Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2003-00392
• BUILDING PERMIT APPLIATION ML 353 Revv iew iew T Tyype: I Jefferson County Department of Community Development 621:he;:d:n:trieet Port Townsend, WA 98368 PERMIT#: BLD3 Received Date: 6/23/2003 SITE ADDRESS: c OWNER: JEFFREY GEORGE PHONE: TAMARA 250 SUNSET BLVD PORT TOWNSEND WA 98368 SUBDIVISION: WOODLAND HILLS#2 PHASE 1 DIV Block: Lot: 7 PARCEL NUMBER: 999900107 Section: 27 Township: 30 N Range: 01 W CONTRACTOR: TERHUNE HOMES INC PHONE 360-697-7000 PO BOX 97 POULSBO WA 98370 Contractor's License TERHUHI133J7 Expires 7/1/2004 REPRESENTATIVE: TERHUNE CUSTOM HOMES PHONE: PO BOX 97 PROJECT DESCRIPTIOI` NEW SINGLE FAMILY RESIDENCE TYPE OF WORK RES SQUARE FOOTAGE: TYPE OF IMP NEW MAIN: 1,762 VALUATION 167,000.00 ADD'L: HEAT TYPE: EEE CODE EDITION: 1997 HEAT BASE: HEAT TYPE: OCCUPANCY: R-3 UNHEATED: #OF STORIES: 1 OCCUPANCY: CONST TYPE: 5N OTHER: SHORELINE: CONST TYPE: GARAGE: 485 SETBACK: DECK: 237 BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PUD PARCEL TAGS: YES NO BEDROOMS: BATHROOMS: STORMWATER: YES NO AREA Exist: Exist: Wetland Erosion Prop: 3 Prop: 2 Seismic Streams Total: 3 Total: 2 Flood Way Floodplain Routing Date: / 3' F&W Landslide (P 2 �� Qi Shoreline Aquifer Forest: Commercial Rural Type Amount Paid By: Date: Receipt: Approved/Date Permit $1,368.95 MJA 06/23/03 57971 APPROVED Plan Check $889.82 MJA 06/23/03 57971 State Building Code $4.50 MJA 06/23/03 57971 JUL 2 8 2003 Potable Water Application $51.00 MJA 06/23/03 57971 Jefferson County Planning Total: $2,314.27 & Building Departmen ..,( • • BUILDING PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT #: BLD03-00392 Received Date 06/23/2003 SITE ADDRESS: 1791 WOODLAND DR Issue Date 07/28/2003 PORT TOWN END 98368 APPLICANT: JEFFREY GEORGE PHONE: TAMARA 250 SUNSET BLVD PORT TOWNSEND WA 98368 SUBDIVISION: WOODLAND HILLS#2 PHASE 1 DIV Block: Lot: 7 PARCEL NUMBER: 999900107 Section: 27 Township: 30 N Range: 01 W CONTRACTOR: TERHUNE HOMES INC PHONE: 360-697-7000 PO BOX 97 POULSBO WA 98370 Contractor's License: TERHUHI133J7 Expires: 07/01/2004 LOAN LENDER/ BOND HOLDER: PROJECT DESCRIPTION: NEW SINGLE FAMILY RESIDENCE REQUIRED INSPECTIONS: [9'- SETBACKS: (:),/< 6,-10'03 [ ] UFFER: [V( Footing: ©t`c 8- -0 3 [117 Foundation:d/C 6 -0 3 [ ] Undergroun Plumbing: /e7 02Q-03 [ ] Underground Insulation: [ ] Shear Wall : , C q-1..6-`6`3 [✓_( Framin /'3-53 [K Plumbir�f i/-3-a 7 [ ] Propane ank/Lines: /N // -03 [ ] Insulation:fiu.A-t.L ;Ay. L t k--t-per [47 Sheetrock`IC,, I I-1O-o. [ ] Septic Sytem Final Approval: [ 1 Zoning Final Approval: [ ] Final/Occupancy Approval /-v2{o14'L, HEALT; DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. HOT LINE AVAILABLE 24 HOURS A DAY SPECIAL CONDITIONS APPLY -SEE REVERSE • • SPECIAL CONDITIONS FOR CASE # BLD03-00392 • 1.) The application was reviewed by the Jefferson County Department of Community Development staff on July 21, 2003 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Special Aquifer Recharge Protection Area. 2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. 3.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1)All Industrial Land Uses (2)All Commercial Uses (3)All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4)All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code. 4.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin. 5.) The applicant is proposing to create or add 3,650 square feet of impervious surface and 5,650 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Small Parcel Erosion and Sediment Control Plan. 6.) A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 7.) Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i). 8.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes rooftops, driveways, concrete, etc. 9.) The building height is not to exceed 35 feet. 10.) Minimum setback from Woodland Dr is 20 feet. Minimum side setbacks are 5 feet. Minimum rear setback is 80 feet (20 feet from the 60 foot road and utility easement). 11.) Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged. 12.) Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible and outside the boundaries of the property. 13.) The subject property is near an airport where a variety of airport dependent uses occur that are not compatible with development. Potential discomforts of inconveniences may include, but are not limited to: noise, aircraft take-offs and landings. 14.) The subject property is located in the proximity of the jefferson County International Airport (JCIA). The JCIA is a public, general aviation airport with a hard surfaces 3,000-foot, 12,500 pound weight bearing capacity runway. JCIA experiences frequent landings and take-offs. Structures located in the proximity to the airport will, to varying degrees, be subject to noise and vibration from aircraft during take-off, landing and approach activities. 15.) The "60' Road and Utility Corridor" lying at the southern boundary of Lots 1 through 8 is also dedicated open space. If at any time a road is constructed within this 60'corridor, Eagle Eye Inc. or its heirs and successors, or home owners association, shall apply to and obtain approval by Jefferson County, a plat amendment to relocate said open space within the Woodland No. 2 Phase I subdivision. 16.) All lots are subject to a 10'wide easement for utilities adjacent to dedicated road rights-of-way and also to an easement for utilities over the westerly and southerly 10 feet. Lots to the south and west of the rights-of-way are subject to a 10 foot wide utility easement as depicted on the Woodland Hills No. 2, Phase 1, Division 2 subdivision including culvert access and maintenance by Jefferson County Public Works. 17.) This parcel was created through the Woodland Hills No. 2 , Phase 1, Division 2 long plat May 19, 2003 and recorded under AFN 469869. A correction to the Long Plat of Woodland Hills No. 2, Phase 1, Division 2 was recorded July 1, 2003 under AFN 471849, Vol 7, pp 191-196 with the Jefferson County Auditor. 18.) A minimum of two (2) on-site parking spaces are required for the single family residence. 19.) This parcel has been designated as Rural Residential 1:10 under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998. 20.) Woodland Dr is a county local access road. A road approach was reviewed under RAP03-00160, and an address of 1791 Woodland Dr has been assigned to the parcel. 21.) A septic permit (SEP03-00165)was approved July 25, 2003 for a system with capacity of 360 gallons per day. 22.) Potable water is provided by an onsite well. 23.) Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard. 24.) Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage)yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA). 25.) The site plan as submitted with the building application on June 23, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated July 25, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 26.) This approval is for a single family residence and road approach only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. I:\F_BLD_Permit_Buildng.rpt 10/29/1999 a- 0 r r. ♦ v 0 a. erns:, :I!. t ':! ;'t.:•,'•:� :•. ,.,k t;. :• . " `- *1, {:{''•, N. 3•:i20p Terhune Custom Homes 136069'77500 p. 2 'r C 1. t �/'�/1 '0 p P� S Ike:- g,4i.. 1:aJ: `iii :a Q - `i ` 2:15-e--- 1 Itiltnertho Strut.Pert Townsend WA Ian Cat)3711401 permoi) no Appilucation . I. , .,1,±kslini lit) "•rre�t Desca• Ma„Am V 1tY1 vest eila i,• .mitre;ratty P Ne�vtr •c. Frame Type! _.... .._.— '▪ C-e a;tlibcbed%Detached 0 Addition 0 Steel • P!'G' Nli�dulae.' 0 Sttael 0 Alteration/Remodel CorrFriceul, i L1 0 Concrete t =5irtly/#bf.Units 0 Masonry 1 • :ir_?t r�d� : 0 Demolition 0 Other Its_ I ` _ ; . tt,brooms: Bedrooms: Type at Sewage Disposal: Type of liens l ti y. r-- Choose one: SnfJtoM ! Existing: �� d Sewer ' "' �`•.j 7.•• Proposed: ��0 1CClar:r/ Cie i. - ^:: x^ Torn . 'Individual System _ 0 WaodFttm CPropane if not sewer,fill out the following: 0 Hear Pump :'Conventional 0 Alternative 0 Other. 9 a o.x-r triply; _, pp � C''0 Private well 0 Two Patty Well 0 Public:Name ut stater a• rem: l � V' t J t Squawxe Foot gC — n h For Office Uae Only — r lr/.•.3irt iol:L 1-1 / 2 Its V O3• ., . `*;,,�, Consistency Rcvicw 47.00_ „ oc Base fee 13�� C1 �— Plan Check£cc—65% Rg . ?a 'i.ci Basement °C8 _ State Surcharge fie � ...._.. A is G"tJA.71.2r t\ Subtotal y_. Pot Water Review fee ,OO 7.2't.t.•;s _ c_D --1 SScato.0 1pQ 911/Rd Approach fee )47' it• 00, Coniviracial — aq ,t TOTAL - S 3 3 . ' 1 Receipt# ?`C . cset Cash/Check5Z'ZZ� '.:off.!Valuatle4 Initials Q r.r t ,��$ 1 7 ..,±7.1 Cost •T` l �j DODDace i(�zj��� ';,tJ? ��I�vP QL�IC sal t• _ ante to High Water Mark ft_Bank Height ft. .';'rxai_':g the appliciaon form,the applicant/area item that the informaeon povidai Mean i.twe and coats:to L7o Oast of Uric p being null and rod k An one.,,:::of a notarial fact nude by the applicant%area wnh teapcct to die tippet-aeonpacket may mpg(.n thi<permit tact `a°g°' y tnace�faitchood oc an . F.f_rt cr tree re rave,vetammfy and hold hentttew Jef&aeonComf. spinal til:¢z,:r..7,anon Coutry u a result of or an consequence of the granting hmdrta,ludgrwc..s,roan saes,reasonable attorocy'f lots and aptvte<:which may in any way accrue(Puri t+6 permit i twthee ever to peeved*aeons and right of entry co Jefferson County and,a's I A.,....-*Ad right of n the c1m avast,shag occur during r r'acme far ne,peepeee howl.of app.tat:ow..view and any required tsar n+<prt9otta. err( applicant's of structure*WI be requested and stWi ut't7Y dutirtg regular banners hours, wr,.�...,...., / � Date:Co~ i I'O 3 -; - " •cr:t t�1NF0>3LDG\PORMS\BLD QY t +_' Ptrt't►irAppication 11-8-01 IQ/TO -.39tid COG 00 j33C I5trtr6LE99E Et:9I EOQZ/LT/90 • ¢$ON co Jefferson Coun4artment of Community Develop lent e 621 Sheridan Street,Port Townsend WA 88368 13601 378-4450 w y13 � prm0t A O o ('�S 0 ii . C�Q�0 0 �?N f Project Description:JQ Ve 4-�,✓Vl C---,2�Yq Building Type: Pict Type: Frame Type: Single Family New 54)Wood ❑ Garage Attached/Detached ❑ Addition ❑ Steel ❑ Modular ❑ Alteration/Remodel ❑ Concrete ❑ Commercial ❑ Repair ❑ Masonry ❑ Multi-family/#of Units ❑ Demolition JUN ? ❑ Other. ❑ Industrial ., i Q(Z- ❑ Other: 11-.1:DSGk I Bathrooms: Bedrooms: Type of Sewage Dis osal MNAEji Type of Heat. H Choose one: Existing: Existing. /-- ❑ Sewer , ' lectricity ❑ Oil Proposed: at(._ Proposed: Individual System.� y ❑ Woodstove ❑ Propane Total: t fZ Total: If not sewer,fill out the following: ❑ Heat Pump .'Conventional ❑ Alternative ❑ Other f Permit# SEP I! Water Supply: r ^— ' t ❑ Private well ❑ Two Party Well❑ Public:Name of water system: l/�X O\ 1(16 H l S Square Footage: ,, For Office Use Only Main Floor- 1 (02- Consistency Review 47.00 2ND Floor Base fee 3rd Floor Plan Check fee—65% Htd Basement State Surcharge fee Unhtd Basement Subtotal Garage/Carport 14 7 Li '5 Pot Water Review fee Decks c3' i 911/Rd Approach fee Commercial TOTAL Industrial Receipt# Other Cash/Check# Total Valuation: Initials Or I� Date Estimated Cost: '+i 1 -1/0 C)D If within 200' of the Shoreline, Distance to Bank or Ordinary High Water Mark ft. Bank Height ft. By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees,representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular business hours. C. C3 Signature: Date: (o'(1'd a O H:HOME\PLNCNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01