Loading...
HomeMy WebLinkAboutBLD2003-00342 • BUILDING PERMIT S Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD03-00342 Received Date 06/4/2003 SITE ADDRESS: 655 WOODLAND DR Issue Date 06/26/2003 PORT TOWNSEND, 98368 APPLICANT: IAN NAPIER PHONE: (360)379-9099 ROSALIE NAPIER 655 WOODLAND PORT TOWNSEND WA 98368 SUBDIVISION: WOODLAND HILLS NO 1 Block: Lot: 24 PARCEL NUMBER: 001275016 Section: 27 Township: 30 N Range: 01 W CONTRACTOR: AAWNINGS/SUNROOMS.DISTNCTN INC PHONE: (360)681-2727 141 TIMBERLINE DR SEQUIM WA 98382 Contractor's License: AAWNII*991DA Expires: 03/20/2005 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION: UNHEATED SUNROOM REQIIRED INSPECTIONS: [ SP-BACKE /Footings /�" 7/' 4 Foundation: / lC l [ ] Underground Plumbing/Underground Insulation: [ ] Shear Wall: [ ] Framing/Plumbing: f 1 Propane Tank/Lines: [ ] Insulation: f 1 Sheetrock: f 1 Septic System Final Approval: [ ] Zoning Final Approval: f'i,1" Final/Occupancy Approval: 7A HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE SPECIAL CONDITIONS FOR CASE BLD03-00342 1.) The application was reviewed by the Jefferson County Department of Community Development staff on June 25, 2003 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Special Aquifer Recharge Area (SAPA). 2.) The subject property is near an airport where a variety of airport dependent uses occur that are not compatible with development. Potential discomforts of inconveniences may include, but are not limited to: noise, aircraft take-offs and landings. 3.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 4.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1)All Industrial Land Uses (2)All Commercial Uses (3)All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4)All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code. 5.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 6.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA)pursuant to WAC 197-11-800(1)(b)(i). 7.) The parcel is a legal non-conforming lot that is designated as Rural Residential (RR 1:5) under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998. 8.) The applicant is proposing to create or add 300 square feet of impervious surface and 300 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Calculation sheet. The applicant submitted a calculation sheet. 9.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 10.) This approval is for an unheated sunroom only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 11.) The site plan as submitted with the building permit application on June 3, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated June 3, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 12.) No building or structure shall be erected, enlarged or structually modified to exceed 35-feet in height. 13.) Maximum impervious surface area (a surface area that creates a barrier to the entry of water into the soil in comparision with natural conditions prior to development, or that causes water to runoff in greater quantities or at an increased rate of flow in comparision with the flow prior to development. Common impervious surfaces may or may not include roofs, driveways, patios, packed earth, and oiled surfaces)for lot 24 shall not exceed 25 percent. • 14.) Minimum Woodland Drive easement/right of way line shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet. 15.) The lots within Woodland Hills, No. 1 were created by means of a survey filed December 14, 1998 in Volume 10, Page 18 of Surveys, Records of Jefferson County. The lots were created prior to the adoption of Jefferson County development regulations for 5 acre or large lot subdivisions. This is a named survey- "Woodland Hills, No. 1." is\F_BLD_Permit_Buildng.rpt 10/29/1999 UILDING PERMIT APPL ICAIJN MR Type:AO3 00307 Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD03-00342 Received Date: 6/4/2003 SITE ADDRESS: 655 WOODLAND DR PORT TOWNSEND, 98368 OWNER: IAN NAPIER PHONE: (360)379-9099 ROSALIE NAPIER 655 WOODLAND PORT TOWNSEND WA 98368 SUBDIVISION: WOODLAND HILLS NO 1 Block: Lot: 24 PARCEL NUMBER: 001275016 Section: 27 Township: 30 N Range: 01 W CONTRACTOR: AAWNINGS/SUNROOMS.DISTNCTN INC PHONE: (360)681-2727 141 TIMBERLINE DR SEQUIM WA 98382 Contractor's License AAWNII*991 DA Expires 3/20/2003 REPRESENTATIVE: BRAD BUCHSER PHONE: ( )461-2627 PROJECT DESCRIPTION UNHEATED SUNROOM TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP ADD MAIN: 300 VALUATION ADD'L: HEAT TYPE: UH CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: UNHEATED: # OF STORIES: OCCUPANCY: OTHER: CONST TYPE: GARAGE: SHORELINE: CONST TYPE: DECK: SETBACK: BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PUD PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES_ NO AREA __ Exist: Exist: Wetland_ Erosion Prop: Prop: Seismic _ Streams Total: Total: Flood Way _ Floodplain Routing Date: r F&W Landslide_ /1 / a Qc Shoreline _Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: PPROV Permit $363.25 RAC 06/03/03 56337 Plan Check $236.11 RAC 06/03/03 56337 JUN 2 7 2003 State Building Code $4.50 RAC 06/03/03 56337 Jefferson County Planrslr35 Total: $603.86 & Building flu • • Z • • AA�vx�t�gs � Su��or�m s ofDistill-ct�.o _ , Inc. Family Tradi'tion'Since 192g" • • . 14r-L____ Cc,r10-\• ' • • �T 47 - ° i� '5lillki 3(3 / s..1.-. ‘'-'.0•311‘..e .......sial, .(peg Ao ♦S • •• tIDIA.-r--°Dti‘ \ . • ....2 ,c) .1,,:s . • ♦ r A Ql 0 ` a. • 0 ,... . \ . • .. N \1 . North . .zrtia . . A • • . 0 i6 ite l A �o si �' JE ; .y!%1;o i, "..r- • 'i"j i i ts _.. S �A t P� 'F• . 4 ,Akt Y irk' t . ,\ i jj • VidVAr[JR r,- „'-i-j21'' � jail 2003 ; , t` U • ......... :.1 _ 44pI (Ds-5- Woo 1� ` �JEFFERSON COUNTY Dea AAwnings & S`unroorns of Distinction Inc. "A Family Tradition Since 1928" (360)681-2727L....0-r- -72-4 .5.a0 AGES \ ON N - J 0 . mac . , , co II F' '4 , . ' 4 I 0 *. 1A . ' ---- irik• t :.. a A-r--riv-4-1 - w : : . 1. Foe. Ems : *40 Ae_eA . . *ik .4,,142 . \ .%11DocA\tP PERMIT" # DED : : : : . , . -,- . PALI - : 1 ''=too '--a 'j 0 3 _ 0 3 4 2 u .4.-►1 _ A I � JEFFERSON COUNTY DCD, , �: :-t1 1.dor277 Sol G - - 1-4 voljLA t�D (-I 'LL-6 1 Lo 2 4 . i - III Jefferson Countyypartment of Community Development ��� s°N °°& 621 Slo an Street,Past Townsend WA 08368 60l 3700-4450 PpI] OCallOra ?emit A n 0 0 0 N Project Description: Building Type: Project Type: Frame Type: X Single Family 0 New ❑ Wood ❑ Garage Attached/Detached M X Addition Steel ❑ Modular ❑ Alteration/Remodel ❑ Concrete • ❑ Commercial ❑ Repair ❑ Masonry ❑ Multi-family/#of Units ❑ Demolition 0 Other: ❑ Industrial ❑ Other: Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat: Choose one: NONj��sT�l� Existing Existing ❑ Sewer ❑ Community System - ❑ Oil Proposed: Proposed: A Individual System ❑ Woodstove 0 Propane Total: Total If not sewer,fill out the following: ❑ Heat Pump ❑ Conventional 0 Alternative ❑ Other Permit# SEP Water Supply: 1' Private well 0 Two Party Well 0 Public:Name of water system: Square Footage: For Office Use Only Main Floor 30--e7 1,— 1 NI-AeA T) 1k1,"--evm Consistency Review 47,00 2ND Floor Base fee 3(3. aS 3rd Floor Plan Check fee—65% 03(a, Htd Basement State Surcharge fee 1' 45 Unhtd Basement Subtotal LSC • s-(,, Garage/Carport Pot Water Review fee "Ct-- Decks 911/Rd Approach fee Commercial TOTAL (p s D, Industrial Receipt# s(p 3- Other Cash/Check# 1 ( (O (11 Total Valuati 22 L,k f s , 00 Initials /t/ C Or Date &4431(� Estimated Cost: If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft.Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours. Signature: &cL . Date: /3/Q3 QYER 0". H:HOME\PLNCNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01