Laserfiche WebLink
T\ 31\.\°1 <br /> �CI JEFFERSON COUNTY <br /> Sheet 1 of 2 DEPARTMENT OF PUBLIC WORKS <br /> Date: 3/4/2019 CHANGE ORDER Change Order No.: 2 <br /> Ordered by County Engineer under terms of <br /> []Section 1 - 04. 4 of the Standard Specifications Contract Number: N/A <br /> []Change proposed by Contractor <br /> To: <br /> Allen Shearer Trucking, Inc. <br /> Endorsed by: Allen Shearer Trucking & Landscape Supply, Inc. P.O. BOX 789 <br /> Contractor Firm Name Belfair, WA 98528 <br /> Signature Date <br /> /44---S* . Project Title: <br /> Title _ Supply of Aggregate Products for BST <br /> Consent given by Surety: (when required) Programs; 2018-2019 <br /> By: <br /> Attorney-in-fact Date <br /> This contract is revised as follows: <br /> This change order increases the quantity of product in existing pay items 2 and 3 as follows: <br /> Item #2; 1/4-U.S. #8 Crushed Aggregate, is increased by 20.81-tons, from 500-tons to 520.81-tons. The unit cost of <br /> the item is unchanged at$41.00 per ton. <br /> Item #3; 3/8"Clean VSI-Crushed Aggregate Chip, is increased by 1,456-tons, from 6,000-tons to 7,456-tons. The unit <br /> cost of the item is unchanged at$44.00 per ton. <br /> This change order also revises the number of haul trips of the 3/8" product directly to the Public Works Quilcene Pit by 11; <br /> from 16 to 27 trips. The unit cost per haul-trip is unchanged at$30.00 per trip. <br /> The above prices do not include Washington State Sales Tax. <br /> No additional contract time is granted with this change order. <br /> All work materials and measurement to be in accordance with the provisions of the Standard Specifications and Special <br /> Provisions for the type of construction involved. <br /> ORIGINAL CURRENT ESTIMATED ESTIMATED <br /> CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL <br /> AMOUNT AMOUNT THIS ORDER AFTER CHANGE <br /> $266,500.00 $290,300.00 $65,247.21 $355,547.21 <br /> ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT <br /> CONTRACT TIME CONTRACT TIME CHANGE (Add/Del) TIME <br /> N/A N/A N/A N/A <br /> APPROVAL RECOMMENDED Fr OVAL RECOMMENDED <br /> OPV <br /> OPP 3Alh 3A-/".• <br /> Project Manager Date County Engineer ate <br /> LAPPPRROV RECOMMENDED Fri <br /> i3/1/lc <br /> 'I l -274--%7-1 <br /> Engineerin e cry es Mngr Date Chair, Jefferson County Commissioners Date <br />