Loading...
HomeMy WebLinkAboutBLD2003-00435 • 6 MLA03-00390 Review Type:I MANUFACTURED/ MOBILE HOME INSTALLATION APPLICATION Jefferson County Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 PERMIT #: BLD03-00435 Received Date: 7/15/2003 SITE ADDRESS: ri0 Li. SWANEY ST PORT HADLOCK, 98339 APPLICANT: DAVID M MAXWELL PHONE: (360) 765-3750 HAZEL E MAXWELL PO BOX 401 QUILCENE WA 98376 SUBDIVISION: IRONDALE Block: 49 Lot: 29-31 PARCEL NUMBER: 961804912 Section: 34 Township: 30 N Range: 01 W CONTRACTOR/ C &J EXCAVATING INC PHONE: 360-683-7741 DEALER: PO BOX 430 CARLSBORG WA 98324-0430 Contractor's License CJEXCI*099PC Expires 8/15/2002 INSTALLER: STAN J SULLINS WAINS1447 2/28/2004 (360)683-7741 PO BOX 430 CARLSBORG WA 98324 REPRESENTATIVE: PHONE: PROJECT DESCRIPTION: NEW MANUFACTURED HOME TYPE OF WORK MOB MANUFACTURED HOME: SHORELINE: TYPE OF IMP NEW MAKE: SKYLINE SETBACK: VALUATION YEAR: 2003 LABOR & INDUSTRIES APPROVAL? SIZE: 68' X 41' BANK HEIGHT: SEWAGE DISPOSAL: CON WATER SYSTEM: PUBLIC BEDROOMS: BATHROOMS: PARCEL TAGS: YES____NO __ Exist: Exist: STORMWATER: YES_ NO __ Prop: 2 Prop: 2 AREA Plat Conditions_ _ Total: 2 Total: 2 Wetland_ Erosion Seismic_ Streams_ Flood Way__ _Floodplain _____ Routing Date ao/0 3 F&W _Landslide — Shoreline _Aquifer Type Amount Paid Bv: Date: Receipt: A P P,-r rGIVE D Permit $151.00 RAC 07/15/03 58128 AUG 1 51003 Permit $31.00 RAC 07/15/03 58128 Potable Water Application $51.00 RAC 07/15/03 58128 Jefferson County Planning Total: $233.00 & Build/ing Department • • MANUFACTURED/MOBILE HOME INSTALLATION PERMIT Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360)379-4450 FAX (360)379-4451 PERMIT#: BLD03-00435 Received Date: 7/15/2003 SITE ADDRESS: 90 W SWANEY ST Issue Date: 8/15/2003 PORT HADLOCK, 98339 APPLICANT: DAVID M MAXWELL HAZEL E MAXWELL PO BOX 401 QUILCENE WA 98376 SUBDIVISION: IRONDALE Block: 49 Lot: 29-31 PARCEL#: 961804912 Section: 34 Township: 30 N Range: 01 W CONTRACTOR/ C & J EXCAVATING INC PHONE: 360-683-7741 DEALER PO BOX 430 CARLSBORG WA 98324-0430 Contractor's License CJEXCI*099PC Expires 08/15/2004 INSTALLER: STAN J SULLINS WAINS1447 Expires: 2/28/20(N PO BOX 430 CARLSBORG WA 98324 PROJECT DESCRIPTION: NEW MANUFACTURED HOME MAKE: SKYLINE YEAR: 2003 SIZE: 68'X 41' THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED. THE FINAL INSPECTION MUST BE SCHEDULED AND PASSED WITHIN THAT YEAR. THE EXPIRATION DATE IS 8/15/2004. REQUIRED INSPECTIONS: //Setback /Footing (CONTINUOUS FOOTIN t., SLAB or PADS USED): �!G 401116 Un Ø /a4/ [ ] Blocking/Plumbing:L /0 —/( -03 [ ] Zoning Approval: [ ] Septic System Approval: [ ] Final/Skirting/Vents/Porches/Steps: S(JRrnI J.L //-S-0, Ii,,4r.�✓�c..o.JOICy/ y HEALTH DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. Office Hours 9:00 a.m. -4:30 p.m. SPECIAL CONDITIONS APPLY-SEE REVERSE HOT-LINE AVAILABLE 24 HOURS A DAY i • SPECIAL CONDITIONS CASE # BLD03-00435 1.) The application was reviewed by the Jefferson County Department of Community Development staff on 8/8/03 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Coastal Seawater Intrusion Protection Zone (SIPZ)and Stormwater. 2.) Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall)and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer. 3.) The parcel is located within a coastal SIPZ (seawater intrusion protection zone)according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy(Resolution 44-22, effective September 23, 2002)that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet. 4.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures. 5.) VOLUNTARY MEASURES OF COASTAL &AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County. 6.) To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite. 7.) The applicant is proposing to create or add 3,512 square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires tha your proposal submit a Medium Stormwater Management Plan. • • 8.) The project shall adhere to the Best Management Practices (BMPs)to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 9.) A Medium Stormwater Management Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed. 10.) The applicant shall infiltrate and control all stormwater onsite. If sedimentation and erosion occurs additonal stormwater management shall apply. 11.) The site plan as submitted with the building application on July 15, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 8/08/03 shall be resubmitted for review and approval by Jefferson County Department of Community Development. 12.) This approval is fora manufactured dwelling only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 13.) Maximum lot coverage is not to exceed 25%. Lot coverage is defined by the amount of impervious surface which includes roof tops, concrete, asphalt, gravel, etc. 14.) The building height is not to exceed 35 feet. 15.) Swaney Street is classified as a local access road and requires a minimum 20-foot front yard setback. The remaining side and rear lot lines require a minimum 5-foot setback. All setbacks shall be measured perpendicularly from the lot line to the proposed development. 16.) The applicant has applied for a Road Approach Permit (RAP03-00148). 17.) The applicant has recorded a Declaration of Restrictive Covenant filed under 473663. JEFFERSON COUNTY ClitUNITY DEVELOPMENT 621 SHERIDAN ST, PURT TOWNSEND WA 98368 MANUFACTURED HOME INSTALLATION PERMIT APPLICATION NEW BUILDING 0 REPLACEMENT SIZE (4j X YEAR t)" MAKE $ k \.I t COST HCTCOOO BEDROOMS: BATHROOMS: EXISTING EXISTING PROPOSED PROPOSED TOTAL ., TOTAL TYPE OF SEWAGE DISPOSAL: WATER SUPPLY: 0 SEWER 0 COMMUNITY SYSTEM PRIVATE WELL T21> TWO PARY WELL INDIVIDUAL SYSTEM 0 Conventional 0 PUBLIC PERMIT#SEPg8;,Z)'( 0 Alternative Name of water system: IF WATERFRONT PROPERTY, DISTANCE TO BANK OR HIGH WATER LINE ft BANK HEIGHT ft By signing the application form, the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void. I further agree to save, indemnify and hold harmless Jefferson County against all liabilities, judgments, court costs, reasonable attorney's fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit. I further agree to provide access and right of entry to Jefferson County and it's employees, representatives or agents for the purpose of application review and any required later inspections. Access and right of entry to the applicant's property or structure shall be requested and shall occur during regular busines urs. SIGNATURE �....(2 Hivit yi-tk of"�L DATE NAME(PLEASE PRINT) <.-( A Ai "J (d L L s FOR OFFICE USE ONLY CONSISTENCY REVIEW FEE 47.00 RECEIPT# ›; BASE FEE y ADDITIONAL SECTIONS 3 t ' CASH/CK# ' SUBTOTAL G7w0� I r O� DATE 1 POTABLE WATER 911/ROAD APPROACH I Lk TOTAL H:W OME\PLNCNTRUN FOBLDIFORMSIMOBI LEAP.11/26/01 w a� Foy : :,..., - z i-zi � r o a _15-�1. / T 1 f _ Ni ' \ b.)4.:>(- ) . C6'S p 9 Y Z b� W o . i 5 C M ? R a P65t- p R.(,: `so �� , Ltb��X (0g/ G 0, Cr.r‘ A ,x N w f a c,T Re G) c ,(;�g-" > <----> 5 'Q c 7 w b ale 4�S �--' n, (n . R,E.5- ;.OE— L' c5) c) ( i > , � , 7O 144 ' .,/ , 175 c,, n D,(6 ..) - c 4-- 7-i10 46 .5(( .) 1"—L- I 9 ,j, . . 1.