Laserfiche WebLink
11W.f--rani Vi.in, . ir, <br />3bol <br />JEFFERSON COUNTY <br />Sheet c of 2 <br />DEPARTMENT OF PUBLIC WORKS <br />Change <br />3 <br />Date: 10/19/2015 <br />CHANGE ORDER <br />Order No. <br />Ordered by County Engineer under terms of <br />FX Section 1 - 04.4 of the Standard Specifications <br />CR17993 <br />Contract No. <br />Change proposed by Contractor <br />To: <br />Bruch & Bruch Construction, Inc. <br />1706 Highway 101 West <br />Endorsed by: <br />Port Angeles, WA 98363 <br />tractor irm Name <br />Project Title Daeans Creek Road <br />d/a <br />Consent given by Surety: (when required) <br />Realignment <br />By. <br />Attorney-in-fact Date <br />You are ordered to perform the following described work upon receipt of an approved copy of this change order: <br />The original plan quantity of Light Loose Rip Rap (replaced in Change Order #1 with Quarry Spalls) is reinstated. Quarry <br />spall quantity added by Change Order #1 is reduced to 800 cy. These items were used to construct embankment per <br />the plan. Additional quantities were used for slope repair damaged by groundwater seeps, embankment slope <br />protection, repair of soft subgrade, additional check dams and erosion control, and minor quantity overrun at planned <br />embankment construction location. <br />This change order authorizes the following: <br />Increase Light Loose Riprap (Bid Item No. 8) quantity 1,300 CY for a total quantity of 1,546 CY and decrease Quarry <br />Spall Blend (Bid Item No. 22) quantity 500 CY for a total quantity of 800 CY. <br />All work materials and measurement to be in accordance with the provisions of the standard specifications and <br />special provisions for the type of construction involved. <br />ORIGINAL <br />CURRENT <br />ESTIMATED <br />ESTIMATED <br />CONTRACT <br />CONTRACT <br />NETCHANGE <br />CONTRACT TOTAL <br />AMOUNT <br />AMOUNT <br />THIS ORDER <br />AFTER CHANGE <br />$338,466.75 <br />$403,589.75 <br />$32,705.00 <br />$436,294.75 <br />- <br />ORIGINAL CONTRACT <br />CURRENT CONTRACT <br />CONTRACT TIME <br />NEW CONTRACT <br />TIME (days) <br />TIME (days) <br />CHANGE (Add/Del) <br />TIME (days) <br />50 <br />56 <br />0 <br />56 <br />APPROVAL RECOMMENDEDAPP OVAL COMMENED <br />L- <br />Project Manag ate County En gi r Date <br />APPRO A R COM ENDED APPROVED <br />i' 1l <br />9�5 <br />/e 2G�i5� <br />Engmeeri g Services Manager Date Chair, AWon County ommrssioners Date <br />