surcharge fee i'f ,SO Unhtd Basement Subtotal 5`I(4' (S Garage/Carport 7/3 I (.0 ' '/:6 ' Lk(ry. Po"t WaterReview fee q 2- . D Decks o7 7 �S 911i/Rd Approach fee x Commercial �. C �2 'TOTAL �- , ,1L-7 ' (S Industrial 1J `-' 1 9- 2- .ram'Receipt# t,©� Other Cash/Check# .-e-9 7 o Total Valuation: Initials )/✓ 1 Or Date r� ! �' . Estimated Cost: l 77,Ocz)— If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft. Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide acces nd ' f e -to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to cap 'c n p perry o structure shall be requested and shall occur during regular business hours. Signature: / 71/tVil . ,� Date: `V/d/(/i OVER ► H:l IOME\PLNCNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01