Loading...
HomeMy WebLinkAboutBLD2003-00295 0 • MANUFACTURED/MOBILE HOME INSTALLATION PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD03-00295 Received Date: 5/8/2003 SITE ADDRESS: 82 N DUQUESNE AVE Issue Date: 6/19/2003 PORT TOWNSEND, 98368 APPLICANT: JAIME KOZELISKEY 1112 S JACOB MILLER RD PORT TOWNSEND WA 98368 SUBDIVISION: IRONDALE Block: 126 Lot: 40-43 PARCEL#: 962112616 Section: 34 Township: 30 N Range: 01 W CONTRACTOR/ DEALER INSTALLER: JAIME KOZELISKY WAINS0626 Expires: 7/31/2004 1112 7 OB MILLER RD PORT TOWNSEND WA 98368 (.7PROJECT DESCRIPTIONS MANUFACTURED HOME INSTALLATION MAKE: FLEETWOOD YEAR: 1982 SIZE: 24 X 48 THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED. THE FINAL INSPECTION MUST BE SCHEDULED AND PASSED WITHIN THAT YEAR. THE EXPIRATION DATE IS 6/19/2004. REQUIRED INSPECTIONS: [ ] Setbacks/Footing (CONTINUOUS FOOTING, SLAB or PADS USED): [� Blocking/Plumbin '7--e_.--0--( [ ] Zoning Approval: [ ] Septic System Approval:[41' Final/Skirting/Vents/Porches/Steps: 4C---C/r rd—O`f HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY-SEE REVERSE HOT-LINE AVAILABLE 24 HOURS A DAY 0 • MLA03- 00254 Review Type: I MANUFACTURED/ MOBILE HOME INSTALLATION APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT#: BLD03-00295 Received Date: 5/8/2003 SITE ADDRESS: 3). N DUQUESNE AVE PORT TOWNSEND, 98368 APPLICANT: JAIME KOZELISKEY PHONE: (360)385-3215 1112 S JACOB MILLER RD PORT TOWNSEND WA 98368 SUBDIVISION: IRONDALE Block: 126 Lot: 40-43 PARCEL NUMBER: 962112616 Section: 34 Township: 30 N Range: 01 W CONTRACTOR/ DEALER: INSTALLER: JAIME KOZELISKY WAINS0626 7/31/2004 (360)385-3215 1112 JACOB MILLER RD PORT TOWNSEND WA 98368 REPRESENTATIVE: PHONE: PROJECT DESCRIPTION , "MANUFACTURED HOME INSTALLATION TYPE OF WORK MOB MANUFACTURED HOME: SHORELINE: TYPE OF IMP NEW MAKE: FLEETWOOD SETBACK: VALUATION 7,500.00 YEAR: 1982 LABOR & INDUSTRIES APPROVAL? SIZE: 24 X 48 BANK HEIGHT: SEWAGE DISPOSAL: OSS WATER SYSTEM: PUD BEDROOMS: BATHROOMS: PARCEL TAGS: YES NO Exist: Exist: STORMWATER: YES NO Prop: 2 Prop: 2 AREA Plat Conditions Total: 2 Total: 2 Wetland Erosion Seismic Streams Flood Way Floodplain Routing Date:• 51/3 t F&W Landslide !/ 03 Shoreline Aquifer DType Amount Paid By: Date: Receipt: AppfOVeoe Manufactured Homes $151.00 MAM 05/12/03 JUN 1 9 2003 Potable Water Application $51.00 MAM 05/12/03 Total: $202.00 Jefferson County Planning & Building Department • JEFFERSON COUNTY COMMUNITY DEVELOPMENT 621 SHERIDAN ST, PORT TOWNSEND WA 98368 MANUFACTURED HOME INSTALLATION PERMIT APPLICATION NEW BUILDING 0 REPLACEMENT SIZE 2 t Y YEAR E?- MAKE F L cosT -7SDO � MAY - 2003 BEDROOMS: BATHROOMS: EXISTING Z EXISTING PROPOSED Z- PROPOSED TOTAL Z-- TOTAL TYPE OF SEWAGE DISPOSAL: WATER SUPPLY: 0 SEWER 0 COMMUNITY SYSTEM 0 PRIVATE WELL 0 TWO PARY WELL ti INDIVIDUAL SYSTEM E9` Conventional to PUBLIC PERMIT#SEP 0 Alternative Name of water system: .(A . IF WATERFRONT PROPERTY, DISTANCE TO BANK OR HIGH WATER LINE ft BANK HEIGHT ft By signing the application form, the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save, indemnify and hold harmless Jefferson County against all liabilities,judgments, court costs, reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees, representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours. SIGNATURE ter ) `�;L DATE - Z. NAME(PLEASE PRINT) pr I Vl4 ( FOR OFFICE USE ONLY CONSISTENCY REVIEW FEE _47.00 RECEIPT# BASE FEE IS l cDD ADDITIONAL SECTIONS CASH/CK# SUBTOTAL , ‘ DATE / / POTABLE WATER ,C7•3 911/ROAD APPROACH Q'J� TOTAL ep�O t/ , H:WOMEIPLNCNTRVNFOBLD\FORMSUNOBILEAP.1 v26/01 a SPECIAL CONDITIONS CASE # BLD03-00295 1.) The application was reviewed by the Jefferson County Department of Community Development staff on 5/16/03 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Aquifer Recharge Area, and Airport Noise Overlay. 2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 3.) Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers. 4.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs)and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 5.) The applicant is proposing to create or add 1,940 square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal adhere to Best Managment Practices (BMPs)to control sedimentation and erosion on the subject property. 6.) The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 7.) The site plan as submitted with the building application on 5/08/03 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 5/21/03 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 8.) This approval is for a manufactured dwelling only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 9.) The applicant has recorded a Declaration of Restrictive Covenant to combine lots 40-43 for development. The document was recorded with the Jefferson County Auditors Office on 5/7/03 under Auditors File No. 469441. 10.) The building height is not to exceed 35 feet. 11.) North Duquesne Avenue is classified as a local access road and thus requires a minimum 20-foot setback. The remaining side and rear lot lines require a minimum 5-foot setback. All setbacks shall be measured perpendicularly from the lot line to the proposed development. 12.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined by the amount of impervious surface which includes roof tops, concrete, etc. 13.) The subject property is near an airport where a variety of airport dependent uses occur that are not compatible with development. Potential discomforts of inconveniences may include, but are not limited to: noise, aircraft take-offs and landings. ,_ _., / / - I ir_ ____ Iii------____ _. _ _ ..._ ......_._ „5- _ ____ �z' ? 35 t l r- — _ _ _ — —, - I 7t ,-- i 5.' i 1 . ). - 15 -----�- / (�7l' i r 4'' '' % 1 -1 . , v-I i @ �ds � , \FFERSON COUNTY DCD - • T Y10�30' �a yDI3Wd0'i30`f1 333�i ?� vr tooz 1 lnr wind.SIAS l' .8o/1aav - 1 (0\1W