Laserfiche WebLink
r <br />14 -o <br />JEFFERSON COUNTY <br />Std 1 of 1 <br />DEPARTMENT OF PUBLIC WORKS <br />Charge <br />i <br />Data &112015 <br />CHANGE ORDER <br />Order No. <br />Ordered by County Engineer under terms of <br />r-1 Section 1 - 04. 4 of the Standard Specfications <br />CR17993 <br />Contract No. <br />❑X Change proposed by Contractor <br />To: <br />Bash & Bruch Construction, Ins. <br />1706 Highway 101 West <br />% / <br />J _/ � / La� <br />E i�ohr G%N tr �,.c� 7 <br />Port Angeles, WA98363 <br />1 � r/H Fi+m /Jame i <br />8a <br />Project Title Dcvans Creek Road <br />D <br />— 3i}pla /t_ure ate e <br />/,1t, - <br />! ✓LQt %& e / <br />Tibe <br />Consent given by Surety: (when required) <br />RealWaient <br />B <br />Atfoney-irtract Date <br />You are ordered to perform the following described vrok upon receipt of an approved copy of this change order: <br />This charge order authorizes replacement of apprm unatedy 1,300 cubic yards of Light Looser Rip sap, (Bid Item No. 8) <br />with a new bid item, Quarry Spell Blend (Bid Item No 22), consisting of the following materials <br />Approrumately 1,000 cubic yards of 4!'- 2" spalls from Snider Quarry blended with appmimately 300 cubic <br />yards of 3° - 1 -112` minus coshed rock from Beaver Falls Quarry. <br />Materials <br />Section 8 -15.2 is supplemented with the following: <br />Materials for Quarry Spelt Blend will be be visually approved and accepted by the Engineer. <br />Measurement <br />Section 8 -15.4 is supplemented with the following: <br />- Quarry Spell Blend will be measured by the cubic yard of Quarry Spoil Blend actually placed. <br />Payment <br />Section 8 -15.5 is supplemented with the following: '.. <br />"Quarry Span Blend", Per cubic yard. The unit price for the blended material shag be $32.351dy. , <br />The estimated total decrease in the contract amount for this change order is as follows: <br />(1,300 cy)'($37.61) - $32.35) = $6,825.00 <br />Ail work matenb5 and measurement m be in accordance with the provisions of the standard specifications and <br />special provisions for the type of eonstmctioh invoNed. <br />ORIGINAL <br />CURRENT <br />ESTIMATED <br />ESTIMATED <br />CONTRACT <br />CONTRACT <br />NETCHANGE <br />CONTRACT TOTAL <br />AMOUNT <br />AMOUNT <br />THIS ORDER <br />AFTER CHANGE <br />3338. 46675 <br />$338,466.75 <br />- 00,825.00 <br />$331,541.75 <br />ORIGINAL CONTRACT <br />CURREN7CON7RACT <br />CONTRACT TIME <br />NEWCONTRACT <br />TIME (days) <br />TIME (days) <br />CHANGE (AddfW <br />TIME (days) <br />50 <br />50 <br />0 <br />50 <br />APPROVAL RECOMMENDED APPROVAL ECOMMEND <br />Project Man ger Dote County E Date <br />APP A R COMMENDED APP VED <br />EngineAng Services Manager Date Chair, Jetfe, o&Courdy Corrtrt>issioners Date <br />