HomeMy WebLinkAboutBLD2003-00447 • MLA03-00403
BUILDING PERMIT APPLICATION Review Type: I
Jefferson County Department of Community Development
621 Sheridan Street Port Townsend, WA 98368
PERMIT #: BLD03-00447 Received Date: 7/21/2003
SITE ADDRESS: 93 BLUE HORIZON CT
PORT TOWNSEND, 98368
OWNER: CLARENCE BRAMHALL PHONE: (360)385-3008
3039 SPRING ST
PORT TOWNSEND WA 98368
SUBDIVISION: WOODLAND HILLS#2 PHASE 1 DIV Block: Lot: 15
PARCEL NUMBER: 999900115 Section: 27 Township: 30 N Range: 01 W
CONTRACTOR: OWNER/BUILDER PHONE:
REPRESENTATIVE: PHONE:
PROJECT DESCRIPTION NEW DETACHED GARAGE WITH BATHROOM & PLUMBING
TYPE OF WORK GAR SQUARE FOOTAGE:
TYPE OF IMP NEW MAIN: 0
VALUATION 28,284.00 ADD'L: HEAT TYPE: UH
CODE EDITION: 1997 HEAT BASE: HEAT TYPE:
OCCUPANCY: UNHEATED: #OF STORIES: 1
OCCUPANCY: OTHER:
CONST TYPE: GARAGE: 1,200 SHORELINE:
CONST TYPE: DECK: SETBACK:
BANK HEIGHT:
SEWAGE DISPOSAL: ALT
WATER SYSTEM: PUD PARCEL TAGS: YES NO
BEDROOMS: BATHROOMS: STORMWATER: YES _ NO AREA
Exist: Exist: Wetland Erosion
Prop: Prop: 1 Seismic Streams
Total: Total: 1 Flood Way Floodplain
Routing Date: , : F&W Landslide
9 00 (1%._,) Shoreline _Aquifer
Forest: Commercial Rural
Type Amount Paid By: Date: Receipt: Approved/Date
State Building Code $4.50 RAC 07/21/03 58141 APPROVED
Potable Water Application $51.00 RAC 07/21/03 58141
Permit $431.65 RAC 07/21/03 58141 AUG 1 5 2003
Plan Check $280.57 RAC 07/21/03 58141
Total: $767.72 Jefferson County Planning
& 6u' ding Departmen eil
76 /WI-
S
a
II
of Comity Developolint
A Street,Port Townsend WA 318-4450
o
� o0
�slvo 0
ocQ�oo�
JEFFERSON COUNTY DOD
Project Description:
Building Type: Proje Type: Fran ype:
❑ Single Family ew Doti
14, Garage Attache etached 0 Addition ❑ Steel
0 Modular ❑ Alteration Remodel
❑ Commercial / ❑ Concrete
❑ Repair ❑ Masonry
❑ Multi-family/#of Units ❑ Demolition ❑ Other:
❑ Industrial
❑ Other:
Bathrooms: Bedrooms: Type of Sewage Disposal: Type of Heat:
Choose one:
Existing: Existing. 6) �j ewer 0 Community System Electricity ❑ Oil
Proposed: -- Proposed: r ( Individual System
Total: ] Total: y ❑ Woodstove ❑ Propane
______I___
T If not sewer,fill out the following: ❑ Heat Pump
❑ Conventional ❑ Alternative ❑ Other
Permit# SEP
Water Supply: /
❑ Private well ❑ Two Party W-ll❑ Public:Name of water system:--. ����7 L t
Square Footage: For Office Use r.�J� Only
Main Floor j,k4::r:6
Consistency Review 47.00
2ND Floor -- Base fee q 3/, (oS 9- 'IJ
3rd Floor -- Plan Check fee—()5/� `�• �° ( a
Htd Basement State Surcharge fee �J -q 5
VJ\Unhtd Basement 1 1 3�- —�j 4 7 Subtotal / r/4 , 7
O O
Garage/Carport 1•, ,, , , - , Pot Water Review f:- i ' s a .
slum.,
Decks _ apel911/Rd Approach fee 0
Commercial — OTAL f4.47 '1 5
Industrial '/. eceipt# 5S"% 5 2 Pei I
Other , 6 Cash/Check# 729 'X ri R8
Total Valuation: Initials
Or Date
' ri' a003 r7la./ia.003
Estimated Cost: %,5;
If within 200' of the Shoreline,
Distance to Bank or Ordinary High Water Mark ft.Bank Height ft.
By signing the application form,the applicant/owner attests that the information provided herein is true and correct to the best of their knowledge. Any material falsehood or any
omission of a material fact made by the applicant/owner with respect to this application packet may result in this permit being null and void.
I further agree to save,indemnify and hold harmless Jefferson County against all liabilities,judgments,court costs,reasonable attomey's fees and expenses which may in any way accrue
against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of- try to Jefferson ty and it's employees,representatives or agents for the purpose of application review and any required later inspections.
Access and right of entry t. 1-applicantperry or stmc shall be requested and shall occur during regular business hours.
Signature: f t .. Date: -2//7/r-",
OW R
H:HOME\PLNCNTR\INFOBLDG\FORMS\BLDpermitApplication 11-8-01
BUILDING PERMIT
Jefferson County Department of Community Development
621 Sheridan Street, Port Townsend, WA 98368
(360)379-4450 FAX (360)379-4451
PERMIT#: BLD03-00447 Received Date 07/21/2003
SITE ADDRESS: 93 BLUE HORIZON CT Issue Date 08/15/2003
PORT TOWNSEND, 98368
APPLICANT: CLARENCE BRAMHALL PHONE: (360)385-3008
3039 SPRING ST
PORT TOWNSEND WA 98368
SUBDIVISION: WOODLAND HILLS#2 PHASE 1 DIV Block: Lot: 15
PARCEL NUMBER: 999900115 Section: 27 Township: 30 N Range: 01 W
CONTRACTOR: OWNER/BUILDER PHONE:
LOAN LENDER/
BOND HOLDER:
PROJECT DESCRIPTION: NEW DETACHED GARAGE WITH BATHROOM& PLUMBING
REQUIRED INSPECTIONS:
[ ] SETBACKS:
[ ] UFFER: (� /1-0S1O3] Footing: yy.
[ ] Foundation:
[ ] Underground Plumbing:
[ ] Underground Insulation:
[ ] Shear Wall :
[1,(- Framing: L //-S-D3
f I Plumbing: L /I- 6--o 3
[ ] Propane Tank/Lines: " ,
[ ] Insulation: $ptutop v 6t/,4a,.s AL_y /0/17/45 4k,
[ 1 Sheetrock: , ofol m ottty. /-/a-oy _
[ ] Septic Sytem Final Approval:
[ 1 / Zoning Final Approval:
[� Final/Occupancy Approval: 8 o1-O7
HEALT DEPARTMENT APPROVAL REQUIRED PRIOR TO FINAL INSPECTION
THIS PERMIT IS VALID FOR ONE YEAR OR IT MUST BE PROPERLY RENEWED
BUILDING INSPECTION HOT-LINE 379-4455. CALL 24 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
Office Hours 9:00 a.m. -4:30 p.m.
HOT LINE AVAILABLE 24 HOURS A DAY
SPECIAL CONDITIONS APPLY-SEE REVERSE
• •
SPECIAL CONDITIONS CASE # BLD03-00447
1.) The application was reviewed by the Jefferson County Department of Community
Development staff on August 2, 2003 for the potential presence of Environmentally
Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC).
After an initial Geographic Information Systems mapping review and an investigative site
inspection, the following ESAs were confirmed to be present on the subject property:
Special Aquifer Recharge Protection Area.
2.) Aquifer Recharge Areas in Jefferson County are characterized by porous geological
formations that allow percolation of the surface water into the soils and the underlying
zone of saturation. Aquifers are geologic formations that contain sufficient saturated
permeable material to yield significant quantities of water to wells and springs. Aquifers
serve as the source of drinking water within most of the rural portions of Jefferson County.
3.) Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special
Aquifer Recharge Protection Areas and the following land uses located within Susceptible
Aquifer Recharge Areas (1)All Industrial Land Uses (2)All Commercial Uses (3)All Rural
Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4)All
Rural Residential Land Uses with nonconforming uses that would otherwise require a
Discretionary Use or Conditional Use Permit(5) Unsewered Planned Rural Residential
Developments (6) Unsewered residential development with gross densities greater than
one unit per acre. All of the above listed uses shall be subject to the applicable
requirements and standards of the Jefferson County Unified Development Code.
4.) Critical Aquifer Recharge Areas may require special protection measures to mitigate water
quality degradation. The submitted proposal does not require additional aquifer
protection measures. However, during construction the project shall follow the Best
Management Practices (BMPs) and facility design standards as identified and defined in
the Stormwater Management Manual for the Puget Sound Basin.
5.) The subject property is near an airport where a variety of airport dependent uses occur
that are not compatible with development. Potential discomforts of inconveniences may
include, but are not limited to: noise, aircraft take-offs and landings.
6.) The subject property is located in the proximity of the jefferson County International Airport
(JCIA). The JCIA is a public, general aviation airport with a hard surfaced 3000-foot,
12,500 pound weight bearing capacity runway. JCIA experiences frequent landings and
take-offs. Structures located in the proximity to the airport will, to varying degrees, be
subject to noise and vibration from aircraft during take-off, landing and approach activities.
7.) Jefferson County Public Utility District#1 provides potable water to this parcel.
8.) A septic permit (SEP03-00187)was approved August 8, 2003 for a system with capacity
of 360 gallons per day.
9.) The site is accessed via Blue Horizon Ct, a local access road. A road approach permit
was reviewed under RAP03-00123. An address of 93 Blue Horizon Ct was assigned to
the parcel.
10.) This parcel was created through the Woodland Hills No 2, Phase 1, Div 2 subdivision May
19, 2003 and recorded with the Jefferson County Auditor under AFN 469869, Vol 7, pp
183 - 188 of Long Plats. This subdivision was reviewed under SUB97-00006 by
Development Review Staff.
11.) This parcel was designated as Rural Residential 1:10 under the Jefferson County
Comprehensive Plan Land Use Map effective August 28, 1998.
12.) The applicant is proposing to create or add 3,000 square feet of impervious surface and
3,100 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson
County Unified Development Code requires that your proposal submit a stormwater plan
meeting minimum requirements#1 through#5 of the Stormwater Management Manual for
Western Washington.
I
13.) A Stormwater Plan has been submitted and approved by the Department of Community
Development. Once the subject permit has been issued the applicant shall fully
implement the provisions of the submitted plan and contact the Jefferson County
Department of Community Development to arrange a schedule to inspect the property for
plan compliance. A Certificate of Occupancy will not be issued until the Department
verifies plan compliance. No clearing for roadways or utilities shall occur on the project
site until clearing necessary for the installation of temporary sedimentation and erosion
control measures have been completed.
14.) Jefferson County determined that this proposal is categorically exempt from review under
the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
15.) Maximum lot coverage is 25%. Lot coverage is defined as amount of impervious surface
which includes rooftops, driveways, concrete, etc.
16.) The building height is not to exceed 35 feet.
17.) Minimum setback from Blue Horizon Ct and Woodland Dr is 20 feet. Minimum setback
from the norhtwestern parcel boundary is 5 feet.
18.) Exterior lighting for residential uses shall not exceed 20 feet in height from the finished
grade excepting when such lighting is an integral part of a building or structure. Ground
level lighting is encouraged.
19.) Lighting fixtures shall be designed and hooded to prevent the light source from being
directly visible and outside the boundaries of the property.
20.) All lots in Woodland Hills No 2 are subject to a 10'wide easement for utilities adjacent to
dedicated road rights-of-way and also to an easement for utilities over the westerly and
southerly 10 feet.
21.) A Site Plan Approval Advance Determination (SPAAD)was approved July 17, 2003 under
MLA02-00612. This approval expires July 17, 2008.
22.) The site plan as submitted with the building application on July 21, 2003 has been
reviewed for consistency under the UDC, and has been approved by Jefferson County
Department of Community Development. Any modifications, changes, and/or additions to
the stamped, approved site plan dated August 12, 2003 shall be resubmitted for review
and approval by Jefferson County Department of Community Development.
23.) This approval is for a Detached Garage with Bathroom & Plumbing only. Any future
permits on this site are subject to review for consistency with applicable codes and
ordinances and does not preclude review and conditions which may be placed on future
permits.
qpp PERMIT # BLD , t 4 fit,
sroRMWATER VEIN
3 - 4
PLAN MS
AUG 1 2at ' JEEFERSON COTY OCP.
JEFFERSON COUNTY
lEFF TORM WATER MANAGEMENT PLAN
DM
bor.OF I ER
�N
—.._.
s5: lu: orizon Court.
MLA# -3I' i3
Lot 15 ,.
MIN. 1 Attached is a drainage plot plan showing direction of slope and area of construction.
The area has recently been logged over and substantially cleared with a brush cutter,
with some native vegetation remaining, Also thistles and noxious weeds have cropped up(some _
have been poisoned). Also some small fir trees are scattered as well as some rhododendron
bushes. Any soils disturbed will be re-seeded and sodded to avoid erosion or water runoff.
Runoff from roofs will be directed by gutter and down spouts,using splash blocks and allowing
water to dissipate into areas of on site vegetation. The natural slope is general slight and is
directed to the south-southwest. No construction run off is expected.
Min.2 Element 1 The area will be marked by stakes and ribbon.
Element 2 The area will have construction access
Element 3 Adjoining properties will be protected from runoff or erosion by straw or other
suitable means.
Element 4 Any disturbed soils will be re seeded and any runoff will go into native
vegetation and seeded areas.
Element 5 Will stabilize soils by re seeding, and sodding.
Element 6 Slopes generally are to the south and south west and will not be changed
Element 7 No construction runoff will enter any drain inlets.
Element 8 Construction site will be stabilized to prevent erosion
Element 9 No on site construction pollutants will contaminate storm water.
Element 10 De-watering water will be treated and handeled the same as stormwater.
Element 11 Management practices will be maintained through-out the construction
period.
Element 12 The project will be managed to reduce and prevent storm water runoff.
Min#3 All disturbed areas will be re-seeded and sodded to capture any runoff
Min#4 Natural drainage will be maintained. No discharges from the area will occur.
Min#5 On site management will consist of gutter and down spouts on all roof areas,splash
blocks with run off into areas of on site vegetation,reseeded,sodded areas. Driveways will be
sloped for water runoff into reseeded,sodded,and vegetation areas. No runoff water will be
positioned to affect adjoining property.
•
flify0,1061. 114 F
JEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
JUL 21 2003
' 0. 621 Sheridan Street• Port Townsend•Washington 98368
360/379-4450.360/379-4451 Fax ,�E PERSON COUNTY DG
http://www.co.jefferson.wa.us/cornmdevelopment/
Stormwater Management Permit Supplemental Application
(Stand-Alone or Integrated)
MLA# PROJECT/APPLICANT NAME
Applications for clearing and grading, land-disturbing activities, and building permits or other land use approvals that require
stormwater management permit shall include the following information. This information may also be provided on other diagrams
plans, studies, or attachments submitted with the project application. If so, please indicate such on this permit application. ThI
Administrator may waive specific submittal requirements determined to be unnecessary for review of the application.
1. Source of fill material and deposition of excess material. .�.v�F-c-e/
• r
2. Physical characteristics of fill material: g �`'� oz�. " 541
3. Proposed methods of placement and compaction consistent with the applicable standards on Appendix Chapter 33 of the
Uniform Building Code. _Z re it--ex `,L
4. Proposed surfacing material. •7 .O I s ,.. b -
CD
5. Proposed method(s)of drainage and erosion control. "-� t L RStTN COUNTY D
6. Methods for restoration of the site.
7. Demonstrate that instream flow of water will remain unobstructed. `---An-o_`¢
8. Demonstrate that erosion and sedimentation from outflow channels will be minimized by vegetation or other means,and
demonstrate that pond runo+ will be controlled to protect adjacent property damn e.
.04-7 rase-e-c-lfrz.tJ
By signing the ap 'cation form,the app' owner attests that the information provided herein is true and correct to the best of their
knowledge. I o
ce ' t this appf n is being made with the full knowledge and consent of all owners of the affected
Property.
Z/, 0G3
(LANDOwN REPRESENT SI TURE) 9414f
STORMWATER MGMT PERMrr.DOC REV.12J20/02
. Deti)411 ft) A fr
Pierallt,
c-4 flic .;,9L•4.::- 491.19/71%.4746 . ,
'36 0 3gs-- 30 a ....._
, 5-6e_g? C eg. Au6 _A) no C A R - G t--
JEFFERSON COUNTY DCD
36 41d
7)9"X 9 9 7 70 0 //-‘-- 7 \---\
iel *-- 45 - .
1 I I/Iv/
/96f.75Azi-le 5r6,
lav")
\‘?
if I('
•i _. sc, ' „Ire.,, ,
JUL 2 1 200,3
..0
4EFFERSON COUNTY ocitri -..: if •
/ 4.,
'Oh \
tl`t .,,. .04--=,1
Cf--)--MT:WLe't(-eN'4 eLie26"11P OP et SP 4°. r 5C Vk.k 4.i
,teirk)c-
. ----
47p)(-->.-241 116-4LA 04 •
&
15141;-A W.76'el dojo \ 1 ,
t)5301-ce wIr assfe 6
_ ...),
ov
Ao(13.
Pr4-iiv ,
41° fe4 lie
CI ...Ser-v I
' t
. (
• , •
------›*
I ,- I . -____--------7-------
• 6:7
.----
,..--------
/of FA-121ri woc,411 trs'
. .-
/ " = ‘0
r
rrKTh
• VNDIS
1 3A3O A.LI NOD 30 1430
A.1141100 N Plaint
<2 7 = " / w?- ,S;
E0OZ Z i 90Y
' .
,
Mirld SIIS
,
CRAOIld•IV
r°0 ,./
......
,.......
.......''''''
„„,....-
/
\‘
.
-
-Pidi.d -
(7.... ..
3'1(1 „........ .
., 4:1 „...„
,
c ,'
7wr4 C, rt.,
=
= =3
C,A1 M Ck:P
CI = co
-.....
1
1=.
l•
(S'
v
-_.. ,
11
v•-\
\ -A
'Ot Ilild-1-'
1
-71-1---
'44..i Alpo 1'03 N3Sa3thq'
k
0 Ato* c. D tedtf 9 --
----z...'
\ .,............. ..,,,,,L,LikiJi
v(e ri
algpt4 .
. .0
C.‘l
466
ph.)(92 oz.,,c - • ,i, ia s-7-zif./ i )
V ...._
5
eroo 8 09e.
......_ _
cil
ivy ij ,I,o id
36 tical
• ritz_.--F.5 JA,ev2 01_, 1,--fod
,....-